Industrial wastewater sedimentation treatment device

By designing dredging components in the industrial wastewater settlement treatment device and using high-pressure gas to clear the sewage pipe and the main sewage pipe, the problems of blockage and inconvenience in dredging of existing devices are solved, and efficient slag discharge treatment and simplified operation process is achieved.

CN222196019UActive Publication Date: 2024-12-20JIANGSU GENA ENVIRONMENTAL ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420811432.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-18
Publication Date
2024-12-20
Estimated Expiration
2034-04-18

AI Technical Summary

Technical Problem

The existing settlement treatment devices are prone to blockage when dealing with viscous impurities, which is inconvenient to unblock. Especially when multiple slag discharge ports are connected to the same main slag discharge port, there is a low efficiency and high probability of blockage, and there is a lack of effective solutions.

Method used

An industrial wastewater settlement treatment device was designed, including dredging components, including gas injection pipes, backflush pipes and support members. The partition sewage pipes and main sewage pipes are dredged through high-pressure gas, and impurities are blown back and blockages are blown out, which simplifies the dredging process and reduces the Manual operation.

Benefits of technology

It realizes rapid unblocking, improves slag discharge efficiency, reduces the risk of blockage, and does not require manual operation, greatly simplifies the unblocking process and improves the efficiency of the device.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222196019U_ABST
    Figure CN222196019U_ABST
Patent Text Reader

Abstract

The utility model discloses an industrial wastewater sedimentation treatment device which comprises a main body, a plurality of branch blow-off pipes are arranged at the bottom of the main body, the end parts of the plurality of branch blow-off pipes are communicated with a main blow-off pipe, a dredging assembly is further arranged on the front surface of the main body, and the dredging assembly comprises a gas injection pipe and a dredging pipe which is arranged at the top of the main blow-off pipe and communicated with the main blow-off pipe. The gas injection pipe is provided with backflushing pipes, the number of the backflushing pipes is larger than that of the branch blow-off pipes, each branch blow-off pipe is at least communicated with one backflushing pipe, and the remaining backflushing pipes are communicated with the main blow-off pipe; through the designed dredging assembly, the rapid dredging effect is achieved by injecting high-pressure air into all the branch deslagging pipes, blockage treatment is achieved from a deslagging source, meanwhile, the main pipeline can be dredged, it is guaranteed that normal deslagging is not affected, and compared with existing dredging from the end of a main deslagging opening, the dredging device is higher in efficiency and more convenient to use. And the dredging assembly is arranged on the sedimentation device, manual operation is not needed, and the dredging process is greatly simplified.
Need to check novelty before this filing date? Find Prior Art