Assembly type steel structure roof drainage pipeline installation structure

By designing the installation structure of components such as support base plate, support frame and elastic sound insulation pad, the problems of low disassembly efficiency and insufficient support of the installation structure of traditional prefabricated steel structure roof drainage pipes are solved, and flexible installation of pipelines, noise and vibration are achieved. The decrease.

CN222252828UActive Publication Date: 2024-12-27SHENZHEN DECHENG CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420818018.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-19
Publication Date
2024-12-27
Estimated Expiration
2034-04-19

AI Technical Summary

Technical Problem

The traditional prefabricated steel structure roof drainage pipe installation structure has low disassembly efficiency and insufficient support. It is impossible to adjust the support position and pipeline distance as needed, which makes it difficult to install and generate greater noise when the water flows through the steel structure pipeline.

Method used

A mounting structure including support base plate, support frame, elastic sound insulation pad, hinge, elastic support pad, limit column and pressure plate is designed. The pipe is realized through hinging and sliding connections. Flexible installation and fixation to prevent noise and vibration.

Benefits of technology

It realizes flexible installation and fixation of pipes, reduces installation difficulty, reduces water noise and vibration, and improves disassembly efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222252828U_ABST
    Figure CN222252828U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of assembly type steel structure roof drainage pipeline installation structures, and discloses an assembly type steel structure roof drainage pipeline installation structure which comprises a main body mechanism, a fixing mechanism is arranged on the top of the main body mechanism, an installation mechanism is arranged on the left side of the main body mechanism, and the main body mechanism comprises a supporting bottom plate. A supporting frame is fixedly connected to the top of the supporting bottom plate, an elastic sound insulation pad is fixedly connected to the surface of the supporting frame, and a hinge is fixedly connected to the left side of the supporting frame. According to the pipeline fixing device, the connecting frame can be fixed in the fixing groove by pulling the connecting frame and used for fixing a pipeline, the limiting column can move downwards by moving the pressing plate downwards, at the moment, the elastic supporting pad connected with the limiting column can be attached to the pipeline, the pipeline is fixed, and the pipeline is prevented from moving; and the elastic sound insulation pad is made of elastic polyurethane foam, so that noise of water flowing in the pipeline can be adsorbed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of an assembled steel structure roof drainage pipe installation structure, in particular to an assembled steel structure roof drainage pipe installation structure. Background Art

[0002] As an emerging building structure, steel structure houses are mainly used in single-story industrial plants, warehouses, commercial buildings, office buildings, multi-story parking lots, residential buildings and other buildings. Among them, drainage pipes are necessary pipes in daily work and life and are widely used in steel structure buildings. In order to meet the installation needs of different drainage pipes, pipe installation structures are generally designed for auxiliary support. Traditional pipe installation structures are mostly single fixed designs with low disassembly efficiency and insufficient support for pipes. When installing the pipes, the support position of the device and the distance between the pipe and the steel plate cannot be freely adjusted according to the installation needs, making the installation difficult.

[0003] Steel structure pipes in existing prefabricated steel structure roof drainage pipe installation structures are generally stronger and stronger than other materials (such as plastic), which means that greater water flow noise will be generated when water passes through the pipes. Utility Model Content

[0004] In order to solve the above technical problems, the utility model provides an assembled steel structure roof drainage pipe installation structure.

[0005] The utility model is implemented by the following technical solutions: an assembled steel structure roof drainage pipe installation structure, comprising a main body mechanism, a fixing mechanism is arranged on the top of the main body mechanism, and an installation mechanism is arranged on the left side of the main body mechanism;

[0006] The main body structure includes a supporting base plate, a supporting frame is fixedly connected to the top of the supporting base plate, an elastic sound insulation pad is fixedly connected to the surface of the supporting frame, a hinge is fixedly connected to the left side of the supporting frame, the surface of the elastic sound insulation pad is in contact with a pipe, the surface of the pipe is in contact with an elastic supporting pad, the end of the elastic supporting pad away from the pipe is fixedly connected to a limiting column, and the end of the limiting column away from the elastic supporting pad is fixedly connected to a pressure plate.

[0007] As a further improvement of the above solution, the main body mechanism includes a limiting column, and there are a plurality of the limiting columns, and the plurality of the limiting columns are equidistantly distributed.

[0008] As a further improvement of the above scheme, the main body structure includes an elastic sound insulation pad, which is made of elastic polyurethane foam, has good elasticity and sound absorption performance, and is commonly used in shock-absorbing pads, sound insulation pads, etc. The elastic support pad is made of rubber, and rubber has a certain friction force, which can prevent movement when the pipeline is fixed.

[0009] As a further improvement of the above solution, the fixing mechanism includes a connecting frame, the connecting frame is fixedly connected to the right side of the hinge, a limiting hole is provided on the surface of the connecting frame, and a fixing groove is provided on the top of the support frame.

[0010] As a further improvement of the above solution, the fixing mechanism includes a connecting frame, the connecting frame is clamped to the inner wall of the fixing groove, and the inner wall of the limiting hole is slidably connected to the limiting column.

[0011] Through the above technical solution, the support frame and the connecting frame are installed in a hinged manner.

[0012] As a further improvement of the above solution, the mounting mechanism includes a mounting plate, the mounting plate is fixedly connected to the right side of the supporting base plate, and a mounting hole is opened on the top of the mounting plate.

[0013] As a further improvement of the above solution, the mounting mechanism includes mounting holes, and there are a plurality of mounting holes, and the plurality of mounting holes are distributed at equal distances. There are two mounting plates, which are distributed at both ends of the supporting base plate.

[0014] Through the above technical solution, the mounting plate is used to install the drainage pipe.

[0015] Compared with the prior art, the beneficial effects of the present invention are:

[0016] The utility model fixes a supporting base plate and a mounting plate at a position where a drainage pipe needs to be installed, then fixes the supporting base plate and the mounting plate by drilling screws into the mounting holes, then separates the connecting frame from the supporting base plate, installs the pipe on the surface of the elastic sound insulation pad, and then connects the pipe to the drainage device so that the pipe can drain excess water inside the house.

[0017] The utility model can fix the connecting frame inside the fixing groove by pulling the connecting frame to fix the pipeline, and the limiting column can be moved downward by moving the pressure plate downward. At this time, the elastic support pad connected to the limiting column will fit the pipeline to fix the pipeline and prevent the pipeline from moving. The material of the elastic sound insulation pad is elastic polyurethane foam, which can absorb the water noise flowing inside the pipeline and reduce the vibration caused by the water colliding with the pipeline. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 This is a schematic diagram of the overall structure of the assembled steel roof drainage pipe installation structure of the utility model;

[0019] Figure 2 This is a schematic diagram of the structure of the support frame for the installation of the drainage pipe structure of the assembled steel structure roof of the utility model;

[0020] Figure 3 This is a schematic diagram of the pipe structure of the assembled steel structure roof drainage pipe installation structure of the utility model;

[0021] Figure 4 This is a schematic diagram of the fixing groove structure of the assembled steel structure roof drainage pipe installation structure of the utility model;

[0022] Figure 5 It is a schematic diagram of the limiting groove structure of the assembled steel structure roof drainage pipe installation structure of the utility model.

[0023] Description of main symbols:

[0024] 1. Main body; 101. Support base plate; 102. Support frame; 103. Elastic sound insulation pad; 104. Hinge; 105. Pipe; 106. Elastic support pad; 107. Limit column; 108. Press plate; 2. Fixing mechanism; 201. Connecting frame; 202. Limit hole; 203. Fixing slot; 3. Installation mechanism; 301. Installation plate; 302. Installation hole. DETAILED DESCRIPTION

[0025] The present invention is further described below in conjunction with the accompanying drawings and specific implementation methods. It should be noted that, under the premise of no conflict, the various embodiments or technical features described below can be arbitrarily combined to form a new embodiment.

[0026] Example:

[0027] Please combine Figure 1-5 , an assembled steel structure roof drainage pipe installation structure of this embodiment includes a main body mechanism 1, a fixing mechanism 2 is arranged on the top of the main body mechanism 1, and an installation mechanism 3 is arranged on the left side of the main body mechanism 1;

[0028] The main mechanism 1 includes a support base plate 101, a support frame 102 is fixedly connected to the top of the support base plate 101, an elastic sound insulation pad 103 is fixedly connected to the surface of the support frame 102, a hinge 104 is fixedly connected to the left side of the support frame 102, a pipe 105 is contacted on the surface of the elastic sound insulation pad 103, and an elastic support pad 106 is contacted on the surface of the pipe 105. The end of the elastic support pad 106 away from the pipe 105 is fixedly connected to a limiting column 107, and the end of the limiting column 107 away from the elastic support pad 106 A pressure plate 108 is fixedly connected, the main body 1 includes a limiting column 107, and the limiting column 107 is a plurality of limiting columns 107, and the plurality of limiting columns 107 are equidistantly distributed. The main body 1 includes an elastic sound insulation pad 103, and the elastic sound insulation pad 103 is made of elastic polyurethane foam, which has good elasticity and sound absorption performance and is commonly used in shock-absorbing pads, sound insulation pads, etc. The material of the elastic support pad 106 is rubber, and the rubber has a certain friction, so that it can prevent movement when the pipe 105 is fixed. By supporting The base plate 101 and the mounting plate 301 are fixed at the position where the drainage pipe needs to be installed. At this time, the support base plate 101 and the mounting plate 301 are fixed by screwing the mounting holes 302. At this time, the connecting frame 201 and the support base plate 101 are separated, and the pipe 105 is installed on the surface of the elastic sound insulation pad 103, and then the pipe 105 is connected to the drainage device so that the pipe 105 can discharge the excess water inside the house. The connecting frame 201 can be fixed inside the fixing groove 203 by pulling the connecting frame 201 to fix the pipe 105. The limiting column 107 can be moved downward by moving the pressing plate 108 downward. At this time, the elastic support pad 106 connected to the limiting column 107 will fit the pipe 105, fix the pipe 105, and prevent the pipe 105 from moving. The material of the elastic sound insulation pad 103 is elastic polyurethane foam, which can absorb the water noise flowing inside the pipe 105 and reduce the vibration caused by the water colliding with the pipe 105.

[0029] The fixing mechanism 2 includes a connecting frame 201, which is fixedly connected to the right side of the hinge 104. A limiting hole 202 is provided on the surface of the connecting frame 201, and a fixing groove 203 is provided on the top of the support frame 102. The fixing mechanism 2 includes a connecting frame 201, and the connecting frame 201 is clamped to the inner wall of the fixing groove 203. The inner wall of the limiting hole 202 is slidably connected to the limiting column 107.

[0030] The mounting mechanism 3 includes a mounting plate 301, which is fixedly connected to the right side of the supporting base plate 101. A mounting hole 302 is opened on the top of the mounting plate 301. The mounting mechanism 3 includes a plurality of mounting holes 302, and the plurality of mounting holes 302 are equidistantly distributed. There are two mounting plates 301, which are distributed at both ends of the supporting base plate 101.

[0031] The implementation principle of the assembled steel structure roof drainage pipe installation structure in the embodiment of the present application is as follows: by fixing the support base plate 101 and the installation plate 301 at the position where the drainage pipe needs to be installed, the support base plate 101 and the installation plate 301 are fixed by screwing the installation holes 302, and then the connecting frame 201 and the support base plate 101 are separated, and the pipe 105 is installed on the surface of the elastic sound insulation pad 103, and then the pipe 105 is connected to the drainage device, so that the pipe 105 can drain the excess water inside the house, and by pulling The connecting frame 201 can fix the connecting frame 201 inside the fixing groove 203, which is used to fix the pipe 105. The limiting column 107 can be moved downward by moving the pressure plate 108 downward. At this time, the elastic support pad 106 connected to the limiting column 107 will fit the pipe 105 to fix the pipe 105 and prevent the pipe 105 from moving. The elastic sound insulation pad 103 is made of elastic polyurethane foam, which can absorb the water noise flowing inside the pipe 105 and reduce the vibration caused by the water colliding with the pipe 105.

[0032] The above-mentioned implementation modes are only preferred implementation modes of the present invention, and cannot be used to limit the protection scope of the present invention. Any non-substantial changes and substitutions made by technicians in this field on the basis of the present invention shall fall within the scope of protection required by the present invention.

Claims

1. An assembled steel structure roof drainage pipe installation structure, characterized in that: It comprises a main body mechanism (1), a fixing mechanism (2) is arranged on the top of the main body mechanism (1), and a mounting mechanism (3) is arranged on the left side of the main body mechanism (1); The main body mechanism (1) comprises a support base plate (101), the top of the support base plate (101) is fixedly connected to a support frame (102), the surface of the support frame (102) is fixedly connected to an elastic sound insulation pad (103), the left side of the support frame (102) is fixedly connected to a hinge (104), the surface of the elastic sound insulation pad (103) is in contact with a pipe (105), the surface of the pipe (105) is in contact with an elastic support pad (106), one end of the elastic support pad (106) away from the pipe (105) is fixedly connected to a limiting column (107), and one end of the limiting column (107) away from the elastic support pad (106) is fixedly connected to a pressing plate (108).

2. The assembled steel structure roof drainage pipe installation structure according to claim 1, characterized in that: The main body structure (1) comprises a limiting column (107), wherein there are a plurality of limiting columns (107), and the plurality of limiting columns (107) are distributed at equal distances.

3. The assembled steel structure roof drainage pipe installation structure according to claim 1, characterized in that: The main body structure (1) comprises an elastic sound insulation pad (103), and the elastic sound insulation pad (103) is made of elastic polyurethane foam.

4. The assembled steel structure roof drainage pipe installation structure according to claim 1, characterized in that: The fixing mechanism (2) comprises a connecting frame (201), the connecting frame (201) is fixedly connected to the right side of the hinge (104), a limiting hole (202) is provided on the surface of the connecting frame (201), and a fixing groove (203) is provided on the top of the supporting frame (102).

5. The assembled steel structure roof drainage pipe installation structure according to claim 4, characterized in that: The connection frame (201) is snap-connected to the inner wall of the fixing groove (203), and the inner wall of the limiting hole (202) is slidably connected to the limiting column (107).

6. The assembled steel structure roof drainage pipe installation structure according to claim 1, characterized in that: The mounting mechanism (3) comprises a mounting plate (301), the mounting plate (301) is fixedly connected to the right side of the supporting base plate (101), and a mounting hole (302) is provided on the top of the mounting plate (301).

7. The assembled steel structure roof drainage pipe installation structure according to claim 6, characterized in that: The mounting mechanism (3) comprises a plurality of mounting holes (302), the plurality of mounting holes (302) being distributed at equal distances, and the mounting plates (301) are two and are distributed at both ends of the supporting base plate (101).