Engineering construction scaffold
By introducing a servo motor-driven rotation system into the engineering construction frame to adjust the height of the railings and protective railings, the problem that the protective frame cannot be adjusted in the existing technology is solved, and the safety and protective effect of construction workers are significantly improved.
Patent Information
- Application Number
- CN202420166735.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-24
- Publication Date
- 2024-10-25
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The protective frame of the existing engineering construction frame cannot be adjusted in height, resulting in poor protection effect during construction on the load-bearing plate.
A construction frame including a servo motor, a rotating rod, a sleeve, a pulley and a threaded rod is designed. The servo motor drives the rotating rod and sleeve to rotate, driving the threaded rod to rise, and adjusting the height of the railings and protective railings to make them Can be adjusted according to the height of the construction worker.
The height of the protective railing is adjustable, which improves the safety and protective effect of construction workers and enhances the protective capability of the load-bearing plate.
Smart Images

Figure CN221896161U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of engineering construction, in particular to an engineering construction frame. Background Art
[0002] Engineering construction refers to the new construction, expansion and reconstruction of construction projects, line pipeline and equipment installation projects, building decoration and renovation projects, etc. It is the general term for the basic production process of forming fixed assets and other related construction work.
[0003] After searching, the announcement number is: CN219343926U, which discloses a construction frame for engineering construction. By setting an adjustment component, the brake-type servo motor is started to rotate forward, so that the right threaded rod rotates forward. Under the transmission of the belt, the left threaded rod rotates forward accordingly, so that the threaded block drives the slide plate and the support rod to move up together, pushing the load-bearing plate to move up. When the brake-type servo motor is reversed, it can be seen from the above that the load-bearing plate moves down, achieving the purpose of adjustable height of the construction frame. However, the above-mentioned existing protective frame is fixedly installed on the load-bearing plate and cannot be adjusted in height. When the construction personnel stand on the load-bearing plate, the height of the protective frame on the load-bearing plate cannot be adjusted to adapt to the height of the construction personnel, and the protective effect of the protective frame is poor.
[0004] In order to solve the above problems, the utility model provides an engineering construction frame. Utility Model Content
[0005] In view of the deficiencies in the prior art, the utility model provides a construction frame for engineering construction to solve the technical problem in the prior art that "the above-mentioned existing protective frame is fixedly installed on the bearing plate and the height cannot be adjusted. When the construction workers stand on the bearing plate, the height of the protective frame on the bearing plate cannot be adjusted to suit the height of the construction workers, and the protective effect of the protective frame is poor."
[0006] In order to achieve the above objectives, the present invention is implemented through the following technical solutions:
[0007] A construction frame for engineering construction comprises a construction base and two vertical plates, the two vertical plates are symmetrically fixedly mounted on the upper end surface of the construction base, two lifting slots are provided on opposite sides of the two vertical plates, four telescopic cylinders are symmetrically fixedly mounted on the upper end surface of the construction base, the telescopic ends of the four telescopic cylinders are fixedly connected with connecting blocks, the four connecting blocks are commonly fixedly connected with a bearing plate, a transmission cavity is provided in the bearing plate, a servo motor is fixedly mounted on the lower end of the bearing plate, a rotating rod is fixedly connected to the output end of the servo motor, a No. 1 pulley is fixedly sleeved on the rotating rod, through holes are provided at the four corners of the bearing plate, a No. 1 sleeve, a No. 2 sleeve, a No. 3 sleeve, and a No. 4 sleeve are respectively slidably connected in the four through holes, and the No. 1 sleeve, the No. 2 sleeve, the No. 3 sleeve, and the No. 4 sleeve are respectively slidably connected in the four through holes, and the No. 1 sleeve, the No. 2 sleeve, the No. 3 sleeve, and the No. 4 sleeve are fixedly sleeved in the four through holes. The same No. 1 pulley and No. 2 pulley are fixedly sleeved on the No. 1 sleeve, the No. 2 sleeve and the No. 3 sleeve, the No. 1 pulley on the rotating rod is connected to the No. 1 pulley of the No. 1 sleeve through a transmission belt, the No. 2 pulley of the No. 1 sleeve is connected to the No. 2 pulley of the No. 2 sleeve through the same transmission belt, the No. 1 pulley of the No. 2 sleeve is connected to the No. 1 pulley of the No. 3 sleeve through a transmission belt, the No. 2 pulley of the No. 3 sleeve is connected to the No. 2 pulley of the No. 4 sleeve through a transmission belt, threaded rods are threadedly connected in the No. 1 sleeve, the No. 2 sleeve, the No. 3 sleeve and the No. 4 sleeve, the upper end surfaces of the four threaded rods are fixedly connected to railings, and a protective railing is fixedly connected between the four railings.
[0008] As a preferred technical solution of the utility model, the lower ends of the No. 1 sleeve, the No. 2 sleeve, the No. 3 sleeve and the No. 4 sleeve are all rotatably connected to the inner wall of the transmission cavity.
[0009] As a preferred technical solution of the utility model, one end of the rotating rod away from the servo motor is rotatably connected to the inner wall of the transmission cavity.
[0010] As a preferred technical solution of the utility model, the four connecting blocks are respectively slidably connected to the inner walls of the matching lifting slots.
[0011] As a preferred technical solution of the utility model, four locking universal wheels are provided on the lower end surface of the construction base.
[0012] As a preferred technical solution of the utility model, the plurality of guardrails are all rectangular metal bars.
[0013] The utility model provides a construction frame for engineering construction, which has the following beneficial effects:
[0014] 1. By setting a servo motor, a bearing plate, a rotating rod, a No. 1 sleeve, a No. 2 sleeve, a No. 3 sleeve, a No. 4 sleeve, a No. 1 pulley, a No. 2 pulley, a transmission belt, a threaded rod, a column, and a guardrail, the output end of the servo motor drives the rotating rod to rotate, so that the No. 1 sleeve, the No. 2 sleeve, the No. 3 sleeve, and the No. 4 sleeve rotate in the transmission cavity under the action of the No. 1 pulley, the No. 2 pulley, and the transmission belt. At this time, the four threaded rods drive the four columns to rise upward under the rotation of the No. 1 sleeve, the No. 2 sleeve, the No. 3 sleeve, and the No. 4 sleeve, and the guardrails between the columns also rise synchronously. At this time, the height adjustment of the columns and the guardrails is completed, so that the columns and the guardrails can be adjusted to a height on the bearing plate according to the height of the construction workers, and the protection effect is better.
[0015] 2. By setting the guardrail as a rectangular metal bar, the rectangular metal bar has a high compressive strength, so that the guardrail can better protect the construction workers on the bearing plate, further improving the protective effect of the guardrail. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 This is a three-dimensional structural schematic diagram of an engineering construction frame proposed by the utility model;
[0017] Figure 2 This is a front structural sectional view of an engineering construction frame proposed by the utility model;
[0018] Figure 3 This is a three-dimensional schematic diagram of a connection structure between a load-bearing plate and a guardrail in a construction frame of an engineering construction proposed by the utility model;
[0019] Figure 4 for Figure 2 A schematic diagram of the enlarged structure at A in the middle;
[0020] Figure 5 for Figure 3 A top view of the structural section;
[0021] Figure 6 for Figure 3 Schematic diagram of the internal structure of the middle load-bearing plate.
[0022] In the figure: 1 construction base, 2 vertical plate, 3 lifting slot, 4 telescopic cylinder, 5 connecting block, 6 bearing plate, 7 transmission chamber, 8 servo motor, 9 rotating rod, 10 No. 1 pulley, 11 No. 2 pulley, 12 driving belt, 13 No. 1 sleeve, 14 No. 2 sleeve, 15 No. 3 sleeve, 16 No. 4 sleeve, 17 threaded rod, 18 column, 19 guardrail. DETAILED DESCRIPTION
[0023] The following is a further detailed description of the implementation mode of the utility model in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the utility model, but cannot be used to limit the scope of the utility model. In the description of the utility model, unless otherwise specified, the meaning of "multiple" is two or more; the orientation or position relationship indicated by the terms "upper", "lower", "left", "right", "inner", "outer", "front end", "rear end", "head", "tail", etc. is based on the orientation or position relationship shown in the accompanying drawings, which is only for the convenience of describing the utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the utility model. In addition, the terms "first", "second", "third", etc. are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.
[0024] Example
[0025] refer to Figure 1-6 A construction frame for engineering construction comprises a construction base 1 and two vertical plates 2. The two vertical plates 2 are symmetrically fixedly installed on the upper end surface of the construction base 1. Two lifting grooves 3 are provided on opposite sides of the two vertical plates 2. Four telescopic cylinders 4 are symmetrically fixedly installed on the upper end surface of the construction base 1. The telescopic ends of the four telescopic cylinders 4 are fixedly connected with connecting blocks 5. The four connecting blocks 5 are commonly fixedly connected with a bearing plate 6. A transmission cavity 7 is provided in the bearing plate 6. A servo motor 8 is fixedly installed at the lower end of the bearing plate 6. A rotating rod 9 is fixedly connected to the output end of the servo motor 8. A No. 1 pulley 10 is fixedly sleeved on the rotating rod 9. Through holes are provided at the four corners of the bearing plate 6. A No. 1 sleeve 13, a No. 2 sleeve 14, a No. 3 sleeve 15, and a No. 4 sleeve 16 are respectively slidably connected in the four through holes. The same No. 1 pulley 10 and No. 2 pulley 11 are all fixedly sleeved, the No. 1 pulley 10 on the rotating rod 9 is connected to the No. 1 pulley 10 of the No. 1 sleeve 13 through a transmission belt 12, the No. 2 pulley 11 of the No. 1 sleeve 13 is connected to the No. 2 pulley 11 of the No. 2 sleeve 14 through the same transmission belt 12, the No. 1 pulley 10 of the No. 2 sleeve 14 is connected to the No. 1 pulley 10 of the No. 3 sleeve 15 through a transmission belt 12, the No. 2 pulley 11 of the No. 3 sleeve 15 is connected to the No. 2 pulley 11 of the No. 4 sleeve 16 through a transmission belt 12, and the No. 1 sleeve 13, the No. 2 sleeve 14, the No. 3 sleeve 15, and the No. 4 sleeve 16 are all threadedly connected with threaded rods 17, the upper end surfaces of the four threaded rods 17 are fixedly connected with fence posts 18, and a protective railing 19 is fixedly connected between the four fence posts 18.
[0026] When the construction base 1 moves to the construction site, the construction personnel stand on the bearing plate 6, and the servo motor 8 is started at this time. The output end of the servo motor 8 drives the rotating rod 9 to rotate, and the No. 1 pulley 10 on the rotating rod 9 rotates and drives the No. 1 pulley 10 on the No. 1 sleeve 13 to rotate through the transmission belt 12. At this time, the No. 1 sleeve 13 rotates and drives the No. 2 pulley 11 on the No. 1 sleeve 13 to rotate, and the No. 2 pulley 11 on the No. 1 sleeve 13 drives the No. 2 pulley 11 on the No. 2 sleeve 14 through the transmission belt 12. The pulley 11 rotates, causing the No. 2 sleeve 14 to rotate and drives the No. 1 pulley 10 on the No. 2 sleeve 14 to rotate. The No. 1 pulley 10 on the No. 2 sleeve 14 rotates and drives the No. 1 pulley 10 on the No. 3 sleeve 15 to rotate through the transmission belt 12, causing the No. 3 sleeve 15 to rotate and drive the No. 2 pulley 11 on the No. 3 sleeve 15 to rotate. The No. 2 pulley 11 on the No. 4 sleeve 16 then drives the No. 2 pulley 11 on the No. 4 sleeve 16 to rotate through the transmission belt 12. At this time, the No. 1 sleeve 13 and the No. 2 sleeve 14 rotate. The cylinder 14, the third sleeve 15, and the fourth sleeve 16 all rotate synchronously in the transmission chamber 7. At this time, the four threaded rods 17 move upward under the rotation of the first sleeve 13, the second sleeve 14, the third sleeve 15, and the fourth sleeve 16. The four threaded rods 17 move upward to make the four fences 18 rise on the bearing plate 6. The guardrails 19 between the four fences 18 rise with the rise of the fences 18. At this time, the height adjustment of the fences 18 and the guardrails 19 on the bearing plate 6 is completed, so that the fences 18 and the guardrails are aligned with each other. 19 can adjust the height on the bearing plate 6 according to the height of the construction workers, and the guardrail 18 and the guardrail 19 have a better protective effect. After the guardrail 18 and the guardrail 19 are adjusted to the height on the bearing plate 6, the four telescopic cylinders 4 are started, and the telescopic ends of the telescopic cylinders 4 push the connecting blocks 5 to move upward along the inner wall of the lifting groove 3, so that the bearing plate 6 moves upward along the side wall of the vertical plate 2 under the drive of the four connecting blocks 5. When the bearing plate 6 moves to the specified height, the construction workers can start the engineering construction at this time;
[0027] The lower ends of the first sleeve 13 , the second sleeve 14 , the third sleeve 15 , and the fourth sleeve 16 are all rotatably connected to the inner wall of the transmission chamber 7 .
[0028] By making the lower ends of the No. 1 sleeve 13, the No. 2 sleeve 14, the No. 3 sleeve 15, and the No. 4 sleeve 16 rotatably connected to the inner wall of the transmission chamber 7, the No. 1 sleeve 13, the No. 2 sleeve 14, the No. 3 sleeve 15, and the No. 4 sleeve 16 can all rotate in the transmission chamber 7;
[0029] One end of the rotating rod 9 which faces away from the servo motor 8 is rotatably connected to the inner wall of the transmission cavity 7 .
[0030] By making the end of the rotating rod 9 away from the servo motor 8 rotatably connected to the inner wall of the transmission chamber 7, the rotating rod 9 can be driven by the output end of the servo motor 8 to rotate in the transmission chamber 7;
[0031] The four connection blocks 5 are respectively slidably connected to the inner walls of the matching lifting slots 3 .
[0032] By making the four connection blocks 5 slidably connected to the inner walls of the matching lifting grooves 3, the four connection blocks 5 can slide along the inner walls of the matching lifting grooves 3;
[0033] Among them, four locking universal wheels are arranged on the lower end surface of the construction base 1.
[0034] By providing four locking universal wheels, the four locking universal wheels can drive the construction base 1 to move on the ground, which is convenient for moving the construction base 1;
[0035] Among them, the multiple guardrails 19 are all rectangular metal bars.
[0036] By configuring the plurality of guardrails 19 as rectangular metal bars, the rectangular metal bars have a higher compressive strength, thereby improving the protective effect of the guardrails 19 .
[0037] The working principle of the utility model is as follows: when the construction base 1 moves to the construction site, the construction personnel stand on the bearing plate 6, and the servo motor 8 is started at this time. The output end of the servo motor 8 drives the rotating rod 9 to rotate, and the No. 1 pulley 10 on the rotating rod 9 rotates and drives the No. 1 pulley 10 on the No. 1 sleeve 13 to rotate through the transmission belt 12. At this time, the No. 1 sleeve 13 rotates and drives the No. 2 pulley 11 on the No. 1 sleeve 13 to rotate, and the No. 2 pulley 11 on the No. 2 sleeve 14 drives the No. 2 pulley 11 on the No. 2 sleeve 14 to rotate through the transmission belt 12, so that the No. 2 sleeve 14 rotates and drives the No. 1 pulley 10 on the No. 2 sleeve 14 to rotate, and the No. 1 pulley 10 on the No. 2 sleeve 14 rotates and drives the No. 1 pulley 10 on the No. 3 sleeve 15 to rotate through the transmission belt 12, so that the No. 3 sleeve 15 rotates and drives the No. 3 sleeve 15 The No. 2 pulley 11 on the No. 3 sleeve 15 rotates, and the No. 2 pulley 11 on the No. 4 sleeve 16 drives the No. 2 pulley 11 to rotate through the transmission belt 12. At this time, the No. 1 sleeve 13, the No. 2 sleeve 14, the No. 3 sleeve 15, and the No. 4 sleeve 16 all rotate synchronously in the transmission chamber 7. At this time, the four threaded rods 17 move upward under the rotation of the No. 1 sleeve 13, the No. 2 sleeve 14, the No. 3 sleeve 15, and the No. 4 sleeve 16. The four threaded rods 17 move upward to raise the four fences 18 on the bearing plate 6. The guardrails 19 between the four fences 18 rise as the fences 18 rise. At this time, the height adjustment of the fences 18 and the guardrails 19 on the bearing plate 6 is completed, so that the fences 18 and the guardrails 19 can be adjusted to the height on the bearing plate 6 according to the height of the construction personnel, and the guardrails 19 have better protection effects;
[0038] After the heights of the fence posts 18 and the guardrails 19 on the bearing plate 6 are adjusted, the four telescopic cylinders 4 are started, and the telescopic ends of the telescopic cylinders 4 push the connecting blocks 5 to move upward along the inner wall of the lifting groove 3, so that the bearing plate 6 moves upward along the side wall of the vertical plate 2 driven by the four connecting blocks 5. When the bearing plate 6 moves to the specified height, the construction workers can start the engineering construction.
[0039] The above is only a preferred specific implementation of the utility model, but the protection scope of the utility model is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical solution and utility model concept of the utility model within the technical scope disclosed by the utility model, which should be included in the protection scope of the utility model. For those skilled in the art, it is obvious that the utility model is not limited to the details of the above exemplary embodiments, and the utility model can be implemented in other specific forms without departing from the spirit or basic features of the utility model.
Claims
1. A construction frame for engineering construction, comprising a construction base (1), two vertical plates (2), It is characterized in that The two vertical plates (2) are symmetrically fixedly mounted on the upper end surface of the construction base (1); two lifting grooves (3) are provided on opposite sides of the two vertical plates (2); four telescopic cylinders (4) are symmetrically fixedly mounted on the upper end surface of the construction base (1); the telescopic ends of the four telescopic cylinders (4) are fixedly connected to connecting blocks (5); the four connecting blocks (5) are commonly fixedly connected to a bearing plate (6); a transmission cavity (7) is provided in the bearing plate (6); and the lower end of the bearing plate (6) is fixedly mounted A servo motor (8) is provided, the output end of the servo motor (8) is fixedly connected to a rotating rod (9), a first pulley (10) is fixedly sleeved on the rotating rod (9), four corners of the bearing plate (6) are provided with through holes, a first sleeve (13), a second sleeve (14), a third sleeve (15), and a fourth sleeve (16) are slidably connected in the four through holes, and the first sleeve (13), the second sleeve (14), and the third sleeve (15) are fixedly sleeved with the same first pulley. (10), a No. 2 pulley (11), the No. 1 pulley (10) on the rotating rod (9) is connected to the No. 1 pulley (10) of the No. 1 sleeve (13) through a transmission belt (12), the No. 2 pulley (11) of the No. 1 sleeve (13) is connected to the No. 2 pulley (11) of the No. 2 sleeve (14) through the same transmission belt (12), the No. 1 pulley (10) of the No. 2 sleeve (14) is connected to the No. 1 belt of the No. 3 sleeve (15) through a transmission belt (12). The first sleeve (13), the second sleeve (14), the third sleeve (15) and the fourth sleeve (16) are all threadedly connected with threaded rods (17), the upper end surfaces of the four threaded rods (17) are all fixedly connected with fence posts (18), and a guardrail (19) is fixedly connected between the four fence posts (18).
2. A construction scaffold for engineering construction according to claim 1, It is characterized in that The lower ends of the No. 1 sleeve (13), the No. 2 sleeve (14), the No. 3 sleeve (15), and the No. 4 sleeve (16) are all rotatably connected to the inner wall of the transmission chamber (7).
3. A construction scaffold for engineering construction according to claim 1, It is characterized in that One end of the rotating rod (9) facing away from the servo motor (8) is rotatably connected to the inner wall of the transmission chamber (7).
4. The construction frame for engineering construction according to claim 1, It is characterized in that The four connection blocks (5) are respectively slidably connected to the inner walls of the matching lifting grooves (3).
5. The construction frame for engineering construction according to claim 1, It is characterized in that The lower end surface of the construction base (1) is provided with four locking universal wheels.
6. The construction frame for engineering construction according to claim 1, It is characterized in that The plurality of guardrails (19) are all rectangular metal bars.
