Grouting device for building construction
By designing the connection and scraping mechanism of the building construction grouting device, the problem of difficulty in cleaning the slurry in the sealed container after solidification is solved, and the grouting efficiency is improved.
Patent Information
- Application Number
- CN202421007562.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-10
- Publication Date
- 2024-12-27
- Estimated Expiration
- 2034-05-10
AI Technical Summary
The current grouting conversion container is generally in a sealed state, which makes it inconvenient to clean after the slurry solidified, affecting the grouting efficiency.
Design a construction grouting device, including two half-boxes and corresponding connection, scraping and traction mechanisms, and realize containers through arc-shaped sealing plates, arc-shaped U-frames, stepped-shaped arc blocks and auxiliary scrapers. Effective scraping and cleaning of internal materials.
Effectively reduce the accumulation of solidified substances inside the container, ensure grouting efficiency, ensure that the materials in the container can be cleaned in time, and avoid solidified substances affecting the subsequent grouting process.
Smart Images

Figure CN222253162U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of construction grouting, in particular to a building construction grouting device. Background Art
[0002] Building construction is an activity that uses various building materials and equipment to build. In the process of building construction, grouting is required for the area. At present, in the process of construction grouting, it is generally necessary to connect the container with the external delivery pipeline for grouting. However, the overall grouting conversion container is generally sealed. When the slurry inside the container solidifies, it is generally inconvenient to clean the inside. Failure to clean the solidified material in time will affect the subsequent grouting efficiency. For this reason, a building construction grouting device is proposed. Utility Model Content
[0003] The purpose of the utility model is to solve the problem that the current overall grouting conversion container is generally in a sealed state. When the slurry inside the container solidifies, it is generally inconvenient to clean the inside. Failure to clean the solidified material in time will affect the subsequent grouting efficiency. The utility model provides a grouting device for construction.
[0004] In order to achieve the above-mentioned purpose, the utility model specifically adopts the following technical solutions:
[0005] A grouting device for building construction comprises two half boxes, a connection mechanism is arranged between the two half boxes, and a scraping mechanism is arranged in the half boxes, the side walls of the half boxes are arranged in an open shape, and a connecting plate is fixedly installed on the side walls of the half boxes, a semicircular plate is fixedly installed on one end of the connecting plate, a traction mechanism is arranged between the semicircular plate and the half boxes, and one side of the traction mechanism is connected to the scraping mechanism, and a feeding pipe and a discharging pipe are respectively installed on the semicircular plates on the upper and lower sides of the half boxes.
[0006] Preferably, the connection mechanism includes two connection plates, which are fixedly mounted on the two half boxes respectively, and a plurality of positioning holes are opened on the side walls of the connection plates, connection bolts are inserted into the positioning holes, and a connection nut is threadedly mounted on one end of the connection bolts.
[0007] Preferably, the scraper mechanism includes an arc-shaped U-shaped frame, both ends of which are fixedly mounted on the side walls of the half box, and a side scraper is provided between the arc-shaped U-shaped frame and the half box, one end of the side scraper is fixedly mounted with a limit baffle, and one end of the limit baffle is fixedly mounted with a toggle connecting rod.
[0008] Preferably, the traction mechanism comprises a stepped arc block, the stepped arc block is slidably mounted between the semicircular plate and the half box, and one end of the toggle connecting rod passes through the stepped arc block.
[0009] Preferably, an auxiliary scraper is fixedly mounted on the lower side of the side scraper, and one side of the auxiliary scraper is in contact with the bottom end of the half box.
[0010] Preferably, an arc-shaped sealing plate is fixedly mounted on the inner side wall of the half box, and one side of the arc-shaped sealing plate is in contact with the inner wall of the other half box.
[0011] The beneficial effects of the utility model are as follows:
[0012] 1. In the utility model, two half boxes are combined into one, and then fixed with the help of the connecting plate and the connecting bolts, and the contact part of the combination is leak-proof by the arc-shaped sealing plate. In this way, when the container is used for grouting, the material enters the box through the feed pipe and is discharged through the discharge pipe. In the container, the staff can drive the stepped arc block to rotate by moving the toggle connecting rod, and the toggle connecting rod will also drive the limit baffle and the side scraper to move. With the help of the side scraper and the auxiliary scraper, the material adhered to the inner wall of the half box can be scraped off, and the container can be opened to clean the solidified material later, which can effectively reduce the generation of more solidified materials inside the container, thereby ensuring the good grouting efficiency of the container. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 This is a front view schematic diagram of the overall connection structure of the utility model;
[0014] Figure 2 It is a schematic diagram of the three-dimensional connection structure of the half box and the connection mechanism in the utility model;
[0015] Figure 3 It is a schematic diagram of the three-dimensional connection structure between the half box and the scraping mechanism in the utility model;
[0016] Figure 4 yes Figure 3 Schematic diagram of the enlarged structure at point A in the middle.
[0017] Figure numerals: 1. half box; 2. discharge pipe; 3. feed pipe; 4. connecting plate; 5. positioning hole; 6. connecting bolt; 7. connecting nut; 8. semicircular plate; 9. connecting plate; 10. toggle connecting rod; 11. stepped arc block; 12. arc-shaped U-shaped frame; 13. auxiliary scraper; 14. arc-shaped sealing plate; 15. limit baffle; 16. side scraper. DETAILED DESCRIPTION
[0018] In order to make the purpose, technical scheme and advantages of the embodiments of the utility model clearer, the technical scheme in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Generally, the components of the embodiments of the utility model described and shown in the drawings here can be arranged and designed in various different configurations.
[0019] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the present invention to be protected, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0020] It should be noted that similar reference numerals and letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further defined and explained in the subsequent drawings. In addition, the terms "first", "second", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance.
[0021] In the description of the embodiments of the present invention, it should be noted that the terms "inside", "outside", "upper", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, or are the orientations or positional relationships in which the utility model product is usually placed when in use. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0022] like Figure 1-4 As shown, a construction grouting device comprises two half boxes 1, a connection mechanism is arranged between the two half boxes 1, the connection mechanism comprises two connection plates 4, the two connection plates 4 are respectively fixedly mounted on the two half boxes 1, and a plurality of positioning holes 5 are opened on the side walls of the connection plates 4, connection bolts 6 are inserted and installed in the positioning holes 5, and a connection nut 7 is screwed and installed at one end of the connection bolt 6, the two half boxes 1 are combined into one, and then fixed with the help of the connection plates 4 and the connection bolts 6, so as to facilitate the assembly and disassembly of the container, an arc-shaped sealing plate 14 is fixedly mounted on the inner wall of the half box 1, and one side of the arc-shaped sealing plate 14 is in contact with the inner wall of the other half box 1, and the combined contact part of the half box 1 can be prevented from leakage by inserting the arc-shaped sealing plates 14 into each other.
[0023] A scraper mechanism is arranged in the half box 1, and the scraper mechanism includes an arc-shaped U-shaped frame 12, both ends of the arc-shaped U-shaped frame 12 are fixedly mounted on the side walls of the half box 1, and a side scraper 16 is arranged between the arc-shaped U-shaped frame 12 and the half box 1, one end of the side scraper 16 is fixedly mounted with a limit baffle 15, and one end of the limit baffle 15 is fixedly mounted with a toggle connecting rod 10. When the container is used for grouting, the staff in the container can drive the stepped arc block 11 to rotate by moving the toggle connecting rod 10, and the toggle connecting rod 10 will also drive the limit baffle 15 and the side scraper 16 to move.
[0024] An auxiliary scraper 13 is fixedly installed on the lower side of the side scraper 16, and one side of the auxiliary scraper 13 is in contact with the bottom end of the half box 1. With the help of the side scraper 16 and the auxiliary scraper 13, the material adhering to the inner wall of the half box 1 can be scraped off, and the container can be opened later to clean the solidified material, which can effectively reduce the generation of more solidified materials inside the container.
[0025] The side wall of the half box 1 is open, and a connecting plate 9 is fixedly installed on the side wall of the half box 1, a semicircular plate 8 is fixedly installed on one end of the connecting plate 9, a traction mechanism is arranged between the semicircular plate 8 and the half box 1, and the traction mechanism includes a stepped arc block 11, the stepped arc block 11 is slidably installed between the semicircular plate 8 and the half box 1, one end of the toggle connecting rod 10 passes through the stepped arc block 11, and a feed pipe 3 and a discharge pipe 2 are respectively installed on the semicircular plates 8 on the upper and lower sides of the half box 1. When grouting is performed using a container, the material enters the box through the feed pipe 3 and is discharged through the discharge pipe 2.
[0026] In summary: during installation, the two half boxes 1 are combined into one, and then fixed with the help of the connecting plate 4 and the connecting bolts 6, and the contact point of the combination is leak-proof through the arc sealing plate 14. In this way, when the container is used for grouting, the material enters the container through the feed pipe 3 and is discharged through the discharge pipe 2. In the container, the staff drives the stepped arc block 11 to rotate by moving the toggle connecting rod 10, and the toggle connecting rod 10 will also drive the limit baffle 15 and the side scraper 16 to move. With the help of the side scraper 16 and the auxiliary scraper 13, the material adhered to the inner wall of the half box 1 can be scraped off, and the container can be opened to clean the solidified material later, which can effectively reduce the generation of more solidified material inside the container.
[0027] The above description enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A grouting device for building construction, characterized in that: The invention comprises two half boxes (1), a connection mechanism is arranged between the two half boxes (1), and a scraping mechanism is arranged inside the half boxes (1); the side walls of the half boxes (1) are arranged in an open shape, and a connecting plate (9) is fixedly installed on the side walls of the half boxes (1); a semicircular plate (8) is fixedly installed on one end of the connecting plate (9); a traction mechanism is arranged between the semicircular plate (8) and the half boxes (1), and one side of the traction mechanism is connected to the scraping mechanism; a feeding pipe (3) and a discharging pipe (2) are respectively installed on the semicircular plates (8) on the upper and lower sides of the half boxes (1).
2. A construction grouting device according to claim 1, characterized in that: The connection mechanism comprises two connection plates (4), the two connection plates (4) are respectively fixedly mounted on the two half-boxes (1), and a plurality of positioning holes (5) are provided on the side walls of the connection plates (4), connection bolts (6) are inserted and installed in the positioning holes (5), and a connection nut (7) is threadedly installed at one end of the connection bolt (6).
3. A construction grouting device according to claim 1, characterized in that: The scraper mechanism comprises an arc-shaped U-shaped frame (12), both ends of which are fixedly mounted on the side walls of the half box (1), and a side scraper (16) is provided between the arc-shaped U-shaped frame (12) and the half box (1), one end of the side scraper (16) is fixedly mounted with a limit baffle (15), and one end of the limit baffle (15) is fixedly mounted with a toggle connecting rod (10).
4. A construction grouting device according to claim 3, characterized in that: The traction mechanism comprises a stepped arc block (11), the stepped arc block (11) is slidably mounted between the semicircular plate (8) and the half box (1), and one end of the toggle connecting rod (10) is arranged to pass through the stepped arc block (11).
5. A construction grouting device according to claim 3, characterized in that: An auxiliary scraper (13) is fixedly mounted on the lower side of the side scraper (16), and one side of the auxiliary scraper (13) is in contact with the bottom end of the half box (1).
6. A construction grouting device according to claim 1, characterized in that: An arc-shaped sealing plate (14) is fixedly mounted on the inner side wall of the half box (1), and one side of the arc-shaped sealing plate (14) is in contact with the inner wall of the other half box (1).