Prefabricated detection section installation and construction structure for performance test of ventilation and air conditioning system
By designing the main mechanism including prefabricated inspection main support base plate, universal wheel, viewing window and dust protection film, as well as the construction mechanism of the water storage tank and water pipe system, the prefabricated inspection section for the performance test of ventilation and air conditioning system is solved. The installation construction structure of the prefabricated inspection section is installed in the use of the construction structure in the use of the prefabricated inspection section for the performance test of ventilation and air conditioning system. The tool pickup, dust removal and internal viewing problems achieve structural stability and protection and improve the use effect.
Patent Information
- Application Number
- CN202323472186.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-20
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2033-12-20
AI Technical Summary
When used for the performance testing of ventilation and air conditioning systems, the prefabricated testing section of the installation construction structure is inconvenient to take tools in time, connect to the water tank for dust removal, and it is not convenient to check the internal situation, which is harmful to the human body.
A prefabricated inspection section installation construction structure including the main mechanism and the construction mechanism is designed. The main mechanism includes the prefabricated inspection main body support base plate, universal wheel, the prefabricated inspection main body support load-bearing box, the internal situation viewing window, dust protection film, etc., for construction The mechanism includes a water storage tank, a water pump, a water inlet pipe, a water outlet pipe, a valve and a nozzle. These components achieve structural stability, protection and practicality.
It realizes structural stability and protection during use, provides practical tool storage and dust removal functions, and improves the stability and service life of the machine.
Smart Images

Figure CN222027938U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of detection, in particular to a prefabricated detection section installation construction structure for performance testing of a ventilation and air conditioning system. Background Art
[0002] The prefabricated inspection section installation construction structure for ventilation and air-conditioning system performance testing is a common device for repairing air conditioners. It is used in all walks of life and families. It is a very common device in society and also a very practical device.
[0003] When the equipment is in use, it is not convenient to take the required tools in time, it is not convenient to connect the water tank for dust removal, and it is not convenient to check the internal situation, which is very harmful to the human body and the health of the workers.
[0004] The prior art adds a dust removal device on this basis, which can remove dust when dust appears, and also adds a viewing window to facilitate real-time viewing of the internal situation, effectively improving the stability and service life of the machine. Utility Model Content
[0005] 1. Technical issues to be solved
[0006] The purpose of the utility model is to provide a prefabricated detection section installation construction structure for ventilation and air-conditioning system performance testing, so as to solve the problems raised in the above-mentioned background technology that it is inconvenient to take the required tools in time, it is inconvenient to connect the water tank for dust removal, and it is inconvenient to check the internal situation.
[0007] (II) Technical solution
[0008] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a prefabricated detection section installation construction structure for ventilation and air conditioning system performance testing, comprising a main body mechanism and a construction mechanism, the construction mechanism is located at the upper end of the main body mechanism, the main body mechanism comprises a first prefabricated detection body support bottom plate, a universal wheel and a prefabricated detection body support load-bearing box, the universal wheel is fixedly installed at the lower end of the first prefabricated detection body support bottom plate, and the prefabricated detection body support load-bearing box is fixedly installed at the upper end of the first prefabricated detection body support bottom plate;
[0009] The main body structure also includes a second prefabricated detection body support base plate, a handle fixing support column, a handle connecting frame, a handle support connecting frame, an internal situation viewing window, a first ladder fixing column, a second ladder fixing column, a ladder fixing plate, a ladder support connecting plate, a load-bearing box opening door, an opening door handle and a dustproof protective film. The second prefabricated detection body support base plate is fixedly installed at the front end of the first prefabricated detection body support base plate.
[0010] Preferably, the handle fixing support column is fixedly installed on the upper end of the second prefabricated inspection body support base plate, the handle connecting frame is fixedly installed on the front end of the handle fixing support column, the handle supporting connecting frame is fixedly installed on the front end of the handle connecting frame, and the internal situation viewing window is fixedly installed on the left end of the prefabricated inspection body support load-bearing box. The design of the handle fixing support column ensures the stability of the installation construction structure of the prefabricated inspection section.
[0011] Preferably, the first ladder fixing column is fixedly installed on the right end of the prefabricated inspection body supporting the load-bearing box, the second ladder fixing column is fixedly installed on the right end of the prefabricated inspection body supporting the load-bearing box, the ladder fixing plate is fixedly installed on the outer ends of the first ladder fixing column and the second ladder fixing column, the ladder support connecting plate is fixedly installed on the left and right ends of the first ladder fixing column and the second ladder fixing column, the first ladder fixing column and the second ladder fixing column have the same structure, and the design of the first ladder fixing column and the second ladder fixing column ensures the stability of the installation construction structure of the prefabricated inspection section.
[0012] Preferably, the load-bearing box opening door is movably installed on the rear end of the load-bearing box supported by the prefabricated inspection body, the opening door handle is fixedly installed on the front end of the load-bearing box opening door, and the dust-proof protective film is movably installed on the outer end of the load-bearing box supported by the prefabricated inspection body. The design of the dust-proof protective film ensures the protectiveness of the installation construction structure of the prefabricated inspection section.
[0013] Preferably, the construction mechanism includes a third prefabricated inspection body supporting base plate, a main body fixed support column, a main body supporting load-bearing plate, an item placement box, a first placement box fixing plate, a second placement box fixing plate, a water storage tank, a water pump, a water inlet pipe, a water outlet pipe, a water storage port, a valve, a water pipe connecting port, a first connecting water pipe, a second connecting water pipe, a third connecting water pipe and a nozzle. The third prefabricated inspection body supporting base plate is fixedly installed on the upper end of the prefabricated inspection body supporting load-bearing box. The design of the third prefabricated inspection body supporting base plate ensures the stability of the installation construction structure of the prefabricated inspection section.
[0014] Preferably, the main body fixed support column is fixedly installed on the upper end of the third prefabricated inspection main body support base plate, the main body support load-bearing plate is fixedly installed on the upper end of the main body fixed support column, and the item placement box is fixedly installed on the upper end of the main body support load-bearing plate. The design of the item placement box ensures the practicability of the installation construction structure of the prefabricated inspection section.
[0015] Preferably, the first placement box fixing plate is fixedly installed on the upper end of the main body support load-bearing plate, the second placement box fixing plate is fixedly installed on the upper end of the main body support load-bearing plate, the water storage tank is fixedly installed inside the prefabricated inspection main body support load-bearing box, and the water pump is fixedly installed inside the water storage tank. The design of the water pump ensures the stability of the installation construction structure of the prefabricated inspection section.
[0016] Preferably, the water inlet pipe is fixedly installed at the left end of the water pump, the water outlet pipe is fixedly installed at the right end of the water pump, the water storage port is fixedly installed at the upper end of the water tank, the valve is fixedly installed at the upper end of the water tank, the water pipe connecting port is fixedly installed at the front end of the prefabricated detection body supporting load-bearing box, the first connecting water pipe is fixedly installed at the front end of the water pipe connecting port, the second connecting water pipe is fixedly installed at the upper end of the first connecting water pipe, the third connecting water pipe is fixedly installed at the rear end of the second connecting water pipe, and the nozzle is fixedly installed at the rear end of the third connecting water pipe. The design of the water inlet pipe and the water outlet pipe ensures the use effect of the prefabricated detection section installation construction structure.
[0017] Compared with the prior art, the beneficial effects of the utility model are:
[0018] 1. The prefabricated detection section installation construction structure for the ventilation and air-conditioning system performance test has a certain protective effect and structural stability when in use through the installation of the main body mechanism. The design of the prefabricated detection main body support load-bearing box ensures the stability of the prefabricated detection section installation construction structure, and the design of the dustproof protective film ensures the stability and protection of the prefabricated detection section installation construction structure;
[0019] 2. The prefabricated detection section installation construction structure for the ventilation and air conditioning system performance test has a good stability effect when in use through the installation construction mechanism. The design of the item placement box ensures the practicality and use effect of the prefabricated detection section installation construction structure;
[0020] 3. The prefabricated detection section installation construction structure for the ventilation and air-conditioning system performance test is installed with a water storage tank and a valve. When the prefabricated detection section installation construction structure is in use, it can remove dust from a certain range of the outside world, thereby improving the protectiveness of the process pipe column body. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 It is a schematic diagram of the three-dimensional structure of the utility model;
[0022] Figure 2 The utility model is a schematic diagram of the three-dimensional local structure Figure 1 ;
[0023] Figure 3 The utility model is a schematic diagram of the three-dimensional local structure Figure 2 ;
[0024] Figure 4 It is a schematic diagram of the partial structure of the cross section of the utility model;
[0025] Figure 5 This is a schematic diagram of the three-dimensional local detail structure of the utility model Figure 1 ;
[0026] Figure 6 This is a schematic diagram of the three-dimensional local detail structure of the utility model Figure 2 .
[0027] In the figure: 1. Main body; 101. First prefabricated test body support bottom plate; 102. Universal wheel; 103. Prefabricated test body support load-bearing box; 104. Second prefabricated test body support bottom plate; 105. Handle fixing support column; 106. Handle connecting frame; 107. Handle supporting connecting frame; 108. Internal situation viewing window; 109. First ladder fixing column; 110. Second ladder fixing column; 111. Ladder fixing plate; 112. Ladder supporting connecting plate; 113. Load-bearing box opening door; 114. Opening door handle; 115. 1. Dust-proof protective film; 2. Construction mechanism; 201. Third prefabricated inspection body support bottom plate; 202. Main body fixed support column; 203. Main body support load-bearing plate; 204. Article placement box; 205. First placement box fixing plate; 206. Second placement box fixing plate; 207. Water storage tank; 208. Water pump; 209. Water inlet pipe; 210. Water outlet pipe; 211. Water storage port; 212. Valve; 213. Water pipe connection port; 214. First connecting water pipe; 215. Second connecting water pipe; 216. Third connecting water pipe; 217. Sprinkler. DETAILED DESCRIPTION
[0028] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0029] See also Figure 1-Figure 6 The utility model provides a technical solution: a prefabricated detection section installation construction structure for ventilation and air conditioning system performance test, including a main body mechanism 1 and a construction mechanism 2, the construction mechanism 2 is located at the upper end of the main body mechanism 1, the main body mechanism 1 includes a first prefabricated detection body support bottom plate 101, a universal wheel 102 and a prefabricated detection body support load-bearing box 103, the universal wheel 102 is fixedly installed at the lower end of the first prefabricated detection body support bottom plate 101, and the prefabricated detection body support load-bearing box 103 is fixedly installed at the upper end of the first prefabricated detection body support bottom plate 101;
[0030] The main body structure 1 also includes a second prefabricated detection body support base plate 104, a handle fixing support column 105, a handle connecting frame 106, a handle supporting connecting frame 107, an internal situation viewing window 108, a first ladder fixing column 109, a second ladder fixing column 110, a ladder fixing plate 111, a ladder supporting connecting plate 112, a load-bearing box opening door 113, an opening door handle 114 and a dust-proof protective film 115. The second prefabricated detection body support base plate 104 is fixedly installed on the front end of the first prefabricated detection body support base plate 101.
[0031] The handle fixing support column 105 is fixedly installed on the upper end of the second prefabricated detection body support bottom plate 104, the handle connecting frame 106 is fixedly installed on the front end of the handle fixing support column 105, the handle supporting connecting frame 107 is fixedly installed on the front end of the handle connecting frame 106, the internal situation viewing window 108 is fixedly installed on the left end of the prefabricated detection body support load-bearing box 103, the first ladder fixing column 109 is fixedly installed on the right end of the prefabricated detection body support load-bearing box 103, the second ladder fixing column 110 is on the right end of the prefabricated detection body support load-bearing box 103, the ladder fixing plate 111 is fixedly installed on the outer ends of the first ladder fixing column 109 and the second ladder fixing column 110, the ladder supporting connecting plate 112 is fixedly installed on the left and right ends of the first ladder fixing column 109 and the second ladder fixing column 110, the first ladder fixing column 109 and the second ladder fixing column 110 have the same structure, and the load-bearing box The opening door 113 is movably installed at the rear end of the prefabricated inspection main body supporting the load-bearing box 103, the opening door handle 114 is fixedly installed at the front end of the opening door 113 of the load-bearing box, and the dust-proof protective film 115 is movably installed at the outer end of the prefabricated inspection main body supporting the load-bearing box 103. The design of the handle fixing support column 105 ensures the stability of the prefabricated inspection section installation construction structure, the design of the handle connecting frame 106 ensures the stability of the prefabricated inspection section installation construction structure, the design of the handle supporting connecting frame 107 ensures the stability of the prefabricated inspection section installation construction structure, the design of the internal situation viewing window 108 ensures the practicality of the prefabricated inspection section installation construction structure, the design of the first ladder fixing column 109 and the second ladder fixing column 110 ensures the stability of the prefabricated inspection section installation construction structure, and the design of the dust-proof protective film 115 ensures the protectiveness of the prefabricated inspection section installation construction structure.
[0032] The construction mechanism 2 includes a third prefabricated inspection body support base plate 201, a body fixed support column 202, a body support load-bearing plate 203, an article placement box 204, a first placement box fixed plate 205, a second placement box fixed plate 206, a water storage tank 207, a water pump 208, a water inlet pipe 209, a water outlet pipe 210, a water storage port 211, a valve 212, a water pipe connection port 213, a first connecting water pipe 214, a second connecting water pipe 215, a third connecting water pipe 216 and a nozzle 217. The third prefabricated inspection body support base plate 201 is fixedly installed on the upper end of the prefabricated inspection body support load-bearing box 103, and the body fixed support column 202 is fixedly installed on the upper end of the prefabricated inspection body support load-bearing box 103. The support column 202 is fixedly installed on the upper end of the third prefabricated detection body support bottom plate 201, the body support load-bearing plate 203 is fixedly installed on the upper end of the body fixed support column 202, the object placement box 204 is fixedly installed on the upper end of the body support load-bearing plate 203, the first placement box fixing plate 205 is fixedly installed on the upper end of the body support load-bearing plate 203, the second placement box fixing plate 206 is fixedly installed on the upper end of the body support load-bearing plate 203, the water storage tank 207 is fixedly installed inside the prefabricated detection body support load-bearing box 103, the water pump 208 is fixedly installed inside the water storage tank 207, and the water inlet pipe 209 is fixedly installed on the water storage tank 207. The left end of the pump 208, the water outlet pipe 210 is fixedly installed at the right end of the water pump 208, the water storage port 211 is fixedly installed at the upper end of the water storage tank 207, the valve 212 is fixedly installed at the upper end of the water storage tank 207, the water pipe connecting port 213 is fixedly installed at the front end of the prefabricated detection body support load-bearing box 103, the first connecting water pipe 214 is fixedly installed at the front end of the water pipe connecting port 213, the second connecting water pipe 215 is fixedly installed at the upper end of the first connecting water pipe 214, the third connecting water pipe 216 is fixedly installed at the rear end of the second connecting water pipe 215, the nozzle 217 is fixedly installed at the rear end of the third connecting water pipe 216, and the third prefabricated detection body is fixedly installed at the front end of the water pipe connecting port 213. The design of the supporting bottom plate 201 of the inspection body ensures the stability of the prefabricated inspection section installation construction structure, the design of the item placement box 204 ensures the practicability of the prefabricated inspection section installation construction structure, the design of the first placement box fixing plate 205 and the second placement box fixing plate 206 ensures the stability of the prefabricated inspection section installation construction structure, the design of the water tank 207 ensures the practicability of the prefabricated inspection section installation construction structure, the design of the water pump 208 ensures the stability of the prefabricated inspection section installation construction structure, and the design of the water inlet pipe 209 and the water outlet pipe 210 ensures the use effect of the prefabricated inspection section installation construction structure.
[0033] Working principle: The design of the handle fixing support column 105 ensures the stability of the prefabricated detection section installation construction structure, the design of the handle connecting frame 106 ensures the stability of the prefabricated detection section installation construction structure, the design of the handle supporting connecting frame 107 ensures the stability of the prefabricated detection section installation construction structure, the design of the internal situation viewing window 108 ensures the practicality of the prefabricated detection section installation construction structure, the design of the first ladder fixing column 109 and the second ladder fixing column 110 ensures the stability of the prefabricated detection section installation construction structure, and the design of the dustproof protective film 115 ensures the protectiveness of the prefabricated detection section installation construction structure. The design of the third prefabricated inspection body supporting bottom plate 201 ensures the stability of the prefabricated inspection section installation construction structure, the design of the item placement box 204 ensures the practicability of the prefabricated inspection section installation construction structure, the design of the first placement box fixing plate 205 and the second placement box fixing plate 206 ensures the stability of the prefabricated inspection section installation construction structure, the design of the water storage tank 207 ensures the practicability of the prefabricated inspection section installation construction structure, the design of the water pump 208 ensures the stability of the prefabricated inspection section installation construction structure, and the design of the water inlet pipe 209 and the water outlet pipe 210 ensures the use effect of the prefabricated inspection section installation construction structure.
[0034] Finally, it should be noted that the above content is only used to illustrate the technical solution of the utility model, rather than to limit the protection scope of the utility model. Simple modifications or equivalent substitutions of the technical solution of the utility model by ordinary technicians in this field do not deviate from the essence and scope of the technical solution of the utility model.
Claims
1. A prefabricated test section installation construction structure for ventilation and air conditioning system performance testing, comprising a main body (1) and a construction mechanism (2), characterized in that: The construction mechanism (2) is located at the upper end of the main mechanism (1); the main mechanism (1) comprises a first prefabricated detection body support base plate (101), a universal wheel (102) and a prefabricated detection body support load-bearing box (103); the universal wheel (102) is fixedly mounted on the lower end of the first prefabricated detection body support base plate (101); and the prefabricated detection body support load-bearing box (103) is fixedly mounted on the upper end of the first prefabricated detection body support base plate (101); The main body structure (1) further comprises a second prefabricated detection body supporting base plate (104), a handle fixing supporting column (105), a handle connecting frame (106), a handle supporting connecting frame (107), an internal situation viewing window (108), a first ladder fixing column (109), a second ladder fixing column (110), a ladder fixing plate (111), a ladder supporting connecting plate (112), a load-bearing box opening door (113), an opening door handle (114) and a dustproof protective film (115); the second prefabricated detection body supporting base plate (104) is fixedly mounted on the front end of the first prefabricated detection body supporting base plate (101).
2. The prefabricated detection section installation construction structure for ventilation and air conditioning system performance testing according to claim 1 is characterized in that: The handle fixing support column (105) is fixedly mounted on the upper end of the second prefabricated detection body support bottom plate (104), the handle connecting frame (106) is fixedly mounted on the front end of the handle fixing support column (105), the handle supporting connecting frame (107) is fixedly mounted on the front end of the handle connecting frame (106), and the internal situation viewing window (108) is fixedly mounted on the left end of the prefabricated detection body support load-bearing box (103).
3. The prefabricated detection section installation construction structure for ventilation and air conditioning system performance testing according to claim 2 is characterized by: The first ladder fixing column (109) is fixedly mounted on the right end of the prefabricated detection body support load-bearing box (103); the second ladder fixing column (110) is fixedly mounted on the right end of the prefabricated detection body support load-bearing box (103); the ladder fixing plate (111) is fixedly mounted on the outer ends of the first ladder fixing column (109) and the second ladder fixing column (110); the ladder support connecting plate (112) is fixedly mounted on the left and right ends of the first ladder fixing column (109) and the second ladder fixing column (110); the first ladder fixing column (109) and the second ladder fixing column (110) have the same structure.
4. The prefabricated detection section installation construction structure for ventilation and air conditioning system performance testing according to claim 3 is characterized by: The load-bearing box opening door (113) is movably mounted on the rear end of the prefabricated detection body supporting the load-bearing box (103); the opening door handle (114) is fixedly mounted on the front end of the load-bearing box opening door (113); and the dustproof protective film (115) is movably mounted on the outer end of the prefabricated detection body supporting the load-bearing box (103).
5. The prefabricated detection section installation construction structure for ventilation and air conditioning system performance testing according to claim 4 is characterized in that: The construction mechanism (2) comprises a third prefabricated inspection body supporting bottom plate (201), a body fixing supporting column (202), a body supporting bearing plate (203), an article placing box (204), a first placing box fixing plate (205), a second placing box fixing plate (206), a water storage tank (207), a water pump (208), a water inlet pipe (209), a water outlet pipe (210), a water storage port (211), a valve (212), a water pipe connecting port (213), a first connecting water pipe (214), a second connecting water pipe (215), a third connecting water pipe (216) and a nozzle (217); the third prefabricated inspection body supporting bottom plate (201) is fixedly mounted on the upper end of the prefabricated inspection body supporting bearing box (103).
6. The prefabricated detection section installation construction structure for ventilation and air conditioning system performance testing according to claim 5 is characterized by: The main body fixed support column (202) is fixedly mounted on the upper end of the third prefabricated detection main body support bottom plate (201), the main body support load-bearing plate (203) is fixedly mounted on the upper end of the main body fixed support column (202), and the article placement box (204) is fixedly mounted on the upper end of the main body support load-bearing plate (203).
7. The prefabricated detection section installation construction structure for ventilation and air conditioning system performance testing according to claim 6 is characterized by: The first placement box fixing plate (205) is fixedly mounted on the upper end of the main body support load-bearing plate (203), the second placement box fixing plate (206) is fixedly mounted on the upper end of the main body support load-bearing plate (203), the water storage tank (207) is fixedly mounted inside the prefabricated detection main body support load-bearing box (103), and the water pump (208) is fixedly mounted inside the water storage tank (207).
8. The prefabricated detection section installation construction structure for ventilation and air conditioning system performance testing according to claim 7 is characterized by: The water inlet pipe (209) is fixedly mounted on the left end of the water pump (208), the water outlet pipe (210) is fixedly mounted on the right end of the water pump (208), the water storage port (211) is fixedly mounted on the upper end of the water storage tank (207), the valve (212) is fixedly mounted on the upper end of the water storage tank (207), the water pipe connection port (213) is fixedly mounted on the front end of the prefabricated detection body support load-bearing box (103), the first connecting water pipe (214) is fixedly mounted on the front end of the water pipe connection port (213), the second connecting water pipe (215) is fixedly mounted on the upper end of the first connecting water pipe (214), the third connecting water pipe (216) is fixedly mounted on the rear end of the second connecting water pipe (215), and the nozzle (217) is fixedly mounted on the rear end of the third connecting water pipe (216).