Automatic tape splicing mechanism and unwinding equipment

By designing an automatic tape connection mechanism, the automatic tape connection of lithium battery production equipment is achieved using adsorption and cutting components, which solves the problems of low production efficiency and inconvenient operation of the equipment, and improves the equipment's productivity and glue quality.

CN222225492UActive Publication Date: 2024-12-24SVOLT ENERGY TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323615535.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-27
Publication Date
2024-12-24
Estimated Expiration
2033-12-27

AI Technical Summary

Technical Problem

The automatic tape connection process in existing lithium battery production equipment takes too long, affecting the equipment production efficiency, and inconvenient operation of material preparation and glue preparation, which can easily lead to insolid adhesive patching and material tape breakage.

Method used

An automatic belt coupling mechanism is designed, including a first adsorption assembly, a second adsorption assembly, a cutting assembly and a material preparation roller. The automatic belt coupling is realized by adsorbing and cutting the material belt, and the belt penetration part and glue sticking fixture on the material preparation roller can Disassembly settings simplify the tape-through and adhesive bonding process to ensure precise positioning.

Benefits of technology

The automatic tape connection process is achieved quickly, the operation is simplified, the equipment production efficiency and productivity are improved, and the unsolid glue patching and material tape breakage are avoided due to inaccurate positioning of the glue preparation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222225492U_ABST
    Figure CN222225492U_ABST
Patent Text Reader

Abstract

The utility model provides an automatic tape splicing mechanism and unreeling equipment, the automatic tape splicing mechanism comprises a first adsorption assembly, a second adsorption assembly, a cutting assembly, a material preparation roller and a glue preparation assembly, the first adsorption assembly can generate a suction force for adsorbing a first material tape, and the second adsorption assembly can generate a suction force for adsorbing a second material tape. The first adsorption assembly and the second adsorption assembly can be relatively close to or far away from each other to enable the first material belt and the second material belt to be in contact with or separated from each other, the cutting assembly can cut off the first material belt and the second material belt to form a first waste material belt, a first positive material belt, a second waste material belt and a second positive material belt correspondingly, and the material preparation roller is provided with a belt penetrating part; the tape threading part is detachably connected with the material preparation roller, the material tape head of the first material tape / the second material tape is fixed to the material preparation roller through the tape threading part, the material preparation roller can wind the first waste material tape / the second waste material tape, the adhesive tape preparation assembly can press and cover a single-face adhesive tape to a kerf to connect the first positive material tape with the second positive material tape, the tape connecting time is short, and the equipment production efficiency is effectively improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of lithium battery production, in particular to an automatic tape splicing mechanism and unwinding equipment. Background Art

[0002] At present, under the background of "dual carbon", China's new energy industry is developing rapidly. Lithium-ion batteries are widely used due to their high energy density, long service life, and green and pollution-free characteristics.

[0003] With the continuous improvement of lithium battery production efficiency, the speed of replacing electrode material rolls is particularly important. In the existing hot composite cutting and stacking machines, after the material tape is used up, it needs to be manually loaded, threaded and spliced. Manual splicing is time-consuming and labor-intensive, and the machine needs to be shut down during threading and splicing. When the equipment production efficiency is high, loading, threading and splicing will be performed every half an hour, which seriously affects the equipment utilization rate and production rhythm. Although some equipment is equipped with an automatic splicing structure, the production efficiency of the whole equipment is low and the number of times it is used is relatively small. Compared with manual splicing, the advantage is not obvious.

[0004] According to the on-site usage, the existing automatic splicing equipment mainly has the following problems:

[0005] 1. The automatic tape splicing process takes too long, which affects the production efficiency of the equipment and greatly hinders the improvement of the equipment's beat;

[0006] 2. When preparing materials, it is necessary to manually pull the material belt to thread it, which is inconvenient to operate;

[0007] 3. Inaccurate positioning of the adhesive preparation results in loose adhesive bonding and the tape breaks in the middle of the tape. Utility Model Content

[0008] The utility model provides an automatic tape splicing mechanism and unwinding equipment, which are used to solve the defects of the prior art that the automatic tape splicing process takes too long and the equipment production efficiency is low.

[0009] On the one hand, the utility model provides an automatic belt splicing mechanism, comprising:

[0010] A first adsorption component can generate a suction force to adsorb the first material strip;

[0011] The second adsorption component can generate suction to adsorb the second material belt, and is arranged opposite to the first adsorption component. The first material belt and the second material belt pass through the first adsorption component and the second adsorption component respectively. The first adsorption component and the second adsorption component can be relatively close to or away from each other to make the first material belt contact or separate from the second material belt;

[0012] A cutting assembly is perpendicular to the first material belt / the second material belt, and can cut the first material belt and the second material belt synchronously when the first material belt contacts the second material belt, so as to form a corresponding first scrap material belt, a first positive material belt, a second scrap material belt and a second positive material belt;

[0013] The material preparation roller comprises a belt threading portion, the belt threading portion is detachably connected to the material preparation roller, the belt head of the first material belt / the second material belt is fixed to the material preparation roller through the belt threading portion, and the material preparation roller can reel up the first waste belt / the second waste belt;

[0014] The adhesive preparation component is arranged opposite to the cutting component, and can press the single-sided adhesive tape onto the cutting seam to connect the first positive tape with the second positive tape.

[0015] In some embodiments, the strap portion includes:

[0016] The belt pressing rod is arranged along the axial direction of the material preparation roller, and a belt pressing groove is opened on the roller surface of the material preparation roller along the axial direction. The belt pressing rod and the belt pressing groove are matched with each other, and the material head of the first material belt / the second material belt is pressed between the belt pressing rod and the belt pressing groove.

[0017] In some of the embodiments, a magnetic element is provided on the belt pressing rod and / or the belt pressing groove, so that the belt pressing rod and the belt pressing groove attract each other.

[0018] In some embodiments, the belt-threading portion further comprises:

[0019] The limiting rod is arranged opposite to the belt pressing rod, and a limiting groove is arranged on the roller surface of the material preparation roller along the axial direction, and the limiting rod and the limiting groove are matched with each other;

[0020] The end handle is arranged at the end of the material preparation roller and is fixedly connected with the limit rod and the belt pressing rod.

[0021] In some embodiments, the adhesive preparation component includes:

[0022] A fifth suction block is arranged at a rear end of the first suction component and opposite to the cutting component;

[0023] The adhesive sticking jig is arranged relative to the fifth suction block and is detachably connected to the fifth suction block. The single-sided tape is laid on the adhesive sticking jig, and the fifth suction block can generate a suction force to separate the single-sided tape from the adhesive sticking jig.

[0024] The fourth driving mechanism is transmission-connected to the fifth suction block.

[0025] In some of the embodiments, protrusions are evenly arranged on the adhesive application jig, and the sticky side of the single-sided tape is laid on the protrusions.

[0026] In some embodiments, the first suction assembly includes a first suction block and a second suction block, and the first suction block and the second suction block are respectively connected to the first driving mechanism in a transmission manner;

[0027] The second adsorption assembly includes a third suction block and a fourth suction block. The third suction block and the fourth suction block are arranged opposite to the first suction block and the second suction block. The third suction block and the fourth suction block are respectively connected to the second driving mechanism in a transmission manner.

[0028] In some embodiments, the cutting assembly includes,

[0029] A cutter, disposed between the third suction block and the fourth suction block;

[0030] The third driving mechanism is connected to the cutter in driving mode, and can make the cutter move forward and backward in a direction perpendicular to the first material belt and / or the second material belt to cut the first material belt and the second material belt.

[0031] In some embodiments, it also includes,

[0032] First guide rollers are respectively arranged at two ends of the first adsorption assembly;

[0033] The second guide rollers are respectively arranged at two ends of the second adsorption assembly.

[0034] An unwinding device, comprising the automatic tape splicing mechanism provided by any of the above specific embodiments, further comprising:

[0035] A first unwinding component, used for placing a first material roll;

[0036] A second unwinding assembly, used for placing a second material roll;

[0037] An arc-shaped flattening roller assembly and a deviation correction sensor assembly are respectively arranged between the first unwinding assembly and the automatic belt splicing mechanism, and between the second unwinding assembly and the automatic belt splicing mechanism.

[0038] The beneficial effects of the utility model are as follows:

[0039] 1. The automatic tape connection structure of the utility model is provided with a detachable tape threading part on the material preparation roller. The material tape can be fixed on the tape threading part to pass through the arc flattening roller assembly and the deviation correction sensor assembly to reach the material preparation roller. It is not necessary to manually pull the material tape for threading, which is convenient. At the same time, the gap between the material threading part and the material preparation roller is matched, and the material tape head can be pressed between the material threading part and the material preparation roller to achieve a quick connection between the material tape head and the material preparation roller, which is simple and quick to operate.

[0040] 2. The automatic tape splicing structure of the utility model is provided with a detachable glue sticking jig on the glue preparation component. When preparing glue manually, the glue sticking jig can be removed from the glue sticking component to facilitate glue preparation. In addition, the glue sticking jig is consistent in shape with the single-sided tape, and can play a role in positioning the single-sided tape, ensuring that the single-sided tape is accurately placed on the glue sticking jig, avoiding the phenomenon of loose glue sticking and tape breakage caused by inaccurate glue preparation positioning.

[0041] 3. The automatic tape splicing structure of the utility model shortens the splicing process and can improve the production efficiency of the equipment; the material preparation process and the glue preparation process do not occupy the production cycle and can effectively improve the equipment utilization rate. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] In order to more clearly illustrate the technical solutions in the present invention or the prior art, a brief introduction will be given below to the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0043] Figure 1 It is a structural schematic diagram of the automatic belt splicing mechanism of the utility model;

[0044] Figure 2 It is a schematic diagram of the overall structure of the unwinding device of the utility model;

[0045] Figure 3 It is a structural schematic diagram of the material preparation roller;

[0046] Figure 4 It is a structural schematic diagram of the belt threading part;

[0047] Figure 5 It is a structural schematic diagram of the adhesive backing component;

[0048] Figure 6 It is a structural schematic diagram of the glue sticking jig;

[0049] Reference numerals:

[0050] 100-first adsorption component, 110-first suction block, 120-second suction block, 200-second adsorption component, 210-third suction block, 220-fourth suction block, 300-cutting component, 310-cutter, 400-material preparation roller, 410-belt pressing rod, 420-belt pressing groove, 430-magnetic suction component, 440-limiting rod, 450-limiting groove, 460-end handle, 500-glue preparation component, 510-fifth suction block, 520-single-sided tape, 530-glue sticking jig, 531-protrusion, 610 first material strip, 620-second material strip, 710-first guide roller, 720-second guide roller, 810-first unwinding component, 820-second unwinding component, 910-arc flattening roller component, 920-deviation correction sensor component. DETAILED DESCRIPTION

[0051] In order to make the purpose, technical solution and advantages of the utility model clearer, the technical solution of the utility model will be described clearly and completely in conjunction with the drawings in the utility model. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0052] Examples of the embodiments are shown in the accompanying drawings, wherein the same or similar symbols throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.

[0053] In the description of the present invention, it is necessary to understand that the orientations or positional relationships indicated by the terms "top", "bottom", "inside", "outside", "axis", "circumferential", etc. are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention or simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0054] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present utility model, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.

[0055] In the present invention, unless otherwise clearly specified and limited, the terms "install", "connect", "connect", "fix", "join", "hinge" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0056] As mentioned in the background technology, the existing automatic tape splicing equipment mainly has the following problems: the automatic tape splicing process takes too long, affecting the production efficiency of the equipment and greatly hindering the improvement of the equipment's rhythm; when preparing materials, it is necessary to manually pull the material tape for threading, which is inconvenient to operate; inaccurate positioning of the glue preparation leads to loose glue application and the material tape breaks in the middle.

[0057] In order to improve the above problems, the present embodiment provides an automatic tape splicing mechanism, including a first adsorption component 100, a second adsorption component 200, a cutting component 300, a material preparation roller 400, and a glue preparation component 500, wherein the first adsorption component 100 can generate a suction force to adsorb the first material tape 610. The second adsorption component 200 can generate a suction force to adsorb the second material tape 620. The second adsorption component 200 is arranged opposite to the first adsorption component 100. The first material tape 610 and the second material tape 620 pass through the first adsorption component 100 and the second adsorption component 200 respectively. The first adsorption component 100 and the second adsorption component 200 can be relatively close to or away from each other so that the first material tape 610 and the second material tape 620 are in contact or separated.

[0058] When the used material tape is about to run out, the first adsorption assembly 100 and the second adsorption assembly 200 are relatively close to each other, so that the first material tape 610 and the second material tape 620 can be brought into contact with each other to perform the tape splicing operation. After the tape splicing operation is completed, the first adsorption assembly 100 and the second adsorption assembly 200 are reset, and the first material tape 610 and the second material tape 620 are kept separated again. The original spare material tape becomes the current used material tape and continues to be transmitted to the subsequent workstation. At the same time, a new spare material tape is manually fixed on the preparation roller 400.

[0059] It should be noted that the first material belt 610 and the second material belt 620 are each other's spare material belts. When the first material belt 610 is the material belt in use, the second material belt 620 is the spare material belt; when the second material belt 620 is the material belt in use, the first material belt 610 is the spare material belt. In order to make the embodiment clear, the following description of this embodiment will be based on the case where the first material belt 610 is the material belt in use and the second material belt 620 is the spare material belt. Otherwise, the same reasoning will be repeated.

[0060] Under normal working conditions, the cutting assembly 300 is perpendicular to the first material belt 610. Under the tape connection state, the first material belt 610 and the second material belt 620 are in parallel contact with each other, and the cutting assembly 300 is perpendicular to the first material belt 610 and the second material belt 620. The cutting assembly 300 can cut the first material belt 610 and the second material belt 620 synchronously at the same position when the first material belt 610 and the second material belt 620 are in contact, thereby ensuring that the slits of the first material belt 610 and the second material belt 620 are consistent, which is convenient for bonding. After cutting, the first material belt 610 forms the corresponding first scrap belt and the first positive belt, and the second material belt 620 forms the corresponding second scrap belt and the second positive belt. Among them, the first positive belt and the second positive belt can continue to be transported to the subsequent workstation after bonding, while the first scrap belt and the second scrap belt are recycled.

[0061] The stock preparation roller 400 has a belt threading portion, which is detachably connected to the stock preparation roller 400. The belt head of the second material belt 620 is fixed to the stock preparation roller 400 through the belt threading portion. Since the belt head of the second material belt 620 is fixed to the stock preparation roller 400, the stock preparation roller 400 is connected to the cut second waste belt. Then, after the first material belt 610 and the second material belt 620 are cut, the stock preparation roller 400 can rewind and recycle the second waste belt. It should be noted that the first waste belt is always connected to the first unwinding assembly 810. After the first material belt 610 and the second material belt 620 are cut, the first waste belt is rewound and recycled by the first unwinding assembly 810. The first positive material belt connected to the corresponding equipment of the subsequent station will continue to be transported to the subsequent station after bonding with the second positive material belt.

[0062] The adhesive preparation component 500 is arranged opposite to the cutting component 300, and the adhesive backing component can press the single-sided adhesive tape 520 onto the cutting seam to connect the first positive tape with the second positive tape.

[0063] Specifically, in the exemplary embodiment, the tape threading portion includes a tape pressing rod 410, which is arranged along the axial direction of the material preparation roller 400, and a tape pressing groove 420 is opened along the axial direction on the roller surface of the material preparation roller 400. The tape pressing rod 410 and the tape pressing groove 420 are clearance-matched, and the tape head of the second material tape 620 is pressed between the tape pressing rod 410 and the tape pressing groove 420. The notch of the tape pressing groove 420 is arranged radially outward, and the tape pressing rod 410 can be inserted from the notch of the tape pressing groove 420, and the tape head of the second material tape 620 is pressed between the tape pressing rod 410 and the tape pressing groove 420 by using the extrusion force between the tape pressing rod 410 and the tape pressing groove 420.

[0064] Specifically, in the exemplary embodiment, a magnetic attraction member 430 is provided on the belt pressing rod 410 and / or the belt pressing groove 420, so that the belt pressing rod 410 and the belt pressing groove 420 attract each other. As a preferred embodiment, a plurality of magnetic attraction sheets are arranged at intervals at the bottom of the belt pressing groove 420, and the belt pressing rod 410 is made of iron-containing material and can be adsorbed in the belt pressing groove 420. Of course, a plurality of magnetic attraction sheets can also be arranged on the belt pressing rod 410, and the bottom of the belt pressing groove 420 is covered with a layer of iron-containing material, so that the belt pressing rod 410 is adsorbed in the belt pressing groove 420. Magnetic attraction sheets can also be arranged on the belt pressing rod 410 and the belt pressing groove 420 respectively, and the belt pressing rod 410 is adsorbed in the belt pressing groove 420 by using the attraction of opposite magnetic poles.

[0065] Specifically, in the exemplary embodiment, the belt threading part further includes a limiting rod 440 and an end handle 460, wherein the limiting rod 440 is arranged opposite to the belt pressing rod 410, and a limiting groove 450 is provided on the roller surface of the material preparation roller 400 along the axial direction, and the limiting rod 440 and the limiting groove 450 are in clearance fit. It is used to assist in limiting the belt pressing rod 410 to prevent the belt pressing rod 410 from slipping out of the belt pressing groove 420. It should be noted that the length of the belt pressing rod 410 is generally consistent with the length of the belt pressing groove 420, and is not less than the width of the material belt head, so as to ensure that the material belt head can be completely pressed between the belt pressing groove 420 and the belt pressing rod 410. There is no limit on the length of the limiting rod 440, as long as it can be inserted into the limiting groove 450, it can limit the belt pressing rod 410. The end handle 460 is arranged at the end of the preparation roller 400, and the inner side of the end handle 460 is fixedly connected to the limit rod 440 and the belt pressing rod 410. The fixed connection structure can be welded, screwed or integrated. The function of the end handle 460 is to connect the limit rod 440 with the belt pressing rod 410 and to facilitate holding.

[0066] Specifically, in the exemplary embodiment, the glue preparation component 500 includes a fifth suction block 510, a glue sticking jig 530 and a fourth driving mechanism, wherein the fifth suction block 510 is arranged at the rear end of the first adsorption component 100 and at a position opposite to the cutting component 300. The glue sticking jig 530 is arranged relative to the adsorption surface of the fifth suction block 510, and the glue sticking jig 530 and the fifth suction block 510 are detachably connected, and a detachable connection structure such as a pin connection, a clamp connection or a screw connection can be adopted. In this embodiment, a positioning pin connection is adopted. The single-sided tape 520 is laid on the glue sticking jig 530, and the fifth suction block 510 can generate a suction force to separate the single-sided tape 520 from the glue sticking jig 530. The fourth driving mechanism is connected to the fifth suction block 510 in a transmission manner, and can move the fifth suction block 510 up and down to bond the single-sided tape 520 to the first positive material tape and the second positive material tape, so that the first positive material tape and the second positive material tape are bonded.

[0067] As an optional implementation, the fourth driving mechanism may adopt a mechanical transmission mechanism such as a motor gear rack transmission, a motor screw transmission, a hydraulic cylinder drive, or a cylinder drive in the prior art to enable the fifth suction block 510 to move up and down.

[0068] When preparing glue manually, place the single-sided tape 520 on the glue jig 530, and then install the glue jig 530 on the lower end of the fifth suction block 510; when glue is to be applied, open the vacuum chamber of the fifth suction block 510 to provide negative pressure adsorption force, adsorb the glue jig 530 on the lower end of the fifth suction block 510, and manually remove the glue jig 530. At the same time, the fourth driving mechanism moves downward, so that the fifth suction block 510 and the single-sided tape 520 move downward synchronously, and stick the single-sided tape 520 at the connection between the first positive material tape and the second positive material tape. After the glue jig 530 is manually removed, the next glue preparation can be carried out. The glue preparation process does not occupy the production cycle, which is conducive to improving production efficiency. In addition, the shapes of the glue jig 530 and the single-sided tape 520 are adapted to each other, which can avoid the phenomenon of loose glue and broken tape caused by inaccurate positioning of the glue preparation.

[0069] Specifically, in the exemplary embodiment, the adhesive jig 530 is evenly provided with protrusions 531, and the sticky side of the single-sided tape 520 is laid on the protrusions 531. This is helpful to prevent the single-sided tape 520 and the adhesive jig 530 from sticking to each other, and facilitates the fifth suction block 510 to suck the single-sided tape 520 away from the adhesive jig 530.

[0070] Specifically, in the exemplary embodiment, the first adsorption assembly 100 includes a first suction block 110 and a second suction block 120, and the first suction block 110 and the second suction block 120 are respectively connected to the first driving mechanism. The second adsorption assembly 200 includes a third suction block 210 and a fourth suction block 220, and the third suction block 210 and the fourth suction block 220 are arranged opposite to the first suction block 110 and the second suction block 120, and the third suction block 210 and the fourth suction block 220 are respectively connected to the second driving mechanism.

[0071] The first suction block 110, the second suction block 120, the third suction block 210, the fourth suction block 220, and the fifth suction block 510 can adopt the negative pressure structure in the prior art so that they can provide negative pressure adsorption force. The negative pressure chambers of the first suction block 110, the second suction block 120, the third suction block 210, the fourth suction block 220, and the fifth suction block 510 are independent of each other.

[0072] The first driving mechanism may adopt a mechanical transmission mechanism such as a motor gear rack transmission, a motor screw transmission, a hydraulic cylinder drive, or a cylinder drive in the prior art to enable the first suction block 110 and the second suction block 120 to move up and down and left and right.

[0073] The second driving mechanism may adopt a mechanical transmission mechanism such as a motor gear rack transmission, a motor screw transmission, a hydraulic cylinder drive, or a cylinder drive in the prior art to enable the third suction block 210 and the fourth suction block 220 to move up and down.

[0074] Specifically, in the exemplary embodiment, the cutting assembly 300 includes a cutter 310 and a third driving mechanism, and the cutter 310 is disposed between the third suction block 210 and the fourth suction block 220. The third driving mechanism is connected to the cutter 310 in a transmission manner, and the cutter 310 can be moved forward and backward in a direction perpendicular to the first material strip 610 and the second material strip 620 to cut the first material strip 610 and the second material strip 620. Among them, the third driving mechanism can adopt a mechanical transmission mechanism such as a motor gear rack transmission or a motor screw transmission or a hydraulic cylinder drive or a cylinder drive in the prior art, so that the cutter 310 can move up and down. Of course, the cutter 310 itself also rotates at a high speed, and the first material strip 610 and the second material strip 620 are quickly cut by providing a rotational cutting force through rotation.

[0075] Specifically, in the exemplary embodiment, a first guide roller 710 and a second guide roller 720 are further included, wherein the first guide roller 710 is respectively disposed at both ends of the first adsorption assembly 100, and the second guide roller 720 is respectively disposed at both ends of the second adsorption assembly 200, for guiding the first material belt 610 and the second material belt 620.

[0076] An unwinding device includes the automatic tape splicing mechanism provided by any of the above specific embodiments, and also includes a first unwinding assembly 810 and a second unwinding assembly 820, wherein the first unwinding assembly 810 is used to place a first material roll, and during production, the first material roll is manually placed on the first unwinding assembly 810, and the first material tape 610 is drawn out from the first material roll as the first unwinding assembly 810 rotates. The second unwinding assembly 820 is used to place a second material roll, and during production, the second material roll is manually placed on the second unwinding assembly 820, and the second material tape 620 is drawn out from the second material roll as the second unwinding assembly 820 rotates. An arc-shaped flattening roller assembly 910 and a deviation correction sensor assembly 920 are respectively arranged between the first unwinding assembly 810 and the automatic tape splicing mechanism, and between the second unwinding assembly 820 and the automatic tape splicing mechanism. The arc-shaped flattening roller assembly 910 is used to flatten the surface of the first material tape 610 and the second material tape 620, and the deviation correction sensor assembly 920 is used to correct the deviation of the first material tape 610 and the second material tape 620.

[0077] Working principle:

[0078] When the first material roll corresponding to the first material tape 610 is almost used up, the machine is stopped for automatic tape connection. First, the third suction block 210 and the fourth suction block 220 move upward together, and the second suction block 120 and the first suction block 110 move downward together. At this time, the four vacuum suction blocks will sandwich the first material tape 610 and the second material tape 620 in the middle; secondly, the cutter 310 will move upward to cut the first material tape 610 and the second material tape 620; then the vacuum chamber inside the third suction block 210 and the second suction block 120 will be disconnected at the same time, and then the material preparation roller 400 will be controlled to rotate counterclockwise to reel in the second waste roll, and the first unwinding assembly 810 will be controlled to rotate clockwise to reel in the first waste roll. After the first waste roll and the second waste roll are collected, the vacuum chamber of the third suction block 210 is opened and the vacuum chamber of the first suction block 110 is closed. At this time, the first positive material tape is adsorbed on the third suction block 210, and the second positive material tape is adsorbed on the fourth suction block 220. Then the second suction block 120 and the first suction block 110 move upward and to both sides at the same time to make way for the fifth suction block 510. The fifth suction block 510 moves downward, and finally the fifth suction block 510 firmly attaches the tape to the cut-off point of the material tape, and then disconnects the vacuum chambers of the third suction block 210 and the fourth suction block 220, and returns to the initial position, thereby realizing automatic tape splicing. In the whole process, the tape splicing action is simple, the glue sticking position is accurate, the material preparation and glue preparation processes do not occupy the production cycle, the tape splicing time is short, and the equipment utilization rate is high.

[0079] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", "a specific embodiment" or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the utility model. In this specification, the schematic representation of terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.

[0080] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the utility model, rather than to limit it. Although the utility model has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the various embodiments of the utility model.

Claims

1. An automatic belt splicing mechanism, characterized in that: include: A first adsorption component can generate a suction force to adsorb the first material strip; The second adsorption component can generate a suction force to adsorb the second material belt, and is arranged opposite to the first adsorption component. The first material belt and the second material belt pass through the first adsorption component and the second adsorption component respectively. The first adsorption component and the second adsorption component can be relatively close to or away from each other to make the first material belt contact or separate from the second material belt; A cutting assembly, which is perpendicular to the first material tape / the second material tape, can cut the first material tape and the second material tape synchronously when the first material tape contacts the second material tape, so as to form a corresponding first scrap tape, a first positive material tape, a second scrap tape and a second positive material tape; A material preparation roller, comprising a belt threading portion, wherein the belt threading portion is detachably connected to the material preparation roller, and a belt head of the first material belt / the second material belt is fixed to the material preparation roller through the belt threading portion, and the material preparation roller can reel up the first waste belt / the second waste belt; The adhesive preparation component is arranged opposite to the cutting component, and can press the single-sided adhesive tape onto the cutting seam to connect the first positive material tape with the second positive material tape.

2. The automatic belt splicing mechanism according to claim 1, characterized in that: The belt-threading portion comprises: A belt pressing rod is arranged along the axial direction of the material preparation roller, and a belt pressing groove is opened on the roller surface of the material preparation roller along the axial direction. The belt pressing rod and the belt pressing groove are clearance-matched to press the material head of the first material belt / the second material belt between the belt pressing rod and the belt pressing groove.

3. The automatic belt splicing mechanism according to claim 2, characterized in that: The belt pressing rod and / or the belt pressing groove are provided with a magnetic attraction member so that the belt pressing rod and the belt pressing groove attract each other.

4. The automatic belt splicing mechanism according to claim 2, characterized in that: The belt-threading portion further comprises: A limit rod is arranged opposite to the belt pressing rod, a limit groove is provided on the roller surface of the material preparation roller along the axial direction, and the limit rod is in clearance with the limit groove; An end handle is arranged at the end of the material preparation roller and is fixedly connected to the limit rod and the belt pressing rod.

5. The automatic belt splicing mechanism according to any one of claims 1 to 4, characterized in that: The glue preparation component comprises: a fifth suction block, arranged at a rear end of the first suction component and opposite to the cutting component; a glue sticking jig, arranged relative to the fifth suction block, and detachably connected to the fifth suction block, the single-sided tape being laid on the glue sticking jig, and the fifth suction block being capable of generating a suction force to separate the single-sided tape from the glue sticking jig; The fourth driving mechanism is transmission-connected to the fifth suction block.

6. The automatic belt splicing mechanism according to claim 5, characterized in that: The adhesive sticking jig is evenly provided with protrusions, and the sticky side of the single-sided adhesive tape is laid on the protrusions.

7. The automatic belt splicing mechanism according to claim 6, characterized in that: The first adsorption assembly includes a first suction block and a second suction block, and the first suction block and the second suction block are respectively connected to the first driving mechanism in a transmission manner; The second adsorption assembly includes a third suction block and a fourth suction block. The third suction block and the fourth suction block are arranged opposite to the first suction block and the second suction block respectively. The third suction block and the fourth suction block are transmission-connected to the second driving mechanism respectively.

8. The automatic belt splicing mechanism according to claim 7, characterized in that: The cutting assembly comprises, A cutter, disposed between the third suction block and the fourth suction block; The third driving mechanism is drivingly connected to the cutter, and can make the cutter move forward and backward along a direction perpendicular to the first material strip and / or the second material strip to cut the first material strip and the second material strip.

9. The automatic belt splicing mechanism according to claim 1, characterized in that: Also includes, First guide rollers are respectively arranged at two ends of the first adsorption assembly; The second guide rollers are respectively arranged at two ends of the second adsorption assembly.

10. A reeling device, characterized in that: The automatic belt splicing mechanism comprises any one of claims 1 to 9, and further comprises: A first unwinding assembly, used for placing a first material roll; A second unwinding assembly, used for placing a second material roll; An arc-shaped flattening roller assembly and a deviation correction sensor assembly are respectively arranged between the first unwinding assembly and the automatic belt splicing mechanism, and between the second unwinding assembly and the automatic belt splicing mechanism.