Suspended ceiling hoop connecting system
The ceiling hoop connection system addresses installation challenges by using connectors and clamps with grooves and bolts to securely attach structural beams and fixing pipes to building ceilings, enhancing efficiency and stability.
Patent Information
- Application Number
- CN202420942847.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-30
- Publication Date
- 2024-12-24
- Estimated Expiration
- 2034-04-30
AI Technical Summary
Existing methods struggle to tightly fix structural I-beams, curved tubes, and curved aluminum square tubes to building ceilings during renovation, leading to installation difficulties and increased working time.
A ceiling hoop connection system comprising connectors, structural beams, clamps, and hoops, utilizing fixing grooves and guide grooves for secure attachment, with components connected via bolts for stability.
Facilitates secure and efficient installation of ceilings, fixing pipes, and structural beams by ensuring tight fixation, reducing installation time and enhancing structural strength.
Smart Images

Figure CN222227708U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building decoration, in particular to a ceiling hoop connection system. Background Art
[0002] Ceiling refers to a kind of decoration on the top of the house living environment. Simply put, it refers to the decoration of the ceiling, which is one of the important parts of interior decoration.
[0003] During the renovation of large buildings, it is necessary to fix the ceiling on the inside of the building's roof. The existing fixing method is difficult to tightly fix the structural I-beams, curved tubes and curved aluminum square tubes on the top of the building, and the fixing parts of the existing fixing method are difficult to install, which greatly increases the working time. Utility Model Content
[0004] The utility model provides a ceiling hoop connection system, which solves the technical problems that the ceiling, a fixing pipe and a structural beam cannot be tightly fixed, and the components used to fix the ceiling, the fixing pipe and the structural beam are difficult to install.
[0005] To solve the above technical problems, the technical solution of this novel invention is as follows:
[0006] A ceiling hoop connection system, comprising:
[0007] Connectors;
[0008] a structural beam connected to the top of the connector;
[0009] A first clamp connected to a side surface of the connecting member;
[0010] The first clamp is connected to the second clamp via a fixing tube;
[0011] The second hoop is connected to the ceiling.
[0012] Optionally, the connecting member includes a fixing groove and a guide groove, and the fixing groove and the guide groove are integrally formed.
[0013] Optionally, the edge of the opening end of the guide groove is fixedly connected to the edge of the opening end of the fixing groove.
[0014] Optionally, the length of the connecting member is the same as the length of the structural beam;
[0015] A through hole is opened on the side of the guide groove, and the structural beam is fixedly connected to the guide groove by bolts.
[0016] Optionally, the first hoop includes a first hoop body and a first hoop hanger vertically connected to the outer surface of the first hoop body.
[0017] Optionally, the first hoop body is an annular structure, and the fixed tube passes through the first hoop body;
[0018] The two ends of the first hoop body are fixedly connected by bolts.
[0019] Optionally, the first hoop pendant is a sheet-like structure;
[0020] The first hoop hanger is fixedly connected to the side surface of the fixing groove.
[0021] Optionally, the second hoop includes a second hoop body, a third hoop body, and a second hoop hanger fixedly connected to the third hoop body;
[0022] The second clamp is arranged outside the first clamp.
[0023] Optionally, the second hoop body and the third hoop body are both arc-shaped structures;
[0024] Both ends of the second hoop body and the third hoop body are fixedly connected by bolts.
[0025] Optionally, the fixed pipe passes through the second hoop body and the third hoop body;
[0026] The second hoop hanger is connected to the ceiling.
[0027] The above solution of the utility model includes at least the following beneficial effects:
[0028] The above scheme of the utility model includes: a connecting member; a structural beam connected to the top of the connecting member; a first hoop connected to the side of the connecting member; the first hoop is connected to the second hoop through a fixing pipe; the second hoop is connected to the ceiling. The fixing of the connecting member to the structural beam is achieved by locating the connecting member below the structure and fixing the side of the structural beam to the upper part of the connecting member by bolts. The fixing of the fixing pipe to the structural beam is achieved by passing the fixing pipe through the first hoop and the second hoop, and the first hoop hanger is fixedly connected to the outer side of the connecting member by bolts. The fixing of the ceiling, the fixing pipe and the structural beam is achieved by fixing the second hoop hanger located at the bottom of the second hoop to the ceiling. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 It is a structural schematic diagram of the utility model;
[0030] Figure 2 This is a schematic diagram of the first clamp structure of the utility model;
[0031] Figure 3 This is a schematic diagram of the second hoop structure of the utility model;
[0032] Figure 4 It is a right view of the utility model;
[0033] Description of reference numerals:
[0034] 1. Connecting piece; 11. Fixing groove; 12. Guide groove; 2. Structural beam; 3. First clamp; 31. First clamp body; 32. First clamp hanger; 4. Fixing pipe; 5. Second clamp; 51. Second clamp body; 52. Third clamp body; 53. Second clamp hanger; 6. Ceiling. DETAILED DESCRIPTION
[0035] The exemplary embodiments of the present application will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present application are shown in the accompanying drawings, it should be understood that the present application can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided in order to enable a more thorough understanding of the present application and to fully convey the scope of the present application to those skilled in the art.
[0036] like Figure 1 and Figure 4 As shown, the embodiment of the utility model provides a ceiling hoop connection system, which is characterized by comprising:
[0037] Connector 1;
[0038] A structural beam 2 connected to the top of the connecting member 1;
[0039] A first clamp 3 connected to the side of the connecting member 1;
[0040] The first clamp 3 is connected to the second clamp 5 through a fixing tube 4;
[0041] The second hoop 5 is connected to the ceiling 6 .
[0042] In the above embodiment, the connecting member 1 is located below the structural beam 2 and the side of the structural beam 2 is fixedly connected to the upper part of the connecting member 1 by bolts, so as to fix the connecting member 1 to the structural beam 2. The fixing pipe 4 passes through the first clamp 3 and the second clamp 5, and the first clamp hanger 32 is fixedly connected to the outer side of the connecting member 1 by bolts, so as to fix the fixing pipe 4 to the structural beam 2. The second clamp hanger 53 located at the bottom of the second clamp 5 is fixedly connected to the ceiling 6, so as to fix the ceiling 6, the fixing pipe 4 and the structural beam 2, and form the ceiling clamp connection system described in the present application.
[0043] In an optional embodiment of the present utility model, the connecting member 1 includes a fixing groove 11 and a guide groove 12;
[0044] The fixing groove 11 and the guide groove 12 are integrally formed.
[0045] In an optional embodiment of the present invention, the edge of the opening end of the guide groove 12 is fixedly connected to the edge of the opening end of the fixing groove 11 .
[0046] In the above two embodiments, the side surfaces of the fixing groove 11 and the guide groove 12 are vertically connected to their bottom surfaces, and the fixing groove 11 and the guide groove 12 are vertically connected to each other. Since the structural beam 2 is a steel material such as an I-beam or a T-shaped steel, by fixing the open end of the guide groove 12 with the edge of the open end of the fixing groove 11, the side surface of the structural beam 2 can be inserted into the guide groove 12, and then the side surface of the structural beam 2 is fixedly connected with the side surface of the guide groove 12 by bolts, so as to fix the structural beam 2.
[0047] The fixing groove 11 is located below the guide groove 12 , and the side surface of the fixing groove 11 is fixedly connected to the first clamp 3 via bolts, thereby fixing the first clamp 3 .
[0048] The fixing groove 11 and the guide groove 12 are integrally formed, which can enhance the structural strength of the connecting member 1 .
[0049] In an optional embodiment of the present invention, the length of the connecting member 1 is the same as the length of the structural beam 2;
[0050] A through hole is opened on the side of the guide groove 12, and the structural beam 2 is fixedly connected to the guide groove 12 by bolts.
[0051] In the above embodiment, if Figure 4 As shown, the length and curvature of the connecting member 1 are the same as those of the structural beam 2, which plays the role of inserting all the sides of the structural beam 2 into the connecting member 1. When in use, a plurality of through holes are opened on the side of the guide groove 12 as needed to fix the connecting member 1 and the structural beam 2.
[0052] In an optional embodiment of the present invention, the first hoop 3 includes a first hoop body 31 and a first hoop hanger 32 vertically connected to the outer surface of the first hoop body 31 .
[0053] In an optional embodiment of the present utility model, the first hoop body 31 is an annular structure, and the fixing tube 4 passes through the first hoop body 31;
[0054] The two ends of the first hoop body 31 are fixedly connected by bolts.
[0055] In the above two embodiments, Figure 2As shown, both ends of the first hoop body 31 are provided with outer flanges, and the first hoop body 31 is fixedly connected to the fixing pipe 4 by passing bolts through the two outer flanges.
[0056] At least two first hoops 3 are disposed on the fixing pipe 4 , and the first hoops 3 are respectively disposed on both sides of the connecting member 1 .
[0057] In an optional embodiment of the present utility model, the first hoop hanger 32 is a sheet-like structure;
[0058] The first hoop hanger 32 is fixedly connected to the side surface of the fixing groove 11 .
[0059] In the above embodiment, the side surface of the first hoop hanger 32 is integrally formed with the outer surface of the first hoop body 31. At least two elliptical holes are formed on the first hoop hanger 32, which play a role in adjusting the fixed position of the first hoop 3 according to the actual environment. The fixing bolt passes through the elliptical hole and the side surface of the fixing groove 11 to fix the first hoop hanger 32 and the connecting member 1.
[0060] In an optional embodiment of the present invention, the second hoop 5 includes a second hoop body 51, a third hoop body 52, and a second hoop hanger 53 fixedly connected to the third hoop body 52;
[0061] The second clamp 5 is arranged outside the first clamp 3 .
[0062] In an optional embodiment of the present invention, the second hoop body 51 and the third hoop body 52 are both arc-shaped structures;
[0063] Both ends of the second hoop body 51 and the third hoop body 52 are fixedly connected by bolts.
[0064] In the above two embodiments, Figure 3 As shown, the second hoop body 51 and the third hoop body 52 are both arc-shaped structures, and the top edges are both provided with outer flanges, and are fixedly connected by bolts. The inner diameter of the enclosed part of the second hoop body 51 and the third hoop body 52 is the same as the outer diameter of the fixed tube 4, so as to fix the fixed tube 4.
[0065] The bottom of the third hoop body 52 is rectangular, the top of the second hoop hanger 53 is fixedly connected to the bottom of the third hoop body 52 by bolts, and the bottom of the second hoop hanger 53 is connected to the upper surface of the ceiling 6. Specifically, a plurality of grooves are provided on the upper surface of the ceiling 6, and when in use, the bottom of the second hoop hanger 53 is inserted into the grooves, so as to fix the ceiling 6 and the second hoop 5.
[0066] At least two second hoops 5 are disposed on the fixing tube 4 , and the second hoops 5 are all disposed on the outside of the first hoops 3 .
[0067] In an optional embodiment of the present utility model, the fixed tube 4 passes through the second hoop body 51 and the third hoop body 52;
[0068] The second hoop hanger 53 is connected to the ceiling 6 .
[0069] In the above embodiment, the fixing pipe 4 is a galvanized round steel pipe. The ceiling 6 is an arc-shaped aluminum square tube, and a metal mesh plate is arranged between adjacent ceilings 6. The ceiling 6 is fixedly connected to the metal mesh partition by bolts. Preferably, the thickness of the metal mesh partition is 2 mm.
[0070] In a specific embodiment of the utility model, both ends of the first hoop body 31, the second hoop body 51 and the third hoop body 52 are fixedly connected by M8 stainless steel bolts. The first hoop hanger 32 is fixedly connected to the side of the fixing groove 11 by M12 stainless steel bolts. The diameter of the fixing pipe 4 is 100mm and the length is 4m. The ceiling 6 is an arc-shaped aluminum square tube with a thickness of 15mm and a width of 300mm, and the metal mesh partition is 2mm thick and 200mm wide.
[0071] The above is a preferred embodiment of the present invention. It should be pointed out that, for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present invention. These improvements and modifications should also be regarded as the protection scope of the present invention.
Claims
1. A ceiling hoop connection system, characterized in that: include: Connector (1); A structural beam (2) connected to the top of the connecting member (1); A first hoop (3) connected to the side of the connecting member (1); The first clamp (3) is connected to the second clamp (5) via a fixing tube (4); The second hoop (5) is connected to the ceiling (6).
2. The ceiling clamp connection system according to claim 1, characterized in that: The connecting member (1) comprises a fixing groove (11) and a guiding groove (12), and the fixing groove (11) and the guiding groove (12) are integrally formed.
3. The ceiling hoop connection system according to claim 2, characterized in that: The edge of the opening end of the guide groove (12) is fixedly connected to the edge of the opening end of the fixing groove (11).
4. The ceiling clamp connection system according to claim 3, characterized in that: The length of the connecting member (1) is the same as the length of the structural beam (2); A through hole is opened on the side of the guide groove (12), and the structural beam (2) is fixedly connected to the guide groove (12) by means of bolts.
5. The ceiling clamp connection system according to claim 4, characterized in that: The first hoop (3) comprises a first hoop body (31) and a first hoop hanger (32) vertically connected to the outer surface of the first hoop body (31).
6. The ceiling clamp connection system according to claim 5, characterized in that: The first hoop body (31) is an annular structure, and the fixed tube (4) passes through the first hoop body (31); The two ends of the first hoop body (31) are fixedly connected by bolts.
7. The ceiling clamp connection system according to claim 6, characterized in that: The first hoop hanger (32) is a sheet-like structure; The first hoop hanger (32) is fixedly connected to the side surface of the fixing groove (11).
8. The ceiling clamp connection system according to claim 7, characterized in that: The second hoop (5) comprises a second hoop body (51), a third hoop body (52), and a second hoop hanger (53) fixedly connected to the third hoop body (52); The second hoop (5) is arranged outside the first hoop (3).
9. The ceiling clamp connection system according to claim 8, characterized in that: The second hoop body (51) and the third hoop body (52) are both arc-shaped structures; Both ends of the second hoop body (51) and the third hoop body (52) are fixedly connected by bolts.
10. The ceiling clamp connection system according to claim 9, characterized in that: The fixed tube (4) passes through the second hoop body (51) and the third hoop body (52); The second hoop hanger (53) is connected to the ceiling (6).
