Pin inserting and pulling auxiliary tool and pin inserting and pulling device

By designing the auxiliary tooling and equipment for plug-in and unplugging pins, the automatic plug-in and unplugging of the tower crane attachment structure is solved, and the problem of time-consuming and labor-intensive installation and deformation of the pin shaft in the existing technology is improved, and the disassembly and assembly efficiency of the tower crane attachment structure and the pin shaft are improved. Service life.

CN222200398UActive Publication Date: 2024-12-20HUNAN ZOOMLION CONSTR HOISTING MASCH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420971376.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-07
Publication Date
2024-12-20
Estimated Expiration
2034-05-07

AI Technical Summary

Technical Problem

The installation and disassembly of the pins of the existing tower crane attachment frame requires manual tapping, which is time-consuming and labor-intensive, and will cause the pins to deform and affect its service life.

Method used

A plug-in and unplugging pin auxiliary tooling and plug-in pin device are designed to support plug-in and unplugging pin through tooling base plate and overhang support structure to realize automatic plug-in and unplugging of pins, reduce manual operation, lock the pin position and use plug-in and unplugging pins. Drive the pin to insert or unplug it.

Benefits of technology

It realizes automatic operation of pins, saves time and effort, reduces pin wear, extends its service life, and improves the disassembly and assembly efficiency and safety of the tower crane attachment structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222200398U_ABST
    Figure CN222200398U_ABST
Patent Text Reader

Abstract

The utility model relates to the field of tower crane disassembling and assembling tools, and discloses a pin inserting and pulling auxiliary tool and a pin inserting and pulling device.The pin inserting and pulling auxiliary tool comprises a tool bottom plate, a bottom plate through hole, a bottom plate fixing structure and an overhanging supporting structure, and the tool bottom plate is used for being supported on the top face of the pin shaft connecting position of a tower crane attachment structure; the bottom plate through hole is formed in the middle of the tool bottom plate and can allow the connecting pin shaft to penetrate through when the connecting pin shaft is inserted and pulled out at the pin shaft connecting position. The bottom plate fixing structure is used for locking the tool bottom plate to the top face of the pin shaft connecting position. The overhanging supporting structure extends upwards from the tool bottom plate and is used for supporting the pin inserting and pulling device which is arranged in an overhanging mode so that the pin inserting and pulling device can be vertically aligned with the bottom plate through hole. According to the pin inserting and pulling auxiliary tool, automatic pin inserting and pulling operation of a tower crane attachment structure can be achieved, time and labor are saved, pin shaft abrasion can be reduced, and the service life of the pin shaft is prolonged.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to tower crane disassembly and assembly tooling, and specifically to pin insertion and extraction auxiliary tooling and a pin insertion and extraction device. Background Art

[0002] The attachment frame of a tower crane is an important component used to fix and support the tower crane. It is generally installed on the structure of a building through an attachment strut, wherein the attachment strut and the attachment frame are connected by a pin. The existing pin installation method is to manually knock the pin to connect the attachment strut and the attachment frame, and the pin is also removed by knocking during disassembly. This process is time-consuming and labor-intensive, and will also cause irreversible deformation to the pin, affecting its service life. Utility Model Content

[0003] The purpose of the present application is to provide a pin insertion and extraction auxiliary tooling and a pin insertion and extraction device to realize the automated pin insertion and extraction operations on the tower crane attachment structure, saving time and labor, and helping to reduce pin shaft wear and extend its service life.

[0004] In order to achieve the above-mentioned purpose, the present application provides, on one hand, a pin plugging and extraction auxiliary tool, the pin plugging and extraction auxiliary tool comprising:

[0005] The tooling bottom plate is used to support the top surface of the pin connection position of the tower crane attachment structure;

[0006] A bottom plate through hole is formed in the middle of the tooling bottom plate and can allow the connecting pin to pass through when plugging and unplugging at the pin connection position;

[0007] A bottom plate fixing structure, used to lock the tooling bottom plate to the top surface of the pin connection position; and

[0008] The hanging support structure is extended upward from the tooling bottom plate and is used to support the hanging pin inserter and extractor so that the pin inserter and extractor are vertically aligned with the bottom plate through hole.

[0009] In some embodiments, the bottom plate fixing structure includes:

[0010] The ear plate avoidance hole is used for allowing the attachment structure ear plate fixed on the top surface of the pin shaft connection position to pass upward;

[0011] A locking ear plate group, comprising two locking ear plates arranged on the top surface of the tooling bottom plate and respectively located on the lateral sides of the ear plate avoidance hole;

[0012] The locking pin is used to connect and fix the two locking ear plates to the attachment structure ear plate when the attachment structure ear plate passes upward through the ear plate avoidance hole.

[0013] In some embodiments, the ear plate avoidance holes and the locking ear plate groups are provided in plurality, and the plurality of locking ear plate groups are arranged in sequence and spaced apart around the bottom plate through hole, and the plurality of ear plate avoidance holes are arranged in one-to-one correspondence with the plurality of locking ear plate groups.

[0014] In some embodiments, the suspension support structure is provided with two suspension holes which are spaced apart in parallel in the transverse direction and are respectively used to support the transverse ends of the suspension shaft in the pin inserter and extractor, and the peripheral wall of the suspension hole is provided with a notch for inserting or removing the suspension shaft.

[0015] In some embodiments, the suspension support structure includes two support uprights and two suspension support plates, the two support uprights are parallelly spaced and vertically connected to the top surface of the tooling base plate, the two suspension support plates are respectively connected to the two support uprights, and the two suspension holes are respectively formed in the two suspension support plates.

[0016] In some embodiments, the suspension support structure includes a first support transverse plate and a second support transverse plate, wherein two lateral ends of the first support transverse plate are respectively connected to first long sides of two support vertical plates, and two lateral ends of the second support transverse plate are respectively connected to second long sides of two support vertical plates;

[0017] Wherein, at least one of the first supporting transverse plate and the second supporting transverse plate is formed as a detachable transverse plate that can be removed from the supporting vertical plate, and the notch portion is arranged to open laterally toward a side where the detachable transverse plate is provided.

[0018] In some embodiments, the plug-and-extract pin auxiliary tooling further includes a reinforcing rib plate connecting the supporting vertical plate and the tooling bottom plate.

[0019] In some embodiments, the suspended support structure includes a connecting horizontal plate and two connecting vertical plates, the two connecting vertical plates are parallel and spaced apart and vertically connected to the top surface of the tooling base plate, the lateral ends of the connecting horizontal plate are respectively connected to the top ends of the two connecting vertical plates, and the connecting horizontal plate is provided with a fixed mounting hole that is vertically aligned with the through hole of the base plate and is used for the pin inserter to vertically pass through and fix.

[0020] In some embodiments, the insertion and extraction pin assist tool includes a lifting lug connected to the top of the overhanging support structure.

[0021] Another aspect of the present application provides a pin plugging and pulling device, the pin plugging and pulling device comprising:

[0022] The above-mentioned auxiliary tooling for plugging and extracting pins; and

[0023] The pin inserter and extractor is suspended and supported by the suspension support structure, and the pin inserter and extractor is vertically aligned with the through hole of the base plate.

[0024] Through the above technical scheme, the pin plugging and extraction auxiliary tooling of the present application can be locked on the tower crane attachment structure through the base plate fixing structure, so that the base plate through hole is aligned with the pin shaft connection position, and the suspended pin plugging and extraction device is supported by the suspended support structure, so that the pin plugging and extraction device is vertically aligned with the base plate through hole, thereby the pin plugging and extraction device can be used to drive the connecting pin shaft to be inserted into or pulled out of the pin shaft connection position through the base plate through hole, thereby realizing the automated operation of connecting pin shaft plugging and extraction, saving time and labor and effectively ensuring the safety of construction personnel, improving the efficiency of disassembly and assembly of the tower crane attachment structure, and at the same time reducing the probability of damage to the connecting pin shaft during the plugging and extraction process, thereby effectively extending its service life.

[0025] Other features and advantages of the embodiments of the present application will be described in detail in the subsequent detailed description. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] The accompanying drawings are used to provide a further understanding of the embodiments of the present application and constitute a part of the specification. Together with the following specific embodiments, they are used to explain the embodiments of the present application, but do not constitute a limitation on the embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on the structures shown in these drawings without creative work. In the drawings:

[0027] Figure 1 It is a schematic diagram of a pin insertion and extraction device in a specific embodiment of the present application, in which the pin insertion and extraction device is arranged on the tower crane attachment structure;

[0028] Figure 2 for Figure 1 A schematic diagram of a plug-in and pull-out pin device;

[0029] Figure 3 for Figure 2 A schematic diagram of a pin plugging and extraction auxiliary tooling of a pin plugging and extraction device;

[0030] Figure 4 for Figure 3 A cross-sectional view of the auxiliary tooling for plugging and extracting pins;

[0031] Figure 5 for Figure 3 A top view of the tooling base plate of the plug-in pin auxiliary tooling.

[0032] Description of Reference Numerals

[0033] 1 Pin Inserter 2 Pin Inserter Auxiliary Tool

[0034] 3 Tower crane attachment structure 4 Connecting pin

[0035] 5 Lifting eye 6 Supporting plate

[0036] 7 Removable cross plate 8 Reinforcement plate

[0037] 9 Tooling base plate 10 Suspension support plate

[0038] 11 Locking lug 12 Locking pin DETAILED DESCRIPTION

[0039] The specific implementation of the present application is described in detail below in conjunction with the accompanying drawings. It should be understood that the specific implementation described here is only used to illustrate and explain the present application, and is not used to limit the present application.

[0040] The pin plugging and extraction auxiliary tooling and the pin plugging and extraction device according to the present application are described below with reference to the accompanying drawings.

[0041] like Figures 1 to 5 As shown, the pin plugging and pulling auxiliary tooling 2 of the present application includes a tooling base plate 9 and a suspension support structure. The tooling base plate 9 is used to support the top surface of the pin shaft connection position of the tower crane attachment structure 3. Specifically, the tooling base plate 9 is provided with a base plate fixing structure, which cooperates with the tower crane attachment structure 3 to lock the tooling base plate 9 on the top surface of the pin shaft connection position; a base plate through hole is also formed in the middle of the tooling base plate 9. When the tooling base plate 9 is locked in the pin shaft connection position, the base plate through hole can be used for the connection pin shaft 4 to pass through to insert or pull out of the pin shaft connection position; the suspension support structure extends upward from the tooling base plate 9 and is used to support the suspended pin plugging and pulling device 1. The pin plugging and pulling device 1 is used in conjunction with the connection pin shaft 4. When the tooling base plate 9 is locked in the pin shaft connection position, the suspended pin plugging and pulling device 1 can be vertically aligned with the base plate through hole to facilitate driving the connection pin shaft 4 to insert or pull out of the pin shaft connection position.

[0042] It can be seen that the pin plugging and extraction auxiliary tooling 2 of the present application can lock itself on the tower crane attachment structure 3 through the base plate fixing structure, so that the base plate through hole is aligned with the pin shaft connection position, and use the suspended support structure to support the suspended pin plugging and extraction device 1, so that the pin plugging and extraction device 1 is vertically aligned with the base plate through hole, thereby the pin plugging and extraction device 1 can be used to drive the connecting pin shaft 4 to be inserted into or pulled out of the pin shaft connection position through the base plate through hole, thereby realizing the automated operation of plugging and pulling out the connecting pin shaft 4, saving time and effort and effectively ensuring the safety of construction personnel, improving the operating efficiency of disassembly and assembly of the tower crane attachment structure, and at the same time reducing the probability of damage to the connecting pin shaft during the plugging and pulling process, thereby effectively extending its service life.

[0043] In an optional or preferred embodiment, referring to Figures 1 to 5The bottom plate fixing structure includes an ear plate avoidance hole, a locking ear plate group and a locking pin shaft 12. Among them, the ear plate avoidance hole is formed on the tooling bottom plate 9 and is used for the attachment structure ear plate (not shown in the figure) fixed on the top surface of the pin shaft connection position to pass upward. In other words, the attachment structure ear plate and the tooling bottom plate 9 are plugged in through the ear plate avoidance hole; the locking ear plate group includes two locking ear plates 11 arranged on the top surface of the tooling bottom plate 9, and the two locking ear plates 11 are respectively located on the lateral sides of the ear plate avoidance hole. Therefore, when the attachment structure ear plate passes through the ear plate avoidance hole, it can be located between the two locking ear plates 11. At this time, the locking pin shaft 12 can be used to connect and fix the two locking ear plates 11 with the attachment structure ear plate, thereby realizing the fixing of the plug-in pin auxiliary tooling 2 to the tower crane attachment structure 3.

[0044] In an optional or preferred embodiment, referring to Figure 5 , there are multiple ear plate avoidance holes and locking ear plate groups, and multiple locking ear plate groups are arranged in sequence around the bottom plate through hole, and multiple ear plate avoidance holes are arranged in a one-to-one correspondence with multiple locking ear plate groups. Therefore, when fixing the plug-in pin auxiliary tooling 2, according to the setting of the attachment structure ear plate of the tower crane attachment structure 3, one of the ear plate avoidance holes and its corresponding locking ear plate group can be selected to match and connect with one attachment structure ear plate, or multiple ear plate avoidance holes and their corresponding multiple locking ear plate groups can be selected to match and connect with multiple attachment structure ear plates one by one, and this exemplary embodiment does not limit this. It can be understood that when multiple ear plate avoidance holes and their corresponding multiple locking ear plate groups are matched and connected with multiple attachment structure ear plates one by one, the connection strength between the plug-in pin auxiliary tooling 2 and the tower crane attachment structure 3 can be improved, thereby improving the stability of the tooling.

[0045] In an optional or preferred embodiment, the suspension support structure is provided with two suspension holes which are spaced parallel to each other in the transverse direction and are respectively used to support the suspension shaft (not shown in the drawings) in the pin inserter 1 at both lateral ends, and the peripheral wall of the suspension hole is provided with a notch for inserting or removing the suspension shaft.

[0046] For example, refer to Figure 3 and Figure 4The suspension support structure includes two support uprights 6 and two suspension support plates 10. The two support uprights 6 are parallel and spaced apart and vertically connected to the top surface of the tooling bottom plate 9. The two suspension support plates 10 are respectively connected to the two support uprights 6. Two suspension holes are respectively formed in the two suspension support plates 10, wherein the peripheral wall of the suspension support plate 10 is concave to form an opening that passes through the suspension hole, thereby forming a notch portion of the suspension hole. Thus, the suspension axis of the pin inserter 1 can be placed in the two suspension support plates 10 through the notch portion, and then the pin inserter 1 is supported by the two suspension support plates 10, so that the pin inserter 1 is suspended between the two support uprights 6. It can be seen that by providing the notch portion in the two suspension support plates 10, the pin inserter 1 can be quickly disassembled and assembled, thereby improving the convenience of tooling use.

[0047] In an optional or preferred embodiment, referring to Figures 1 to 4 The suspended support structure includes a first supporting transverse plate and a second supporting transverse plate, the two lateral ends of the first supporting transverse plate are respectively connected to the first long sides of the two supporting vertical plates 6, and the two lateral ends of the second supporting transverse plate are respectively connected to the second long sides of the two supporting vertical plates 6, so that the first supporting transverse plate, the second supporting transverse plate and the two supporting vertical plates 6 together form a stable frame structure. Therefore, when the pin inserter 1 is suspended between the two supporting vertical plates 6, the first supporting transverse plate and the second supporting transverse plate can effectively limit the pin inserter 1 to improve safety.

[0048] Furthermore, considering the disassembly and assembly requirements of the pin inserter and extractor 1, at least one of the first supporting transverse plate and the second supporting transverse plate is formed as a detachable transverse plate 7 that can be removed from the supporting vertical plate 6. For example, the detachable transverse plate 7 and the supporting vertical plate 6 can be detachably connected by bolts. At the same time, the notch portion of the hanging supporting plate 10 is arranged to open laterally toward the side where the detachable transverse plate 7 is provided. Therefore, when the detachable transverse plate 7 located on one side of the two supporting vertical plates 6 is removed, the pin inserter and extractor 1 can enter or move out of the suspended swing position between the two supporting vertical plates 6 from this side. The pin inserter and extractor 1 that enters the suspended swing position can then be suspended on the two hanging supporting plates 10 through the notch portion, and there is no need to adjust the placement direction of the hanging axis of the pin inserter and extractor 1, which is convenient and quick.

[0049] In some other embodiments, the hanging support structure can be composed of a connecting horizontal plate and two connecting vertical plates, the two connecting vertical plates are parallel and spaced and vertically connected to the top surface of the tooling bottom plate 9, the lateral ends of the connecting horizontal plate are respectively connected to the top ends of the two connecting vertical plates, so that the hanging support structure is formed into a gate arch structure, and the connecting horizontal plate is provided with a fixed installation hole that is vertically aligned with the bottom plate through hole and is used for the pin plugging and pulling device 1 to be vertically inserted and fixed. Therefore, when the pin plugging and pulling device 1 is vertically inserted and fixed to the fixed installation hole of the connecting horizontal plate, it can be suspended between the two connecting vertical plates. At this time, the telescopic end of the pin plugging and pulling device 1 is aligned with the bottom plate through hole, which is convenient for driving the connecting pin shaft 4 to be inserted and pulled out of the pin shaft connection position of the tower crane attachment structure 3.

[0050] In an optional or preferred embodiment, referring to Figure 1 The plug-in pin auxiliary tooling 2 also includes a reinforcing rib plate 8 connecting the supporting vertical plate 6 and the tooling bottom plate 9. Specifically, the reinforcing rib plate 8 is welded between the supporting vertical plate 6 and the tooling bottom plate 9, thereby enhancing the stability of the entire tooling.

[0051] In an optional or preferred embodiment, referring to Figure 1 The pin-plugging auxiliary tooling 2 includes a lifting ear 5 connected to the top of the suspended support structure, and the lifting ear 5 can be passed through an external lifting mechanism to facilitate the use of the lifting mechanism to lift the pin-plugging auxiliary tooling 2 to the pin shaft connection position of the tower crane attachment structure 3.

[0052] The second exemplary embodiment of the present application provides a pin insertion and extraction device, which includes the above-mentioned pin insertion and extraction auxiliary tooling 2 and the pin insertion and extraction device 1, wherein the pin insertion and extraction device 1 is suspended, and supported by the suspension support structure of the pin insertion and extraction auxiliary tooling 2, the pin insertion and extraction device 1 is vertically aligned with the bottom plate through hole. Obviously, the pin insertion and extraction device of this exemplary embodiment has all the technical effects brought by the above-mentioned pin insertion and extraction auxiliary tooling 2, so it will not be repeated here.

[0053] In the description of the present application, it should be understood that the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one of the features. In the description of the present application, "plurality" means at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0054] In this application, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection, an electrical connection, or communication with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0055] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.

[0056] Although the embodiments of the present application have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limitations on the present application. Ordinary technicians in this field can change, modify, replace and modify the above embodiments within the scope of the present application.

Claims

1. Auxiliary tooling for plugging and pulling pins, characterized in that: include: A tooling bottom plate (9) used for supporting the top surface of the pin connection position of the tower crane attachment structure (3); A bottom plate through hole is formed in the middle of the tooling bottom plate (9) and can allow the connecting pin shaft (4) to pass through when being inserted or removed at the pin shaft connection position; A bottom plate fixing structure, used for locking the tooling bottom plate (9) on the top surface of the pin shaft connection position; and A suspension support structure is arranged to extend upward from the tooling base plate (9) and is used to support a suspended pin inserter (1) so that the pin inserter (1) is vertically aligned with the base plate through hole.

2. The pin plugging and extraction auxiliary tooling according to claim 1, characterized in that: The bottom plate fixing structure comprises: The ear plate avoidance hole is used for allowing the attachment structure ear plate fixed on the top surface of the pin shaft connection position to pass upward; A locking ear plate group, comprising two locking ear plates (11) arranged on the top surface of the tooling bottom plate (9) and respectively located on the lateral sides of the ear plate avoidance hole; The locking pin shaft (12) is used to connect and fix the two locking ear plates (11) with the attachment structure ear plate when the attachment structure ear plate passes upward through the ear plate avoidance hole.

3. The pin plugging and extraction auxiliary tooling according to claim 2, characterized in that: There are multiple ear plate avoidance holes and multiple locking ear plate groups, and the multiple locking ear plate groups are arranged in sequence around the bottom plate through hole. The multiple ear plate avoidance holes are arranged in one-to-one correspondence with the multiple locking ear plate groups.

4. The pin plugging and extraction auxiliary tooling according to claim 1, characterized in that: The suspension support structure is provided with two suspension holes which are spaced apart in parallel in the transverse direction and are respectively used to support the transverse ends of the suspension shaft in the pin inserter (1); the peripheral wall of the suspension hole is provided with a notch portion for inserting or removing the suspension shaft.

5. The pin plugging and extraction auxiliary tooling according to claim 4, characterized in that: The suspended support structure comprises two supporting uprights (6) and two hanging support plates (10), the two supporting uprights (6) are parallel and spaced apart and vertically connected to the top surface of the tooling base plate (9), the two hanging support plates (10) are respectively connected to the two supporting uprights (6), and the two hanging holes are respectively formed in the two hanging support plates (10).

6. The pin plugging and extraction auxiliary tooling according to claim 5, characterized in that: The suspended support structure comprises a first support transverse plate and a second support transverse plate, wherein the two lateral ends of the first support transverse plate are respectively connected to the first long sides of the two support vertical plates (6), and the two lateral ends of the second support transverse plate are respectively connected to the second long sides of the two support vertical plates (6); At least one of the first supporting transverse plate and the second supporting transverse plate is formed as a detachable transverse plate (7) that can be removed from the supporting vertical plate (6), and the notch portion is arranged to open laterally toward a side where the detachable transverse plate (7) is provided.

7. The pin plugging and extraction auxiliary tooling according to claim 5, characterized in that: The pin plugging and extraction auxiliary tooling (2) also includes a reinforcing rib plate (8) connecting the supporting vertical plate (6) and the tooling bottom plate (9).

8. The pin plugging and extraction auxiliary tooling according to claim 1, characterized in that: The suspended support structure comprises a connecting transverse plate and two connecting vertical plates, the two connecting vertical plates are parallel and spaced apart and vertically connected to the top surface of the tooling base plate (9), the two lateral ends of the connecting transverse plate are respectively connected to the top ends of the two connecting vertical plates, and the connecting transverse plate is provided with a fixing installation hole which is vertically aligned with the through hole of the base plate and is used for the pin inserter (1) to vertically pass through and fix.

9. The pin plugging and extraction auxiliary tooling according to claim 1, characterized in that: The pin insertion and extraction auxiliary tool (2) comprises a lifting lug (5) connected to the top of the suspended support structure.

10. A pin insertion and extraction device, characterized in that: include: The pin plugging and extraction auxiliary tool (2) according to any one of claims 1 to 9; and The pin inserter and extractor (1) is suspended and supported by the suspension support structure, and the pin inserter and extractor (1) is vertically aligned with the bottom plate through hole.