Turnover type steel beam hoisting automatic correction device
By using automatic positioning and adjustment technology of strong magnetic buried plates and electrode leads during the steel beam lifting process, the problem of long mechanical occupation time is solved, the installation rate is improved and the cost is reduced, and more efficient steel beam installation is achieved.
Patent Information
- Application Number
- CN202420043456.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-08
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-01-08
AI Technical Summary
The mechanical occupation time during the lifting of existing steel beams affects the installation rate, and it is necessary to increase the installation rate and reduce construction costs.
The automatic correction device for lifting of turnable steel beams is adopted to automatically position and adjust the steel beams by using magnetic force and motor controllers to reduce equipment disengagement and cost by combining elastic blocks and grouting materials. .
It improves the installation rate of steel beams, reduces manual operation time, reduces construction costs, and improves installation efficiency and stability of equipment connection.
Smart Images

Figure CN222101540U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of steel structures, and in particular to a rotatable steel beam hoisting automatic correction device. Background Art
[0002] Lightweight steel roofs are lightweight and high-strength, have a short construction period, are easy to rebuild and dismantle, and have less construction pollution. They meet the requirements of building industrialization and sustainable development. Therefore, they are favored by construction units in some building construction fields, especially industrial factory roofs, and their structural designs are widely used.
[0003] When the existing roof steel beam is connected to the lower frame column, an installation worker is usually deployed at each end, the tower crane hoists the steel beam, and the traction rope pulls the steel beam and the lower installation column into place. When the steel beam is hoisted to the corresponding span, it is manually adjusted, and the workers at both ends manually assist the steel beam to fall into the embedded parts. This construction method has the problem of long machine occupancy time, which affects the overall installation speed, and therefore needs further improvement. Utility Model Content
[0004] In order to increase the installation rate of steel beams, the present application provides a rotatable steel beam lifting automatic correction device.
[0005] The present application provides a rotatable steel beam lifting automatic correction device, which adopts the following technical solution:
[0006] A rotatable steel beam lifting automatic correction device is arranged on an installation column. The rotatable steel beam lifting automatic correction device includes a strong magnetic embedded plate pre-buried in the installation column. The installation columns located on both sides of the steel beam are provided with strong magnetic embedded plates. The strong magnetic embedded plates are detachably connected to the installation columns. The installation columns are provided with fixings fixedly connected to the steel beam.
[0007] By adopting the above technical solution, after the installation column is installed on the floor slab, the tower crane is used to hoist the steel beam. When the two ends of the steel beam approach the installation columns on both sides, the magnetic force of the strong magnetic embedded plate is used to attract the steel beam hoisted above the installation column to position the two ends of the steel beam on the two installation columns. This can reduce the need for workers to rotate the two ends of the steel beam on the installation columns on both sides to position them with the installation columns on both sides, thereby increasing the installation speed of the steel beam. The strong magnetic embedded plate is detachably connected to the installation column and can be removed after the steel beam and the corresponding installation column are installed for next use, thereby reducing construction costs.
[0008] Preferably, it also includes an electrode lead pre-buried in the mounting column and a controller externally mounted outside the mounting column and electrically connected to the motor lead.
[0009] By adopting the above technical solution, when the steel beam moves toward the horizontal position close to the installation column, the steel beam may move horizontally in the same direction, or the steel beam may be arranged to intersect with the two installation columns, and the deviation between the steel beam and the installation column increases. At this time, the two ends of the steel beam need to move toward the direction of the installation column, so the movement directions of the two ends of the steel beam are different. At this time, the controller is used to adjust the magnetic pole direction of the electrode lead so that the two ends of the steel beam intersecting with the two installation columns move in different directions, so that the steel beam rotates to be arranged horizontally between the two installation columns. The controller is used to adjust the magnetic pole direction of the electrode lead to speed up the adjustment of the steel beam to speed up the installation efficiency of the steel beam. The controller can also be used to adjust the magnetic force of the electrode lead to increase the magnetic force of the strong magnetic buried plate to increase the attraction of the upper steel beam to speed up the adjustment of the steel beam.
[0010] Preferably, the electrode lead is detachably connected to the mounting post.
[0011] By adopting the above technical solution, the motor lead can be detachably connected to the mounting column, and the electrode lead can be repeatedly used in the next mounting column, so as to further reduce the cost caused by the electrode lead.
[0012] Preferably, a mounting groove for mounting the electrode lead is formed through the side wall of the mounting column, and both ends of the electrode lead are sleeved with elastic blocks, and the elastic blocks are slidably embedded in the mounting groove.
[0013] By adopting the above technical solution, since the electrode lead is relatively thin, it may fall off during the process of installing the steel beam on the mounting column. At this time, an elastic block is provided, and the elastic block is embedded in the mounting groove, which can reduce the possibility of the electrode lead falling off due to external force, so as to improve the connection strength between the electrode lead and the mounting column. Due to the elasticity of the elastic block itself, it is also easy to disassemble it from the mounting column, so as to disassemble the electrode lead from the mounting column, and the cost of the elastic block itself is also disclosed, which can reduce construction costs.
[0014] Preferably, a slot is provided on the side wall of the mounting column for the strong magnetic embedded plate to be slidably inserted, and an elastic pad is fixedly connected to the edge of the strong magnetic embedded plate, and the elastic pad is embedded in the notch of the slot.
[0015] By adopting the above technical solution, when installing a light steel roof, if the light steel roof is installed at a construction site, there is a possibility that the strong magnetic embedded plate may slip and detach from the slot. At this time, an elastic pad is provided and the elastic pad is used to embed it in the slot through its own elastic force, so as to reduce the possibility of the strong magnetic embedded plate being affected by external forces and detaching from the slot, and can reduce construction costs.
[0016] Preferably, the installation column is located in the installation groove and the slot and grouting material is injected into it.
[0017] By adopting the above technical solution, after the strong magnetic plug plate and the electrode lead are disassembled from the installation column, grouting material is injected into the installation groove and the slot to fill the groove opened by the installation column, so as to reduce the impact on the subsequent installation column's own strength.
[0018] Preferably, the fixing member includes a fixing bolt fixedly connected to the mounting column and a fixing nut threadedly connected to the fixing bolt, and fixing grooves for the fixing bolt to pass through are respectively formed at both ends of the steel beam.
[0019] By adopting the above technical solution, the steel beam and the installation column are fixed by sliding the fixing bolt through the fixing groove and then threading the fixing nut.
[0020] Preferably, a guide groove is provided at the lower end of the fixing groove, and the diameter of the guide groove gradually decreases in a direction away from the mounting column.
[0021] By adopting the above technical solution, a guide groove is provided at the lower end of the fixing groove, and the diameter of the guide groove is gradually reduced in the direction away from the installation column, so that the fixing bolt can be slidably inserted into the fixing groove, thereby accelerating the installation speed between the installation column and the steel beam.
[0022] In summary, the utility model has the following beneficial effects:
[0023] The strong magnetic embedded plate uses its own magnetic force to attract the steel beam hoisted above the installation column, so that the two ends of the steel beam are positioned on the two installation columns, which can reduce the need for workers to rotate the two ends of the steel beam on the installation columns on both sides; and in conjunction with the electrode lead and controller, the pre-embedded motor controller adjusts the electrode size and the direction of the magnetic pole, which can flexibly adapt to the inconvenience caused by slight deviation of the steel beam, making the installation of the steel beam more convenient, speeding up the adjustment of the steel beam, and thus increasing the installation rate of the steel beam. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 is a schematic diagram of the structure of Example 1 of the present application;
[0025] Figure 2 It is a schematic diagram of the structure of the strong magnetic buried plate and the electrode lead in Example 1 of the present application;
[0026] Figure 3 This is a schematic diagram of the structure of the horizontal arrangement of the steel beam and the two mounting columns in Example 1 of the present application;
[0027] Figure 4 This is a schematic structural diagram of a state in which a steel beam and two mounting columns are arranged to intersect in Example 1 of the present application;
[0028] Figure 5is a schematic diagram of the structure of the elastic pad and the elastic block in Example 2 of the present application;
[0029] Figure 6 It is a schematic diagram of the structure of the guide groove in Example 2 of the present application.
[0030] Explanation of the accompanying drawings: 1. Mounting column; 11. Slot; 12. Mounting groove; 2. Floor; 3. Strong magnetic buried plate; 311. Elastic pad; 4. Electrode lead; 41. Elastic block; 5. Controller; 6. Steel beam; 61. Fixing groove; 62. Guide groove; 7. Fixing piece; 71. Fixing bolt; 72. Fixing nut. DETAILED DESCRIPTION
[0031] The following is combined with Figure 1-6 , further details of this application are given.
[0032] The embodiment of the present application discloses a rotatable steel beam hoisting automatic correction device.
[0033] Embodiment 1:
[0034] A revolving steel beam lifting automatic correction device, referring to Figure 1 , arranged on the mounting column 1. In this embodiment, the mounting column 1 can be a steel column or a concrete column. The mounting column 1 is specifically a steel column and is all arranged on the floor 2. The mounting columns 1 are symmetrically arranged on both sides of the floor 2, and several mounting columns 1 are arranged at intervals along the length direction of the floor 2.
[0035] Reference Figure 1 , Figure 2 The revolvable steel beam 6 hoisting automatic correction device includes a strong magnetic embedded plate 3 pre-buried in the installation column 1, an electrode lead 4 pre-buried in the installation column 1, and a controller 5 electrically connected to the electrode lead 4. In this embodiment, the strong magnetic embedded plate 3 and the electrode lead 4 can be detachably connected to the installation column 1. Specifically, for the strong magnetic embedded plate 3, the side wall of the installation column 1 is provided with a slot 11 for the strong magnetic embedded plate 3 to be slidably inserted, the slot 11 is arranged horizontally with the floor 2, and the slot 11 is arranged close to the upper end surface of the installation column 1, and one end of the strong magnetic embedded plate 3 is exposed in the slot 11. For the electrode lead 4, the side wall of the installation column 1 is penetrated with an installation slot 12 for the electrode lead 4 to be slidably inserted, and the installation slot 12 is specifically arranged 50-100 mm below the slot 11, and the controller 5 is placed outside the installation column 1.
[0036] Reference Figure 2 , Figure 3As for the mounting column 1 and the steel beam 6, a fixing member 7 fixedly connected to the steel beam 6 is provided on the mounting column 1. Specifically, the fixing member 7 includes a fixing bolt 71 fixedly connected to the mounting column 1 and a fixing nut 72 threadedly connected to the fixing bolt 71. Both ends of the steel beam 6 are respectively penetrated with fixing grooves 61 for the fixing bolt 71 to pass through. It should be noted that four fixing bolts 71 are provided on one mounting column 1, and the four fixing bolts 71 are spaced apart along the width direction and the length direction of the upper surface of the mounting column 1. Correspondingly, four fixing grooves 61 are penetrated at one end of the steel beam 6 to allow the four fixing bolts 71 to slide through.
[0037] When the fixing bolt 71 on the mounting column 1 is slidably inserted into the fixing groove 61, the strong magnetic embedded plate 3 and the electrode lead 4 are respectively slid out of the corresponding slot 11 and the mounting groove 12, and then the grouting material is injected into the mounting groove 12 and the slot 11 to reduce the influence of the gap left after the steel beam 6 and the mounting column 1 are installed, which affects the subsequent strength of the mounting column 1 itself.
[0038] The implementation principle of the rotatable steel beam lifting automatic correction device of the embodiment of the present application is: the steel beam 6 is lifted to the top of the installation column 1 by a tower crane, and the two ends of the steel beam 6 are attracted by the magnetic force of the strong magnetic embedded plate 3 itself. If the strong magnetic embedded plate 3 is arranged to intersect with the two installation columns 1 located in the same horizontal direction, such as Figure 4 As shown, at this time, the controller 5 adjusts the magnetic pole direction of the electrode lead 4 to speed up the adjustment of the steel beam 6, so as to speed up the installation efficiency of the steel beam 6. The controller 5 can also adjust the magnetic force of the electrode lead 4 to increase the magnetic force of the strong magnetic buried plate 3, so as to increase the attraction of the upper steel beam 6, so as to speed up the adjustment of the steel beam 6.
[0039] Embodiment 2:
[0040] Reference Figure 5 , which is different from Example 1, further, in order to reduce the possibility of the strong magnetic buried plate 3 sliding out of the slot 11 due to external vibration, the strong magnetic buried plate 3 is provided with an elastic pad 311, which is specifically arranged at the edge of the strong magnetic buried plate 3, and the elastic pad 311 is embedded in the notch of the slot 11 and exposed outside the slot 11, so that the hand can apply force to the elastic pad 311 exposed outside the slot 11 to insert the strong magnetic buried plate 3 into the slot 11 and detach it from the slot 11. Similarly, in order to reduce the possibility of the electrode lead 4 sliding out of the installation slot 12, both ends of the electrode lead 4 are sleeved with elastic blocks 41, and the elastic blocks 41 are slidably embedded in the installation slot 12.
[0041] Reference Figure 6A guide groove 62 is provided at the lower end of the fixing groove 61 , and the diameter of the guide groove 62 gradually decreases in the direction away from the mounting column 1 to increase the range in which the upper end of the fixing bolt 71 can be inserted, so as to improve the positioning effect and accuracy of the fixing bolt 71 .
[0042] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A rotatable steel beam lifting automatic correction device, arranged on a mounting column (1), characterized in that: The invention comprises a strong magnetic embedded plate (3) pre-embedded in a mounting column (1), the mounting columns (1) located on both sides of a steel beam (6) are each provided with a strong magnetic embedded plate (3), the strong magnetic embedded plate (3) being detachably connected to the mounting column (1), and a fixing piece (7) fixedly connected to the steel beam (6) being provided on the mounting column (1).
2. The rotatable steel beam lifting automatic correction device according to claim 1 is characterized in that: It also includes an electrode lead (4) pre-buried in the mounting column (1) and a controller (5) externally mounted outside the mounting column (1) and electrically connected to the motor lead.
3. The rotatable steel beam lifting automatic correction device according to claim 2 is characterized in that: The electrode lead (4) is detachably connected to the mounting post (1).
4. The rotatable steel beam lifting automatic correction device according to claim 3 is characterized in that: A mounting groove (12) for mounting the electrode lead (4) is formed through the side wall of the mounting column (1), and elastic blocks (41) are sleeved on both ends of the electrode lead (4), and the elastic blocks (41) are slidably engaged in the mounting groove (12).
5. The rotatable steel beam lifting automatic correction device according to claim 4 is characterized in that: The side wall of the mounting column (1) is provided with a slot (11) for the strong magnetic embedded plate (3) to be slidably inserted, and the edge of the strong magnetic embedded plate (3) is fixedly connected with an elastic pad (311), and the elastic pad (311) is embedded in the notch of the slot (11).
6. The rotatable steel beam lifting automatic correction device according to claim 5 is characterized in that: The installation column (1) is located in the installation groove (12) and the slot (11) is injected with grouting material.
7. The rotatable steel beam lifting automatic correction device according to claim 1 is characterized in that: The fixing member (7) comprises a fixing bolt (71) fixedly connected to the mounting column (1) and a fixing nut (72) threadedly connected to the fixing bolt (71), and fixing grooves (61) for the fixing bolt (71) to pass through are respectively provided at both ends of the steel beam (6).
8. The rotatable steel beam lifting automatic correction device according to claim 7 is characterized in that: A guide groove (62) is provided at the lower end of the fixing groove (61), and the diameter of the guide groove (62) gradually decreases in a direction away from the mounting column (1).