Hanging basket for constructional engineering
By setting up a sliding placement table and bracket mechanism on the hanging basket for construction projects, the problems of inconvenient storage of construction tools and the shaking and leakage of pigment barrels are solved, and the convenient access and safe fixation of construction tools are achieved, which improves the practicality of the hanging basket and Security.
Patent Information
- Application Number
- CN202420515033.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-18
- Publication Date
- 2024-12-20
- Estimated Expiration
- 2034-03-18
AI Technical Summary
The existing hanging baskets for construction projects lack construction tool storage equipment, making it inconvenient for construction personnel to pick up and place tools, and lack a platform for placing construction materials, which leads to displacement and leakage of pigment barrels due to shaking, reducing the practicality of hanging baskets. sex.
A hanging basket for construction engineering including a guardrail, a placement mechanism and a bracket mechanism is designed. By setting a sliding placement table and a bracket mechanism on the guardrail, a placement groove and a placement hole are provided, allowing construction personnel to conveniently within the hanging basket. Place and replace the tools and secure the pigment bucket by supporting legs to avoid shaking and leaking.
The process of picking and putting tools by construction personnel is simplified, avoiding repeated bending and picking of tools, improving the convenience and safety of tools, and saving space through folding of the bracket mechanism, improving the practicality and safety of the hanging basket.
Smart Images

Figure CN222207187U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of hanging baskets, in particular to a hanging basket for construction engineering. Background Art
[0002] The hanging basket is a new type of high-altitude working equipment that can replace traditional scaffolding, reduce labor intensity, improve work efficiency, and can be reused. The existing construction hanging basket is mostly used for high-altitude operations such as exterior wall construction, curtain wall installation, insulation construction, and maintenance and cleaning of exterior walls of high-rise or multi-story buildings. The hanging basket is flexible to operate, easy to move, convenient and practical, and safe and reliable. The construction hanging basket is widely used in high-altitude operations such as exterior wall construction, curtain wall installation, insulation construction, and maintenance and cleaning of exterior walls of high-rise buildings. Construction workers can walk on the bottom plate of the hanging basket to perform their operations.
[0003] However, the existing hanging basket for construction engineering also has the following disadvantages:
[0004] 1. There is a lack of storage equipment for construction tools, which makes it inconvenient for construction workers to take and put away construction tools;
[0005] 2. There is a lack of a platform for placing construction materials such as paint buckets, which causes the paint buckets placed inside the hanging basket to shift and leak due to shaking, reducing practicality. Utility Model Content
[0006] The utility model aims to provide a hanging basket for construction projects, which solves the problems that the existing hanging baskets for construction projects lack storage tools for construction tools, construction workers are not convenient in taking and placing construction tools, and lack a platform for placing construction materials such as paint buckets, which causes the paint buckets placed inside the hanging basket to be displaced and leak due to shaking, thereby reducing the practicality.
[0007] In order to achieve the above-mentioned object, the utility model provides a hanging basket for construction engineering, comprising:
[0008] Base;
[0009] A guardrail is fixedly mounted on the upper side of the base, and a group of hoists and safety locks are respectively mounted on the inner walls on both sides thereof. The safety locks are located on the upper side of the hoists, and an electrical box is fixed inside the guardrail;
[0010] The placing mechanism comprises a placing platform, wherein the placing platform is provided with a placing groove, and the bottom and side of the placing platform are respectively provided with a roller assembly I and a roller assembly II, wherein the roller assembly I and the roller assembly II are respectively slidably connected with the top and the side wall of the guardrail;
[0011] The support mechanism comprises a rotating plate, on which a plurality of groups of placement holes are arranged at intervals, one side of the rotating plate is rotatably connected to the inside of the guardrail, and the rotating plate is provided with supporting legs for supporting the rotating plate;
[0012] The protective door is rotatably connected to the passage opening opened on the protective fence, and is fixedly connected to the protective fence through a limiting component.
[0013] As a further solution of the utility model, the roller assembly I includes a first roller, and multiple groups of the first rollers are rotatably connected in a limiting groove set at the bottom of the placement table. The limiting groove is adapted to slide with the top of the guardrail, and multiple groups of the first rollers are slidably connected to the side of the guardrail.
[0014] As a further solution of the utility model, the roller assembly II includes a second roller, and multiple groups of the second rollers are rotatably connected in a rolling groove set on the side of the placement table, and are slidably connected to a sliding groove set on the side of the guardrail.
[0015] As a further solution of the utility model, the rotating plate is provided with a storage groove for accommodating the supporting leg on a side different from the placement hole, and a magnetic piece is fixed on the placement leg, and the magnetic piece is used for magnetic adsorption on the guardrail.
[0016] As a further solution of the utility model, the limit assembly includes a limit switch, a limit slide groove is provided at the passage opening of the guardrail, a through hole is provided on one side of the limit slide groove, the limit switch is slidably connected inside the limit slide groove, an insertion rod is fixedly connected to one side of the limit switch, a spring is sleeved on the outer surface of the insertion rod, and a slot for inserting the limit switch is provided on one side of the protective door.
[0017] As a further solution of the utility model, a limiting baffle is fixedly connected to the bottom of the protective door.
[0018] Compared with the prior art, the utility model provides a sliding placement table on the guardrail. When in use, the construction worker can put the tool into the placement slot on the top of the placement table. During the construction operation back and forth in the hanging basket, the placement table is pushed to the construction operation position. When the construction worker needs to replace the tool, he only needs to replace the required construction tool inside the placement table, avoiding the construction worker from repeatedly bending over to pick up the tool, saving time and effort, simplifying the retrieval process, and facilitating use.
[0019] At the same time, the utility model arranges a bracket mechanism on one side inside the guardrail. When in use, the supporting legs are pulled to open the bracket mechanism and the bottom of the supporting legs is placed on the bottom plate inside the hanging basket. Then, construction materials such as paint buckets are placed inside the placement holes for fixation. This avoids displacement and leakage of the paint buckets placed inside the hanging basket due to shaking. When installing and repairing components on the exterior walls of high-rise buildings, the bracket mechanism can be folded on one side inside the guardrail, saving space and improving the practicability of the device. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 The utility model is a structural schematic diagram of a hanging basket for construction engineering provided by the utility model.
[0021] Figure 2 The utility model is a structural sectional view of a hanging basket for construction engineering provided by the utility model.
[0022] Figure 3 The utility model provides Figure 2 A schematic diagram of the structure enlargement at the center A;
[0023] Figure 4 A structural schematic diagram of the placement mechanism provided by the utility model;
[0024] Figure 5 This is a structural schematic diagram of the bracket mechanism provided by the utility model.
[0025] In the attached drawings: 1. base; 2. guardrail; 3. hoist; 4. safety lock; 5. electrical box; 6. sliding beam; 7. slide; 8. placement mechanism; 801. placement table; 802. placement slot; 803. limit slot; 804. first roller; 805. rolling slot; 806. second roller; 9. bracket mechanism; 901. rotating plate; 902. placement hole; 903. storage slot; 904. support leg; 905. magnet; 10. limit slide; 11. through hole; 12. limit switch; 13. plug rod; 14. spring; 15. protective door; 16. limit baffle; 17. slot. DETAILED DESCRIPTION
[0026] The technical solution of the utility model is further described in detail below in conjunction with specific implementation methods.
[0027] like Figure 1 , Figure 2 , Figure 4 and Figure 5As shown, in an embodiment of the utility model, a hanging basket for construction engineering includes a base 1; a guardrail 2, which is fixedly installed on the upper side of the base 1, and a group of hoists 3 and safety locks 4 are respectively installed on the inner walls of the two sides, and the safety locks 4 are located on the upper side of the hoists 3, and an electrical box 5 is fixed inside the guardrail 2; a placement mechanism 8, including a placement table 801, the placement table 801 is provided with a placement groove 802, and the bottom and side of the placement table 801 are respectively provided with roller components I and roller components II, and the roller components I and roller components II are respectively slidably connected to the top and side walls of the guardrail 2; a bracket mechanism 9, including a rotating plate 901, on which a plurality of groups of placement holes 902 are arranged at intervals, one side of the rotating plate 901 is rotatably connected to the inside of the guardrail 2, and the rotating plate 901 is provided with a support leg 904 for supporting the rotating plate 901; a protective door 15, which is rotatably connected to the passage opening opened on the guardrail 2, and is fixedly connected to the guardrail 2 through a limit assembly;
[0028] Specifically, when the utility model is used:
[0029] 1. The operator slides the placement table 801 onto the guardrail 2, and the tools used by the operator can be placed in the placement slot 802 for storage;
[0030] 2. By setting a bracket mechanism 9 on one side inside the guardrail 2, when in use, pull the support leg 904 to place the bottom of the support leg 904 on the bottom plate inside the hanging basket, and then place the paint bucket and other construction materials inside the placement hole 902 for fixation.
[0031] like Figure 4 As shown, in the embodiment of the utility model, the roller assembly I includes a first roller 804, and multiple groups of the first rollers 804 are rotatably connected in a limiting groove 803 provided at the bottom of the placement table 801, and the limiting groove 803 is adapted to slide with the top of the guardrail 2, and multiple groups of the first rollers 804 are slidably connected with the side of the guardrail 2;
[0032] Furthermore, the roller assembly II includes a second roller 806, and a plurality of groups of the second rollers 806 are rotatably connected in a rolling groove 805 provided on the side of the placement platform 801, and are slidably connected to a sliding groove 7 provided on a sliding beam 6 on the side of the guardrail 2;
[0033] When in use, the construction personnel can put the operating tool into the placement groove 802, and can slide the placement table 801 to a suitable operating position for operation. A shock-absorbing and anti-slip rubber pad is provided at the bottom of the placement groove 802 to prevent the operating tool inside the placement groove 802 from sliding. A limiting groove 803 is opened on one side of the placement table 801 so that the limiting groove 803 is clamped on one side of the guardrail 2. A second roller 806 is provided inside the rolling groove 805 so that the second roller 806 is slidably connected to the inside of the slide groove 7, so that the placement table 801 can slide smoothly on one side of the guardrail 2.
[0034] like Figure 2 and Figure 5 As shown, in an embodiment of the utility model, the rotating plate 901 is different from the side where the placement hole 902 is set, and a storage groove 903 for accommodating the support leg 904 is provided. A magnetic piece is fixed on the placement leg, and the magnetic piece is used to be magnetically adsorbed on the guardrail 2. The magnetic piece is a magnet 905. When there is no liquid construction material, the bracket mechanism 9 can be folded on one side inside the guardrail 2 and fixed to one side of the guardrail 2 by the magnet 905, thereby achieving the purpose of saving the internal space of the hanging basket.
[0035] like Figure 3 As shown, in the embodiment of the utility model, the limit assembly includes a limit switch 12, a limit slide groove 10 is provided at the passage opening of the guardrail 2, a through hole 11 is provided on one side of the limit slide groove 10, the limit switch 12 is slidably connected to the inside of the limit slide groove 10, a plug rod 13 is fixedly connected to one side of the limit switch 12, a spring 14 is sleeved on the outer surface of the plug rod 13, a card slot 17 for inserting the limit switch 12 is provided on one side of the guard door 15, the limit switch 12 is pushed by the spring 14 to prevent the guard door 15 from opening when the hanging basket is in use, and the guard door 15 is provided to ensure the overall frame structure on one side of the guardrail 2, thereby avoiding the reduction in the strength of the guardrail 2 caused by the opening of the guard door 15;
[0036] Through the slot 17 provided on one side of the protection door 15, the limit switch 12 slides into the slot 17 under the action of the spring 14, and the protection door 15 is fixed by the cooperation between the limit switch 12 and the limit baffle 16;
[0037] At the same time, the bottom of the protective door 15 is fixedly connected to a limit baffle 16, which can prevent the protective door 15 from being pushed out from the inside of the hanging basket and causing danger.
[0038] Based on the above;
[0039] 1. The utility model provides a sliding placement table 801 on the guardrail 2. When in use, construction workers can put tools into the placement slot 802 on the top of the placement table 801. When the construction operation is carried out back and forth inside the hanging basket, the placement table 801 is pushed to the construction operation position. When the construction workers need to replace the tools, they only need to replace the required construction tools inside the placement table 801, which avoids the construction workers repeatedly bending down to pick up the tools, saving time and effort, simplifying the retrieval process, and facilitating use;
[0040] 2. The utility model sets a bracket mechanism 9 on one side inside the guardrail 2. When in use, pull the support leg 904 to open the bracket mechanism 9 and place the bottom of the support leg 904 on the bottom plate inside the hanging basket. Then, construction materials such as paint buckets are placed inside the placement hole 902 for fixation. This avoids displacement and leakage of the paint bucket placed inside the hanging basket due to shaking. When installing and repairing components on the exterior wall of a high-rise building, the bracket mechanism 9 can be folded on one side inside the guardrail 2 to save space and improve the practicality of the device.
[0041] The preferred embodiments of the present invention are described in detail above, but the present invention is not limited to the above embodiments, and various changes can be made within the knowledge scope of ordinary technicians in this field without departing from the purpose of the present invention.
Claims
1. A hanging basket for construction engineering, characterized in that: include: Base; A guardrail is fixedly mounted on the upper side of the base, and a group of hoists and safety locks are respectively mounted on the inner walls on both sides thereof. The safety locks are located on the upper side of the hoists, and an electrical box is fixed inside the guardrail; The placing mechanism comprises a placing platform, wherein the placing platform is provided with a placing groove, and the bottom and side of the placing platform are respectively provided with a roller assembly I and a roller assembly II, wherein the roller assembly I and the roller assembly II are respectively slidably connected with the top and the side wall of the guardrail; The support mechanism comprises a rotating plate, on which a plurality of groups of placement holes are arranged at intervals, one side of the rotating plate is rotatably connected to the inside of the guardrail, and the rotating plate is provided with supporting legs for supporting the rotating plate; The protective door is rotatably connected to the passage opening opened on the protective fence, and is fixedly connected to the protective fence through a limiting component.
2. A construction engineering hanging basket according to claim 1, characterized in that: The roller assembly I includes a first roller, and multiple groups of the first rollers are rotatably connected in a limiting groove set at the bottom of the placement table. The limiting groove is adapted to slide with the top of the guardrail, and multiple groups of the first rollers are slidably connected to the side of the guardrail.
3. A construction engineering hanging basket according to claim 1, characterized in that: The roller assembly II includes a second roller, and a plurality of groups of the second rollers are rotatably connected in a rolling groove arranged on the side of the placement table, and are slidably connected with a sliding groove arranged on the side of the guardrail.
4. A construction engineering hanging basket according to claim 1, characterized in that: The rotating plate is provided with a storage groove for accommodating the supporting leg on one side different from the placement hole, and a magnetic piece is fixed on the placement leg, and the magnetic piece is used for magnetic adsorption on the guardrail.
5. A construction engineering hanging basket according to claim 1, characterized in that: The limit assembly includes a limit switch, a limit slide groove is provided at the passage opening of the guardrail, a through hole is provided on one side of the limit slide groove, the limit slide groove is internally slidably connected to the limit switch, a plug rod is fixedly connected to one side of the limit switch, a spring is sleeved on the outer surface of the plug rod, and a slot for inserting the limit switch is provided on one side of the guard door.
6. A construction engineering hanging basket according to claim 1, characterized in that: The bottom of the protective door is fixedly connected with a limit baffle.
