Equipment performance test system

By designing an equipment performance testing system, it is possible to simultaneously test heat recovery fresh air units and fan coil units on a single set of equipment, solving the problems of large footprint and high cost of existing equipment, and improving testing efficiency and automation.

CN222013537UActive Publication Date: 2024-11-15SHANGHAI ZHONGCAI ENG DETECTION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420019406.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-04
Publication Date
2024-11-15
Estimated Expiration
2034-01-04

AI Technical Summary

Technical Problem

Existing testing equipment can only perform performance testing on either heat recovery fresh air handling units or fan coil units, which requires a large space, a lot of equipment, and high costs, and cannot complete both tests simultaneously.

Method used

Design a device performance testing system comprising a first chamber and a second chamber, used for adjusting environmental parameters and testing the test piece, respectively. The system is connected to a heat recovery fresh air unit or a fan coil unit via air ducts and water pipes. A control unit is used to uniformly control the components, thereby automating both types of testing.

Benefits of technology

The testing of heat recovery fresh air units and fan coil units can be completed on a single set of equipment, saving space and labor costs, improving testing efficiency, and realizing automated testing of performance parameters such as air volume, cooling capacity, heating capacity, and exchange efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222013537U_ABST
    Figure CN222013537U_ABST
Patent Text Reader

Abstract

The utility model discloses an equipment performance test system, which comprises a first chamber, a second chamber, a first controller and a second controller, a second equipment box body is arranged in the second chamber; the test piece mounting table is arranged in the second chamber, and an air pipe assembly and a water pipe assembly are arranged on the test piece mounting table; a control unit; when the to-be-tested piece is a heat recovery fresh air handling unit, the heat recovery fresh air handling unit is connected with the second equipment box body through the air pipe assembly and connected with the first equipment box body through the air pipe assembly; and when the to-be-tested piece is a fan coil unit, the fan coil unit is connected with the second equipment box body and is connected with the water circulation system through the water pipe assembly. According to the utility model, the work of two different test experiments of the heat recovery fresh air handling unit and the fan coil unit can be completed, the space and the labor cost can be effectively saved, and the efficiency of the test work is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of air conditioning equipment, and further to an equipment performance testing system. Background Art

[0002] The ultra-low energy consumption building projects currently underway are all equipped with heat recovery fresh air units with high exchange efficiency, while in the design and installation of conventional HVAC systems, fan coil units are often used for terminal air conditioning equipment. According to the relevant provisions of the standards "Heat Recovery Fresh Air Unit" GB / T21087-2020 and "Fan Coil Unit" GB / T19232-2019, the relevant performance parameters of the heat recovery fresh air unit and the fan coil unit should be tested under laboratory conditions. The test of the heat recovery fresh air unit requires the control of the simulated indoor test environment temperature and humidity conditions and the simulated outdoor test environment temperature and humidity conditions, while the test of the fan coil unit requires the control of the simulated indoor test environment temperature and humidity conditions. At present, the existing test equipment can only realize the performance test of the heat recovery fresh air unit or the fan coil unit. The two sets of test equipment occupy a large space and are equipped with many control devices, resulting in high costs.

[0003] Therefore, it is necessary to design an equipment performance testing system to solve the above problems. Utility Model Content

[0004] In response to the above technical problems, the purpose of the utility model is to provide an equipment performance testing system that can complete two different test experiments of heat recovery fresh air units and fan coil units, which can effectively save space and labor costs and improve the efficiency of testing work.

[0005] In order to achieve the above object, the utility model provides an equipment performance testing system, comprising:

[0006] A first chamber, wherein a first equipment box is disposed in the first chamber, and the first equipment box is used to adjust environmental parameters in the first chamber;

[0007] A second chamber, wherein a second equipment box is disposed in the second chamber, and the second equipment box is used to adjust the environmental parameters in the second chamber and detect the test piece;

[0008] A test piece installation table is arranged in the second chamber, and an air duct assembly and a water pipe assembly are arranged at the test piece installation table, the air duct assembly is used to connect the first equipment box and the second equipment box, the water pipe assembly is used to connect the water circulation system, and the test piece installation table is used to install the test piece, and the test piece is a heat recovery fresh air unit or a fan coil unit;

[0009] A control unit, the control unit is connected to the first device box, the second device box, and the device to be tested respectively;

[0010] When the test piece is a heat recovery fresh air unit, the heat recovery fresh air unit is connected to the second equipment box through the air duct assembly, and is connected to the first equipment box through the air duct assembly;

[0011] When the test piece is a fan coil unit, the fan coil unit is connected to the second equipment box and is connected to the water circulation system through the water pipe assembly.

[0012] In some embodiments, the first equipment box includes a first temperature regulating device and a first humidity regulating device, and the first temperature regulating device and the first humidity regulating device are respectively connected to the control unit, and the control unit controls the first temperature regulating device to adjust the indoor temperature of the first chamber, and the control unit controls the first humidity regulating device to adjust the indoor humidity of the first chamber.

[0013] In some embodiments, the second equipment box includes a second temperature regulating device and a second humidity regulating device, and the second temperature regulating device and the second humidity regulating device are respectively connected to the control unit, and the control unit controls the second temperature regulating device to adjust the indoor temperature of the second chamber, and the control unit controls the second humidity regulating device to adjust the indoor humidity of the second chamber.

[0014] In some embodiments, the second equipment box also includes an air volume testing device, which includes a static pressure chamber, a mixing chamber, a receiving chamber and a discharge chamber arranged in sequence, the static pressure chamber is connected to the test piece, the static pressure chamber is connected to the mixing chamber through a mixer, the mixing chamber is connected to the receiving chamber through a first flow equalizing plate, and the receiving chamber is connected to the discharge chamber through a flow nozzle.

[0015] In some embodiments, the mixing chamber is provided with an air sampling device, the air sampling device comprising a wet bulb thermometer and a dry bulb thermometer;

[0016] The flow nozzles are provided in plurality, and the plurality of flow nozzles are arranged at intervals and are respectively connected to the control unit, and the control unit controls the opening and closing of the flow nozzles.

[0017] In some embodiments, a second flow equalizing plate, an auxiliary fan and a return air duct are provided in the discharge chamber, the second flow equalizing plate divides the discharge chamber into two chambers, the auxiliary fan and the return air duct are located in the chamber on the side of the second flow equalizing plate away from the receiving chamber, the auxiliary fan is connected to the return air duct, and the end of the return air duct away from the auxiliary fan is connected to the second chamber.

[0018] In some embodiments, a differential pressure gauge is provided at the flow nozzle;

[0019] And / or, the auxiliary fan is a variable frequency induced draft fan, and the variable frequency induced draft fan is connected to the control unit.

[0020] In some embodiments, the air duct assembly includes a first air duct, a second air duct, a third air duct and a fourth air duct, wherein a first end of the first air duct is connected to the first equipment box, and a second end of the first air duct extends to the specimen mounting platform for connecting to the specimen to be tested;

[0021] The first end of the second air duct is located in the first chamber, the second end of the second air duct extends to the test piece mounting table for connecting with the test piece, the second air duct is provided with a first air volume regulating valve, and the first air volume regulating valve is located in the first chamber;

[0022] The first end of the third air duct is located in the second chamber, the second end of the third air duct extends to the test piece mounting table and is used to be connected to the test piece, the third air duct is provided with a second air volume regulating valve, and the second air volume regulating valve is located in the second chamber;

[0023] The first end of the fourth air duct is connected to the second equipment box, and the second end of the fourth air duct extends to the test piece installation platform for connecting to the test piece.

[0024] In some embodiments, a plurality of brake wheels arranged at intervals are provided at the bottom of the first equipment box;

[0025] And / or, a plurality of brake wheels arranged at intervals are provided at the bottom of the second equipment housing;

[0026] And / or, a plurality of brake wheels arranged at intervals are provided at the bottom of the specimen mounting platform.

[0027] Compared with the prior art, the equipment performance testing system provided by the utility model has the following beneficial effects:

[0028] In the utility model, the equipment performance testing system can complete two different test experiments of the heat recovery fresh air unit and the fan coil unit, and complete the two different test experiments on one set of testing equipment, which can effectively save space and labor costs and improve the efficiency of the testing work; the equipment performance testing system can realize the performance parameter testing of the test piece such as air volume, cooling capacity, heat, exchange efficiency, etc., and it has complete functions and a high degree of automation. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] The preferred implementation modes will be described below in a clear and understandable manner with reference to the accompanying drawings to further illustrate the above-mentioned characteristics, technical features, advantages and implementation methods of the present utility model.

[0030] Figure 1 It is a structural schematic diagram of a device performance test system of a preferred embodiment of the utility model;

[0031] Figure 2 It is a structural schematic diagram of an air volume testing device according to a preferred embodiment of the utility model.

[0032] Description of Figure Numbers:

[0033] The first chamber 1, the first equipment box 2, the second chamber 3, the air sampler 31, the second equipment box 4, the static pressure chamber 41, the mixing chamber 42, the air sampling device 421, the receiving chamber 43, the exhaust chamber 44, the second flow equalizing plate 441, the auxiliary fan 442, the return air duct 443, the mixer 45, the first flow equalizing plate 46, the flow nozzle 47, the differential pressure gauge 471, the test piece mounting table 5, the air duct assembly 51, the first air duct 511, the second air duct 512, the first air volume regulating valve 5121, the third air duct 513, the second air volume regulating valve 5131, the fourth air duct 514, and the test piece 6. DETAILED DESCRIPTION

[0034] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the specific implementation methods of the utility model will be described below with reference to the accompanying drawings. Obviously, the accompanying drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings and other implementation methods can be obtained based on these drawings without creative work.

[0035] In order to simplify the drawings, only the parts related to the utility model are schematically shown in each figure, and they do not represent the actual structure of the product. In addition, in order to simplify the drawings and facilitate understanding, in some figures, only one of the parts with the same structure or function is schematically drawn or marked. In this article, "one" not only means "only one", but also means "more than one".

[0036] It should be further understood that the term “and / or” used in the specification and appended claims refers to any combination and all possible combinations of one or more of the associated listed items, and includes these combinations.

[0037] In this article, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this utility model can be understood according to specific circumstances.

[0038] In addition, in the description of the present application, the terms "first", "second", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance.

[0039] In one embodiment, the reference specification Figure 1 , Figure 2 The utility model provides a device performance test system, including: a first chamber 1, a second chamber 2, a test piece installation platform 3 and a control unit. A first equipment box 2 is arranged in the first chamber 1, and the first equipment box 2 is used to adjust the environmental parameters in the first chamber 1. A second equipment box 4 is arranged in the second chamber 2, and the second equipment box 4 is used to adjust the environmental parameters in the second chamber 2 and to detect the test piece. The test piece installation platform 3 is arranged in the second chamber 2, and an air duct assembly 51 and a water pipe assembly are arranged at the test piece installation platform 3. The air duct assembly 51 is used to connect the first equipment box 2 and the second equipment box 4, and the water pipe assembly is used to connect the water circulation system. The test piece installation platform 3 is used to install the test piece 6, and the test piece 6 is a heat recovery fresh air unit or a fan coil unit. The control unit is respectively connected to the first equipment box 2, the second equipment box 3, and the test piece 6, and controls the working state of each component.

[0040] When the test piece 6 is a heat recovery fresh air unit, the heat recovery fresh air unit is connected to the second equipment box 4 through the air duct assembly 51, and is connected to the first equipment box 2 through the air duct assembly 51; when the test piece 6 is a fan coil unit, the fan coil unit is connected to the second equipment box 4, and is connected to the water circulation system through the water pipe assembly.

[0041] In this embodiment, the equipment performance testing system can complete two different test experiments of the heat recovery fresh air unit and the fan coil unit, and complete two different test experiments on one set of testing equipment, which can effectively save space and labor costs and improve the efficiency of the testing work.

[0042] In one embodiment, the reference specification Figure 1 , Figure 2 , the first chamber 1 is equivalent to a closed room, which is used to simulate the outdoor environment. The first equipment box 2 includes a first temperature regulating device and a first humidity regulating device, which are respectively connected to the control unit, and the control unit controls the first temperature regulating device to adjust the indoor temperature of the first chamber 1, and the control unit controls the first humidity regulating device to adjust the indoor humidity of the first chamber 1. A plurality of brake wheels arranged at intervals can also be provided at the bottom of the first equipment box 2 to facilitate the movement and fixation of the first equipment box 2. By integrating the first temperature regulating device and the first humidity regulating device into the first equipment box 2, the indoor space can be effectively saved, the test instrument can be regular and tidy, and the messy placement can be avoided, and it is also easy to move and use as a whole. Among them, the first temperature regulating device can be a heater, a refrigerator and other devices, and the first humidity regulating device can be a humidifier and other devices. Of course, the first temperature regulating device and the first humidity regulating device can also be an integrated machine, such as a constant temperature and humidity air conditioner, etc., as long as the device can achieve temperature and humidity regulation in the first chamber 1.

[0043] The second chamber 3 is equivalent to a closed room, which is used to simulate the indoor environment. The second equipment box 4 includes a second temperature regulating device and a second humidity regulating device, which are respectively connected to the control unit, and the control unit controls the second temperature regulating device to adjust the indoor temperature of the second chamber 3, and the control unit controls the second humidity regulating device to adjust the indoor humidity of the second chamber 3. A plurality of brake wheels arranged at intervals can also be provided at the bottom of the second equipment box 4 to facilitate the movement and fixation of the second equipment box 4. By integrating the second temperature regulating device and the second humidity regulating device into the second equipment box 4, the indoor space can be effectively saved, the test instrument can be regular and tidy, and the messy placement can be avoided, and it is also easy to move and use as a whole. Among them, the second temperature regulating device can be a heater, a refrigerator and other devices, and the second humidity regulating device can be a humidifier and other devices. Of course, the second temperature regulating device and the second humidity regulating device can also be an integrated machine, such as a constant temperature and humidity air conditioner, etc., as long as the device can achieve temperature and humidity regulation in the second chamber 3.

[0044] In one embodiment, the reference specification Figure 1 , Figure 2 The second equipment box 4 also includes an air volume test device, which includes a static pressure chamber 41, a mixing chamber 42, a receiving chamber 43 and a discharge chamber 44 arranged in sequence. The static pressure chamber 41 is connected to the test piece 6 through a pipeline, the static pressure chamber 41 is connected to the mixing chamber 42 through a mixer 45, the mixing chamber 42 is connected to the receiving chamber 43 through a first flow equalizing plate 46, and the receiving chamber 43 is connected to the discharge chamber 44 through a flow nozzle 47.

[0045] The mixing chamber 42 is provided with an air sampling device 421, which includes a wet bulb thermometer and a dry bulb thermometer. A plurality of flow nozzles 47 are provided, and the plurality of flow nozzles 47 are arranged at intervals and are respectively connected to a control unit, which controls the opening and closing of the flow nozzles 47.

[0046] A second flow equalizing plate 441, an auxiliary fan 442 and a return air duct 443 are provided in the discharge chamber 44. The second flow equalizing plate 441 divides the discharge chamber 44 into two chambers. The auxiliary fan 442 and the return air duct 443 are located in the chamber of the second flow equalizing plate 441 away from the receiving chamber 43. The auxiliary fan 442 is connected to the return air duct 443, and the end of the return air duct 443 away from the auxiliary fan 442 is connected to the second chamber 3.

[0047] Furthermore, a differential pressure gauge 471 is provided at the flow nozzle 47; the auxiliary fan 442 is a variable frequency induced draft fan, and the variable frequency induced draft fan is connected to the control unit.

[0048] In one embodiment, the reference specification Figure 1 , Figure 2 The air duct assembly 51 includes a first air duct 511, a second air duct 512, a third air duct 513 and a fourth air duct 514. The first end of the first air duct 511 is connected to the first equipment box 2, and the second end of the first air duct 511 extends to the specimen mounting platform 5, and is used to connect with the test piece 6. The first end of the second air duct 512 is located in the first chamber 1, and the second end of the second air duct 512 extends to the specimen mounting platform 5, and is used to connect with the test piece 6. The second air duct 512 is provided with a first air volume regulating valve 5121, and the first air volume regulating valve 5121 is located in the first chamber 1, and is used to adjust the air volume of the second air duct 512. The first end of the third air duct 513 is located in the second chamber 3, and the second end of the third air duct 513 extends to the specimen mounting platform 5, and is used to connect with the test piece 6. The third air duct 513 is provided with a second air volume regulating valve 5131, and the second air volume regulating valve 5131 is located in the second chamber 3, and is used to adjust the air volume of the third air duct 513. The first end of the fourth air duct 514 is connected to the second equipment box 4, and the second end of the fourth air duct 514 extends to the specimen mounting platform 5, and is used to connect with the test piece 6.

[0049] Furthermore, a detachable joint is provided at the pipe connection of the air duct assembly 51, and different joints can be used to achieve connection according to different sizes of the test pieces 6. The bottom of the test piece mounting platform 5 is provided with a plurality of brake wheels arranged at intervals to facilitate the movement and fixing of the test piece mounting platform 5, and further facilitate the adjustment of the position angle of the test piece 6.

[0050] Since a water circulation system is required for testing the fan coil unit, a water pipe assembly is provided at the test piece mounting platform 5 for connecting the water circulation system, so that the water circulation system can be arranged outdoors, which can further save indoor space. The water circulation system may include a cold water tank, a hot water tank, a circulation pipeline, and various refrigeration and heating equipment.

[0051] The control unit is the brain of the equipment performance test system. It can be a PLC electric control box or other devices with control functions. It connects various components in the system through lines, can control the operation of each component through programs, and realize the storage and calculation of sensor collected data.

[0052] In this embodiment, two rooms are set up to respectively control the simulated outdoor environment temperature and humidity and the indoor environment temperature and humidity. When testing the fan coil unit or the heat recovery fresh air unit, the operator only needs to install the test piece 6 in the time state 5 of the second chamber 2 and connect it to the corresponding air duct assembly 51. Different static pressure test devices are installed according to the different specifications and sizes of the test piece 6. If the test piece 6 is a fan coil unit, it is necessary to connect the fan coil unit to the water pipe assembly; if the test sample is a heat recovery fresh air unit, it is necessary to adjust the air duct connection direction and position according to the air duct form of the heat recovery fresh air unit. Through the test probes connected to the equipment, the wind speed, temperature, humidity and other parameters in the sample air duct are tested, and finally the air volume, cooling capacity, heat, exchange efficiency and other results of the sample are calculated. If the test piece 6 is a fan coil unit, the control unit only controls the simulated indoor environmental parameters to meet the test condition requirements of the GB / T 19232-2019 "Fan Coil Unit" standard; if the test piece 6 is a heat recovery fresh air unit, the control unit will automatically control the simulated indoor environmental parameters and outdoor environmental parameters to meet the test condition requirements of the GB / T21087-2020 "Heat Recovery Fresh Air Unit" standard.

[0053] The second chamber 3 simulates the indoor environment, and the air volume test device can test the air flow of the test piece 6. According to the flow direction of the air, the air volume test device is composed of a static pressure chamber, a mixing chamber, a mixer, an air sampling device, a receiving chamber, a front equalizing plate, a discharge chamber, a rear equalizing plate, an auxiliary fan, an air valve and a return air duct. The device can be used to measure the air flow of the test piece 6 and the dry-bulb and wet-bulb temperatures of the air.

[0054] The testing principle is as follows: first, the air volume of the test piece 6 is tested through the control of the air volume test device, and then the control unit controls the simulated indoor and outdoor temperature and humidity to test the efficiency value of the test piece 6. During the air volume test, the control unit controls the indoor and outdoor temperature and humidity to the specified working conditions, and then turns on the test piece 6 and the air volume test device, and adjusts the pipeline pressure balance. At this time, the measured value of the air volume test device is the air volume of the test piece. During the exchange efficiency test, the control unit controls the indoor and outdoor temperature and humidity to the specified working conditions respectively, and then turns on the test piece 6, and controls the air volume of the air volume test device to the rated value until the temperature and humidity are stable. The exchange efficiency and other performance parameters of the test piece 6 are calculated through the test results of temperature and humidity in each air duct.

[0055] According to another aspect of the present invention, the reference specification Figure 1 , Figure 2 The utility model further provides a method for using the device performance testing system as described in any one of the above, comprising the steps of:

[0056] Install the test piece 6 on the test piece installation platform 5, and connect it with the corresponding pipe fitting according to the type of the test piece 6;

[0057] When the test piece 6 is a heat recovery fresh air unit, the heat recovery fresh air unit is connected to the second equipment box 4 through the air duct assembly 51, and is connected to the first equipment box 2 through the air duct assembly 51;

[0058] When the test piece 6 is a fan coil unit, the fan coil unit is connected to the second equipment box 4 and connected to the water circulation system through the water pipe assembly.

[0059] Specifically, when the test piece 6 is a heat recovery fresh air unit, place the heat recovery fresh air unit on the test piece mounting table 5, and connect the air duct and the test probe to the test box according to the installation form of the unit's supply air duct and return air duct. After the equipment is installed, switch to the heat recovery fresh air unit test mode on the control unit according to the type of equipment being tested, select the number of flow nozzles based on the sample design air volume, and start the test piece 6. Click to start the test on the control software of the control unit, and the control unit will start the variable frequency induced draft fan and adjust the air pressure of the supply and return air outlets of the test piece 6 to the standard test state. After waiting for the temperature and humidity of the test environment to reach the test standard requirements and stabilize, the system automatically collects various parameters of the sample to be tested.

[0060] When the test piece 6 is a fan coil unit, place the fan coil on the test piece mounting table 5, and only use the second equipment box 4 that simulates the indoor environment for testing. The partition wall connecting the simulated indoor side and the simulated outdoor side is blocked with insulation material, and the two water pipes of the test equipment are connected to the fan coil according to the pipeline form of the fan coil. According to the size of the air outlet of the test piece 6, install the static pressure ring reducer, and then connect the reducer to the second equipment box 4. According to the designed air volume of the test piece 6, select the number of flow nozzles. After the installation is completed, switch the mode to the fan coil test mode on the control unit, and click to start the test on the control software of the control unit. The control unit will start the fan coil and start the water circulation system to form a complete air and water circulation. After waiting for the temperature and humidity of the test environment to reach the test standard requirements and stabilize, the control unit automatically collects various parameters of the sample to be tested.

[0061] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0062] It should be noted that the above embodiments can be freely combined as needed. The above are only preferred implementations of the utility model. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the utility model, and these improvements and modifications should also be regarded as the protection scope of the utility model.

Claims

1. A device performance testing system, characterized in that: include: A first chamber, wherein a first equipment box is disposed in the first chamber, and the first equipment box is used to adjust environmental parameters in the first chamber; A second chamber, wherein a second equipment box is disposed in the second chamber, and the second equipment box is used to adjust the environmental parameters in the second chamber and detect the test piece; A test piece installation table is arranged in the second chamber, and an air duct assembly and a water pipe assembly are arranged at the test piece installation table, the air duct assembly is used to connect the first equipment box and the second equipment box, the water pipe assembly is used to connect the water circulation system, and the test piece installation table is used to install the test piece, and the test piece is a heat recovery fresh air unit or a fan coil unit; A control unit, the control unit is connected to the first device box, the second device box, and the device to be tested respectively; When the test piece is a heat recovery fresh air unit, the heat recovery fresh air unit is connected to the second equipment box through the air duct assembly, and is connected to the first equipment box through the air duct assembly; When the test piece is a fan coil unit, the fan coil unit is connected to the second equipment box and is connected to the water circulation system through the water pipe assembly.

2. The equipment performance testing system according to claim 1, characterized in that: The first equipment box includes a first temperature regulating device and a first humidity regulating device, and the first temperature regulating device and the first humidity regulating device are respectively connected to the control unit. The control unit controls the first temperature regulating device to regulate the indoor temperature of the first chamber, and the control unit controls the first humidity regulating device to regulate the indoor humidity of the first chamber.

3. The equipment performance testing system according to claim 1, characterized in that: The second equipment box includes a second temperature regulating device and a second humidity regulating device, and the second temperature regulating device and the second humidity regulating device are respectively connected to the control unit. The control unit controls the second temperature regulating device to adjust the indoor temperature of the second chamber, and the control unit controls the second humidity regulating device to adjust the indoor humidity of the second chamber.

4. The equipment performance testing system according to claim 3, characterized in that: The second equipment box also includes an air volume testing device, which includes a static pressure chamber, a mixing chamber, a receiving chamber and a discharge chamber arranged in sequence, the static pressure chamber is connected to the test piece, the static pressure chamber is connected to the mixing chamber through a mixer, the mixing chamber is connected to the receiving chamber through a first flow equalizing plate, and the receiving chamber is connected to the discharge chamber through a flow nozzle.

5. The equipment performance testing system according to claim 4, characterized in that: The mixing chamber is provided with an air sampling device, and the air sampling device includes a wet-bulb thermometer and a dry-bulb thermometer; The flow nozzles are provided in plurality, and the plurality of flow nozzles are arranged at intervals and are respectively connected to the control unit, and the control unit controls the opening and closing of the flow nozzles.

6. The equipment performance testing system according to claim 5, characterized in that: A second flow equalizing plate, an auxiliary fan and a return air duct are provided in the discharge chamber. The second flow equalizing plate divides the discharge chamber into two chambers. The auxiliary fan and the return air duct are located in the chamber of the second flow equalizing plate on the side away from the receiving chamber. The auxiliary fan is connected to the return air duct, and the end of the return air duct away from the auxiliary fan is connected to the second chamber.

7. The equipment performance testing system according to claim 6, characterized in that: A differential pressure gauge is provided at the flow nozzle; And / or, the auxiliary fan is a variable frequency induced draft fan, and the variable frequency induced draft fan is connected to the control unit.

8. The equipment performance testing system according to claim 1, characterized in that: The air duct assembly includes a first air duct, a second air duct, a third air duct and a fourth air duct, wherein a first end of the first air duct is connected to the first equipment box, and a second end of the first air duct extends to the test piece mounting platform for connecting to the test piece; The first end of the second air duct is located in the first chamber, the second end of the second air duct extends to the test piece mounting table for connecting with the test piece, the second air duct is provided with a first air volume regulating valve, and the first air volume regulating valve is located in the first chamber; The first end of the third air duct is located in the second chamber, the second end of the third air duct extends to the test piece mounting table and is used to be connected to the test piece, the third air duct is provided with a second air volume regulating valve, and the second air volume regulating valve is located in the second chamber; The first end of the fourth air duct is connected to the second equipment box, and the second end of the fourth air duct extends to the test piece installation platform for connecting to the test piece.

9. The equipment performance testing system according to claim 1, characterized in that: A plurality of brake wheels arranged at intervals are provided at the bottom of the first equipment box; And / or, a plurality of brake wheels arranged at intervals are provided at the bottom of the second equipment housing; And / or, a plurality of brake wheels arranged at intervals are provided at the bottom of the specimen mounting platform.