Spraying sedimentation device for large-pipe-diameter row piles

By designing side-by-side settlement structures and distance adjustment structures, the problem that multiple pile pipes in the prior art cannot settle at the same time is solved, and the speed of offshore piles and the stability of the ocean platform is improved.

CN221941334UActive Publication Date: 2024-11-01SHANDONG HAISHENG OCEAN ENG GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420191662.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-26
Publication Date
2024-11-01
Estimated Expiration
2034-01-26

AI Technical Summary

Technical Problem

The prior art cannot achieve the simultaneous settlement of multiple pile pipes in rows, resulting in a slower speed of pile sinking at sea.

Method used

A large-diameter pile spraying and settlement device is designed, including a settlement structure and a distance adjustment structure arranged side by side. Through components such as pile holder, grouting rotary nozzle and adjusting parts, multiple pile pipes can be settled simultaneously, and The distance between the settlement structures is adjusted by driving the motor to ensure the stability of the pile sinking process.

Benefits of technology

Multiple pile pipes have been settled in rows and simultaneously, which has accelerated the speed of pile sinking at sea, and improved the stability of the ocean platform by adjusting the distance between structures.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221941334U_ABST
    Figure CN221941334U_ABST
Patent Text Reader

Abstract

The utility model is suitable for the technical field of ocean platforms, and provides a large-pipe-diameter row pile spraying sedimentation device which comprises a plurality of sets of sedimentation structures arranged side by side, and a distance adjusting structure is arranged between every two adjacent sets of sedimentation structures. The settlement structure comprises a base body, a pile gripper is fixedly arranged in the base body, a concrete pipe pile is arranged in the pile gripper, and a grouting rotary spraying pipe is movably arranged in the concrete pipe pile; the distance adjusting structure comprises an adjusting piece, the two ends of the adjusting piece are connected with the two adjacent base bodies respectively, and the adjusting piece is connected with the driving assembly. In conclusion, the multiple sets of settlement structures are arranged side by side, the multiple pile pipes can be settled in rows at the same time, and the offshore pile sinking speed is increased.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of marine platforms, in particular to a large-diameter pile jetting and sinking device. Background Art

[0002] With the advancement of science and technology, wind power generation has developed from traditional onshore wind power to the current offshore intertidal zones and offshore waters; wind power generation structures require the use of offshore platforms, and offshore platforms require the use of piles when they are built.

[0003] Pile driving is a process that utilizes the principle of high-pressure water jetting to form mud around the soil of the pile foundation, thereby forming a local hollowing out. The generated mud is discharged by air lift. The combination of hydraulic jetting and air lift discharge causes the soil around the pile foundation to be continuously stirred up and discharged, and the pile pipe sinks using its own weight. The sinking speed is controlled to achieve the purpose of pile pipe settlement.

[0004] Patents with authorization announcement numbers CN 103215956 B and CN 103981867 B both disclose multi-pile holding devices, which solve the problem of driving multiple piles in one ship position. However, the above patented technologies cannot achieve the simultaneous sinking of multiple pile pipes in a row. Therefore, the technology for accelerating the speed of offshore pile sinking needs to be improved. Utility Model Content

[0005] In view of this, the utility model proposes a large-diameter pile row jetting and sinking device to solve the problem that the prior art cannot realize the simultaneous sinking of multiple pile pipes in a row and the speed of offshore pile sinking needs to be further improved.

[0006] The technical solution of the utility model is achieved in this way:

[0007] The utility model provides a large-diameter pile jetting and settling device, comprising a plurality of sets of settling structures arranged side by side, wherein a distance-adjusting structure is arranged between two adjacent sets of settling structures; the settling structure comprises a base body, a pile gripper is fixedly arranged inside the base body, a concrete pipe pile is arranged in the pile gripper, and a grouting rotary jetting pipe is movably arranged inside the concrete pipe pile; the distance-adjusting structure comprises an adjusting member, wherein two ends of the adjusting member are respectively connected to two adjacent base bodies, and the adjusting member is connected to a driving assembly.

[0008] Preferably, the base includes a plurality of main steel bases arranged from top to bottom, and a first reinforcing steel base is arranged between two adjacent main steel bases.

[0009] Preferably, a second reinforcing steel base is arranged between two adjacent first reinforcing steel bases.

[0010] Preferably, a pile gripper is provided in each main steel foundation, and a plurality of groups of wheel plates are evenly distributed radially and extended inwardly inside the pile gripper, rollers are provided in the wheel plates, the plurality of rollers are located in the same circle on the plane, and the plurality of rollers abut against the outer surface of the concrete pipe pile.

[0011] Preferably, two adjusting members are rotatably arranged between two adjacent main steel bases, each of which includes an adjusting plate and a first telescopic shaft connected to each other, the adjusting plate and the first telescopic shaft are respectively connected to two adjacent main steel bases; racks are arranged on opposite surfaces of the two adjusting plates; the driving assembly includes an adjusting gear, the adjusting gear is arranged between the two adjusting plates and meshes with the two racks, and the adjusting gear is connected to the driving motor.

[0012] Preferably, a mounting plate is further arranged between two adjacent main steel bases, a second telescopic shaft is respectively arranged on both sides of the mounting plate, and the two second telescopic shafts are respectively connected to two adjacent bases.

[0013] Preferably, a third telescopic axis is further arranged between two adjacent base bodies.

[0014] Compared with the prior art, the large-diameter pile spraying and settling device of the utility model has the following beneficial effects:

[0015] 1. The utility model arranges several groups of sinking structures side by side, which can realize the simultaneous sinking of multiple pile pipes in a row, thus speeding up the speed of offshore pile sinking.

[0016] 2. A distance adjustment structure is set between two adjacent groups of settlement structures. By controlling the driving motor, the equal distance adjustment of the adjusting parts can be achieved, that is, the equal distance adjustment between the two adjacent groups of settlement structures is achieved, so that the distance between the two adjacent concrete pipe piles is equal during the pile sinking process, thereby improving the stability of the offshore platform. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0018] Figure 1 This is a structural diagram of a large-diameter pile jetting and settling device in the utility model;

[0019] Figure 2 This is a top-down structural diagram of one of the subsidence structures;

[0020] In the figure: base 1, main steel base 11, first reinforced steel base 12, second reinforced steel base 13; pile gripper 2, roller 21, wheel plate 22; concrete pipe pile 3; grouting rotary jet pipe 4, rotary jet port 41, drill bit 42; adjustment member 5, adjustment plate 50, first telescopic shaft 51; adjustment gear 6, drive motor 61, support block 62; mounting plate 7, second telescopic shaft 71; third telescopic shaft 8. DETAILED DESCRIPTION

[0021] The following will be combined with the implementation of the utility model to clearly and completely describe the technical solutions in the implementation of the utility model. Obviously, the described implementation is only a part of the implementation of the utility model, not all of the implementations. Based on the implementation of the utility model, all other implementations obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0022] The large-diameter pile jetting and settling device of the utility model comprises a plurality of sets of settling structures arranged side by side, and a distance adjustment structure is arranged between two adjacent sets of settling structures.

[0023] See also Figure 1 Each set of settlement structures includes a base 1, a pile gripper 2 is fixedly arranged inside the base 1, a concrete pipe pile 3 is arranged in the pile gripper 2, and a grouting rotary spraying pipe 4 is movably arranged inside the concrete pipe pile 3; the distance adjustment structure includes an adjusting member 5, two ends of the adjusting member 5 are respectively connected to two adjacent bases 1, and the adjusting member 5 is connected to the driving assembly.

[0024] See also Figure 1 and Figure 2 The base 1 includes a plurality of main steel bases 11 arranged from top to bottom, and a first reinforcing steel base 12 is arranged between two adjacent main steel bases 11. In the present utility model, three main steel bases 11 are arranged from top to bottom. Preferably, a second reinforcing steel base 13 is arranged between two adjacent first reinforcing steel bases 12, and in the present utility model, the second reinforcing steel base 13 is an "X"-shaped structure. The main steel base 11, the first reinforcing steel base 12 and the second reinforcing steel base 13 together constitute a support frame structure.

[0025] A pile gripper 2 is provided in each main steel foundation 11, and a plurality of groups of wheel plates 22 are evenly distributed radially and extended inwardly inside the pile gripper 2, and rollers 21 are provided in the wheel plates 22, and the plurality of rollers 21 are located in the same circle on a plane, and the plurality of rollers 21 are all in contact with the outer surface of the concrete pipe pile 3. The pile gripper 2 is used to straighten the concrete pipe pile 3 during the pile sinking process, and ensure that the concrete pipe pile 3 is in a downward vertical state during the pile sinking process; the sliding of the rollers 21 can release the concrete pipe pile 3 downward and control the release speed.

[0026] In the present invention, the bottom of the grouting jet pipe 4 is provided with a jet nozzle 41 and a drill bit 42 from top to bottom, the jet nozzle 41 is used to spray cement slurry, and the drill bit 42 is used to drill into the sand. The outer diameters of the jet nozzle 41 and the drill bit 42 are both smaller than the inner diameter of the concrete pile 3.

[0027] In the utility model, two adjusting members 5 are arranged between two adjacent main steel bases 11 so as to rotate 180 degrees, and each adjusting member 5 includes an adjusting plate 50 and a first telescopic shaft 51 which are connected to each other, and the adjusting plate 50 and the first telescopic shaft 51 are respectively connected to the two adjacent main steel bases 11; racks are arranged on the opposite surfaces of the two adjusting plates 50; the driving assembly includes an adjusting gear 6, which is arranged between the two adjusting plates 50 and meshed with the two racks, and the adjusting gear 6 is connected to the driving motor 61. When the driving motor 61 is working, it drives the adjusting gear 6 to rotate. When the adjusting gear 6 rotates, the two adjusting plates 50 move toward each other or in the opposite direction. When the two adjusting plates 50 move toward each other, the first telescopic shafts 51 connected to the two adjusting plates 50 are shortened, and the distance between the two adjacent main steel bases 11 becomes smaller, that is, the distance between the two adjacent groups of settlement structures becomes smaller. When the two adjusting plates 50 move in the opposite direction, the first telescopic shafts 51 connected to the two adjusting plates 50 are extended, and the distance between the two adjacent main steel bases 11 becomes larger, that is, the distance between the two adjacent groups of settlement structures becomes larger.

[0028] Preferably, a mounting plate 7 is further provided between two adjacent main steel bases 11, and a second telescopic shaft 71 is respectively provided on both sides of the mounting plate 7, and the two second telescopic shafts 71 are respectively connected to two adjacent bases 1; when the distance between two adjacent groups of settlement structures becomes larger or smaller, the second telescopic shaft 71 is extended or shortened, and by setting the mounting plate 7 and the second telescopic shaft 71, the distance adjustment between the two adjacent groups of settlement structures is made more stable.

[0029] In the present invention, the drive motor 61 is arranged on the mounting plate 7. Since the mounting plate 7 is always arranged between two adjacent main steel bases 11 and is located in the middle between the two adjacent main steel bases 11, the position of the mounting plate 7 is fixed and the drive motor 61 can be arranged on the mounting plate 7. Of course, the drive motor 61 can also be arranged on other suitable frames.

[0030] Preferably, a third telescopic shaft 8 is further provided between two adjacent base bodies 1. When the distance between two adjacent subsidence structures increases or decreases, the third telescopic shaft 8 is extended or shortened, and the provision of the third telescopic shaft 8 further improves the stability of the distance adjustment between the two adjacent subsidence structures.

[0031] The working principle of the utility model is:

[0032] During the operation of each settling structure, the grouting rotary jet pipe 4 moves downward, drilling into the sand through the drill bit 42 while spraying cement slurry; at the same time, the concrete pipe pile 3 is lowered by the pile gripper 2, so that the concrete pipe pile 3 can form an effective connection with the cement slurry.

[0033] Since the utility model arranges several groups of settling structures side by side, the several groups of settling structures can work simultaneously.

[0034] When building an offshore platform, in order to improve its stability, piles are generally required to be set at equal distances. By controlling the drive motor, the distances adjusted by multiple adjustment plates are controlled to be equal, that is, the distances between several groups of sinking structures are equal, thus achieving equidistant pile driving.

[0035] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A large diameter pile jetting and settling device, characterized in that: It includes several groups of settlement structures arranged side by side, and a distance adjustment structure is arranged between two adjacent groups of settlement structures; The settlement structure comprises a base (1), a pile gripper (2) is fixedly arranged inside the base (1), a concrete pipe pile (3) is arranged in the pile gripper (2), and a grouting rotary spraying pipe (4) is movably arranged inside the concrete pipe pile (3); The distance adjustment structure comprises an adjusting member (5), two ends of the adjusting member (5) are respectively connected to two adjacent base bodies (1), and the adjusting member (5) is connected to a driving assembly.

2. The large diameter pile spraying and settling device according to claim 1, characterized in that: The base (1) comprises a plurality of main steel bases (11) arranged from top to bottom, and a first reinforcing steel base (12) is arranged between two adjacent main steel bases (11).

3. The large diameter pile spraying and settling device according to claim 2, characterized in that: A second reinforcing steel base (13) is arranged between two adjacent first reinforcing steel bases (12).

4. The large diameter pile spraying and settling device according to claim 2, characterized in that: A pile gripper (2) is arranged in each of the main steel foundations (11), and a plurality of groups of wheel plates (22) are evenly distributed radially and extended inwardly inside the pile gripper (2), and rollers (21) are arranged in the wheel plates (22). The plurality of rollers (21) are located in the same circle on a plane, and the plurality of rollers (21) are in contact with the outer surface of the concrete pipe pile (3).

5. The large diameter pile spraying and settling device according to claim 2, characterized in that: Two adjusting members (5) are arranged between two adjacent main steel bases (11) so as to rotate 180 degrees, and each adjusting member (5) comprises an adjusting plate (50) and a first telescopic shaft (51) connected to each other, and the adjusting plate (50) and the first telescopic shaft (51) are respectively connected to the two adjacent main steel bases (11); and racks are arranged on the opposite surfaces of the two adjusting plates (50); The driving assembly comprises an adjusting gear (6), which is arranged between the two adjusting plates (50) and meshes with both racks, and the adjusting gear (6) is connected to a driving motor (61).

6. The large diameter pile spraying and settling device according to claim 5, characterized in that: A mounting plate (7) is also arranged between two adjacent main steel bases (11), and a second telescopic shaft (71) is respectively arranged on both sides of the mounting plate (7), and the two second telescopic shafts (71) are respectively connected to the two adjacent bases (1).

7. The large diameter pile spraying and settling device according to claim 1, characterized in that: A third telescopic shaft (8) is also arranged between two adjacent base bodies (1).