Comprehensive desulfurization device

By designing multiple spraying and uniformly distributed structures in the desulfurization device, the problem of short reaction time of sulfide and desulfurization agent in the prior art is solved, and a more efficient desulfurization effect is achieved.

CN222219150UActive Publication Date: 2024-12-24YIJINHUOLUO QI MENGTAI COAL CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420946554.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-30
Publication Date
2024-12-24
Estimated Expiration
2034-04-30

Smart Images

  • Figure CN222219150U_ABST
    Figure CN222219150U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of desulfurization, in particular to a comprehensive desulfurization device. According to the technical scheme, the device comprises a base and a desulfurizing tower, a spraying pump is fixedly installed on the rear surface of the desulfurizing tower, an air inlet pipe is fixedly connected to the position, close to the edge, of the upper surface of the desulfurizing tower, an air outlet pipe is rotatably installed at the axis position of the upper surface of the desulfurizing tower, and an inner cylinder is fixedly connected to the end, located in the desulfurizing tower, of the air outlet pipe; an annular pipe is fixedly installed on the outer surface of the inner cylinder, a plurality of first spray heads and second spray heads are fixedly installed on the outer surface of the annular pipe in an annular array at equal intervals, the first spray heads and the second spray heads are located outside and inside the inner cylinder respectively, and a first porous flow equalizing plate is fixedly installed at the position, close to the upper surface, of the outer surface of the inner cylinder. According to the desulfurization tower, the reaction time of harmful sulfurized gas and a desulfurizing agent in the desulfurization tower can be prolonged, meanwhile, the desulfurizing agent is in uniform contact with the harmful sulfurized gas, and the desulfurization efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of desulfurization, in particular to a comprehensive desulfurization device. Background Art

[0002] At present, a large amount of harmful gas sulfides that can cause air pollution will be produced during the coal pretreatment process, so it is necessary to use desulfurization equipment to desulfurize and purify these harmful gas sulfides.

[0003] During use, the existing desulfurization device for harmful gas sulfides generated in coal pretreatment usually directly transports the harmful gas sulfides into the interior of the desulfurization tower and treats them by spraying desulfurizer on the top of the tower. The reaction time between the harmful gas sulfides and the desulfurizer is short, resulting in reduced desulfurization efficiency. For this reason, we propose a comprehensive desulfurization device. Utility Model Content

[0004] The utility model aims to provide a comprehensive desulfurization device, which has the advantages of being able to prolong the reaction time of harmful sulfide gas and desulfurizer inside the desulfurization tower, while the desulfurizer and harmful sulfide gas are in uniform contact, thereby improving the desulfurization efficiency. It solves the problem that the existing desulfurization device for harmful gas sulfides generated in coal pretreatment usually directly transports the harmful gas sulfides to the interior of the desulfurization tower during use, and treats them by spraying the desulfurizer on the top of the tower, resulting in a short reaction time between the harmful gas sulfides and the desulfurizer, thereby reducing the desulfurization efficiency.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a comprehensive desulfurization device, comprising a base and a desulfurization tower, a spray pump is fixedly installed on the rear surface of the desulfurization tower, an air inlet pipe is fixedly connected to the upper surface of the desulfurization tower near the edge, an air outlet pipe is rotatably installed at the axial position of the upper surface of the desulfurization tower, one end of the air outlet pipe located inside the desulfurization tower is fixedly connected to an inner cylinder, an annular pipe is fixedly installed on the outer surface of the inner cylinder, a plurality of first nozzles and second nozzles are fixedly installed at equal intervals in a circular array on the outer surface of the annular pipe, the first nozzle and the second nozzle are respectively located on the outside and inside of the inner cylinder, a first multi-porous flow equalizing plate is fixedly installed on the outer surface of the inner cylinder near the upper surface, and a second multi-porous flow equalizing plate is fixedly installed on the inner wall of the inner cylinder near the lower surface.

[0006] Preferably, a base is fixedly installed on the lower surface of the desulfurization tower.

[0007] Preferably, the end of the spray pump output pipe is fixedly connected to the outer surface of the annular pipe, and the end of the spray pump input pipe is fixedly connected to the outer surface of the base near the lower surface.

[0008] Preferably, a demister is fixedly installed inside the inner cylinder near the upper surface.

[0009] Preferably, a support frame is fixedly installed on the upper surface of the desulfurization tower, a rotating motor is fixedly installed on the upper surface of the support frame, a cam is fixedly connected to the end of the output shaft of the rotating motor, a lever is fixedly connected to the outer surface of the outlet pipe, and a coil spring is fixedly connected to the outer surface of the lever.

[0010] Preferably, a roller is rotatably mounted on one side of the outer surface of the cam.

[0011] Compared with the prior art, the beneficial effects of the utility model are as follows:

[0012] 1. The utility model achieves the effect of prolonging the reaction time of harmful sulfide gas and desulfurizer inside the desulfurization tower by arranging a desulfurization tower, an inner cylinder, an annular tube, a first nozzle, a second nozzle, a first porous flow equalizing plate and a second porous flow equalizing plate. At the same time, the desulfurizer and the harmful sulfide gas are in uniform contact, thereby improving the desulfurization efficiency. The harmful sulfide gas generated during the coal pretreatment process enters between the desulfurization tower and the inner cylinder through the air inlet pipe and flows downward, and is evenly distributed between the desulfurization tower and the inner cylinder after passing through the first porous flow equalizing plate, and then contacts, mixes and reacts with the desulfurizer sprayed from the first nozzle. Then, the gas after one spraying reaction enters the inner cylinder, and is evenly distributed inside the inner cylinder after passing through the second porous flow equalizing plate, and then contacts, mixes and reacts with the desulfurizer sprayed from the second nozzle, completing the secondary spraying reaction, and the desulfurized and purified gas is discharged from the air outlet pipe.

[0013] 2. The utility model achieves the effect of uniform distribution of atomized desulfurizer inside the inner cylinder and between the inner cylinder and the desulfurization tower by arranging a rotating motor, a cam, a lever and a coil spring, so that harmful sulfide gas and the desulfurizer are in uniform contact, which is beneficial to the desulfurization and purification of harmful sulfide gas. The rotating motor drives the cam to rotate, and the raised part of the cam periodically contacts the lever. During the contact process, the lever drives the air outlet pipe, the inner cylinder and the annular tube to rotate. When the raised part of the cam and the lever are separated, the compressed coil spring is released, so that the lever is reset, and the air outlet pipe, the inner cylinder and the annular tube are reversely rotated and reset, so that the first nozzle and the second nozzle can rotate and swing back and forth, which is beneficial to the uniform distribution of atomized desulfurizer inside the inner cylinder and between the inner cylinder and the desulfurization tower.

[0014] 3. The utility model converts the sliding friction between the cam and the lever into rolling friction by arranging the roller, thereby reducing friction loss and extending the service life of the lever and the cam. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a three-dimensional schematic diagram of the utility model;

[0016] Figure 2 This is a schematic diagram of the main cross-sectional structure of the utility model;

[0017] Figure 3 For this utility model Figure 2 A is a schematic diagram of the enlarged structure of the middle part;

[0018] Figure 4 For this utility model Figure 2 A schematic diagram of the enlarged structure of B;

[0019] Figure 5 It is a side structural schematic diagram of the utility model.

[0020] Figure numerals: 1. base; 2. desulfurization tower; 3. air inlet pipe; 4. air outlet pipe; 5. rotating motor; 6. support frame; 7. inner cylinder; 8. first multi-porous flow equalizing plate; 9. demister; 10. second multi-porous flow equalizing plate; 11. first nozzle; 12. annular pipe; 13. second nozzle; 14. roller; 15. cam; 16. lever; 17. coil spring; 18. spray pump. DETAILED DESCRIPTION

[0021] The technical solution of the utility model is further described below in conjunction with the accompanying drawings and specific embodiments.

[0022] Embodiment 1

[0023] like Figure 1 , Figure 2 , Figure 3 and Figure 5 As shown, the utility model proposes a comprehensive desulfurization device, including a base 1 and a desulfurization tower 2, a spray pump 18 is fixedly installed on the rear surface of the desulfurization tower 2, the base 1 is fixedly installed on the lower surface of the desulfurization tower 2, the desulfurizer is stored inside the base 1, and an air inlet pipe 3 is fixedly connected to the upper surface of the desulfurization tower 2 near the edge. Harmful sulfide gas produced in coal pretreatment enters the desulfurization tower 2 from the air inlet pipe 3, and an air outlet pipe 4 is rotatably installed at the axial position of the upper surface of the desulfurization tower 2. The air outlet pipe 4 is located at one end of the desulfurization tower 2 and is fixedly connected to an inner tube 7. An annular tube 12 is fixedly installed on the outer surface of the inner tube 7, the end of the output pipe of the spray pump 18 is fixedly connected to the outer surface of the annular tube 12, and the ends of the input pipes of the spray pump 18 are fixedly connected to the outer surface of the base 1 near the lower surface.

[0024] A plurality of first nozzles 11 and second nozzles 13 are equidistantly fixedly installed on the outer surface of the annular tube 12 in an annular array. The first nozzles 11 and the second nozzles 13 are respectively located outside and inside the inner tube 7. A first porous flow equalizing plate 8 is fixedly installed on the outer surface of the inner tube 7 near the upper surface, a second porous flow equalizing plate 10 is fixedly installed on the inner wall of the inner tube 7 near the lower surface, and a demister 9 is fixedly installed inside the inner tube 7 near the upper surface. The gas after desulfurization and purification inside the desulfurization tower 2 passes through the demister 9 to remove water mist and is discharged from the outlet pipe 4.

[0025] When the utility model is in use, the harmful sulfide gas generated during the coal pretreatment process enters between the desulfurization tower 2 and the inner tube 7 through the air inlet pipe 3 and flows downward, and is evenly distributed between the desulfurization tower 2 and the inner tube 7 after passing through the first porous flow equalizing plate 8, and then contacts, mixes and reacts with the desulfurizer sprayed from the first nozzle 11, and then the gas after one spraying reaction enters the inner tube 7, and is evenly distributed inside the inner tube 7 after passing through the second porous flow equalizing plate 10, and then contacts, mixes and reacts with the desulfurizer sprayed from the second nozzle 13, completing the secondary spraying reaction, which can extend the reaction time of the harmful sulfide gas and the desulfurizer inside the desulfurization tower 2, and at the same time, the desulfurizer and the harmful sulfide gas are evenly contacted, thereby improving the desulfurization efficiency, and the desulfurized and purified gas is discharged from the air outlet pipe 4.

[0026] Embodiment 2

[0027] like Figure 1-Figure 4 As shown, the utility model proposes a comprehensive desulfurization device. Compared with the first embodiment, this embodiment also includes a support frame 6 fixedly installed on the upper surface of the desulfurization tower 2, a rotating motor 5 fixedly installed on the upper surface of the support frame 6, a cam 15 fixedly connected to the end of the output shaft of the rotating motor 5, a lever 16 fixedly connected to the outer surface of the outlet pipe 4, and a coil spring 17 fixedly connected to the outer surface of the lever 16, a roller 14 rotatably installed on one side of the outer surface of the cam 15, and the setting of the roller 14 converts the sliding friction between the cam 15 and the lever 16 into rolling friction, thereby reducing friction loss and extending the service life of the lever 16 and the cam 15.

[0028] In this embodiment, the rotating motor 5 drives the cam 15 to rotate, and the raised portion of the cam 15 periodically contacts the lever 16. During the contact process, the lever 16 drives the outlet pipe 4, the inner tube 7 and the annular tube 12 to rotate. When the raised portion of the cam 15 and the lever 16 are separated, the compressed coil spring 17 is released, so that the lever 16 is reset, and the outlet pipe 4, the inner tube 7 and the annular tube 12 rotate in the opposite direction and reset, so that the first nozzle 11 and the second nozzle 13 can rotate and swing back and forth, which is beneficial to the uniform distribution of the atomized desulfurizer inside the inner tube 7 and between the inner tube 7 and the desulfurization tower 2.

[0029] The above-mentioned specific embodiments are only several preferred embodiments of the present invention. Based on the technical solution of the present invention and the relevant inspiration of the above-mentioned embodiments, those skilled in the art can make various alternative improvements and combinations to the above-mentioned specific embodiments.

Claims

1. A comprehensive desulfurization device, comprising a base (1) and a desulfurization tower (2), characterized in that: A spray pump (18) is fixedly installed on the rear surface of the desulfurization tower (2); an air inlet pipe (3) is fixedly connected to the upper surface of the desulfurization tower (2) near the edge; an air outlet pipe (4) is rotatably installed at the axial position of the upper surface of the desulfurization tower (2); one end of the air outlet pipe (4) located inside the desulfurization tower (2) is fixedly connected to an inner cylinder (7); an annular pipe (12) is fixedly installed on the outer surface of the inner cylinder (7); a plurality of first nozzles (11) and second nozzles (13) are fixedly installed on the outer surface of the annular pipe (12) in an annular array at equal intervals; the first nozzles (11) and the second nozzles (13) are respectively located outside and inside the inner cylinder (7); a first multi-porous flow equalizing plate (8) is fixedly installed on the outer surface of the inner cylinder (7) near the upper surface; and a second multi-porous flow equalizing plate (10) is fixedly installed on the inner wall of the inner cylinder (7) near the lower surface.

2. A comprehensive desulfurization device according to claim 1, characterized in that: A base (1) is fixedly mounted on the lower surface of the desulfurization tower (2).

3. A comprehensive desulfurization device according to claim 1, characterized in that: The end of the output pipe of the spray pump (18) is fixedly connected to the outer surface of the annular pipe (12), and the end of the input pipe of the spray pump (18) is fixedly connected to the outer surface of the base (1) near the lower surface.

4. A comprehensive desulfurization device according to claim 1, characterized in that: A demister (9) is fixedly installed inside the inner cylinder (7) near the upper surface.

5. A comprehensive desulfurization device according to claim 1, characterized in that: A support frame (6) is fixedly mounted on the upper surface of the desulfurization tower (2), a rotating motor (5) is fixedly mounted on the upper surface of the support frame (6), a cam (15) is fixedly connected to the end of the output shaft of the rotating motor (5), a lever (16) is fixedly connected to the outer surface of the outlet pipe (4), and a coil spring (17) is fixedly connected to the outer surface of the lever (16).

6. A comprehensive desulfurization device according to claim 5, characterized in that: A roller (14) is rotatably mounted on one side of the outer surface of the cam (15).