Automatic installation system for positive and negative junction boxes of photovoltaic panel

By designing the automatic installation system for positive and negative junction boxes of photovoltaic panels, and using components such as transmission belts, transmission belts and robotic arms, the precise docking of photovoltaic panels and junction boxes is achieved, solving the problem of inaccurate grasping of junction boxes in photovoltaic panel production. Improved production efficiency and installation quality.

CN222203963UActive Publication Date: 2024-12-20CHANGZHOU DONGJIE AUTOMATION EQUIP CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420167153.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-23
Publication Date
2024-12-20
Estimated Expiration
2034-01-23

AI Technical Summary

Technical Problem

During the production process of photovoltaic panels, the bus bars on the photovoltaic panel are arranged perpendicularly to the board surface and the material is soft, which makes it difficult to accurately grasp the junction box when fully assembled, which can easily cause the bus bar to bend, affect the automated production process and may damage it. Photovoltaic panels.

Method used

An automatic installation system for positive and negative junction box of photovoltaic panels is designed, including a first conveying mechanism, a second conveying mechanism and a material picking mechanism. Through the vertical arrangement of the transmission belt and the conveying belt, it is combined with a robotic arm, a pneumatic jaw and a monitoring mechanism. Realize accurate grasping and docking operations of the junction box to ensure correct docking of the bus bar.

Benefits of technology

Fully automatic installation of photovoltaic panels and junction boxes is realized, production efficiency and installation quality are improved, and busbar bending and photovoltaic panel damage is avoided.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222203963U_ABST
    Figure CN222203963U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of photovoltaic module production, in particular to a photovoltaic panel anode and cathode junction box automatic installation system which comprises a first conveying mechanism, a second conveying mechanism and a material taking mechanism arranged above the first conveying mechanism and the second conveying mechanism, and the second conveying mechanism comprises two conveying belts arranged in parallel; a photovoltaic panel is conveyed to an installation station through the first conveying mechanism, positive and negative electrode junction boxes are conveyed to the installation station through the two parallel conveying belts correspondingly, whether the junction boxes are conveyed in place or not is detected in cooperation with the first monitoring mechanism and the second monitoring mechanism, and the junction boxes on the two conveying belts are grabbed through the two material taking mechanisms correspondingly; and then butt joint installation with a bus bar on the photovoltaic panel is carried out. The installation process is controlled in a full-automatic mode, after the photovoltaic panel and the junction box are conveyed in place, the first monitoring mechanism and the second monitoring mechanism detect the position states of the junction box and the bus bar respectively, and the two material taking mechanisms can conveniently and accurately grab the junction box and be in accurate butt joint with the photovoltaic panel bus bar. And the installation quality is improved while the production efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of photovoltaic component production, in particular to an automatic installation system for positive and negative junction boxes of photovoltaic panels. Background Art

[0002] The photovoltaic panel junction box is a connecting device between the photovoltaic cell array composed of photovoltaic cell modules and the photovoltaic charging control device. Its main function is to connect the power generated by the photovoltaic cells to the external circuit and conduct the current generated by the photovoltaic modules. The junction box needs to be installed after the photovoltaic panels are produced.

[0003] The busbars on the photovoltaic panels are arranged perpendicular to the panel surface and are made of soft material. The matching junction box structure includes not only the box body but also the power cord. During fully automatic assembly, the junction box is in a scattered state after delivery. If the overall junction box cannot be accurately grasped, the busbars will easily be bent when plugged in, which will not only affect the automated production process but also cause damage to the photovoltaic panels. Utility Model Content

[0004] The purpose of the utility model is to provide an automatic installation system for positive and negative junction boxes of photovoltaic panels in view of the defects existing in the prior art.

[0005] In order to achieve the above-mentioned purpose, the technical solution adopted by the utility model is: an automatic installation system for positive and negative junction boxes of photovoltaic panels, including a first conveying mechanism, a second conveying mechanism and a material taking mechanism arranged above the first conveying mechanism and the second conveying mechanism;

[0006] The first conveying mechanism includes a conveying belt arranged along a first direction, and the second conveying mechanism includes a conveying belt arranged along a second direction, one end of the conveying belt extends above the conveying belt, and the first direction and the second direction are arranged vertically in a horizontal plane;

[0007] The transmission belt is arranged on the mounting platform of the first bracket and is arranged in parallel in the second direction, the transmission belt is arranged on the second bracket and is arranged in parallel in the first direction, and the material taking mechanism is suspended on the top beam of the first bracket and is arranged in parallel with two transmission belts;

[0008] The material picking mechanism includes a mechanical arm and a clamping device arranged at its free end. A first monitoring mechanism and a second monitoring mechanism are respectively arranged on both sides of the material picking mechanism in the second direction. The first monitoring mechanism and the second monitoring mechanism are both arranged on the top beam and are respectively arranged corresponding to the middle position of the first conveying mechanism and the output position of the second conveying mechanism.

[0009] Furthermore, the clamping device includes a support frame and a first pneumatic clamping jaw, a second pneumatic clamping jaw, a limiting assembly and a positioning assembly arranged thereon;

[0010] The positioning assembly is located between the first pneumatic clamp and the limiting assembly, and both are arranged corresponding to the box body of the junction box, and the second pneumatic clamp is arranged corresponding to the cable of the junction box.

[0011] Furthermore, the support frame includes a connecting plate and a mounting plate arranged in parallel, and the mounting plate is connected to the connecting plate through a guide column;

[0012] The connecting plate is connected to the free end of the mechanical arm via a connecting shaft, the mounting plate is slidably connected to one end of the guide column, and a compression spring is provided on the outer ring of the guide column.

[0013] Further, the limiting assembly includes a first cylinder and a limiting plate arranged thereon, and the limiting plate is driven by the first cylinder to move toward the first pneumatic clamping jaw;

[0014] The first pneumatic clamp comprises a first clamp cylinder and an L-shaped clamp plate arranged thereon, wherein two L-shaped clamp plates are arranged in parallel, and the two L-shaped clamp plates move relatively along the length direction of the limit plate under the drive of the first clamp cylinder.

[0015] Furthermore, the positioning assembly includes a second cylinder and a positioning rod disposed thereon, and the second cylinder drives the positioning rod to move in a direction perpendicular to the running direction of the limit plate and the L-shaped clamping plate;

[0016] A clamping claw is arranged at one end of the positioning rod away from the second cylinder. The clamping claw is located between the two L-shaped clamping plates and the limiting plate and matches with the wire hole of the junction box.

[0017] Furthermore, the second cylinder is arranged on the mounting plate and is located between the connecting plate and the mounting plate, and the output shaft of the second cylinder passes through the mounting plate and is connected to the positioning rod;

[0018] A limiting seat is arranged on one side of the mounting plate away from the connecting plate, a limiting hole is formed through the limiting seat, and the positioning rod is arranged in the limiting hole and slidably connected with the limiting hole.

[0019] Further, the first clamping jaw cylinder and the first cylinder are fixed to a side of the mounting plate away from the connecting plate through a first supporting plate and a second supporting plate respectively;

[0020] The second pneumatic clamp includes a second clamp cylinder and a cable clamp arranged thereon, the cable clamp is located on a side of the L-shaped clamp away from the limiting plate, and the second clamp cylinder is fixed to one side of the mounting plate through a third support plate.

[0021] Furthermore, the first monitoring mechanism includes a plurality of first cameras arranged along a first direction, and a first light source is arranged near the first cameras.

[0022] Furthermore, the second monitoring mechanism includes two second cameras respectively arranged corresponding to the two conveyor belts, and a second light source is arranged near the second cameras;

[0023] The second camera and the second light source are both suspended on the top beam through a connecting frame and are located above the output end of the conveyor belt.

[0024] Furthermore, the plurality of transmission belts are powered by a first power device, and the transmission belt is powered by a second power device disposed on the second bracket.

[0025] The beneficial effects of the utility model are:

[0026] In the present application, the photovoltaic panel is transported to the installation station by a first conveying mechanism, and the positive and negative terminal junction boxes are respectively transported to the installation station by two parallel conveyor belts. The first monitoring mechanism and the second monitoring mechanism are used to check whether the junction boxes are in place, and the two picking mechanisms are used to grab the junction boxes on the two conveyor belts respectively, and then they are respectively docked with the bus bars on the photovoltaic panel for installation; the installation process is fully automated. After the photovoltaic panel and the junction box are transported to the right place, the first monitoring mechanism and the second monitoring mechanism are used to detect the position status of the junction box and the bus bar respectively, so that the two picking mechanisms can accurately grab the junction box and dock it with the photovoltaic panel bus bar accurately; thus improving the production efficiency and the installation quality. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0028] Figure 1 This is a schematic diagram of the structure of the automatic installation system of the positive and negative junction boxes of photovoltaic panels in the utility model;

[0029] Figure 2 It is a structural schematic diagram of the first monitoring mechanism in the utility model;

[0030] Figure 3 It is a structural schematic diagram of the second monitoring mechanism in the utility model;

[0031] Figure 4 It is a structural schematic diagram of the material taking mechanism in the utility model;

[0032] Figure 5 It is a structural schematic diagram of the clamping device in the utility model;

[0033] Figure 6 It is a schematic diagram of the exploded structure of the clamping device in the utility model;

[0034] Figure 7 It is a schematic diagram of the clamping state of the clamping device on the junction box in the utility model;

[0035] Figure 8 It is a schematic diagram of the operation of the automatic installation system in the utility model.

[0036] Figure numerals: 1, first bracket; 11, mounting platform; 12, top beam; 2, second bracket; 3, first conveying mechanism; 31, transmission belt; 32, first power device; 4, second conveying mechanism; 41, transmission belt; 42, second power device; 5, material taking mechanism; 51, mechanical arm; 52, connecting shaft; 6, clamping device; 61, support frame; 611, connecting plate; 612, mounting plate; 613, guide column; 614, compression spring; 62, first pneumatic clamp; 621, first clamp cylinder; 622, L-shaped clamp; 623, The first support plate; 63, the second pneumatic clamp; 631, the second clamp cylinder; 632, the cable clamp; 633, the third support plate; 64, the limiting assembly; 641, the first cylinder; 642, the limiting plate; 643, the second support plate; 65, the positioning assembly; 651, the second cylinder; 652, the positioning rod; 652a, the clamp; 653, the limiting seat; 653a, the limiting hole; 7, the first monitoring mechanism; 71, the first camera; 72, the first light source; 8, the second monitoring mechanism; 81, the second camera; 82, the second light source; 83, the connecting frame. DETAILED DESCRIPTION

[0037] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.

[0038] It should be noted that when an element is referred to as being "fixed to" another element, it may be directly on the other element or there may be a central element. When an element is considered to be "connected to" another element, it may be directly connected to the other element or there may be a central element at the same time. The terms "vertical", "horizontal", "left", "right" and similar expressions used herein are for illustrative purposes only and do not represent the only implementation method.

[0039] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art in the technical field of the present invention. The terms used herein in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "and / or" used herein includes any and all combinations of one or more related listed items.

[0040] like Figures 1 to 8 The shown automatic installation system of the positive and negative terminal boxes of photovoltaic panels includes a first conveying mechanism 3, a second conveying mechanism 4 and a material picking mechanism 5 arranged above the first conveying mechanism 3 and the second conveying mechanism 4, wherein the first conveying mechanism 3 includes a transmission belt 31 arranged along a first direction, and the second conveying mechanism 4 includes a transmission belt 41 arranged along a second direction, one end of the transmission belt 41 extends above the transmission belt 31, and the first direction and the second direction are arranged vertically in a horizontal plane.

[0041] The transmission belt 31 is arranged on the mounting platform 11 of the first bracket 1 and multiple transmission belts are arranged in parallel in the second direction. The transmission belt 41 is arranged on the second bracket 2 and two transmission belts are arranged in parallel in the first direction. The material picking mechanism 5 is suspended on the top beam 12 of the first bracket 1 and two transmission belts are arranged corresponding to the transmission belts 41. The material picking mechanism 5 includes a mechanical arm 51 and a clamping device 6 arranged at its free end. The first monitoring mechanism 7 and the second monitoring mechanism 8 are respectively arranged on both sides of the material picking mechanism 5 in the second direction. The first monitoring mechanism 7 and the second monitoring mechanism 8 are both arranged on the top beam 12 and are respectively arranged corresponding to the middle position of the first conveying mechanism 3 and the output position of the second conveying mechanism 4.

[0042] In the present application, the photovoltaic panel is transported to the installation station by the first conveying mechanism 3, and the positive and negative terminal junction boxes are respectively transported to the installation station by two parallel conveyor belts 41. The first monitoring mechanism 7 and the second monitoring mechanism 8 are used to check whether they are delivered to the installation station, and the two material picking mechanisms 5 are used to grab the junction boxes on the two conveyor belts 41 respectively, and then they are respectively connected and installed with the bus bars on the photovoltaic panel; the installation process is fully automated. After the photovoltaic panel and the junction box are delivered to the installation station, the first monitoring mechanism 7 and the second monitoring mechanism 8 respectively detect the position status of the junction box and the bus bar, so that the two material picking mechanisms 5 can accurately grab the junction box and accurately connect it with the photovoltaic panel bus bar; thus improving the production efficiency and the installation quality.

[0043] In this embodiment, if Figure 5 As shown, the clamping device 6 includes a support frame 61 and a first pneumatic clamp 62, a second pneumatic clamp 63, a limit assembly 64 and a positioning assembly 65 arranged thereon; the positioning assembly 65 is located between the first pneumatic clamp 62 and the limit assembly 64, and both are arranged corresponding to the box body of the junction box, and the second pneumatic clamp 63 is arranged corresponding to the cable of the junction box.

[0044] Both the positive and negative terminal boxes include a box body and cables. When the clamping device 6 is used to grab them, the first pneumatic clamp 62 is used to clamp and fix them from both sides of the box body, and the limiting component 64 is used to press one end of the box body to achieve a stable grasping of the terminal box body; the cable of the terminal box is clamped and fixed by the second pneumatic clamp 63 to prevent the weight of the cable from affecting the stability of the box body, thereby ensuring the overall stability of the terminal box clamping process.

[0045] Specifically, Figure 6 As shown, the limiting assembly 64 includes a first cylinder 641 and a limiting plate 642 arranged thereon, and the limiting plate 642 is driven by the first cylinder 641 to move toward the first pneumatic clamp 62; the first pneumatic clamp 62 includes a first clamp cylinder 621 and an L-shaped clamp 622 arranged thereon, and two L-shaped clamps 622 are arranged in parallel. The two L-shaped clamps 622 move relative to each other along the length direction of the limiting plate 642 under the drive of the first clamp cylinder 621.

[0046] The positioning assembly 65 includes a second cylinder 651 and a positioning rod 652 arranged thereon. The second cylinder 651 drives the positioning rod 652 to move in a direction perpendicular to the running direction of the limit plate 642 and the L-shaped clamp plate 622. A claw 652a is arranged at the end of the positioning rod 652 away from the second cylinder 651. The claw 652a is located between the two L-shaped clamp plates 622 and the limit plate 642, and cooperates with the wire hole of the junction box.

[0047] In the specific clamping process of the junction box body, first adjust the angle of the clamping device 6 to align the positioning rod 652 with the wire hole on the box body, and drive the positioning rod 652 through the second cylinder 651 to make the claw 652a at its end engage with the wire hole to realize the positioning of the box body and the subsequent clamping operation; then drive the two L-shaped clamping plates 622 arranged thereon through the first clamping claw cylinder 621 to clamp and fix the long sides of the box body on both sides, and then drive the limit plate 642 through the first cylinder 641 to press the end of the box body away from the cable, remove the three sides of the box body where the cable is provided, and clamp and fix the box body, thereby completing the clamping and fixation of the box body.

[0048] In this embodiment, the support frame 61 includes a connecting plate 611 and a mounting plate 612 arranged in parallel, and the mounting plate 612 is connected to the connecting plate 611 through a guide column 613; the connecting plate 611 is connected to the free end of the robotic arm 51 through a connecting shaft 52, and the mounting plate 612 is slidably connected to one end of the guide column 613, and a compression spring 614 is provided on the outer ring of the guide column 613.

[0049] The second cylinder 651 is arranged on the mounting plate 612 and is located between the connecting plate 611 and the mounting plate 612. The output shaft of the second cylinder 651 passes through the mounting plate 612 and is connected to the positioning rod 652. A limiting seat 653 is arranged on the side of the mounting plate 612 away from the connecting plate 611. A limiting hole 653a is opened through the limiting seat 653. The positioning rod 652 is arranged in the limiting hole 653a and is slidably connected thereto.

[0050] Furthermore, the first clamping cylinder 621 and the first cylinder 641 are respectively fixed on the side of the mounting plate 612 away from the connecting plate 611 through the first support plate 623 and the second support plate 643; the second pneumatic clamp 63 includes a second clamping cylinder 631 and a cable clamp 632 arranged thereon, the cable clamp 632 is located on the side of the L-shaped clamp 622 away from the limiting plate 642, and the second clamping cylinder 631 is fixed on one side of the mounting plate 612 through the third support plate 633.

[0051] Each cylinder that performs the clamping operation on the junction box is installed on the mounting plate 612 of the support frame 61. In the process of pressing the junction box against the surface of the photovoltaic panel, the mounting plate 612 moves toward the connecting plate 611 after being subjected to force, and recovers under the action of the compression spring 614 after the installation is completed, thereby avoiding excessive pressure on the surface of the photovoltaic panel during the installation process, which may cause damage to the photovoltaic panel.

[0052] In this embodiment, if Figure 2 and Figure 3 As shown, the first monitoring mechanism 7 includes a plurality of first cameras 71 arranged along the first direction, and a first light source 72 is arranged near the first camera 71. The second monitoring mechanism 8 includes two second cameras 81 arranged corresponding to the two conveyor belts 41, and a second light source 82 is arranged near the second camera 81; the second camera 81 and the second light source 82 are both suspended on the top beam 12 through a connecting frame 83, and are located above the output end of the conveyor belt 41.

[0053] The first camera 71 and the second camera 81 monitor the transport status of the junction box and the photovoltaic panel in real time, so as to facilitate the accurate grasping of the junction box and the precise docking with the bus bar on the photovoltaic panel.

[0054] In this embodiment, the plurality of transmission belts 31 are powered by a first power device 32 , and the transmission belt 41 is powered by a second power device 42 disposed on the second bracket 2 .

[0055] Those skilled in the art should understand that the present invention is not limited by the above embodiments. The above embodiments and the description are only for explaining the principle of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which are within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. An automatic installation system for positive and negative junction boxes of photovoltaic panels, It is characterized in that It comprises a first conveying mechanism (3), a second conveying mechanism (4), and a material taking mechanism (5) arranged above the first and second conveying mechanisms; The first conveying mechanism (3) comprises a transmission belt (31) arranged along a first direction, and the second conveying mechanism (4) comprises a transmission belt (41) arranged along a second direction, one end of the transmission belt (41) extends above the transmission belt (31), and the first direction and the second direction are arranged vertically in a horizontal plane; The transmission belt (31) is arranged on the mounting platform (11) of the first bracket (1) and is arranged in parallel in the second direction in multiple numbers; the transmission belt (41) is arranged on the second bracket (2) and is arranged in parallel in the first direction in two numbers; the material taking mechanism (5) is suspended on the top beam (12) of the first bracket (1) and is arranged in two numbers corresponding to the transmission belt (41); The material picking mechanism (5) comprises a mechanical arm (51) and a clamping device (6) arranged at a free end thereof, and a first monitoring mechanism (7) and a second monitoring mechanism (8) are respectively arranged on both sides of the material picking mechanism (5) in the second direction, and the first monitoring mechanism (7) and the second monitoring mechanism (8) are both arranged on the top beam (12) and are respectively arranged corresponding to the middle position of the first conveying mechanism (3) and the output position of the second conveying mechanism (4).

2. The photovoltaic panel positive and negative terminal box automatic installation system according to claim 1, It is characterized in that The clamping device (6) comprises a support frame (61) and a first pneumatic clamping jaw (62), a second pneumatic clamping jaw (63), a limiting component (64) and a positioning component (65) arranged thereon; The positioning assembly (65) is located between the first pneumatic clamp (62) and the limiting assembly (64), and both are arranged corresponding to the box body of the junction box, and the second pneumatic clamp (63) is arranged corresponding to the cable of the junction box.

3. The photovoltaic panel positive and negative terminal box automatic installation system according to claim 2, It is characterized in that The support frame (61) comprises a connecting plate (611) and a mounting plate (612) arranged in parallel, and the mounting plate (612) is connected to the connecting plate (611) via a guide column (613); The connecting plate (611) is connected to the free end of the mechanical arm (51) via a connecting shaft (52), the mounting plate (612) is slidably connected to one end of the guide column (613), and a compression spring (614) is provided on the outer ring of the guide column (613).

4. The photovoltaic panel positive and negative terminal box automatic installation system according to claim 3, It is characterized in that The limiting assembly (64) comprises a first cylinder (641) and a limiting plate (642) arranged thereon, wherein the limiting plate (642) is driven by the first cylinder (641) to move toward the first pneumatic clamp (62); The first pneumatic clamp (62) comprises a first clamp cylinder (621) and an L-shaped clamp plate (622) arranged thereon, wherein two L-shaped clamp plates (622) are arranged in parallel, and the two L-shaped clamp plates (622) move relative to each other along the length direction of the limit plate (642) under the drive of the first clamp cylinder (621).

5. The photovoltaic panel positive and negative terminal box automatic installation system according to claim 4, It is characterized in that The positioning assembly (65) comprises a second cylinder (651) and a positioning rod (652) arranged thereon, wherein the second cylinder (651) drives the positioning rod (652) to move in a direction perpendicular to the running direction of the limit plate (642) and the L-shaped clamping plate (622); A clamping claw (652a) is provided at one end of the positioning rod (652) away from the second cylinder (651), and the clamping claw (652a) is located between the two L-shaped clamping plates (622) and the limiting plate (642), and cooperates with the wire hole of the junction box.

6. The photovoltaic panel positive and negative terminal box automatic installation system according to claim 5, It is characterized in that The second cylinder (651) is arranged on the mounting plate (612) and is located between the connecting plate (611) and the mounting plate (612); the output shaft of the second cylinder (651) passes through the mounting plate (612) and is connected to the positioning rod (652); A limiting seat (653) is arranged on one side of the mounting plate (612) away from the connecting plate (611), a limiting hole (653a) is provided through the limiting seat (653), and the positioning rod (652) is arranged in the limiting hole (653a) and is slidably connected thereto.

7. The photovoltaic panel positive and negative terminal box automatic installation system according to claim 4, It is characterized in that The first clamping jaw cylinder (621) and the first cylinder (641) are fixed to a side of the mounting plate (612) away from the connecting plate (611) via a first supporting plate (623) and a second supporting plate (643) respectively; The second pneumatic clamp (63) comprises a second clamp cylinder (631) and a cable clamp (632) arranged thereon, wherein the cable clamp (632) is located on a side of the L-shaped clamp (622) away from the limiting plate (642), and the second clamp cylinder (631) is fixed to one side of the mounting plate (612) via a third support plate (633).

8. The photovoltaic panel positive and negative terminal box automatic installation system according to claim 1, It is characterized in that The first monitoring mechanism (7) comprises a plurality of first cameras (71) arranged along a first direction, and a first light source (72) is arranged close to the first cameras (71).

9. The photovoltaic panel positive and negative terminal box automatic installation system according to claim 1, It is characterized in that The second monitoring mechanism (8) comprises two second cameras (81) respectively arranged corresponding to the two conveyor belts (41), and a second light source (82) is arranged near the second camera (81); The second camera (81) and the second light source (82) are both suspended on the top beam (12) via a connecting frame (83) and are located above the output end of the conveyor belt (41).

10. The photovoltaic panel positive and negative terminal box automatic installation system according to claim 1, It is characterized in that The plurality of transmission belts (31) are powered by a first power device (32), and the transmission belt (41) is powered by a second power device (42) disposed on the second bracket (2).

Citation Information

Cited By

  • Junction box assembling equipment and method

    CN121670334A