Prestressed steel pipe truss laminated slab shelving node

By designing prestressed steel pipe truss shelving nodes in large span buildings, using sliding chutes and fixed troughs to connect, single-person installation and convenient disassembly are achieved, solving the problems of multi-person operation and high labor costs in the existing technology, and improving Installation efficiency and stability.

CN222044658UActive Publication Date: 2024-11-22安徽金鹏建设集团股份有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420671780.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-03
Publication Date
2024-11-22
Estimated Expiration
2034-04-03

AI Technical Summary

Technical Problem

In the construction of large-span and large flat panel buildings, the fixing parts of the laminated plates in the prior art need to be fixed by multiple bolts and distributed on both sides of the prefabricated beams, which requires multiple people to cooperate during installation, which is troublesome during disassembly and has high labor costs.

Method used

Design a prestressed steel pipe truss shelving node, by installing a node assembly on the prefabricated beam, including a first fixing member and a second fixing member, the steel pipe passes through the fixing member, square steel clamps on the prefabricated beam, and uses a sliding groove Connect to the fixing groove to reduce the number of bolts, and realize single-person installation and convenient disassembly.

Benefits of technology

It realizes the single-person installation of fixtures, reduces labor costs, optimizes the fixing method, improves work efficiency and installation stability, and reduces the complexity of later disassembly.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222044658U_ABST
    Figure CN222044658U_ABST
Patent Text Reader

Abstract

The utility model discloses a prestressing steel pipe truss composite slab shelving node, a node assembly comprises a first fixing piece and a second fixing piece, a steel pipe is arranged in a precast beam in a penetrating mode, square steel is arranged on both sides of the precast beam, the two square steel are respectively clamped on the precast beam by the first fixing piece and the second fixing piece, and the first fixing piece and the second fixing piece are fixed on the precast beam. The first fixing part is provided with a sliding groove and a first fixing groove, the second fixing part is provided with a second fixing groove, and the second fixing part is inserted into the sliding groove, so that the first fixing groove and the second fixing groove are communicated and fixed through two bolts. The first fixing piece, the precast beam and the second fixing piece are connected in series through the steel pipe, the square steel can be fixed to the side face of the precast beam only by fixing the relative positions of the first fixing piece and the second fixing piece, and therefore the fixing mode of the fixing pieces is optimized to a great extent, installation is convenient, and the installation efficiency is improved. And the bolts are convenient to disassemble in the later period due to less use quantity of the bolts.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of composite plate shelving, in particular to a prestressed steel tube truss composite plate shelving node. Background Art

[0002] In the construction of large-span and large-slab buildings, the composite slab is placed between two precast beams by fixing parts. However, the existing technology takes into account the problems of composite slab leakage, bottom integrity and installation stability, so that multiple fixing parts are needed to fix the composite slab when it is arranged. The fixing parts are often fixed with bolts and distributed on both sides of the precast beam, which requires the cooperation of multiple people during installation. It is also troublesome to remove the fixing parts later, and the labor cost is too high. Utility Model Content

[0003] The utility model aims to provide a prestressed steel tube truss composite plate laying node to solve the above-mentioned shortcomings in the prior art.

[0004] In order to achieve the above-mentioned purpose, the utility model provides the following technical solutions: a prestressed steel tube truss composite plate placement node, including a prefabricated beam, a node assembly is installed on the prefabricated beam, the top of the prefabricated beam and the node assembly are placed on the composite plate, the node assembly includes a first fixing member and a second fixing member, a steel pipe is passed through the prefabricated beam, one end of the steel pipe passes through the first fixing member, and the other end of the steel pipe passes through the second fixing member, square steels are arranged on both sides of the prefabricated beam, and the two square steels are clamped on the prefabricated beam by the first fixing member and the second fixing member respectively, the first fixing member is provided with a slide groove and a first fixing groove, the second fixing member is provided with a second fixing groove, the second fixing member is inserted into the slide groove, so that the first fixing groove is connected with the second fixing groove, and is fixed by two bolts.

[0005] Furthermore, the two bolts respectively fix the first fixing member and the second fixing member from the two sides of the slot connecting the first fixing slot and the second fixing slot.

[0006] Further, the first fixing member includes a first fixing plate and a second fixing plate, the first fixing plate and the second fixing plate are connected by a first connecting plate, the first fixing plate and the second fixing plate are both rotatably set on the first connecting plate, and a first clamping hole is formed when the first fixing plate and the second fixing plate are affixed, and the second fixing member includes a third fixing plate and a fourth fixing plate, the third fixing plate and the fourth fixing plate are connected by a second connecting plate, the third fixing plate and the fourth fixing plate are both rotatably set on the first connecting plate, and a second clamping hole is formed when the third fixing plate and the fourth fixing plate are affixed.

[0007] Furthermore, the bottom ends of the two square steels fall on the first fixing member and the second fixing member respectively.

[0008] Furthermore, a reserved hole is opened on the prefabricated beam, and the steel pipe passes through the second clamping hole, the reserved hole, and the first clamping hole in sequence.

[0009] Furthermore, the first clamping hole and the second clamping hole are roughened.

[0010] In the above technical solution, the utility model provides a prestressed steel tube truss composite plate shelving node with the beneficial effects of:

[0011] The utility model uses a fixing method in which the second fixing part is inserted into the first fixing part, so that a single person can install the fixing part under the prefabricated beam, thereby reducing labor costs. The first fixing part, the prefabricated beam, and the second fixing part are connected in series through a steel pipe, so that the square steel can be fixed to the side of the prefabricated beam only by fixing the relative positions of the first fixing part and the second fixing part, thereby greatly optimizing the fixing method of the fixing part, which is not only convenient for installation, but also convenient for disassembly in the later stage due to the small number of bolts used, thereby greatly improving work efficiency and reducing labor costs.

[0012] It is to be understood that both the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the disclosure.

[0013] This application document provides an overview of various implementations or examples of the technology described in the present disclosure, and is not a comprehensive disclosure of the entire scope or all features of the disclosed technology. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present utility model. For ordinary technicians in this field, other drawings can also be obtained based on these drawings.

[0015] Figure 1 A diagram of the installation position of the node components provided in the embodiment of the utility model;

[0016] Figure 2 A cross-sectional view of the installation of a node assembly provided in an embodiment of the utility model;

[0017] Figure 3 An exploded view of a fixing member provided in an embodiment of the utility model;

[0018] Figure 4 This is a schematic diagram of the fixing structure provided in an embodiment of the utility model.

[0019] Description of reference numerals:

[0020] 1. Column; 2. Main beam; 3. Precast beam; 31. Reserved hole; 4. Composite plate; 5. Node assembly; 51. First fixing piece; 511. Slide groove; 512. First fixing groove; 513. First fixing plate; 514. Second fixing plate; 519. First clamping hole; 52. Second fixing piece; 521. Second fixing groove; 522. Third fixing plate; 523. Fourth fixing plate; 529. Second clamping hole; 6. Steel pipe; 7. Square steel; 8. Bolt; 9. First connecting plate; 10. Second connecting plate. DETAILED DESCRIPTION

[0021] In order to make the purpose, technical solution and advantages of the embodiments of the present disclosure clearer, the technical solution of the embodiments of the present disclosure will be clearly and completely described below in conjunction with the drawings of the embodiments of the present disclosure. Obviously, the described embodiments are part of the embodiments of the present disclosure, not all of the embodiments. Based on the described embodiments of the present disclosure, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present disclosure.

[0022] Please refer to 1-4, a prestressed steel tube truss composite plate mounting node includes a precast beam 3, a node assembly 5 is installed on the precast beam 3, a composite plate 4 is mounted on the top of the precast beam 3 and the node assembly 5, the node assembly 5 includes a first fixing member 51 and a second fixing member 52, a steel pipe 6 is passed through the precast beam 3, one end of the steel pipe 6 passes through the first fixing member 51, and the other end of the steel pipe 6 passes through the second fixing member 52, square steels 7 are arranged on both sides of the precast beam 3, and the two square steels 7 are clamped on the precast beam 3 by the first fixing member 51 and the second fixing member 52 respectively, a slide groove 511 and a first fixing groove 512 are opened on the first fixing member 51, a second fixing groove 521 is opened on the second fixing member 52, and the second fixing member 52 is inserted into the slide groove 511, so that the first fixing groove 512 is connected with the second fixing groove 521, and fixed by two bolts 8.

[0023] Specifically, refer to Figure 1 , the precast beam 3 is erected on the main beam 2, the main beam 2 is cast between two columns 1, and the node component 5 is Figure 1 The utility model can install the square steel 7 on the side of the prefabricated beam 3 by inserting the second fixing member 52 into the first fixing member 51, so that a single person can install the fixing member under the prefabricated beam 3, thereby reducing labor costs. The first fixing member 51, the prefabricated beam 3, and the second fixing member 52 are connected in series through the steel pipe 6, so that the square steel 7 can be fixed to the side of the prefabricated beam 3 only by fixing the relative positions of the first fixing member 51 and the second fixing member 52, thereby greatly optimizing the fixing method of the fixing member, which is not only convenient for installation, but also convenient for disassembly in the later stage due to the small number of bolts 8 used, thereby greatly improving work efficiency and reducing labor costs.

[0024] Furthermore, two bolts 8 fix the first fixing member 51 and the second fixing member 52 respectively from the two sides of the communicating slots of the first fixing slot 512 and the second fixing slot 521 .

[0025] Specifically, refer to Figure 4 When the first fixing member 51 and the second fixing member 52 clamp the two square steels 7 on the prefabricated beam 3 respectively, the second fixing member 52 is inserted into the slide groove 511, and the first fixing groove 512 overlaps with the second fixing groove 521. At this time, the two bolts 8 pass through the overlapping part and are fixed at the two ends of the overlapping part respectively. This makes the first fixing member 51 and the second fixing member 52 be clamped and limited, and cannot be separated, further enhancing the installation stability of the node assembly 5.

[0026] Further, the first fixing member 51 includes a first fixing plate 513 and a second fixing plate 514, which are connected by a first connecting plate 9, and the first fixing plate 513 and the second fixing plate 514 are both rotatably set on the first connecting plate 9, and a first clamping hole 519 is formed when the first fixing plate 513 and the second fixing plate 514 are fitted together, and the second fixing member 52 includes a third fixing plate 522 and a fourth fixing plate 523, and the third fixing plate 522 and the fourth fixing plate 523 are connected by a second connecting plate 10, and the third fixing plate 522 and the fourth fixing plate 523 are both rotatably set on the first connecting plate 9, and a second clamping hole 529 is formed when the third fixing plate 522 and the fourth fixing plate 523 are fitted together.

[0027] Specifically, refer to Figure 2 , Figure 3 , Figure 4 When installing the node assembly 5, first insert the steel pipe 6 into the reserved hole 31, then place the first fixing member 51 and the second fixing member 52 on both ends of the steel pipe 6 respectively, and then place two square steels 7 on both sides of the prefabricated beam 3 respectively, and then adjust the positions of the first fixing member 51 and the second fixing member 52 so that the first fixing member 51 and the second fixing member 52 both clamp the square steel 7 on the prefabricated beam 3. At this time, the first clamping hole 519 and the second clamping hole 529 are respectively sleeved on the two ends of the steel pipe 6, and the first fixing member 51 clamps the second fixing member 52 therein, and fixes the connection by bolts 8, and the installation of the node assembly 5 is completed. Here, the second fixing member 52 can also be an integrated design, that is, the second fixing member 52 is provided with a second clamping hole 529 and a second fixing groove 521.

[0028] Furthermore, the bottom ends of the two square steels 7 fall on the first fixing member 51 and the second fixing member 52 respectively.

[0029] Specifically, refer to Figure 2The bottom end of the square steel 7 is tightly attached to the top end of the first fixing member 51 or the second fixing member 52 , and the node assembly 5 provides support for the square steel 7 , thereby ensuring the stability of the composite plate 4 when placed on the node assembly 5 .

[0030] Furthermore, a reserved hole 31 is opened on the prefabricated beam 3, and the steel pipe 6 passes through the second clamping hole 529, the reserved hole 31, and the first clamping hole 519 in sequence.

[0031] Specifically, refer to Figure 2 The method of opening the reserved hole 31 on the prefabricated beam 3 is that, during the production stage of the prefabricated beam 3, a 60mm PVC sleeve is reserved 76mm below the prefabricated surface, with a spacing of 1000mm.

[0032] Furthermore, the first clamping hole 519 and the second clamping hole 529 are roughened.

[0033] Specifically, refer to Figure 3 By roughening the first clamping hole 519 and the second clamping hole 529 , the friction between the first fixing member 51 and the second fixing member 52 and the steel pipe 6 is increased, and the installation stability of the node assembly 5 is further enhanced.

[0034] In the utility model, after the prefabricated beam 3 is brought into the site but before being hoisted, a steel pipe 6 is passed through the reserved hole 31, and the first fixing member 51 and the second fixing member 52 are sleeved on the steel pipe 6. At the same time, the square steel 7 is pressed tightly against the side of the prefabricated beam 3. The bottom of the square steel 7 is made of iron sheet and the top surface is leveled with plywood to ensure that the square wood and the prefabricated surface are flat. The square steel 7 can be replaced by square wood.

[0035] The above only describes some exemplary embodiments of the present invention by way of illustration. It is undoubted that those skilled in the art can modify the described embodiments in various ways without departing from the spirit and scope of the present invention. Therefore, the above drawings and descriptions are illustrative in nature and should not be construed as limiting the scope of protection of the claims of the present invention.

Claims

1. A prestressed steel tube truss composite plate laying node, comprising a prefabricated beam (3), Features: A node assembly (5) is installed on the prefabricated beam (3), a composite plate (4) is placed on the top of the prefabricated beam (3) and the node assembly (5), the node assembly (5) comprises a first fixing member (51) and a second fixing member (52), a steel pipe (6) is passed through the prefabricated beam (3), one end of the steel pipe (6) passes through the first fixing member (51), and the other end of the steel pipe (6) passes through the second fixing member (52), and square steels (7) are provided on both sides of the prefabricated beam (3). ), the two square steels (7) are clamped on the prefabricated beam (3) by a first fixing member (51) and a second fixing member (52), respectively; the first fixing member (51) is provided with a slide groove (511) and a first fixing groove (512); the second fixing member (52) is provided with a second fixing groove (521); the second fixing member (52) is inserted into the slide groove (511) so that the first fixing groove (512) is connected to the second fixing groove (521), and is fixed by two bolts (8).

2. A prestressed steel tube truss composite plate laying node according to claim 1, It is characterized in that The two bolts (8) respectively fix the first fixing member (51) and the second fixing member (52) from the two sides of the slot openings connecting the first fixing slot (512) and the second fixing slot (521).

3. A prestressed steel tube truss composite plate laying node according to claim 2, It is characterized in that The first fixing member (51) comprises a first fixing plate (513) and a second fixing plate (514), the first fixing plate (513) and the second fixing plate (514) are connected via a first connecting plate (9), the first fixing plate (513) and the second fixing plate (514) are both rotatably arranged on the first connecting plate (9), and a first clamping hole (519) is formed when the first fixing plate (513) and the second fixing plate (514) are in abutment with each other, and the second fixing member (52) comprises a third fixing plate (522) and a fourth fixing plate (523), the third fixing plate (522) and the fourth fixing plate (523) are connected via a second connecting plate (10), the third fixing plate (522) and the fourth fixing plate (523) are both rotatably arranged on the first connecting plate (9), and a second clamping hole (529) is formed when the third fixing plate (522) and the fourth fixing plate (523) are in abutment with each other.

4. A prestressed steel tube truss composite plate laying node according to claim 1, It is characterized in that The bottom ends of the two square steels (7) fall on the first fixing member (51) and the second fixing member (52) respectively.

5. A prestressed steel tube truss composite plate laying node according to claim 3, It is characterized in that The prefabricated beam (3) is provided with a reserved hole (31), and the steel pipe (6) passes through the second clamping hole (529), the reserved hole (31), and the first clamping hole (519) in sequence.

6. A prestressed steel tube truss composite plate laying node according to claim 5, It is characterized in that The first clamping hole (519) and the second clamping hole (529) are roughened.