Quick assembly structure and building curtain wall
By using fixed chute plates, ball card and spring structures in the building curtain wall assembly device, the rapid assembly of the building curtain wall is achieved, solving the problem of low assembly efficiency in the existing technology, and improving assembly efficiency and stability.
Patent Information
- Application Number
- CN202421024327.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-13
- Publication Date
- 2024-12-27
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
It is difficult to assemble the existing architectural curtain wall assembly device quickly during use, resulting in long-term use of hand twisting tools, resulting in hand soreness, reducing assembly efficiency.
The fixed chute plate, ball card, spring and slider structure is adopted to enable rapid assembly of the building curtain wall through manual pressing, and the linkage mechanism between the ball card and the ball is quickly fixed.
It improves the assembly efficiency of building curtain walls, reduces the complexity and labor intensity of manual operations, reduces the risk of hand acid, and enhances the speed and stability of assembly.
Smart Images

Figure CN222252666U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of curtain walls, and in particular relates to a quick assembly structure and a building curtain wall. Background Art
[0002] The curtain wall is the exterior wall protection of a building. It does not bear weight and is hung like a curtain, so it is also called a suspended wall. It is a lightweight wall with decorative effects commonly used in modern large and high-rise buildings. It is composed of a structural frame and inlaid panels. It is a building envelope structure that does not bear the load and function of the main structure.
[0003] Known China Public Authorized Utility Model: (Publication No.: CN220225826U) discloses an assembly device for building curtain walls, specifically related to the field of curtain walls, including a supporting wall, a fixed plate is provided on one side of the supporting wall, a plug rod is slidably connected inside the fixed plate, a frame is fixedly connected to one end of the plug rod away from the fixed plate, a curtain wall is provided on one side of the frame, a connector is fixedly installed on one side of the curtain wall, a limit plate is provided on the outer wall of the connector, the limit plate is fixedly installed on the outer wall of the frame, the limit plate is fixedly connected to one end of the plug rod, a fastening plate is slidably connected inside the limit plate, a threaded rod is rotatably connected to one side of the fastening plate, and a threaded sleeve is connected to the outer wall of the threaded rod through a thread. The utility model sets a fastening plate and a triangular stopper, first picks up the curtain wall and inserts the connector into the limit plate, then picks up the next curtain wall and inserts the connector into the limit plate, and finally moves the fastening plate to fix the connector, so as to achieve the effect of quickly assembling and fixing the curtain wall.
[0004] However, in the implementation of relevant technologies, it was found that the above-mentioned assembly device for building curtain walls has the following problems: during use, it is difficult to quickly assemble the building curtain walls with the prior art, and most of the tools on the market are hand-tightened. Tightening the tools by hand for a long time can easily cause hand soreness and reduce the assembly efficiency. This device only requires alignment and pressing to assemble the building curtain wall, thereby improving the assembly efficiency. Therefore, a quick assembly structure and a building curtain wall are proposed. Utility Model Content
[0005] The utility model provides a quick assembly structure and a building curtain wall, which solves the problem that it is difficult to quickly assemble the building curtain wall in the related art. Most tools and bolts on the market are manually twisted, which can easily cause hand soreness after long-term manual twisting of the tools, thereby reducing the assembly efficiency.
[0006] The technical scheme of the utility model is as follows: a quick assembly structure and a building curtain wall, comprising: a fixed slide plate, a building curtain wall located in front of the fixed slide plate, two fixed plates relatively fixedly installed on the rear side of the building curtain wall, mounting grooves relatively opened on the rear sides of the two fixed plates, a ball clamp fixedly installed on the bottom wall of the mounting groove, and a spring relatively fixedly installed on the inner side wall of the mounting groove and connected to the outer side wall of the ball clamp;
[0007] A plurality of sliding blocks slidably engaged with the interior of the fixed sliding groove plate and a clamping ball fixedly mounted on the front side of the plurality of sliding blocks and engaged with the ball clamp.
[0008] Preferably, a screw hole plate is fixedly installed on one side of each of the plurality of sliding blocks, a hand screw penetrates the internal thread of the screw hole plate, and the hand screw penetrates into the interior of the fixed slide groove plate, and the two are in contact with each other.
[0009] Preferably, an inner groove is integrally formed on one side of the building curtain wall, and the inner groove is rectangular in shape.
[0010] Preferably, a convex block is integrally formed on the other side of the building curtain wall, and the shape of the convex block is rectangular, and the convex block and the inner groove can be clamped to connect multiple building curtain walls.
[0011] Preferably, a protective plastic film is provided on the front side of the building curtain wall, and the protective plastic film is adhered to the front side of the building curtain wall.
[0012] Preferably, a plurality of mounting holes are sequentially opened on the rear side of the fixed slide slot plate from left to right, and bolts are inserted through the interiors of the plurality of mounting holes.
[0013] The working principle and beneficial effects of the utility model are:
[0014] By manually picking up the building curtain wall, aligning the installation groove on the rear side of the fixed plate with the card ball on the front side of the slider, and then pushing the building curtain wall to make the card ball contact the ball card, the linkage spring contracts, and when the card ball is inserted into the inside of the ball card, the spring rebounds and pushes the ball card to completely wrap the card ball in the ball card, thereby achieving the purpose of rapid assembly of the building curtain wall. The building curtain wall can be assembled by only aligning and pressing, thereby improving the assembly efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0016] Figure 1 This is a schematic diagram of the overall three-dimensional structure proposed by the utility model;
[0017] Figure 2 This is a side view schematic diagram of the three-dimensional structure proposed by the utility model;
[0018] Figure 3 The utility model proposes Figure 2 A in the figure is an enlarged schematic diagram of the three-dimensional structure;
[0019] Figure 4 The utility model proposes Figure 1 A schematic diagram of the three-dimensional structure is enlarged at B in FIG.
[0020] In the figure: 1. Fixed slide plate; 2. Building curtain wall; 3. Fixed plate; 4. Mounting groove; 5. Ball clamp; 6. Spring; 7. Slider; 8. Clamp ball; 9. Screw hole plate; 10. Tightening screw; 11. Mounting hole; 12. Bolt; 13. Protective plastic film; 14. Inner groove; 15. Bump. DETAILED DESCRIPTION
[0021] The following will be combined with the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0022] Embodiment 1
[0023] See also Figure 1 - Figure 4 A quick assembly structure and a building curtain wall, comprising: a fixed slide plate 1, a building curtain wall 2 located in front of the fixed slide plate 1, two fixed plates 3 relatively fixedly installed on the rear side of the building curtain wall 2, mounting grooves 4 relatively opened on the rear sides of the two fixed plates 3, a ball card 5 fixedly installed on the inner bottom wall of the mounting groove 4, and a spring 6 relatively fixedly installed on the inner side wall of the mounting groove 4 and connected to the outer side wall of the ball card 5;
[0024] A plurality of slide blocks 7 are slidably engaged in the interior of the fixed slide slot plate 1 , and a clamping ball 8 is fixedly mounted on the front side of the plurality of slide blocks 7 and engaged with the ball clamp 5 .
[0025] The utility model provides a quick assembly structure and a building curtain wall. The building curtain wall 2 is manually picked up, and the installation groove 4 opened on the rear side of the fixing plate 3 is aligned with the card ball 8 on the front side of the sliding block 7. After the alignment, the building curtain wall 2 is pushed to make the card ball 8 contact the ball card 5, and the linkage spring 6 contracts. When the card ball 8 is connected and enters the interior of the ball card 5, the spring 6 rebounds and pushes the ball card 5, so that the card ball 8 is completely wrapped in the ball card 5, so that the purpose of quick assembly of the building curtain wall 2 is achieved. The building curtain wall 2 can be assembled by only aligning and pressing, thereby improving the assembly efficiency.
[0026] Furthermore, a screw hole plate 9 is fixedly installed on one side of the plurality of sliders 7 , and a hand screw 10 is passed through the internal thread of the screw hole plate 9 , and the hand screw 10 penetrates into the interior of the fixed slide groove plate 1 , and the two are in contact with each other.
[0027] Specifically, by manually rotating the hand screw 10, the hand screw 10 performs threaded movement inside the screw hole plate 9. When one end of the hand screw 10 contacts the inside of the fixed slide plate 1, it is used to fix the slider 7 to the fixed slide plate 1. When there is no contact, the slider 7 can be slidably connected inside the fixed slide plate 1.
[0028] Furthermore, a protective plastic film 13 is provided on the front side of the building curtain wall 2 , and the protective plastic film 13 is adhered to the front side of the building curtain wall 2 .
[0029] Specifically, by sticking the protective plastic film 13 on the front side of the building curtain wall 2, the front surface of the building curtain wall 2 is made non-slip, which effectively prevents the front surface of the building curtain wall 2 from being scratched during transportation, thereby improving the protectiveness of the building curtain wall 2 and keeping the surface of the building curtain wall 2 smooth.
[0030] Furthermore, a plurality of mounting holes 11 are sequentially formed on the rear side of the fixed slide plate 1 from left to right, and bolts 12 are inserted through the plurality of mounting holes 11 .
[0031] Specifically, by opening a plurality of mounting holes 11 in sequence from left to right on the rear side of the fixed slide plate 1, bolts 12 can be inserted in sequence after the fixed slide plate 1 is cut off, thereby effectively fixing the fixed slide plate 1 to the wall.
[0032] Embodiment 2
[0033] Based on the first embodiment, in this embodiment: an inner groove 14 is integrally formed on one side of the building curtain wall 2, and the shape of the inner groove 14 is rectangular, and a protrusion 15 is integrally formed on the other side of the building curtain wall 2, and the shape of the protrusion 15 is rectangular, and the protrusion 15 and the inner groove 14 can clamp multiple building curtain walls 2 together.
[0034] The technical solution provided by this embodiment is: by providing an integral inner groove 14 on one side of the building curtain wall 2 and an integral protrusion 15 on the other side of the building curtain wall 2, multiple building curtain walls 2 can be easily connected to each other through the protrusion 15 and the inner groove 14.
[0035] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A quick assembly structure and a building curtain wall, characterized in that: include: A fixed slide plate (1), a building curtain wall (2) located in front of the fixed slide plate (1), two fixed plates (3) fixedly mounted relatively up and down on the rear side of the building curtain wall (2), a mounting groove (4) relatively opened on the rear sides of the two fixed plates (3), a ball clamp (5) fixedly mounted on the inner bottom wall of the mounting groove (4), and a spring (6) relatively fixedly mounted on the inner side wall of the mounting groove (4) and connected to the outer side wall of the ball clamp (5); A plurality of sliding blocks (7) slidably engaged inside the fixed sliding groove plate (1) and a clamping ball (8) fixedly mounted on the front side of the plurality of sliding blocks (7) and engaged with the ball clamp (5).
2. A rapid assembly structure and building curtain wall according to claim 1, characterized in that: A screw hole plate (9) is fixedly mounted on one side of each of the plurality of sliding blocks (7), a hand screw (10) passes through the internal thread of the screw hole plate (9), and the hand screw (10) penetrates into the interior of the fixed slide groove plate (1), and the two are in contact with each other.
3. The rapid assembly structure and building curtain wall according to claim 1, characterized in that: An inner groove (14) is integrally formed on one side of the building curtain wall (2), and the inner groove (14) is rectangular in shape.
4. The rapid assembly structure and building curtain wall according to claim 3, characterized in that: A protrusion (15) is integrally formed on the other side of the building curtain wall (2), and the shape of the protrusion (15) is rectangular, and the protrusion (15) and the inner groove (14) can be used to clamp a plurality of building curtain walls (2) together.
5. The rapid assembly structure and building curtain wall according to claim 1, characterized in that: The front side of the building curtain wall (2) is provided with a protective plastic film (13), and the protective plastic film (13) is adhered to the front side of the building curtain wall (2).
6. The rapid assembly structure and building curtain wall according to claim 1, characterized in that: A plurality of mounting holes (11) are sequentially opened on the rear side of the fixed slide slot plate (1) from left to right, and bolts (12) are inserted into the interior of the plurality of mounting holes (11).
