Tensioning equipment for bridge construction
By introducing dust-proof cover, dust ring and drawer frame structures into the bridge construction tensioning equipment, the equipment transportation and organization problems are solved, portability and durability are improved, and more efficient construction site management is achieved.
Patent Information
- Application Number
- CN202420776580.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-16
- Publication Date
- 2024-12-27
- Estimated Expiration
- 2034-04-16
AI Technical Summary
The existing bridge construction tensioning equipment is difficult to quickly organize after transportation, storage and use, resulting in chaos on the construction site and the device cannot effectively store accessories, affecting portability and management.
A bridge construction tensioning equipment including a tensioning equipment body, a control unit and a bottom chamber is designed, and adopts a dust-proof cover, dust-proof ring and drawer frame structure, which can store the tensioning cylinder assembly when not in use, improving the portability of the device. and protect the controller through dust-proof design to reduce dust pollution.
It has achieved improved portability and durability of the equipment, reduced chaos and cleaning workload at the construction site, and improved the overall integration and use efficiency of the equipment.
Smart Images

Figure CN222251774U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of bridge construction, in particular to a tensioning device for bridge construction. Background Art
[0002] Bridge construction refers to the process of building a bridge according to the design content, mainly referring to bridge construction technology and construction organization, construction management, and bridge construction machinery. It is a branch discipline of civil engineering.
[0003] In the process of bridge construction, tensioning equipment is an indispensable key tool, mainly used for prefabricated railways, highways, road bridges, engineering construction concrete prefabricated components, and used to tension prestressed tendons to ensure the stability and safety of bridge structures. At present, the common tensioning equipment on the market is mainly composed of jacks, high-pressure oil pumps and other accessories, which need to be transported to the work site in batches for combined use. The device cannot effectively store the accessories, making it difficult to transport, store and manage them in a non-use state at the construction site. In addition, after the existing tensioning equipment is used, its extended part is often difficult to quickly organize, which easily causes chaos at the construction site. Therefore, in response to the above problems, we propose a bridge construction tensioning equipment with a storage structure. Utility Model Content
[0004] The purpose of the utility model is to provide a tensioning device for bridge construction to solve the problems raised in the above background technology.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a tensioning device for bridge construction, comprising a tensioning device body, a control unit and a bottom bin, a control unit is provided on the top of the tensioning device body, the control unit comprises a dust cover, a dust ring and a controller, a dust cover is installed on the top of the control unit through a hinge, a dust ring is installed on the top outer side of the control unit, an inspection door is installed on the front of the tensioning device body through a hinge, a bottom bin is installed on the bottom of the tensioning device body, a drawer rack is installed inside the bottom bin through a slide rail, and a tensioning cylinder assembly is placed on the top of the drawer rack.
[0006] The tensioning equipment is a special equipment for tensioning prestressed anchor rods and establishing prestress. It is mainly composed of a jack and a high-pressure oil pump, and sometimes also includes a pressure sensor for measuring tension and a dial gauge for measuring anchor head displacement. It is used to tension prestressed tendons to ensure the stability and safety of the bridge structure. When in use, the drawer frame is pulled out, the tensioning cylinder assembly is taken out, the tensioning cylinder assembly is installed on the steel bar, and the tensioning cylinder assembly is electrically connected to the tensioning equipment body to perform tensioning operations;
[0007] The device is provided with a bottom bin, through which the tensioning cylinder assembly can be stored when not in use, thereby improving the integration of the device. When needed, the drawer frame can be pulled out from the bottom bin, which is convenient for storage and transportation, greatly improving the portability of the device;
[0008] During the use of the device, the controller can be sealed and protected by the design of the dustproof cover and dustproof ring. The controller can be protected from dust in dusty environments on construction sites to prevent dust from entering the controller and causing pollution. The design of the dustproof ring can improve the sealing of the dustproof cover when it is closed, thereby achieving dust and water prevention and reducing the cleaning work of the staff while improving the durability of the device.
[0009] Preferably, two sets of handles are fixedly installed on both sides of the tensioning device body, a signal light is arranged on the top of the tensioning device body, and a communication interface is arranged on the front side of the tensioning device body.
[0010] The handle can provide a holding position for the staff, so that the staff can hold the handle to push and pull the device.
[0011] Preferably, a handle is fixedly mounted on the front of the drawer frame, and an anti-slip sleeve is provided on the outside of the handle.
[0012] The handle can provide a gripping position for the staff's hands, and the anti-slip cover can improve the comfort of the staff when holding the handle. The staff can pull and draw the drawer rack by holding the handle.
[0013] Preferably, a controller is provided on the top of the control unit, and the controller is electrically connected to the signal light.
[0014] The controller can adopt PLC or PC system, which is a device used to control mechanical equipment or system, making it convenient for the staff to control the tensioning equipment body.
[0015] Preferably, movable wheels are installed at the bottom of the bottom bin.
[0016] The moving wheels can be moved, and the device can be moved to a designated construction location via the moving wheels, making it convenient for workers to use.
[0017] In summary, this application includes the following beneficial technical effects:
[0018] 1. During the use of this device, the controller can be sealed and protected by the design of the dust cover and the dust ring. The controller can be protected from dust in dusty environments on construction sites to prevent dust from entering the controller and causing pollution to the controller. The design of the dust ring can improve the sealing of the dust cover when it is closed, achieving dust and water resistance, reducing the cleaning work of the staff and improving the durability of the device.
[0019] 2. The device is provided with a bottom bin and a drawer rack for storage. The device can store the tensioning cylinder assembly when not in use through the coordinated use of the bottom bin and the drawer rack, thereby improving the integration of the device. When needed, the drawer rack can be pulled out from the bottom bin, which is convenient for storage and transportation, and greatly improves the portability of the equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is the front view of the utility model;
[0021] Figure 2 This is a schematic diagram of the unfolded structure of the drawer board of the utility model;
[0022] Figure 3 It is a schematic diagram of the unfolded structure of the dust cover of the utility model.
[0023] In the figure: 1. tensioning equipment body; 101. handle; 102. signal light; 103. communication interface; 2. control unit; 201. dust cover; 202. dust ring; 203. controller; 3. inspection door; 4. bottom bin; 401. moving wheel; 5. drawer rack; 501. handle; 6. tensioning cylinder assembly. DETAILED DESCRIPTION
[0024] The following specific embodiments are provided to help the reader obtain a comprehensive understanding of the methods, devices and / or systems described herein. However, after understanding the disclosure of the present application, various changes, modifications and equivalents of the methods, devices and / or systems described herein will be apparent. For example, the order of operations described herein is merely an example, and is not limited to the order set forth herein, but in addition to the operations that must occur in a particular order, changes that will be apparent after understanding the disclosure of the present application may be made. In addition, in order to improve clarity and brevity, descriptions of features known in the art may be omitted.
[0025] The features described herein may be implemented in different forms and should not be interpreted as being limited to the examples described herein. Rather, the examples described herein have been provided only to illustrate some of the many possible ways of implementing the methods, devices and / or systems described herein that will be apparent after understanding the disclosure of the present application.
[0026] Throughout the specification, when an element (such as a layer, a region, or a substrate) is described as being “on”, “connected to”, “bound to”, “over”, or “covering” another element, it may be directly “on”, “connected to”, “bound to”, “over”, or “covering” another element, or one or more other elements may be present between them. In contrast, when an element is described as being “directly on”, “directly connected to”, “directly bound to”, “directly over”, or “directly covering” another element, there may be no other elements present between them.
[0027] As used herein, the term "and / or" includes any one of the associated listed items and any combination of any two or more items.
[0028] Although terms such as "first", "second", and "third" may be used herein to describe various components, assemblies, regions, layers, or portions, these components, assemblies, regions, layers, or portions are not limited by these terms. Rather, these terms are only used to distinguish one component, component, region, layer, or portion from another component, component, region, layer, or portion. Therefore, without departing from the teachings of the examples described herein, the first component, component, region, layer, or portion referred to may also be referred to as the second component, component, region, layer, or portion.
[0029] For ease of description, spatial relative terms such as "above", "upper", "below", and "lower" may be used herein to describe the relationship of one element to another element as shown in the drawings. Such spatial relative terms are intended to encompass different orientations of the device in use or operation in addition to the orientation depicted in the drawings. For example, if the device in the drawings is turned over, an element described as being "above" or "upper" relative to another element would then be located "below" or "lower" relative to the other element.
[0030] Therefore, the term "above" includes both "above" and "below" orientations depending on the spatial orientation of the device. The device may be otherwise oriented (e.g., rotated 90 degrees or at other orientations), and the spatially relative terms used herein will be interpreted accordingly.
[0031] The terms used herein are only used to describe various examples and are not used to limit the present disclosure. Unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. The terms "include", "comprise" and "have" list the stated features, quantities, operations, components, elements and / or their combinations that exist, but do not exclude the existence or addition of one or more other features, quantities, operations, components, elements and / or their combinations.
[0032] Variations in the shapes shown in the drawings may occur due to manufacturing techniques and / or tolerances. Therefore, the examples described herein are not limited to the specific shapes shown in the drawings but include variations in shapes that occur during manufacturing.
[0033] The features of the examples described herein may be combined in various ways that will be apparent after understanding the disclosure of the present application. In addition, although the examples described herein have various configurations, it will be apparent after understanding the disclosure of the present application that other configurations are possible.
[0034] The technical solution of the utility model is further described below in conjunction with the accompanying drawings and specific embodiments.
[0035] Embodiment 1
[0036] like Figure 1 , Figure 2 , Figure 3 As shown, the utility model proposes a tensioning device for bridge construction, including a tensioning device body 1, a control unit 2 and a bottom bin 4. The top of the tensioning device body 1 is provided with a control unit 2, the control unit 2 includes a dust cover 201, a dust ring 202 and a controller 203, the top of the control unit 2 is installed with a dust cover 201 through a hinge, the top outer side of the control unit 2 is installed with a dust ring 202, the front of the tensioning device body 1 is installed with an inspection door 3 through a hinge, the bottom of the tensioning device body 1 is installed with a bottom bin 4, the interior of the bottom bin 4 is installed with a drawer rack 5 through a slide rail, and the top of the drawer rack 5 is placed with a tensioning cylinder assembly 6.
[0037] The working principle of the tensioning equipment for bridge construction based on the first embodiment is as follows: the tensioning equipment body 1 is a special equipment for tensioning prestressed anchor rods to establish prestress, which is mainly composed of a jack and a high-pressure oil pump, and sometimes also includes a pressure sensor for measuring tension and a dial gauge for measuring anchor head displacement. It is a device used to tension prestressed tendons to ensure the stability and safety of the bridge structure. When in use, the drawer frame 5 is pulled out, the tensioning cylinder assembly 6 is taken out, the tensioning cylinder assembly 6 is installed on the steel bar, and the tensioning cylinder assembly 6 is electrically connected to the tensioning equipment body 1 to perform tensioning operations;
[0038] The device is provided with a bottom bin 4, through which the tensioning cylinder assembly 6 can be stored when not in use, thereby improving the integration of the device. When needed, the drawer rack 5 can be pulled out from the bottom bin 4, which is convenient for storage and transportation, greatly improving the portability of the device;
[0039] When the device is in use, the controller 203 can be sealed and protected by the design of the dustproof cover 201 and the dustproof ring 202. The controller 203 can be protected from dust in a dusty environment on the construction site to prevent dust from entering the controller 203 and causing pollution to the controller 203. The design of the dustproof ring 202 can improve the sealing performance of the dustproof cover 201 when it is closed, thereby achieving dust and water prevention and reducing the cleaning work of the staff while improving the durability of the device.
[0040] Embodiment 2
[0041] like Figure 1 , Figure 3 As shown, the utility model proposes a tensioning device for bridge construction. Compared with the first embodiment, this embodiment also includes: two sets of handles 101 are fixedly installed on both sides of the tensioning device body 1, a signal light 102 is arranged on the top of the tensioning device body 1, a communication interface 103 is arranged on the front side of the tensioning device body 1, a handle 501 is fixedly installed on the front of the drawer frame 5, and an anti-slip sleeve is arranged on the outside of the handle 501, a controller 203 is arranged on the top of the control unit 2, and the controller 203 is electrically connected to the signal light 102, and a moving wheel 401 is installed at the bottom of the bottom bin 4.
[0042] In this embodiment, Figure 1 As shown, the handle 101 can provide a holding position for the staff, so that the staff can hold the handle 101 to push and pull the device; Figure 1 As shown, the handle 501 can provide a gripping position for the staff's hand, and the anti-slip sleeve can improve the comfort of the staff when holding the handle 501. The staff can pull the drawer rack 5 by holding the handle 501; Figure 3 As shown, the controller 203 can adopt a PLC or PC system, which is a device for controlling mechanical equipment or systems, and is convenient for workers to control the tensioning equipment body 1; Figure 1 As shown, the moving wheels 401 can be moved, and the device can be moved to a designated construction location via the moving wheels 401, making it convenient for workers to use it.
[0043] The above-mentioned specific embodiments are only several preferred embodiments of the present invention. Based on the technical solution of the present invention and the relevant inspiration of the above-mentioned embodiments, those skilled in the art can make various alternative improvements and combinations to the above-mentioned specific embodiments.
Claims
1. A tensioning device for bridge construction, comprising a tensioning device body (1), a control unit (2) and a bottom bin (4), characterized in that: A control unit (2) is provided on the top of the tensioning device body (1), and the control unit (2) comprises a dust cover (201), a dust ring (202) and a controller (203). The dust cover (201) is installed on the top of the control unit (2) via a hinge, and a dust ring (202) is installed on the outer side of the top of the control unit (2). An inspection door (3) is installed on the front of the tensioning device body (1) via a hinge. A bottom bin (4) is installed on the bottom of the tensioning device body (1), and a drawer rack (5) is installed inside the bottom bin (4) via a slide rail, and a tensioning cylinder assembly (6) is placed on the top of the drawer rack (5).
2. A tensioning device for bridge construction according to claim 1, characterized in that: Two sets of handles (101) are fixedly mounted on both sides of the tensioning device body (1), a signal light (102) is arranged on the top of the tensioning device body (1), and a communication interface (103) is arranged on the front side of the tensioning device body (1).
3. The tensioning equipment for bridge construction according to claim 1, characterized in that: A handle (501) is fixedly mounted on the front of the drawer frame (5), and an anti-slip sleeve is provided on the outside of the handle (501).
4. The tensioning equipment for bridge construction according to claim 2, characterized in that: A controller (203) is provided on the top of the control unit (2), and the controller (203) is electrically connected to the signal light (102).
5. The tensioning equipment for bridge construction according to claim 1, characterized in that: The bottom of the bottom bin (4) is provided with moving wheels (401).