Double-pump well cementation system and equipment
By designing two drive devices that are spare in the dual-pump cementing system, ensuring the simultaneous operation of circulation, infusion, injection or water supply centrifugal pumps, the problem of large-displacement operation in the event of equipment failure is solved, and the operation efficiency is improved. User experience.
Patent Information
- Application Number
- CN202420297179.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-18
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2034-02-18
AI Technical Summary
When the existing dual-pump cementing equipment fails on one side, it cannot meet the circulation and infusion requirements at the same time, resulting in the inability to perform large-displacement operations, reducing operating efficiency and affecting user experience.
Design a dual-pump cementing system, which includes two drives connecting the circulating centrifugal pump, infusion centrifugal pump, injection centrifugal pump or water supply centrifugal pump, to ensure that even if one drive fails, at least three centrifugal pumps can be operated simultaneously. The mutually backup design realizes large-displacement operation.
It enables the simultaneous operation of the circulating, filling and spraying or water supply centrifugal pump even when a drive device fails, improving operational efficiency and improving user experience.
Smart Images

Figure CN222067105U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of dynamic equipment monitoring, and in particular to a dual-pump cementing system and equipment. Background Art
[0002] At present, the dual-engine dual-pump cementing equipment mainly includes four centrifugal pumps: a circulating centrifugal pump, a jet centrifugal pump, an injection centrifugal pump, and a water supply centrifugal pump, and the four centrifugal pumps are generally driven by a hydraulic system. In the prior art, conventional dual-pump cementing equipment generally includes a main driving side and a co-driving side, and its closed hydraulic system driving mode is: the hydraulic pump connected to the gearbox on the main driving side drives the injection centrifugal pump and the water supply centrifugal pump, and the hydraulic pump connected to the gearbox on the co-driving side drives the circulating centrifugal pump and the injection centrifugal pump.
[0003] During routine operations, although the circulating centrifugal pump and the filling centrifugal pump are interchangeable in function, when operating at a large displacement, it is necessary to fill the high-pressure plunger pump while circulating. Therefore, it is generally necessary for the circulating centrifugal pump, the filling centrifugal pump, and the jet centrifugal pump to operate at the same time, or for the circulating centrifugal pump, the filling centrifugal pump, and the water supply centrifugal pump to operate at the same time.
[0004] However, the existing driving method of the four centrifugal pumps of the above-mentioned dual-pump cementing equipment requires that the gearboxes on the driver's side and the co-driver's side work at the same time if the three centrifugal pumps are to work at the same time. If there is a failure in the engine or gearbox on one side, the centrifugal pump on that side cannot be driven, and only one side of the engine can be used during operation, which makes it impossible to meet the requirements of circulation and injection at the same time, and thus it is impossible to perform large-displacement operations, which reduces operating efficiency and affects user experience. Utility Model Content
[0005] The present application provides a dual-pump cementing system and equipment to solve the technical problem that if the dual-pump cementing equipment in the prior art has an engine or gearbox failure on one side, it will not be able to meet the circulation and injection requirements at the same time, thereby failing to perform large-displacement operations, reducing operating efficiency and affecting user experience.
[0006] In a first aspect, an embodiment of the present application provides a dual-pump cementing system, comprising: a first drive device, a second drive device, a circulation centrifugal pump, a perfusion centrifugal pump, a jet centrifugal pump, and a water supply centrifugal pump;
[0007] The first driving device is connected to the circulating centrifugal pump, the perfusion centrifugal pump, and the jet centrifugal pump respectively, and the first driving device is used to drive the circulating centrifugal pump, the perfusion centrifugal pump, and the jet centrifugal pump to operate;
[0008] The second driving device is connected to the circulation centrifugal pump, the perfusion centrifugal pump, and the water supply centrifugal pump respectively, and is used to drive the circulation centrifugal pump, the perfusion centrifugal pump, and the water supply centrifugal pump to operate.
[0009] As a possible implementation, the first driving device includes a first driving module, a first circulating plunger pump, a first priming plunger pump, and a jet plunger pump; the second driving device includes a second driving module, a second circulating plunger pump, a second priming plunger pump, and a water supply plunger pump;
[0010] The first driving module is connected to the first circulation plunger pump, the first perfusion plunger pump, and the injection plunger pump respectively, and the first driving module is used to drive the first circulation plunger pump, the first perfusion plunger pump, and the injection plunger pump to operate;
[0011] The second driving module is respectively connected to the second circulation plunger pump, the second perfusion plunger pump, and the water supply plunger pump, and the second driving module is used to drive the second circulation plunger pump, the second perfusion plunger pump, and the water supply plunger pump to operate;
[0012] The first circulating plunger pump and the second circulating plunger pump are respectively connected to the circulating centrifugal pump, and the first circulating plunger pump and the second circulating plunger pump are both used to drive the circulating centrifugal pump to operate;
[0013] The first perfusion plunger pump and the second perfusion plunger pump are respectively connected to the perfusion centrifugal pump, and the first perfusion plunger pump and the second perfusion plunger pump are both used to drive the perfusion centrifugal pump to operate;
[0014] The jet plunger pump is connected to the jet centrifugal pump, and the jet plunger pump is used to drive the jet centrifugal pump to operate;
[0015] The water supply plunger pump is connected to the water supply centrifugal pump, and the water supply plunger pump is used to drive the water supply centrifugal pump to operate.
[0016] As a possible implementation, the first circulation plunger pump and the injection plunger pump are connected in series, and the first circulation plunger pump drives the injection plunger pump to operate via a tail drive;
[0017] The second priming plunger pump and the water supply plunger pump are connected in series, and the second priming plunger pump drives the water supply plunger pump to operate via a tail drive.
[0018] As a possible implementation, the first drive module includes a main driving engine and a main driving gearbox, and the main driving gearbox is equipped with a main driving upper power take-off and a main driving side power take-off;
[0019] The main driving engine is connected to the main driving gearbox;
[0020] The main driving power take-off is connected to the first circulating plunger pump;
[0021] The main driving side power take-off is connected to the first filling plunger pump.
[0022] As a possible implementation, the second drive module includes a passenger engine and a passenger gearbox, and the passenger gearbox is equipped with a passenger upper power take-off and a passenger side power take-off;
[0023] The passenger engine is connected to the passenger gearbox;
[0024] The co-pilot upper power take-off is connected to the second priming plunger pump;
[0025] The passenger side power take-off is connected to the second circulating piston pump.
[0026] As a possible implementation, it also includes: a hydraulic oil tank, a first control valve, a second control valve, a first electromagnetic reversing valve, and a second electromagnetic reversing valve;
[0027] The first circulation plunger pump, the second circulation plunger pump, the first filling plunger pump, the second filling plunger pump, the injection plunger pump, and the water supply plunger pump are all hydraulically controlled variable plunger pumps;
[0028] The first control valve is respectively connected to the oil return port of the hydraulic oil tank, the injection plunger pump, and the first electromagnetic reversing valve, and the first electromagnetic reversing valve is respectively connected to the first circulation plunger pump, the second circulation plunger pump, and the circulation switching plate of the control panel;
[0029] The injection plunger pump is connected to the oil outlet of the hydraulic oil tank and supplies oil to the first control valve, the first control valve supplies oil to the first electromagnetic reversing valve, and the first electromagnetic reversing valve supplies oil to the corresponding target circulation plunger pump according to the rotation of the circulation switching plate, so that the target circulation plunger pump can operate, and the target circulation plunger pump is the first circulation plunger pump or the second circulation plunger pump;
[0030] The second control valve is respectively connected to the oil return port of the hydraulic oil tank, the water supply plunger pump, and the second electromagnetic reversing valve, and the second electromagnetic reversing valve is respectively connected to the first priming plunger pump, the second priming plunger pump, and the priming switching plate of the control panel;
[0031] Among them, the water supply plunger pump is connected to the oil outlet of the hydraulic oil tank and supplies oil to the second control valve, the second control valve supplies oil to the second solenoid reversing valve, and the second solenoid reversing valve supplies oil to the corresponding target perfusion plunger pump according to the twisting direction of the perfusion switching plate to make the target perfusion plunger pump run, and the target perfusion plunger pump is the first perfusion plunger pump or the second perfusion plunger pump.
[0032] As a possible implementation, it also includes: a hydraulic oil tank, a first control valve and a second control valve;
[0033] The first circulation plunger pump, the second circulation plunger pump, the first filling plunger pump, the second filling plunger pump, the injection plunger pump, and the water supply plunger pump are all hydraulically controlled variable plunger pumps;
[0034] The first control valve is respectively connected to the oil return port of the hydraulic oil tank, the injection plunger pump, the first circulation plunger pump, and the second circulation plunger pump, and the first control valve includes a first handle that moves in two directions;
[0035] The injection plunger pump is connected to the oil outlet of the hydraulic oil tank and supplies oil to the first control valve. The first control valve supplies oil to the corresponding target circulation plunger pump according to the direction of the first handle to make the target circulation plunger pump run. The target circulation plunger pump is the first circulation plunger pump or the second circulation plunger pump.
[0036] The second control valve is respectively connected to the oil return port of the hydraulic oil tank, the water supply plunger pump, the first priming plunger pump, and the second priming plunger pump, and the second control valve includes a second handle that moves in two directions;
[0037] Among them, the water supply plunger pump is connected to the oil outlet of the hydraulic oil tank and supplies oil to the second control valve. The second control valve supplies oil to the corresponding target perfusion plunger pump according to the direction of the second handle to make the target perfusion plunger pump run. The target perfusion plunger pump is the first perfusion plunger pump or the second perfusion plunger pump.
[0038] As a possible implementation, it also includes: a hydraulic oil tank;
[0039] The first circulation plunger pump, the second circulation plunger pump, the first filling plunger pump, the second filling plunger pump, the injection plunger pump, and the water supply plunger pump are all electrically controlled variable plunger pumps, and are respectively connected to the oil outlet and oil return port of the hydraulic oil tank, wherein the electrically controlled variable plunger pump operates by receiving a control signal.
[0040] As a possible implementation, it further includes: a first flushing valve, a second flushing valve, a first one-way valve, and a second one-way valve;
[0041] The first flushing valve is respectively connected to the first circulating plunger pump, the second circulating plunger pump, and the first one-way valve, the first flushing valve is used to flush the first circulating plunger pump and the second circulating plunger pump at the same time, and the first one-way valve is used to control a first maximum pressure value for flushing the first circulating plunger pump and the second circulating plunger pump;
[0042] The second flushing valve is respectively connected to the first perfusion plunger pump, the second perfusion plunger pump, and the second one-way valve. The second flushing valve is used to flush the first perfusion plunger pump and the second perfusion plunger pump at the same time. The second one-way valve is used to control the second maximum pressure value for flushing the first perfusion plunger pump and the second perfusion plunger pump.
[0043] As a possible implementation, the circulating centrifugal pump, the first circulating plunger pump, the second circulating plunger pump, the priming centrifugal pump, the first priming plunger pump, and the second priming plunger pump all include a first oil circuit and a second oil circuit;
[0044] After the first oil circuits of the first circulating plunger pump and the second circulating plunger pump are connected, the first oil circuit of the circulating centrifugal pump is then connected;
[0045] After the second oil circuits of the first circulating plunger pump and the second circulating plunger pump are connected, the second oil circuit of the circulating centrifugal pump is connected;
[0046] After the first oil circuits of the first priming plunger pump and the second priming plunger pump are connected, the first oil circuit of the priming centrifugal pump is then connected;
[0047] After the second oil circuits of the first priming plunger pump and the second priming plunger pump are connected, the second oil circuit of the priming centrifugal pump is connected.
[0048] In a second aspect, an embodiment of the present application provides a dual-pump cementing equipment, comprising the dual-pump cementing system described in any one of the first aspects.
[0049] The dual-pump cementing system provided in the embodiment of the present application includes a first drive device, a second drive device, a circulating centrifugal pump, an injection centrifugal pump, a jet centrifugal pump, and a water supply centrifugal pump, wherein the first drive device can be connected to the circulating centrifugal pump, the injection centrifugal pump, and the jet centrifugal pump respectively, and the first drive device can be used to drive the circulating centrifugal pump, the injection centrifugal pump, and the jet centrifugal pump respectively, and the second drive device can be connected to the circulating centrifugal pump, the injection centrifugal pump, and the water supply centrifugal pump respectively, and the second drive device can be used to drive the circulating centrifugal pump, the injection centrifugal pump, and the water supply centrifugal pump respectively. In this dual-pump cementing system, the circulating centrifugal pump and the injection centrifugal pump included in it can be driven by the two drive devices of the dual-pump cementing system, and the jet centrifugal pump and the water supply centrifugal pump can be driven by the two drive devices respectively, therefore, even if one of the drive devices fails, as long as one of the drive devices can operate normally, the three centrifugal pumps of the circulating centrifugal pump, the injection centrifugal pump, and one of the jet centrifugal pump and the water supply centrifugal pump can be guaranteed to operate simultaneously, thereby ensuring that the dual-pump cementing equipment can perform large-displacement operations, improve operating efficiency, and enhance user experience. BRIEF DESCRIPTION OF THE DRAWINGS
[0050] The accompanying drawings herein are incorporated in and constitute a part of the specification, illustrate embodiments consistent with the present utility model, and together with the description, are used to explain the principles of the present utility model.
[0051] In order to more clearly illustrate the technical solutions in the embodiments of the utility model or the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.
[0052] One or more embodiments are exemplarily described by pictures in the corresponding drawings, and these exemplified descriptions do not constitute limitations on the embodiments. Elements with the same reference numerals in the drawings represent similar elements, and unless otherwise stated, the figures in the drawings do not constitute proportional limitations.
[0053] Figure 1 A schematic diagram of the structure of a dual-pump cementing system provided in an embodiment of the present application;
[0054] Figure 2 A schematic diagram of the structure of another dual-pump cementing system provided in an embodiment of the present application;
[0055] Figure 3 A schematic diagram of the structure of another dual-pump cementing system provided in an embodiment of the present application;
[0056] Figure 4 A schematic diagram of a switch board twist provided in an embodiment of the present application;
[0057] Figure 5 A schematic diagram of the principle structure of a dual-pump cementing system provided in an embodiment of the present application;
[0058] Figure 6 A schematic diagram of the principle structure of another dual-pump cementing system provided in an embodiment of the present application;
[0059] Figure 7 A schematic diagram of a control valve handle provided in an embodiment of the present application;
[0060] Figure 8 A schematic diagram of the principle structure of another dual-pump cementing system provided in an embodiment of the present application;
[0061] Fig. 9 A schematic diagram of the structure of a dual-pump cementing equipment provided in an embodiment of the present application;
[0062] Among them, 101: a first driving device; 102: a second driving device; 103: a circulating centrifugal pump; 104: a perfusion centrifugal pump; 105: a jet centrifugal pump; 106: a water supply centrifugal pump;
[0063] 21: first drive module; 22: first circulation plunger pump; 23: first filling plunger pump; 24: injection plunger pump; 25: second drive module; 26: second circulation plunger pump; 27: second filling plunger pump; 28: water supply plunger pump;
[0064] 31: Main driver's engine; 32: Main driver's gearbox; 33: Passenger driver's engine; 34: Passenger driver's gearbox; 321: Main driver's upper power take-off; 322: Main driver's side power take-off; 341: Passenger driver's upper power take-off; 342: Passenger driver's side power take-off;
[0065] 1: Hydraulic oil tank; 2: Oil suction filter; 3: Oil suction butterfly valve; 4: Variable piston pump; 5: Piston motor; 6: Variable piston pump; 7: Piston motor; 8: Flushing valve; 9: Control valve; 10: Solenoid reversing valve; 11: Check valve; 12: Pressure gauge; 13: Oil replenishment pressure gauge; 14: Check valve; 15: Thermostat; 16: Check valve; 17: Radiator; 18: Return oil filter. DETAILED DESCRIPTION
[0066] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.
[0067] The disclosure below provides many different embodiments or examples for realizing different structures of the present invention. In order to simplify the disclosure of the present invention, the components and settings of specific examples are described below. Of course, they are only examples, and the purpose is not to limit the present invention. In addition, the present invention may repeat reference numbers and / or letters in different examples. This repetition is for the purpose of simplification and clarity, and does not itself indicate the relationship between the various embodiments and / or settings discussed.
[0068] In order to solve the technical problem in the prior art that if the dual-pump cementing equipment has a failure in the engine or gearbox on one side, it will not be able to meet the requirements of circulation and injection at the same time, thereby failing to perform large-displacement operations, reducing operating efficiency and affecting user experience, the present application provides a dual-pump cementing system and equipment, which can realize the backup design of the driving of the circulation centrifugal pump and the injection centrifugal pump on the main driver's side and the co-driver's side respectively, so that only by starting the engine on either side, the three centrifugal pumps of circulation, injection and injection (water supply) can operate simultaneously, thereby ensuring that the dual-pump cementing equipment can perform large-displacement operations, improve operating efficiency and enhance user experience.
[0069] The dual-pump cementing system provided by the present application is further explained below with reference to specific embodiments in conjunction with the accompanying drawings. The embodiments do not constitute a limitation on the embodiments of the present utility model.
[0070] join Figure 1 , is a schematic diagram of the structure of a dual-pump cementing system provided in an embodiment of the present application. Figure 1 As shown, the dual-pump cementing system 100 may include: a first driving device 101 , a second driving device 102 , a circulation centrifugal pump 103 , an injection centrifugal pump 104 , a jet centrifugal pump 105 , and a water supply centrifugal pump 106 .
[0071] The first driving device 101 and the second driving device 102 are respectively used to drive the centrifugal pumps to operate. The centrifugal pumps may include but are not limited to: a circulation centrifugal pump 103 , a perfusion centrifugal pump 104 , a jet centrifugal pump 105 , and a water supply centrifugal pump 106 .
[0072] Furthermore, the first driving device 101 and the second driving device 102 are driving devices installed on the dual-pump cementing equipment, for example, they may be a main driving side driving device and a secondary driving side driving device of the dual-pump cementing equipment.
[0073] The above-mentioned circulating centrifugal pump 103, injection centrifugal pump 104, jet centrifugal pump 105, and water supply centrifugal pump 106 are centrifugal pumps used in the dual-pump cementing equipment when performing displacement work. Among them, when the dual-pump cementing equipment performs large-displacement work, it is necessary to circulate and inject the high-pressure plunger pump at the same time. Therefore, it is generally necessary for the circulating centrifugal pump 103, the injection centrifugal pump 104, and the jet centrifugal pump 105 to work at the same time, or the circulating centrifugal pump 103, the injection centrifugal pump 104, and the water supply centrifugal pump 106 to work at the same time.
[0074] Furthermore, the first driving device 101 can be connected to the circulating centrifugal pump 103, the perfusion centrifugal pump 104, and the jet centrifugal pump 105, respectively, and can be used to drive the circulating centrifugal pump 103, the perfusion centrifugal pump 104, and the jet centrifugal pump 105 to operate.
[0075] Furthermore, the second driving device 102 can be connected to the circulating centrifugal pump 103, the filling centrifugal pump 104, and the water supply centrifugal pump 106 respectively, and can be used to drive the circulating centrifugal pump 103, the filling centrifugal pump 104, and the water supply centrifugal pump 106 to operate.
[0076] The dual-pump cementing system provided in the embodiment of the present application includes a first drive device, a second drive device, a circulating centrifugal pump, an injection centrifugal pump, a jet centrifugal pump, and a water supply centrifugal pump, wherein the first drive device can be connected to the circulating centrifugal pump, the injection centrifugal pump, and the jet centrifugal pump respectively, and the first drive device can be used to drive the circulating centrifugal pump, the injection centrifugal pump, and the jet centrifugal pump respectively, and the second drive device can be connected to the circulating centrifugal pump, the injection centrifugal pump, and the water supply centrifugal pump respectively, and the second drive device can be used to drive the circulating centrifugal pump, the injection centrifugal pump, and the water supply centrifugal pump respectively. In this dual-pump cementing system, the circulating centrifugal pump and the injection centrifugal pump included in it can be driven by the two drive devices of the dual-pump cementing system, and the jet centrifugal pump and the water supply centrifugal pump can be driven by the two drive devices respectively, therefore, even if one of the drive devices fails, as long as one of the drive devices can operate normally, the three centrifugal pumps of the circulating centrifugal pump, the injection centrifugal pump, and one of the jet centrifugal pump and the water supply centrifugal pump can be guaranteed to operate simultaneously, thereby ensuring that the dual-pump cementing equipment can perform large-displacement operations, improve operating efficiency, and enhance user experience.
[0077] join Figure 2 , is a schematic structural diagram of another dual-pump cementing system provided in an embodiment of the present application. Figure 2 The dual pump cementing system shown in Figure 1 Based on the dual pump cementing system 100 shown in FIG. 1 , the specific structures of the first driving device 101 and the second driving device 102 are further described. Figure 2As shown, the dual-pump cementing system 20 may include: a first driving module 21, a first circulating plunger pump 22, a first filling plunger pump 23, an injection plunger pump 24, a second driving module 25, a second circulating plunger pump 26, a second filling plunger pump 27, a water supply plunger pump 28, and Figure 1 It includes a circulation centrifugal pump 103, a perfusion centrifugal pump 104, a jet centrifugal pump 105, and a water supply centrifugal pump 106.
[0078] in, Figure 1 The first driving device 101 shown may include a first driving module 21, a first circulation plunger pump 22, a first priming plunger pump 23, and an injection plunger pump 24. The first circulation plunger pump 22, the first priming plunger pump 23, and the injection plunger pump 24 may be a hydraulically controlled variable plunger pump or an electrically controlled variable plunger pump, which is not limited in the present embodiment of the application.
[0079] Figure 1 The second driving device 102 shown may include a second driving module 25, a second circulating plunger pump 26, a second priming plunger pump 27, and a water supply plunger pump 28. The second driving module 25, the second circulating plunger pump 26, the second priming plunger pump 27, and the water supply plunger pump 28 may be a hydraulically controlled variable plunger pump or an electrically controlled variable plunger pump, which is not limited in the present embodiment.
[0080] Furthermore, the first driving module 21 can be connected to the first circulation plunger pump 22 , the first filling plunger pump 23 , and the injection plunger pump 24 , respectively, and can be used to drive the first circulation plunger pump 22 , the first filling plunger pump 23 , and the injection plunger pump 24 to operate.
[0081] The first circulation plunger pump 22 and the injection plunger pump 24 can be connected in series, so that when the first driving module 21 drives the first circulation plunger pump 22 and the injection plunger pump 24 to operate, the injection plunger pump 24 can be driven to operate by the tail drive of the first circulation plunger pump 22 .
[0082] Optionally, the first driving module 21 may also be connected to the first circulation plunger pump 22, the first perfusion plunger pump 23, and the water supply plunger pump 28 respectively, and may be used to drive the first circulation plunger pump 22, the first perfusion plunger pump 23, and the water supply plunger pump 28 to operate.
[0083] The first circulation plunger pump 22 and the water supply plunger pump 28 can be connected in series, so that when the first driving module 21 drives the first circulation plunger pump 22 and the water supply plunger pump 28 to operate, the water supply plunger pump 28 can be driven to operate by the tail drive of the first circulation plunger pump 22 .
[0084] Furthermore, the second driving module 25 can be connected to the second circulation plunger pump 26, the second filling plunger pump 27, and the water supply plunger pump 28 respectively, and can be used to drive the second circulation plunger pump 26, the second filling plunger pump 27, and the water supply plunger pump 28 to operate.
[0085] The second filling plunger pump 27 and the water supply plunger pump 28 can be connected in series, so that when the second driving module 25 drives the second filling plunger pump 27 and the water supply plunger pump 28 to operate, the water supply plunger pump 28 can be driven to operate by the tail drive of the second filling plunger pump 27 .
[0086] Optionally, the second driving module 25 may also be connected to the second circulation plunger pump 26 , the second filling plunger pump 27 , and the injection plunger pump 24 , respectively, and may be used to drive the second circulation plunger pump 26 , the second filling plunger pump 27 , and the injection plunger pump 24 to operate.
[0087] The second priming plunger pump 27 and the injection plunger pump 24 can be connected in series, so that when the second driving module 25 drives the second priming plunger pump 27 and the injection plunger pump 24 to operate, the injection plunger pump 24 can be driven to operate by the tail drive of the second priming plunger pump 27 .
[0088] Furthermore, the first circulating plunger pump 22 and the second circulating plunger pump 26 may be connected to the circulating centrifugal pump 103 respectively, and both the first circulating plunger pump 22 and the second circulating plunger pump 26 may be used to drive the circulating centrifugal pump 103 to operate.
[0089] The first perfusion plunger pump 23 and the second perfusion plunger pump 27 can be connected to the perfusion centrifugal pump 104 respectively. Both the first perfusion plunger pump 23 and the second perfusion plunger pump 27 can be used to drive the perfusion centrifugal pump 104 to operate.
[0090] The jet plunger pump 24 can be connected to the jet centrifugal pump 105 , and can be used to drive the jet centrifugal pump 105 to operate.
[0091] The water supply plunger pump 28 can be connected to the water supply centrifugal pump 106 , and can be used to drive the water supply centrifugal pump 106 to operate.
[0092] In the embodiment of the present application, a circulating plunger pump and a perfusion plunger pump are respectively arranged in the first driving device 101 and the second driving device 102, and the circulating plunger pumps (the first circulating plunger pump 22 and the second circulating plunger pump 26) can drive the circulating centrifugal pump 103, and the perfusion plunger pumps (the first perfusion plunger pump 23 and the second perfusion plunger pump 27) can drive the perfusion centrifugal pump 104. The above connection allows the circulating centrifugal pump and the perfusion centrifugal pump to be driven by the first driving device 101 and the second driving device 102, respectively, and each driving device can drive the jet centrifugal pump and the water supply centrifugal pump, respectively, so that no matter which driving device fails, at least three centrifugal pumps in the dual-pump cementing equipment can be ensured to operate simultaneously, and the three centrifugal pumps in operation include the circulating centrifugal pump and the perfusion centrifugal pump, so as to ensure that the dual-pump cementing equipment can perform large-displacement operations, improve operating efficiency, and enhance user experience.
[0093] join Figure 3 , which is a structural schematic diagram of another dual-pump cementing system provided in an embodiment of the present application. Figure 3 The first driving device 101 of the dual-pump cementing system is the main driving device of the dual-pump cementing equipment, and the second driving device 102 is the auxiliary driving device of the dual-pump cementing equipment. Figure 3 As shown, the first driving module 21 of the first driving device 101 may include a main driving engine 31 and a main driving gearbox 32 , and a main driving upper power take-off 321 and a main driving side power take-off 322 are installed on the main driving gearbox 32 .
[0094] The main driving engine 31 may be connected to the main driving gearbox 32 , and may be used to drive the main driving gearbox 32 to operate.
[0095] The above-mentioned main driving side power take-off 321 can be connected to the above-mentioned first circulation plunger pump 22 to drive the above-mentioned first circulation plunger pump 22 to operate. The above-mentioned main driving side power take-off 322 can be connected to the above-mentioned first priming plunger pump 23 to drive the above-mentioned first priming plunger pump 23 to operate.
[0096] It should be noted that the above-mentioned main driving power take-off 321 can also be connected to the first filling plunger pump 23, and the above-mentioned main driving side power take-off 322 can also be connected to the first circulation plunger pump 22. The embodiment of the present application does not limit the plunger pumps connected to the main driving power take-off 321 and the main driving side power take-off 322. Since the purpose is that the main driving gearbox can drive the circulation plunger pump and the filling plunger pump at the same time, therefore, the embodiment of the present application can connect the circulation plunger pump and the filling plunger pump to the main driving power take-off 321 and the main driving side power take-off 322 respectively, or the filling plunger pump and the circulation plunger pump can be used.
[0097] Furthermore, the first circulation plunger pump 22 or the first filling plunger pump 23 may be connected in series with the injection plunger pump 24 or the water supply plunger pump 28 , so that the first circulation plunger pump 22 or the first filling plunger pump 23 may operate simultaneously with the injection plunger pump 24 or the water supply plunger pump 28 .
[0098] The second driving module 25 of the second driving device 102 may include a passenger engine 33 and a passenger gearbox 34 , and a passenger upper power take-off 341 and a passenger side power take-off 342 are mounted on the passenger gearbox 34 .
[0099] The passenger engine 33 may be connected to the passenger gearbox 34 , and may be used to drive the passenger gearbox 34 to operate.
[0100] The passenger side power take-off 341 may be connected to the second circulating plunger pump 26 to drive the second circulating plunger pump 26 to operate. The passenger side power take-off 342 may be connected to the second priming plunger pump 27 to drive the second priming plunger pump 27 to operate.
[0101] It should be noted that the above-mentioned passenger power take-off 341 can also be connected to a second filling plunger pump 27, and the above-mentioned passenger side power take-off 342 can also be connected to a second circulation plunger pump 26. The embodiment of the present application does not limit the plunger pumps connected to the passenger power take-off 341 and the passenger side power take-off 342. Since the purpose is that the passenger gearbox can drive the circulation plunger pump and the filling plunger pump at the same time, the embodiment of the present application can respectively connect the circulation plunger pump and the filling plunger pump to the passenger power take-off 341 and the passenger side power take-off 342, or the filling plunger pump and the circulation plunger pump.
[0102] Furthermore, the second priming plunger pump 27 or the second circulating plunger pump 26 may be connected in series with the water supply plunger pump 28 or the injection plunger pump 24 , so that the second priming plunger pump 27 or the second circulating plunger pump 26 may operate simultaneously with the injection plunger pump 24 or the water supply plunger pump 28 .
[0103] It should be noted that the injection plunger pump 24 and the water supply plunger pump 28 are connected in series with different plunger pumps on the driver's side and the passenger's side, respectively. That is, if the injection plunger pump 24 is connected in series to the circulation plunger pump (the first circulation plunger pump 22 or the second circulation plunger pump 26), the water supply plunger pump 28 is connected in series to the perfusion plunger pump (the first perfusion plunger pump 23 or the second perfusion plunger pump 27); if the water supply plunger pump 28 is connected in series to the circulation plunger pump (the first circulation plunger pump 22 or the second circulation plunger pump 26), the injection plunger pump 24 is connected in series to the perfusion plunger pump (the first circulation plunger pump 23 or the second perfusion plunger pump 27).
[0104] In addition, based on Figure 3As shown in the system structure diagram, both the main driver side and the co-driver side can drive the circulation plunger pump and the priming plunger pump, which is achieved by a piston system that serves as a backup for each other. Therefore, in the embodiment of the present application, the control panel can be designed as follows Figure 4 See the switch plate shown. Figure 4 , is a schematic diagram of a switch board twist provided in an embodiment of the present application. Figure 4 As shown, when the switch plate is switched to the driver's side, the circulating plunger pump or the perfusion plunger pump is driven by the driver's side engine. Conversely, when the switch plate is switched to the passenger side, the circulating plunger pump or the perfusion plunger pump is driven by the passenger side engine, which are then used to drive the circulating centrifugal pump and the perfusion centrifugal pump respectively.
[0105] In the embodiment of the present application, the upper power take-off and the side power take-off included on the driver's side and the co-driver's side of the dual-pump cementing system respectively drive the circulation plunger pump and the injection plunger pump, that is, the upper power take-off and the side power take-off of the gearbox corresponding to the driver's side respectively drive the circulation plunger pump and the injection plunger pump, and the upper power take-off and the side power take-off of the gearbox corresponding to the co-driver's side respectively drive the circulation plunger pump and the injection plunger pump, and each driving device can drive the jet centrifugal pump and the water supply centrifugal pump respectively, so that no matter which driving device fails, at least three centrifugal pumps in the dual-pump cementing equipment can be ensured to operate simultaneously, and the three operating centrifugal pumps include the circulation centrifugal pump and the injection centrifugal pump, thereby ensuring that the dual-pump cementing equipment can perform large-displacement operations, improve operating efficiency, and enhance user experience.
[0106] The dual-pump cementing system provided by the present application can drive the circulating centrifugal pump and the injection centrifugal pump respectively in the two driving devices, so that the two driving devices of the dual-pump cementing system can serve as backup systems for each other when driving the circulating centrifugal pump and the injection centrifugal pump. Specifically, how to switch the two driving devices that serve as backup for each other, the embodiment of the present application provides three switching methods, which are respectively explained through three principle structure diagrams of the dual-pump cementing system as follows:
[0107] See also Figure 5 , is a schematic diagram of the principle structure of a dual-pump cementing system provided in an embodiment of the present application. Figure 5 The dual-pump cementing system shown is described by taking the first circulation plunger pump 22, the first injection plunger pump 23, the injection plunger pump 24, the second circulation plunger pump 26, the second injection plunger pump 27, and the water supply plunger pump 28 as examples, all of which are hydraulically controlled variable plunger pumps. Figure 5 As shown, the dual-pump cementing system may include: a hydraulic oil tank 1, an oil suction filter 2, an oil suction butterfly valve 3, a variable plunger pump (hydraulic control) 4, a plunger motor 5, a variable plunger pump (hydraulic control) 6, a plunger motor 7, a flushing valve 8, a control valve 9, an electromagnetic reversing valve 10, a one-way valve 11, a pressure gauge 12, an oil replenishment pressure gauge 13, a one-way valve 14, a thermostat 15, a one-way valve 16, a radiator 17, and an oil return filter 18.
[0108] It should be noted that the first circulation plunger pump 22 may be Figure 5 The variable displacement piston pump corresponding to the power take-off (front side) on the main driving is shown, and the second circulation piston pump 26 can be Figure 5 The variable displacement piston pump corresponding to the passenger side power take-off shown in the figure, the first filling piston pump 23 can be Figure 5 The variable displacement piston pump corresponding to the main driving side power take-off shown in the figure, the second filling piston pump 27 can be Figure 5 The variable displacement piston pump corresponding to the front side power take-off shown in the figure, the above-mentioned injection piston pump 24 can be Figure 5 The variable displacement plunger pump corresponding to the power take-off (rear side) on the main driving shown in the figure, the water supply plunger pump 28 can be Figure 5 The variable displacement piston pump corresponding to the passenger side power take-off (rear side) is shown.
[0109] Among them, the variable piston pump 4 driven by the power take-off on the driver's side and the variable piston pump 4 driven by the side power take-off on the passenger side are backup for each other and are used to drive the circulation centrifugal pump motor 5, the variable piston pump 4 driven by the side power take-off on the passenger side and the variable piston pump 4 driven by the driver's side are backup for each other and are used to drive the perfusion centrifugal pump motor 5; the variable piston pump 6 driven by the power take-off on the driver's side is used to drive the injection centrifugal pump motor 7, and the variable piston pump 6 driven by the power take-off on the passenger side is used to drive the water supply centrifugal pump motor 7.
[0110] In the embodiment of the present application, the whole hydraulic system draws oil from the hydraulic oil tank 1. After the system is running, the housing oil of the variable piston pump is drained into the radiator 17 for heat dissipation, and the housing oil of the piston motor and the control oil return of the variable piston pump are directly connected back to the oil tank. The specific functions of the above-mentioned mutual backup system parts are introduced as follows:
[0111] 1. For the injection and water supply hydraulic system, a flushing valve 8 is installed, and the hydraulic oil is led out from the M1 port of the variable piston pump 6 to the 1 port (inlet) of the flushing valve 8, and the 2 port (outlet) of the flushing valve 8 is connected to the oil drain port L2 of the variable piston pump 6, so as to realize the flushing of the housing of the variable piston pump, replace part of the hot oil in the closed system, and then flow into the thermostat 15 through the oil drain port L1 of the variable piston pump 6, and then flow into the radiator 17 for heat dissipation, and finally flow back to the hydraulic oil tank 1;
[0112] 2. For the circulation and filling hydraulic system, a flushing valve 8 is installed. The hydraulic oil is led out from the M1 port of the main driving side variable piston pump 4 to the 1 port (inlet) of the flushing valve 8. The 2 port (outlet) of the flushing valve 8 is connected to the oil drain port L2 of the main driving side variable piston pump 4, and then connected from the L1 port of the main driving side variable piston pump 4 to the L1 port of the passenger side variable piston pump 4, and then flows from the L2 port of the passenger side variable piston pump 4 to the thermostat 15, and then flows into the radiator 17 for heat dissipation, and finally flows back to the hydraulic oil tank 1; a one-way valve 11 is installed at the L1 port of the main driving side variable piston pump, and the opening pressure of this one-way valve is 0.15MPa to ensure that the shell pressure of the main driving side variable piston pump 4 does not exceed 0.15MPa to prevent the shell pressure from being too high;
[0113] 3. From the M3 port of the variable piston pump 4 of the main driver's side circulation system and the passenger side filling system, lead a pipeline to the P port of the control valve 9. Add a one-way valve 14 to this pipeline. Behind the two one-way valves 14, a connecting pipeline is designed to connect the pipelines connecting the P ports of the two control valves 9;
[0114] Fourth, the 4 ports of the two control valves 9 are respectively connected to the X2 port of the injection and water supply variable plunger pump 4, so as to realize the control of the variable plunger pump 4, that is, the control of the circulation and water supply hydraulic system; the 2 ports of the two control valves 9 are respectively connected to the P port of the electromagnetic reversing valve 10, and the T port of the control valve 9 is connected to the oil return port of the hydraulic oil tank;
[0115] 5. The electromagnetic reversing valve 10 switches the backup functions of the closed system. For the circulation / infusion system, the B port of the electromagnetic reversing valve 10 is connected to the control port X2 of the variable piston pump 4 on the driver's side, the A port is connected to the control port X2 of the variable piston pump 4 on the passenger's side, and the T port of the electromagnetic reversing valve 10 is connected to the oil return port of the hydraulic oil tank.
[0116] 6. In the circulation system, the A-port pipeline of the variable piston pump 4 driven by the driver's side and the A-port pipeline of the variable piston pump 4 driven by the passenger's side are collected together through a tee or a high-pressure collecting block, and then connected to the A-port of the circulation piston motor 5; the B-port pipeline of the variable piston pump 4 driven by the driver's side and the B-port pipeline of the variable piston pump 4 driven by the passenger's side are collected together through a tee or a high-pressure collecting block, and then connected to the B-port of the circulation piston motor 5; the filling system is connected in the same way.
[0117] 7. An oil replenishment pressure gauge 13 is installed at the M3 port of the variable plunger pump 6 of the injection system and the water supply system to display the oil replenishment pressure of the injection system and the water supply system; an oil replenishment pressure gauge 13 is installed at the M1 port of the variable plunger pump 4 of the circulation system and the injection system to display the oil replenishment pressure of the circulation system and the injection system. For the two variable plunger pumps 4 on the driver's and co-driver's sides of the drive circulation and injection system, only one oil replenishment pressure gauge 13 needs to be installed at the M1 port. A pressure gauge 12 is installed at the M2 port of the variable plunger pumps 4 and 6 of the circulation, injection, injection, and water supply systems to display the high-pressure driving oil pressure of the hydraulic system. Similarly, for the two variable plunger pumps 4 on the driver's and co-driver's sides of the drive circulation and injection system, only one pressure gauge 12 needs to be installed at the M2 port.
[0118] In one embodiment, it can be seen from the above description that the dual-pump cementing system further includes a hydraulic oil tank ( Figure 5 The hydraulic oil tank 1 shown in the figure), the first control valve ( Figure 5 The control valve 9 connected to the power take-off on the main driver), the second control valve ( Figure 5 The control valve 9 connected to the power take-off on the passenger side shown in the figure), the first electromagnetic reversing valve ( Figure 5 The electromagnetic reversing valve 10 connected to the power take-off on the main driver is shown, and the second electromagnetic reversing valve ( Figure 5 The solenoid reversing valve 10 connected to the power take-off on the passenger side is shown.
[0119] Among them, the first circulation plunger pump 22, the second circulation plunger pump 26, the first filling plunger pump 23, the second filling plunger pump 27, the injection plunger pump 24, and the water supply plunger pump 28 are all hydraulically controlled variable plunger pumps.
[0120] Furthermore, the first control valve can be connected to the oil return port of the hydraulic oil tank, the injection plunger pump, and the first electromagnetic reversing valve respectively, and the first electromagnetic reversing valve can be connected to the first circulation plunger pump, the second circulation plunger pump, and the circulation switching plate of the control panel (for example Figure 4 (the loop switch board in the middle).
[0121] Among them, the above-mentioned jet plunger pump can be connected to the oil outlet of the hydraulic oil tank and supply oil to the first control valve, the above-mentioned first control valve supplies oil to the first solenoid reversing valve, and the above-mentioned first solenoid reversing valve can select the plunger pump to supply oil according to the target corresponding to the twist direction of the circulation switching plate to make the target circulation plunger pump run. The above-mentioned target circulation plunger pump is the circulation plunger pump directed by the circulation switching plate, which can be the first circulation plunger pump or the second circulation plunger pump. The embodiment of the present application does not limit this.
[0122] Furthermore, the second control valve can be connected to the oil return port of the hydraulic tank, the water supply plunger pump, and the second electromagnetic reversing valve respectively, and the second electromagnetic reversing valve can be connected to the first filling plunger pump, the second filling plunger pump, and the filling switching plate of the control panel (for example Figure 4 (twist the perfusion switch plate in the middle).
[0123] Among them, the above-mentioned water supply plunger pump can be connected to the oil outlet of the hydraulic oil tank and supply oil to the second control valve, and the second control valve supplies oil to the second solenoid reversing valve. The above-mentioned second solenoid reversing valve can supply oil to the corresponding target perfusion plunger pump according to the twisting direction of the above-mentioned perfusion switching plate to make the target perfusion plunger pump run. The above-mentioned target perfusion plunger pump is the perfusion plunger pump to which the perfusion switching plate is twisted, which can be the first perfusion plunger pump or the second perfusion plunger pump. The executing subject of the embodiment of the present application does not impose any restrictions on this.
[0124] The dual-pump cementing system provided in the embodiment of the present application can switch the control oil input by the control valve 9 through the electromagnetic reversing valve 10. The control oil input by the control valve 9 is switched to the control chamber X2 port of the variable piston pump 4 driven by the main driving side through the switching plate on the operation panel, so that the variable piston pump on the main driving side can be controlled, and the circulating piston motor 5 can be driven by the variable piston pump 4 on the main driving side; conversely, the control oil input by the control valve 9 is switched to the control chamber X2 port of the variable piston pump 4 driven by the co-pilot side, so that the variable piston pump on the co-pilot side can be controlled, and the circulating piston motor 5 can be driven by the variable piston pump 4 on the co-pilot side; in the above manner, the mutual backup of the control of the circulating hydraulic system and the perfusion hydraulic system is achieved.
[0125] See also Figure 6 , which is a schematic diagram of the principle structure of another dual-pump cementing system provided in an embodiment of the present application. Figure 6 The dual-pump cementing system shown is described by taking the first circulation plunger pump 22, the first injection plunger pump 23, the injection plunger pump 24, the second circulation plunger pump 26, the second injection plunger pump 27, and the water supply plunger pump 28 as examples, all of which are hydraulically controlled variable plunger pumps. Figure 6 As shown, the principle structure diagram of the dual-pump cementing system may include: a hydraulic oil tank 1, an oil suction filter 2, an oil suction butterfly valve 3, a variable plunger pump (hydraulic control) 4, a plunger motor 5, a variable plunger pump (hydraulic control) 6, a plunger motor 7, a flushing valve 8, a control valve 9, a one-way valve 11, a pressure gauge 12, an oil replenishment pressure gauge 13, a one-way valve 14, a thermostat 15, a one-way valve 16, a radiator 17, and an oil return filter 18.
[0126] It should be noted that the first circulation plunger pump 22 may be Figure 6 The variable displacement piston pump corresponding to the power take-off (front side) on the main driving is shown, and the second circulation piston pump 26 can be Figure 6The variable displacement piston pump corresponding to the passenger side power take-off shown in the figure, the first filling piston pump 23 can be Figure 6 The variable displacement piston pump corresponding to the main driving side power take-off shown in the figure, the second filling piston pump 27 can be Figure 6 The variable displacement piston pump corresponding to the front side power take-off shown in the figure, the above-mentioned injection piston pump 24 can be Figure 6 The variable displacement plunger pump corresponding to the power take-off (rear side) on the main driving shown in the figure, the water supply plunger pump 28 can be Figure 6 The variable displacement piston pump corresponding to the passenger side power take-off (rear side) is shown.
[0127] In the embodiment of the present application, Figure 6 The principle structure diagram of the dual pump cementing system shown in the figure is similar to Figure 5 The difference between the schematic diagram shown is that: Figure 5 The electromagnetic reversing valve 10 in the control valve 9 is connected to the X2 ports of the two variable plunger pumps 4 which are used as spare parts through the two output ports of each control valve 9. For example, when the port 1 of the control valve 9 above is discharged, the variable plunger pump 4 for the side power take-off on the passenger side is controlled, and when the port 2 of the control valve 9 is discharged, the variable plunger pump 4 for the power take-off on the driver side is controlled. By pushing the handle of the control valve 9 in two directions, the two plunger pumps can be controlled separately. For example, see Figure 7 , is a schematic diagram of a control valve handle provided in an embodiment of the present application, such as Figure 7 The handle can be pushed in both up and down directions. Figure 5 In the scheme shown, according to conventional working habits, only the function of pushing the handle forward is used, and pushing it backward is not used.
[0128] It should be noted that Figure 5 and Figure 6 The two hydraulic control schemes corresponding to the principle structure diagram shown in the figure can use a control valve that is integrated with multiple pieces or a single piece. The control valve can be a single valve, a double valve, a triple valve, a quadruple valve, etc., and the embodiments of the present application do not impose any restrictions on this.
[0129] In the present application embodiment, Figure 6 As shown, the dual-pump cementing system provided in the embodiment of the present application further includes a hydraulic oil tank, a first control valve and a second control valve. Figure 6 The hydraulic oil tank 1 shown in the figure, the first control valve is Figure 6 The control valve 9 connected to the power take-off on the main driver is shown, and the second control valve can be Figure 6 The control valve 9 connected to the power take-off on the passenger side is shown.
[0130] Among them, the first circulation plunger pump, the second circulation plunger pump, the first filling plunger pump, the second filling plunger pump, the injection plunger pump, and the water supply plunger pump are all hydraulically controlled variable plunger pumps.
[0131] Furthermore, the first control valve is respectively connected to the oil return port of the hydraulic oil tank, the injection plunger pump, the first circulation plunger pump, and the second circulation plunger pump, and the first control valve may include a first handle (e.g. Figure 7 control valve handle shown).
[0132] Among them, the above-mentioned jet plunger pump can be connected to the oil outlet of the hydraulic oil tank and supply oil to the first control valve. The first control valve can supply oil to the corresponding target circulating plunger pump according to the direction of the first handle to make the target circulating plunger pump run. The above-mentioned target circulating plunger pump can be the circulating plunger pump pointed to by the first handle of the control valve, which can be the first circulating plunger pump or the second circulating plunger pump. The embodiment of the present application does not limit this.
[0133] Furthermore, the water supply plunger pump can be connected to the oil outlet of the hydraulic oil tank, the water supply plunger pump, the first filling plunger pump, and the second filling plunger pump, and the second control valve can include a second handle (for example, Figure 7 control valve handle shown).
[0134] Among them, the above-mentioned water supply plunger pump can be connected to the oil outlet of the hydraulic oil tank and supply oil to the second control valve. The second control valve can supply oil to the corresponding target perfusion plunger pump according to the direction of the second handle to make the target perfusion plunger pump run. The above-mentioned target perfusion plunger pump is the perfusion plunger pump pointed to by the second handle, which can be the first perfusion plunger pump or the second perfusion plunger pump. The embodiment of the present application does not limit this.
[0135] The dual-pump cementing system provided in the embodiment of the present application can realize the mutual backup switching of the main and auxiliary centrifugal pumps by pushing the handle of the control valve 9 in two directions.
[0136] See also Figure 8 , which is a schematic diagram of the principle structure of another dual-pump cementing system provided in an embodiment of the present application. Figure 8 The dual-pump cementing system shown is described by taking the first circulation plunger pump 22, the first injection plunger pump 23, the injection plunger pump 24, the second circulation plunger pump 26, the second injection plunger pump 27, and the water supply plunger pump 28 as an example, all of which are electrically controlled variable plunger pumps. Figure 8 As shown, the principle structure diagram of the dual-pump cementing system may include: a hydraulic oil tank 1, an oil suction filter 2, an oil suction butterfly valve 3, a variable plunger pump (electronically controlled) 4, a plunger motor 5, a variable plunger pump (electronically controlled) 6, a plunger motor 7, a flushing valve 8, a one-way valve 11, a pressure gauge 12, an oil replenishment pressure gauge 13, a thermostat 15, a one-way valve 16, a radiator 17, and an oil return filter 18.
[0137] It should be noted that the first circulation plunger pump 22 may be Figure 8The variable displacement piston pump corresponding to the power take-off (front side) on the main driving is shown, and the second circulation piston pump 26 can be Figure 8 The variable displacement piston pump corresponding to the passenger side power take-off shown in the figure, the first filling piston pump 23 can be Figure 8 The variable displacement piston pump corresponding to the main driving side power take-off shown in the figure, the second filling piston pump 27 can be Figure 8 The variable displacement piston pump corresponding to the front side power take-off shown in the figure, the above-mentioned injection piston pump 24 can be Figure 8 The variable displacement plunger pump corresponding to the power take-off (rear side) on the main driving shown in the figure, the water supply plunger pump 28 can be Figure 8 The variable displacement piston pump corresponding to the passenger side power take-off (rear side) is shown.
[0138] In the present application embodiment, Figure 8 As shown in the schematic diagram of the principle structure of the dual-pump cementing system, the dual-pump cementing system may also include a hydraulic oil tank, wherein the first circulation plunger pump, the second circulation plunger pump, the first filling plunger pump, the second filling plunger pump, the injection plunger pump, and the water supply plunger pump may all be electrically controlled variable plunger pumps, and are respectively connected to the oil outlet and the oil return port of the hydraulic oil tank to obtain the driving oil from the hydraulic oil tank to drive the operation. The electrically controlled variable plunger pump may be operated by receiving a control signal.
[0139] Based on this, the executing entity of the embodiment of the present application can send a control signal to the corresponding electrically controlled variable piston pump corresponding to the main driver's seat or the electrically controlled variable piston pump corresponding to the co-driver's seat through the control interface, thereby controlling the operation of the corresponding electrically controlled variable piston pump.
[0140] In the embodiment of the present application, Figure 8 The dual pump cementing system shown is Figure 5 and Figure 6 Compared with the hydraulic variable piston pump solution shown in the figure, the hydraulic variable piston pump is replaced by an electric variable piston pump, and the original control valve 9 and the electromagnetic reversing valve 10 are cancelled. This technical solution can realize the switching of the backup functions by changing the control signals such as the control current or voltage of the electric variable piston pump. For example, when a control signal is given to the variable piston pump 4 driven by the power take-off on the main driver's side, there is no control signal for the variable piston pump 4 driven by the power take-off on the passenger side. At this time, the circulating motor 5 is driven by the variable piston pump 4 driven by the power take-off on the main driver's side, and vice versa.
[0141] At this point, the description of the three principle structure diagrams of the dual-pump cementing system is completed.
[0142] In one embodiment, it can be seen from the description of the above three principle structure diagrams that the above dual-pump cementing system further includes a first flushing valve, a second flushing valve, a first one-way valve, and a second one-way valve.
[0143] Among them, the first flushing valve can be connected to the first circulating plunger pump, the second selected plunger pump, and the first one-way valve respectively. The above-mentioned first flushing valve can be used to flush the first circulating plunger pump and the second selected plunger pump at the same time. The first one-way valve can be used to control the first maximum pressure value of the first circulating plunger pump and the second circulating plunger pump being flushed.
[0144] The above-mentioned second flushing valve can be connected to the first perfusion plunger pump, the second perfusion plunger pump, and the second one-way valve respectively. The above-mentioned second flushing valve can be used to flush the first perfusion plunger pump and the second perfusion plunger pump at the same time. The second one-way valve can be used to control the second maximum pressure value for flushing the first perfusion plunger pump and the second perfusion plunger pump.
[0145] In one embodiment, it can be seen from the description of the above three principle structure diagrams that the circulating centrifugal pump, the first circulating plunger pump, the second circulating plunger pump, the injection centrifugal pump, the first injection plunger pump, and the second injection plunger pump of the above dual-pump cementing system all include a first oil circuit and a second oil circuit.
[0146] After the first oil circuits of the first circulating plunger pump and the second circulating plunger pump are connected, the first oil circuit of the circulating centrifugal pump can be further connected.
[0147] After the second oil paths of the first circulating plunger pump and the second circulating plunger pump are connected, the second oil path of the circulating centrifugal pump is connected.
[0148] After the first oil circuits of the first priming plunger pump and the second priming plunger pump are connected, the first oil circuit of the priming centrifugal pump can be further connected.
[0149] After the second oil circuits of the first priming plunger pump and the second priming plunger pump are connected, the second oil circuit of the priming centrifugal pump can be further connected.
[0150] In the embodiment of the present application, through the above design, it can be achieved that the variable piston pumps on the main and co-pilot sides can supply oil to the control valve. When any engine or two engines are started at the same time during operation, oil can be supplied to the control valve, thereby controlling the circulation piston pump, the priming piston pump, and the injection or water supply piston pump. At the same time, the one-way valve can prevent the control oil from being depressurized through the injection or water supply piston pump on the side of the engine that is not started when one engine is started and the other engine is not started, thereby ensuring that the oil pressure of the control oil is normal.
[0151] In this application, the dual pump cementing system can be controlled by the following steps:
[0152] (1) Adjust the pressure of the variable piston pump oil supply relief valve. At an engine speed of 1500 rpm, first adjust the flushing valve pressure to the maximum (tighten the pressure adjustment screw to the bottom), then adjust the oil supply relief valve pressure to 380-400 psi, and confirm the pressure value by reading the oil supply pressure gauge;
[0153] (2) After adjusting the oil replenishment pressure, adjust the pressure of the hydraulic system flushing valve. At an engine speed of 1500 rpm, slowly loosen the flushing valve pressure regulating screw that has been adjusted to the maximum pressure in step (1) to gradually reduce the pressure until the oil replenishment pressure gauge reads between 330 and 350 psi, completing the flushing valve pressure adjustment.
[0154] (3) Start the main driving side engine, switch the circulation pump switch on the control panel to the main driving side, and push the circulation pump control valve handle. At this time, the control oil circuit is input to the circulation variable plunger pump control chamber on the main driving side through the electromagnetic reversing valve to control the circulation centrifugal pump to run, stop, and adjust the speed. In this case, the circulation centrifugal pump is driven by the main driving side engine;
[0155] (4) Start the main driving side engine, switch the priming pump switch plate on the control panel to the main driving side, and push the priming pump control valve handle. At this time, the control oil circuit is input to the priming variable plunger pump control chamber on the main driving side through the electromagnetic reversing valve to control the priming centrifugal pump to run, stop, and adjust the speed. In this case, the priming centrifugal pump is driven by the main driving side engine;
[0156] (5) Start the passenger side engine, switch the circulation pump switch plate on the control panel to the passenger side, and push the circulation pump control valve handle. At this time, the control oil circuit is input to the circulation variable plunger pump control chamber on the passenger side through the electromagnetic reversing valve to control the circulation centrifugal pump to run, stop, and adjust the speed. In this case, the circulation centrifugal pump is driven by the passenger side engine;
[0157] (6) Start the passenger side engine, switch the priming pump switch plate on the control panel to the passenger side, and push the priming pump control valve handle. At this time, the control oil circuit is input to the priming variable piston pump control chamber on the passenger side through the electromagnetic reversing valve to control the priming centrifugal pump to run, stop, and adjust the speed. In this case, the priming centrifugal pump is driven by the passenger side engine;
[0158] (7) Both the main driver's side engine and the co-pilot's side engine are started, and the circulating centrifugal pump and the filling centrifugal pump can be selected according to the work requirements. Switch the switch knob on the control panel to the main driver's side, and the main driver's side engine will drive the vehicle. Switch the switch knob on the control panel to the co-pilot's side, and the co-pilot's side engine will drive the vehicle. The circulating centrifugal pump and the filling centrifugal pump can be driven by the main driver's side or co-pilot's side engine at the same time, or one centrifugal pump can be driven by the main driver's side engine and the other by the co-pilot's side engine.
[0159] In this application, through the description of the above three principle structure diagrams of the dual-pump cementing system, it can be seen that the dual-pump cementing system in this application has the following beneficial effects:
[0160] 1. Mutual backup function is realized. Figure 5 The technical scheme shown can switch the control oil input by the control valve 9 through the electromagnetic reversing valve 10. The control oil input by the control valve 9 is switched to the control chamber X2 port of the variable piston pump 4 driven by the main driver's side through the switching plate on the operation panel, so that the variable piston pump on the main driver's side can be controlled, and the circulating piston motor 5 can be driven by the variable piston pump 4 on the main driver's side; conversely, the control oil input by the control valve 9 is switched to the control chamber X2 port of the variable piston pump 4 driven by the co-pilot side, so that the variable piston pump on the co-pilot side can be controlled, and the circulating piston motor 5 can be driven by the variable piston pump 4 on the co-pilot side; in the above manner, the mutual backup of the control of the circulating hydraulic system and the perfusion hydraulic system is achieved.
[0161] Figure 6 The technical solution shown realizes the mutual backup switching of the main and auxiliary centrifugal pumps by pushing the handle of the control valve 9 in two directions.
[0162] Figure 8 The technical solution shown realizes the mutual backup switching of the main and auxiliary centrifugal pumps by giving different control signals to the electrically controlled variable piston pumps.
[0163] 2. Flushing circuit design. A flushing valve 8 is designed, and the L1 port of the driver's side variable piston pump 4 and the L2 port of the passenger's side variable piston pump 4 are connected in series, so that only one flushing valve can be used to flush the variable piston pumps 4 on both sides in the mutual backup system; at the same time, by adding a pressurized one-way valve in the series circuit, the maximum pressure of the flushing circuit is limited, so that the shell pressure of the variable piston pump will not be over-pressured.
[0164] 3. Control oil circuit design. Figure 5 and Figure 6In the technical solution shown, the control oil is drawn from the M3 port of the variable plunger pump 6 driven by the main and co-pilot sides, and connected to the P port of the control valve 9 respectively, and the P port is connected through a connecting pipeline, so that the variable plunger pump 6 on the main and co-pilot sides can supply oil to the control valve 9. When any engine or two engines are started at the same time during operation, the control valve 9 can be supplied with oil, thereby controlling the variable plunger pumps 4 and 6. At the same time, the one-way valve 14 prevents the control oil from being depressurized through the variable plunger pump 6 on the side of the engine that is not started when one engine is started and the other engine is not started, so as to ensure that the oil pressure of the control oil is normal.
[0165] 4. Design of main oil port of closed system. The oil circuits of port A and port A, port B and port B of variable piston pump 4 driven by the main and driving sides are gathered together, and then the oil circuit of port A is connected to port A of piston motor 5, and the oil circuit of port B is connected to the oil circuit of port B of piston motor, so that the main oil circuits serve as backup for each other;
[0166] 5. Design of oil filling pressure measurement. For the circulation and injection hydraulic systems that are backup for each other, the oil filling pressure gauge needs to be connected to the low-pressure side pressure measuring port (M1 port) of the closed system. No matter which side of the variable piston pump 4 is used to drive the piston motor 5, the value of the oil filling pressure can be displayed.
[0167] See also Fig. 9 , is a schematic structural diagram of a dual-pump cementing equipment provided in an embodiment of the present application, the dual-pump cementing equipment 90 may include a dual-pump cementing system 91;
[0168] The above-mentioned dual pump cementing system 91 can be Figure 1 to Figure 3 , Figure 5 , Figure 6 ,as well as Figure 8 Any of the dual pump cementing systems shown.
[0169] The device embodiments described above are merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0170] Through the description of the above implementation methods, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a general hardware platform, and of course, by hardware. Based on this understanding, the above technical solution is essentially or the part that contributes to the relevant technology can be embodied in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, a disk, an optical disk, etc., including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each embodiment or some parts of the embodiments.
[0171] It should be understood that the terms used in the text are only for the purpose of describing specific example embodiments, and are not intended to be limiting. Unless the context clearly indicates otherwise, the singular forms "one", "an" and "said" as used in the text may also be meant to include plural forms. The terms "include", "comprise", "contain", and "have" are inclusive, and therefore specify the existence of stated features, steps, operations, elements and / or parts, but do not exclude the existence or addition of one or more other features, steps, operations, elements, parts, and / or combinations thereof. The method steps, processes, and operations described herein are not interpreted as necessarily requiring them to be performed in the specific order described or illustrated, unless the execution order is clearly indicated. It should also be understood that additional or alternative steps may be used.
[0172] The above description is only a specific embodiment of the present invention, so that those skilled in the art can understand or implement the present invention. Various modifications to these embodiments will be obvious to those skilled in the art, and the general principles defined herein can be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but should conform to the widest scope consistent with the principles and novel features applied herein.
Claims
1. A dual-pump cementing system, characterized in that: include: A first drive device, a second drive device, a circulation centrifugal pump, a priming centrifugal pump, a jet centrifugal pump, and a water supply centrifugal pump; The first driving device is connected to the circulating centrifugal pump, the perfusion centrifugal pump, and the jet centrifugal pump respectively, and the first driving device is used to drive the circulating centrifugal pump, the perfusion centrifugal pump, and the jet centrifugal pump to operate; The second driving device is connected to the circulation centrifugal pump, the perfusion centrifugal pump, and the water supply centrifugal pump respectively, and is used to drive the circulation centrifugal pump, the perfusion centrifugal pump, and the water supply centrifugal pump to operate.
2. The dual-pump cementing system according to claim 1, characterized in that: The first driving device includes a first driving module, a first circulating plunger pump, a first priming plunger pump, and an injection plunger pump; the second driving device includes a second driving module, a second circulating plunger pump, a second priming plunger pump, and a water supply plunger pump; The first driving module is connected to the first circulation plunger pump, the first perfusion plunger pump, and the injection plunger pump respectively, and the first driving module is used to drive the first circulation plunger pump, the first perfusion plunger pump, and the injection plunger pump to operate; The second driving module is respectively connected to the second circulation plunger pump, the second perfusion plunger pump, and the water supply plunger pump, and the second driving module is used to drive the second circulation plunger pump, the second perfusion plunger pump, and the water supply plunger pump to operate; The first circulating plunger pump and the second circulating plunger pump are respectively connected to the circulating centrifugal pump, and the first circulating plunger pump and the second circulating plunger pump are both used to drive the circulating centrifugal pump to operate; The first perfusion plunger pump and the second perfusion plunger pump are respectively connected to the perfusion centrifugal pump, and the first perfusion plunger pump and the second perfusion plunger pump are both used to drive the perfusion centrifugal pump to operate; The jet plunger pump is connected to the jet centrifugal pump, and the jet plunger pump is used to drive the jet centrifugal pump to operate; The water supply plunger pump is connected to the water supply centrifugal pump, and the water supply plunger pump is used to drive the water supply centrifugal pump to operate.
3. The dual-pump cementing system according to claim 2, characterized in that: The first circulation plunger pump and the injection plunger pump are connected in series, and the first circulation plunger pump drives the injection plunger pump to operate through the tail drive; The second priming plunger pump and the water supply plunger pump are connected in series, and the second priming plunger pump drives the water supply plunger pump to operate via a tail drive.
4. The dual-pump cementing system according to claim 3, characterized in that: The first driving module includes a main driving engine and a main driving gearbox, and the main driving gearbox is equipped with a main driving upper power take-off and a main driving side power take-off; The main driving engine is connected to the main driving gearbox; The main driving power take-off is connected to the first circulating plunger pump; The main driving side power take-off is connected to the first filling plunger pump.
5. The dual-pump cementing system according to claim 4, characterized in that: The second drive module includes a passenger engine and a passenger gearbox, and the passenger gearbox is equipped with a passenger upper power take-off and a passenger side power take-off; The passenger engine is connected to the passenger gearbox; The co-pilot upper power take-off is connected to the second priming plunger pump; The passenger side power take-off is connected to the second circulating piston pump.
6. The dual-pump cementing system according to claim 5, characterized in that: Also includes: A hydraulic oil tank, a first control valve, a second control valve, a first electromagnetic reversing valve, and a second electromagnetic reversing valve; The first circulation plunger pump, the second circulation plunger pump, the first filling plunger pump, the second filling plunger pump, the injection plunger pump, and the water supply plunger pump are all hydraulically controlled variable plunger pumps; The first control valve is respectively connected to the oil return port of the hydraulic oil tank, the injection plunger pump, and the first electromagnetic reversing valve, and the first electromagnetic reversing valve is respectively connected to the first circulation plunger pump, the second circulation plunger pump, and the circulation switching plate of the control panel; The injection plunger pump is connected to the oil outlet of the hydraulic oil tank and supplies oil to the first control valve, the first control valve supplies oil to the first electromagnetic reversing valve, and the first electromagnetic reversing valve supplies oil to the corresponding target circulation plunger pump according to the rotation of the circulation switching plate, so that the target circulation plunger pump can operate, and the target circulation plunger pump is the first circulation plunger pump or the second circulation plunger pump; The second control valve is respectively connected to the oil return port of the hydraulic oil tank, the water supply plunger pump, and the second electromagnetic reversing valve, and the second electromagnetic reversing valve is respectively connected to the first priming plunger pump, the second priming plunger pump, and the priming switching plate of the control panel; Among them, the water supply plunger pump is connected to the oil outlet of the hydraulic oil tank and supplies oil to the second control valve, the second control valve supplies oil to the second solenoid reversing valve, and the second solenoid reversing valve supplies oil to the corresponding target perfusion plunger pump according to the twisting direction of the perfusion switching plate to make the target perfusion plunger pump run, and the target perfusion plunger pump is the first perfusion plunger pump or the second perfusion plunger pump.
7. The dual-pump cementing system according to claim 5, characterized in that: Also includes: A hydraulic oil tank, a first control valve and a second control valve; The first circulation plunger pump, the second circulation plunger pump, the first filling plunger pump, the second filling plunger pump, the injection plunger pump, and the water supply plunger pump are all hydraulically controlled variable plunger pumps; The first control valve is respectively connected to the oil return port of the hydraulic oil tank, the injection plunger pump, the first circulation plunger pump, and the second circulation plunger pump, and the first control valve includes a first handle that moves in two directions; The injection plunger pump is connected to the oil outlet of the hydraulic oil tank and supplies oil to the first control valve. The first control valve supplies oil to the corresponding target circulation plunger pump according to the direction of the first handle to make the target circulation plunger pump run. The target circulation plunger pump is the first circulation plunger pump or the second circulation plunger pump. The second control valve is respectively connected to the oil return port of the hydraulic oil tank, the water supply plunger pump, the first priming plunger pump, and the second priming plunger pump, and the second control valve includes a second handle that moves in two directions; Among them, the water supply plunger pump is connected to the oil outlet of the hydraulic oil tank and supplies oil to the second control valve. The second control valve supplies oil to the corresponding target perfusion plunger pump according to the direction of the second handle to make the target perfusion plunger pump run. The target perfusion plunger pump is the first perfusion plunger pump or the second perfusion plunger pump.
8. The dual-pump cementing system according to claim 5, characterized in that: Also includes: Hydraulic oil tank; The first circulation plunger pump, the second circulation plunger pump, the first filling plunger pump, the second filling plunger pump, the injection plunger pump, and the water supply plunger pump are all electrically controlled variable plunger pumps, and are respectively connected to the oil outlet and oil return port of the hydraulic oil tank, wherein the electrically controlled variable plunger pump operates by receiving a control signal.
9. The dual-pump cementing system according to any one of claims 6 to 8, characterized in that: Also includes: a first flush valve, a second flush valve, a first check valve, and a second check valve; The first flushing valve is respectively connected to the first circulating plunger pump, the second circulating plunger pump, and the first one-way valve, the first flushing valve is used to flush the first circulating plunger pump and the second circulating plunger pump at the same time, and the first one-way valve is used to control a first maximum pressure value for flushing the first circulating plunger pump and the second circulating plunger pump; The second flushing valve is respectively connected to the first perfusion plunger pump, the second perfusion plunger pump, and the second one-way valve. The second flushing valve is used to flush the first perfusion plunger pump and the second perfusion plunger pump at the same time. The second one-way valve is used to control the second maximum pressure value for flushing the first perfusion plunger pump and the second perfusion plunger pump.
10. The dual-pump cementing system according to any one of claims 6 to 8, characterized in that: The circulating centrifugal pump, the first circulating plunger pump, the second circulating plunger pump, the priming centrifugal pump, the first priming plunger pump, and the second priming plunger pump all include a first oil circuit and a second oil circuit; After the first oil circuits of the first circulating plunger pump and the second circulating plunger pump are connected, the first oil circuit of the circulating centrifugal pump is then connected; After the second oil circuits of the first circulating plunger pump and the second circulating plunger pump are connected, the second oil circuit of the circulating centrifugal pump is connected; After the first oil circuits of the first priming plunger pump and the second priming plunger pump are connected, the first oil circuit of the priming centrifugal pump is then connected; After the second oil circuits of the first priming plunger pump and the second priming plunger pump are connected, the second oil circuit of the priming centrifugal pump is connected.
11. A dual-pump cementing equipment, characterized in that: A dual-pump cementing system comprising any one of claims 1-10.