Water-cooled wall tube row hoisting tool
By designing adjustable connection components and stability limit mechanism, the problem that the water-cooled wall pipe hoisting equipment cannot adjust the lifting point position is solved, achieving a more stable lifting process and safe operation.
Patent Information
- Application Number
- CN202422892917.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-27
- Publication Date
- 2024-12-27
- Estimated Expiration
- 2034-11-27
AI Technical Summary
The existing lifting equipment cannot adjust the lifting point position according to the specific size of the water-cooled wall pipe row, which makes it difficult to ensure stability during the lifting process, and the pipe row is unevenly subjected to damage.
A water-cooled wall pipe row hoisting tool is designed, using removable connecting components and fixing mechanisms, allowing the lifting point position to be adjusted according to the pipe row size during the lifting process, and ensuring the stability of the rope connection through the clamping assembly and spring mechanism. Prevent loosening.
It improves the stability of the pipe discharge during the lifting process, ensures uniform stress, avoids damage caused by lifting, and facilitates the maintenance and replacement of ropes, improving safety.
Smart Images

Figure CN222249698U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of hoisting tools, in particular to a water-cooled wall tube row hoisting tool. Background Art
[0002] At present, million-kilowatt ultra-supercritical coal-fired boiler units have become the mainstream trend of domestic thermal power development. Whether it is a "tower" type furnace or a "Π" type furnace, its interior is composed of many heating surfaces, and it needs to be equipped with water-cooled wall tube rows to achieve cooling of the heating surfaces. In view of the large size of the water-cooled wall tube row and the large number of installations required, the existing lifting equipment has fixed lifting points during the lifting process, and the lifting point position cannot be adjusted according to the specific size of the water-cooled wall tube row. This makes it difficult to ensure stability during the lifting process, and the tube row is unevenly stressed, which is easy to cause damage. To this end, we proposed a water-cooled wall tube row lifting tool. Utility Model Content
[0003] The utility model aims to provide a water-cooled wall tube row hoisting tool to solve the problems raised in the above-mentioned background technology.
[0004] To achieve the above object, the utility model provides the following technical solutions: a water-cooled wall tube row hoisting tool, comprising a fixing frame, the top of the fixing frame is fixedly connected to a connecting frame, the bottom of the fixing frame is provided with an assembly groove, the assembly frame is assembled in the assembly groove, a connecting component is assembled between the assembly frame and the assembly groove, and the bottom of the assembly frame is fixedly assembled with fixing mechanisms symmetrically distributed in front and rear;
[0005] The connection assembly comprises a connection block, the connection block is fixedly connected to the top of the assembly frame, a connection hole is formed on the side wall of the connection block, a positioning hole is formed on the side wall of the fixing frame that penetrates into the assembly groove, and a positioning bolt is screwed on the side wall of the fixing frame that penetrates into the connection hole;
[0006] The fixing mechanism comprises a first fixing plate and a second fixing plate, wherein the first fixing plate and the second fixing plate are fixedly connected to the bottom of the assembly frame, a fixing bolt threadedly connected to the second fixing plate is inserted into the side wall of the first fixing plate, and an annular groove is formed on the side wall of the fixing bolt.
[0007] Preferably, the number of the assembly slots is at least four groups, the number of the assembly slots in each group is two, and the two assembly slots are symmetrically distributed at the bottom of the fixing frame in the front and rear directions.
[0008] Preferably, a clamping assembly is assembled between the side wall of the first fixing plate and the fixing bolt, the clamping assembly includes a mounting frame, the mounting frame is fixedly connected to the side wall of the first fixing plate, a mounting block is assembled in the mounting frame, a clamping pin penetrating the mounting frame is fixedly connected to the top of the mounting block, the clamping pin is arranged in a slot, the slot is arranged in the side wall of the fixing bolt, a handle frame penetrating the mounting frame is fixedly connected to the bottom of the mounting block, and a spring is fixedly assembled between the mounting block and the mounting frame.
[0009] Preferably, a marking groove is formed on the side wall of the fixing bolt, a marking block is fixedly connected to the side wall of the first fixing plate, and the marking groove corresponds to the position of the marking block.
[0010] Compared with the prior art, the utility model has the following beneficial effects: a water-cooled wall tube row hoisting tool is used for hoisting operations on water-cooled wall tube rows, the overall structure is simple, and it is easy to install and use. Compared with the traditional hoisting device, the assembly frame and the assembly slot are detachably and fixedly connected by a connecting component, and the position of the hoisting point can be fine-tuned according to the size of the tube row and the specific requirements of the hoisting during the hoisting of the tube row, thereby improving the stability of the tube row during the hoisting process, ensuring that the tube row is well stressed, and will not be damaged due to hoisting;
[0011] The utility model further provides a fixing mechanism for connecting the ends of the rope, so as to facilitate maintenance and replacement of the rope after it is worn. In the fixing mechanism, a clamping assembly for limiting the position of the fixing bolt is provided, which can effectively limit the connection position of the fixing bolt during the process of using the rope to hoist the pipe row, preventing it from loosening from the fixed position, thereby ensuring the stability of the rope connection position and avoiding safety accidents caused by the connection position falling off. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 It is a three-dimensional diagram of the utility model.
[0013] Figure 2 It is a structural schematic diagram of the assembly frame and the assembly slot of the utility model.
[0014] Figure 3 It is a structural schematic diagram of the fixing mechanism of the utility model.
[0015] Figure 4 It is a structural schematic diagram of the clamping assembly of the utility model.
[0016] Figure 5 It is a structural schematic diagram of the fixing bolt of the utility model.
[0017] Figure 6 It is a schematic diagram of the structure of the utility model after the water-cooled wall tube row is hoisted.
[0018] In the figure: 1. fixing frame; 2. connecting frame; 3. assembly groove; 4. assembly frame; 5. connecting assembly; 51. connecting block; 52. connecting hole; 53. positioning hole; 54. positioning bolt; 6. fixing mechanism; 61. first fixing plate; 62. second fixing plate; 63. fixing bolt; 631. annular groove; 7. clamping assembly; 71. mounting frame; 72. mounting block; 73. bayonet pin; 74. clamping groove; 75. handle frame; 76. spring; 8. marking groove; 9. marking block. DETAILED DESCRIPTION
[0019] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.
[0020] See also Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 and Figure 6 The utility model provides a technical solution: a water-cooled wall tube row hoisting tool, which is mainly used for the hoisting of water-cooled wall tube rows, economizers, reheaters, and superheater tube rows, including a fixing frame 1, a connecting frame 2 is welded and fixed on the top of the fixing frame 1, and the number of the connecting frames 2 is at least four. By setting the end of the rope in the connecting frame 2, the fixing frame 1 is connected to a lifting device such as a crane by setting the connecting frame 2. The setting of four connecting frames 2 can increase the overall stability of the fixing frame 1 during the hoisting process. The bottom of the fixing frame 1 is provided with an assembly groove 3, and the number of the assembly groove 3 is at least four groups. Each group of the assembly grooves 3 is respectively equipped with an assembly frame 4, and the two assembly grooves 3 of each group are symmetrically opened on the fixing frame 1 in the front and rear. The bottom of the assembly frame 4 is detachably fixedly connected to the assembly groove 3 through a connecting component 5. By setting the connecting component 5, the assembly frame 4 can be adjusted to a short-distance fixed position in the assembly groove 3, so that in the process of hoisting the water-cooled wall tube row, it is convenient to adjust the position of the hanging point according to the specific size of the tube row, so that the utility model can hoist water-cooled wall tube rows of different sizes more stably. The bottom of the assembly frame 4 is symmetrically fixedly equipped with a fixing mechanism 6 in the front and rear. The fixing mechanism 6 is used to be fixedly connected to one end of the rope, and the other end of the rope is sleeved on the hoisting point of the water-cooled wall tube row.
[0021] like Figure 2As shown in the figure, the connecting component 5 includes a connecting block 51, which is integrally formed at the top of the assembly frame 4. There are two connecting blocks 51, and the two connecting blocks 51 are symmetrically distributed in the front and rear and are respectively inserted into the assembly slot 3. The side walls of the connecting blocks 51 are provided with connecting holes 52 symmetrically distributed in the left and right directions. The connecting holes 52 penetrate the connecting blocks 51, and the side walls of the fixing frame 1 are evenly provided with positioning holes 53 penetrating into the assembly slot 3. The side walls of the fixing frame 1 are screwed with positioning bolts 54 penetrating the positioning holes 53 and the connecting holes 52. By screwing the positioning bolts 54 into the connecting holes 52, the connection and fixation of the assembly frame 4 and the assembly slot 3 are achieved. The connection and fixation of the connecting blocks 51 and the assembly slot 3 from the front and rear directions can enhance the stability of the fixation between the assembly frame 4 and the fixing frame 1.
[0022] like Figure 3 , Figure 4 and Figure 5 As shown in the figure, the fixing mechanism 6 includes a first fixing plate 61 and a second fixing plate 62, and the first fixing plate 61 and the second fixing plate 62 are welded and fixed to the bottom of the assembly frame 4, and the side wall of the first fixing plate 61 is inserted with a fixing bolt 63 that is screwed to the second fixing plate 62, and the side wall of the fixing bolt 63 is provided with an annular groove 631 for rope sleeve. The rope is sleeved in the annular groove 631, so that the rope can be located between the first fixing plate 61 and the second fixing plate 62, and the rope is limited by the first fixing plate 61 and the second fixing plate 62 to prevent the rope from falling off from between the first fixing plate 61 and the second fixing plate 62 during the lifting process.
[0023] A clamping assembly 7 is installed between the side wall of the first fixing plate 61 and the fixing bolt 63. After the fixing bolt 63 is screwed to the installation position by the provided clamping assembly 7, the position of the fixing bolt 63 is clamped and fixed to avoid the fixing bolt 63 being driven by the rope to rotate in the first fixing plate 61 and the second fixing plate 62 during the process of using the rope to hoist the water-cooled wall tube row. The connection between the fixing bolt 63 and the first fixing plate 61 and the second fixing plate 62 is unstable, making the rope connected with the fixing bolt 63 easy to fall off, thereby causing a safety accident during the hoisting process.
[0024] like Figure 3 and Figure 4As shown in the figure, the clamping assembly 7 includes a mounting frame 71, which is welded and fixed to the side wall of the first fixing plate 61, and a mounting block 72 is slidably assembled in the mounting frame 71. A clamping pin 73 that penetrates the mounting frame 71 and is symmetrically distributed on the left and right is welded and fixed on the top of the mounting block 72. A clamping groove 74 corresponding to the clamping pin 73 is opened on the side wall of the fixing bolt 63. The clamping pin 73 is clamped into the clamping groove 74 to limit and fix the connection position of the fixing bolt 63 and the first fixing plate 61 and the second fixing plate 62, thereby increasing the fixing To ensure the stability of the bolt 63, the bottom of the mounting block 72 is fixedly connected to a handle frame 75 that passes through the mounting frame 71, and a spring 76 is fixedly assembled between the bottom of the mounting block 72 and the mounting frame 71. The elastic force generated by the spring 76 on the mounting block 72 keeps the connection position of the pin 73 with the slot 74 stable. After the mounting block 72 is driven downward by the handle frame 75 and the pin 73 is moved out of the slot 74, the fixing bolt 63 can be disassembled, which facilitates the maintenance and replacement of the rope assembled on the outer wall of the fixing bolt 63.
[0025] like Figure 3 , Figure 4 and Figure 5 As shown in the figure, the side wall of the fixing bolt 63 is provided with marking grooves 8 which are symmetrically distributed on the left and right, and the side wall of the first fixing plate 61 is welded and fixed with marking blocks 9 which are symmetrically distributed on the left and right. In the process of assembling and fixing the fixing bolt 63 with the first fixing plate 61 and the second fixing plate 62, the marking grooves 8 and the marking blocks 9 are used to facilitate the judgment of the position of the card slot 74, and to facilitate the docking of the position between the card slot 74 and the card pin 73.
[0026] Working principle: Figure 6 As shown in , during the use of the utility model, first, the rope passing through the connecting frame 2 is connected to a lifting device such as a crane, and a lifting point is set according to the size of the water-cooled wall tube row to be lifted. The relative position between the assembly frame 4 and the assembly groove 3 is adjusted according to the lifting point. The adjustment process is simple and convenient. Then, one end of the rope is connected to the fixing mechanism 6, and the other end of the rope is sleeved on the lifting point of the water-cooled wall tube row. The lifting operation of the water-cooled wall tube row can be completed. When the rope is worn and needs maintenance and replacement, the handle frame 75 is pulled downward, and then the fixing bolt 63 and the first fixing plate 61 and the second fixing plate 62 are disassembled, and the rope can be maintained and replaced later.
Claims
1. A water-cooled wall tube row hoisting tool, comprising a fixing frame (1), characterized in that: The top of the fixing frame (1) is fixedly connected to a connecting frame (2), the bottom of the fixing frame (1) is provided with an assembly groove (3), an assembly frame (4) is mounted in the assembly groove (3), a connecting component (5) is mounted between the assembly frame (4) and the assembly groove (3), and the bottom of the assembly frame (4) is fixedly equipped with fixing mechanisms (6) symmetrically distributed in the front and rear; The connecting assembly (5) comprises a connecting block (51), the connecting block (51) being fixedly connected to the top of the assembly frame (4), a connecting hole (52) being provided on a side wall of the connecting block (51), a positioning hole (53) penetrating into the assembly groove (3) being provided on a side wall of the fixing frame (1), and a positioning bolt (54) penetrating into the connecting hole (52) being screwed onto the side wall of the fixing frame (1); The fixing mechanism (6) comprises a first fixing plate (61) and a second fixing plate (62), wherein the first fixing plate (61) and the second fixing plate (62) are fixedly connected to the bottom of the assembly frame (4), a fixing bolt (63) threadedly connected to the second fixing plate (62) is inserted into a side wall of the first fixing plate (61), and an annular groove (631) is formed on the side wall of the fixing bolt (63).
2. The water-cooled wall tube row hoisting tool according to claim 1, characterized in that: The number of the assembly grooves (3) is at least four groups, the number of the assembly grooves (3) in each group is two, and the two assembly grooves (3) are symmetrically distributed at the bottom of the fixing frame (1) in the front and rear directions.
3. The water-cooled wall tube row hoisting tool according to claim 1, characterized in that: A clamping assembly (7) is assembled between the side wall of the first fixing plate (61) and the fixing bolt (63), the clamping assembly (7) comprising a mounting frame (71), the mounting frame (71) being fixedly connected to the side wall of the first fixing plate (61), a mounting block (72) being assembled in the mounting frame (71), a clamping pin (73) penetrating the mounting frame (71) being fixedly connected to the top of the mounting block (72), the clamping pin (73) being arranged in a clamping groove (74), the clamping groove (74) being arranged in the side wall of the fixing bolt (63), a handle frame (75) penetrating the mounting frame (71) being fixedly connected to the bottom of the mounting block (72), and a spring (76) being fixedly assembled between the mounting block (72) and the mounting frame (71).
4. The water-cooled wall tube row hoisting tool according to claim 1, characterized in that: A marking groove (8) is provided on the side wall of the fixing bolt (63), a marking block (9) is fixedly connected to the side wall of the first fixing plate (61), and the marking groove (8) corresponds to the position of the marking block (9).