Protective fence for constructional engineering
By designing an adjustable guardrail structure, the problems of fixed and insolid installation of existing guardrails are solved, flexible adjustment of guardrail height and installation stability are achieved, construction safety hazards are reduced, and storage and transportation processes are simplified. .
Patent Information
- Application Number
- CN202420989136.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-09
- Publication Date
- 2024-12-27
- Estimated Expiration
- 2034-05-09
AI Technical Summary
The existing guardrails are fixed in height and cannot be adjusted, which leads to the need to replace the guardrails when higher construction scenarios are needed, which increases inconvenience for construction personnel, and the installation of the high guardrails is not firmly, posing safety hazards.
A guardrail including a railing body, locking mechanism, connecting plate, oblique support mechanism and adjustment mechanism is designed. Through the cooperation of these mechanisms, the height of the guardrail can be adjusted, and can be stored and fixed when not in use, simplified Storage and transportation to enhance installation stability.
It realizes flexible adjustment of the height of the guardrail, reduces inconvenience for construction personnel, improves the installation stability of the guardrail, reduces safety hazards, and facilitates storage and transportation.
Smart Images

Figure CN222253448U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of construction safety, in particular to a guardrail for construction engineering. Background Art
[0002] The main purpose of installing guardrails at construction sites is to protect the safety of workers and passers-by, prevent accidents, and reduce safety risks at construction sites.
[0003] Generally speaking, the height of the guardrails required at the construction site depends on factors such as the construction height, the weight of the construction object, and the height of the workers. For higher construction scenes, higher guardrails are needed to ensure the safety of workers and surrounding personnel. For example, when building high-rise buildings or bridges, workers need to work at higher altitudes. In order to avoid high-altitude falls, guardrails of appropriate height are needed for safety protection.
[0004] However, the height of the existing guardrail cannot be adjusted. When a higher guardrail is needed, a higher guardrail needs to be purchased, which brings inconvenience to the construction workers. The higher guardrail is also not easy to store and transport. In addition, since the higher guardrail has a larger windward surface and a higher center of gravity, it is easy to be installed loosely, which brings certain safety hazards to the construction workers. To this end, we propose a guardrail for construction projects. Utility Model Content
[0005] The purpose of the utility model is to provide a guardrail for construction engineering to solve the problems raised in the above background technology.
[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a guardrail for construction engineering, comprising a fence body one, a fence body two is slidably inserted into the inner wall of the fence body one, and locking mechanisms are respectively provided between the two side walls of the fence body one and the two side walls of the fence body one, and connecting plates are fixedly connected at the two side edges of the upper front end of the fence body one, and the lower ends of the two connecting plates are provided with diagonal bracing mechanisms, and the diagonal bracing mechanisms include long board one, the long board one is rotatably connected to the lower end of the connecting plate, and the front end of the long board one is fitted with the long board two, and the rear end of the long board two is fixedly connected with a T-shaped plate, the front end of the long board one is provided with a T-shaped slot, the T-shaped slot and the T-shaped plate are slidably matched, and an adjustment mechanism is provided between the T-shaped slot and the long board two, the lower end of the long board two is rotatably connected to a limiting plate, and a fixing mechanism is provided between the limiting plate and the fence body one.
[0007] Preferably, the locking mechanism includes an internal threaded tube and two screw holes three, the internal threaded tube is connected to the side wall of the fence body one near the upper edge, and the inner wall of the internal threaded tube is threadedly connected with a knob screw, the two screw holes three are respectively opened at the upper and lower edges of the side wall of the fence body two, and the screw hole three located at the bottom is threadedly matched with the knob screw.
[0008] Preferably, the adjustment mechanism includes two screw holes 2 and two groups of screw holes 1, the two screw holes 2 are respectively opened through the front ends of the long plate 2 and the T-shaped plate near the lower edge, and the inner walls of the two screw holes 2 are commonly threadedly connected with bolts, the bolts are inserted into and tightened in the inner wall of the T-shaped slot, and the two groups of screw holes 1 are respectively opened through the front ends of the long plate 2 and the T-shaped plate.
[0009] Preferably, the fixing mechanism includes a fixing plate and a hole groove, the hole groove is opened through the upper end of the limiting plate, the fixing plate is attached to the lower end of the limiting plate, and the rear end of the fixing plate is fixedly connected to the front end of the fence body, and a plug column is slidably inserted into the inner wall of the upper end of the fixing plate, the plug column and the hole groove are slidably matched, and a pull plate is fixedly connected to the bottom end of the plug column, and a spring is fixedly connected between the upper end of the pull plate and the lower end of the fixing plate, and the spring is slidably sleeved on the outer wall of the plug column.
[0010] Preferably, mounting plates are fixedly connected to both side edges of the lower front end and the lower rear end of the fence body 1, and mounting holes are penetrated through the upper ends of the four mounting plates.
[0011] Preferably, a handle is fixedly connected to the middle portion of the upper end of the second fence body.
[0012] Compared with the prior art, the beneficial effects of the utility model are: through the mutual cooperation of barrier body one, barrier body two, locking mechanism, connecting plate, long board one, long board two, T-shaped plate, T-shaped groove, adjustment mechanism, limit plate and fixing mechanism, the height of the guardrail can be adjusted, which brings convenience to construction personnel, and when not in use, barrier body two can be stored and fixed in barrier body one, so as to facilitate storage and transportation. At the same time, the two diagonal bracing mechanisms can make the installation of the guardrail more firm and stable, reducing the safety hazards of construction operations. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0014] Figure 2 for Figure 1 A schematic diagram of the structure enlargement at point A;
[0015] Figure 3 for Figure 1 A schematic diagram of the structure at B in FIG.
[0016] Figure 4It is a display diagram of the long plate 2, the limiting plate, the screw hole 1, the T-shaped plate, the hole groove and the screw hole 2 of the utility model;
[0017] Figure 5 It is a display diagram of the connecting plate, the long plate and the T-slot of the utility model.
[0018] In the attached drawings, the parts represented by each reference numeral are listed as follows: 1. Column body one; 2. Column body two; 3. Handle; 4. Connecting plate; 5. Long board one; 6. Long board two; 7. Limiting plate; 8. Fixing plate; 9. Mounting plate; 10. Mounting hole; 11. Screw hole one; 12. Internally threaded pipe; 13. Knob screw; 14. Insert column; 15. Pull plate; 16. Spring; 17. Bolt; 18. T-shaped plate; 19. Hole groove; 20. Screw hole two; 21. T-shaped slot; 22. Screw hole three. DETAILED DESCRIPTION
[0019] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0020] See also Figure 1-Figure 5 A guardrail for construction engineering shown in the figure includes a fence body 1, a fence body 2 is slidably inserted into the inner wall of the fence body 1, and locking mechanisms are respectively provided between the two side walls of the fence body 2 and the two side walls of the fence body 1, and connecting plates 4 are fixedly connected to the edges of the upper front end of the fence body 1, and the lower ends of the two connecting plates 4 are provided with diagonal bracing mechanisms, which include long plates 15, which are rotatably connected to the lower ends of the connecting plates 4, and the front ends of the long plates 15 are fitted with long plates 26, and the rear ends of the long plates 26 are fixedly connected with T-shaped plates 18, and the front ends of the long plates 15 are provided with T-shaped grooves 21, which are slidably matched with the T-shaped grooves 21, and an adjustment mechanism is provided between the T-shaped grooves 21 and the long plates 26, and the lower ends of the long plates 26 are rotatably connected to the limiting plates 7, and a fixing mechanism is provided between the limiting plates 7 and the fence body 1.
[0021] See also Figure 1 and Figure 2 In the figure, the locking mechanism includes an internal threaded tube 12 and two screw holes 3 22. The internal threaded tube 12 is connected to the side wall of the fence body 1 near the upper edge, and the inner wall of the internal threaded tube 12 is threadedly connected with a knob screw 13. The two screw holes 3 22 are respectively opened at the upper and lower edges of the side wall of the fence body 2, and the screw hole 3 22 located at the bottom is threadedly matched with the knob screw 13.
[0022] See also Figure 1-Figure 4In the figure, the adjustment mechanism includes two screw holes 20 and two groups of screw holes 11. The two screw holes 20 are respectively opened through the front ends of the long plate 26 and the T-shaped plate 18 near the lower edge, and the inner walls of the two screw holes 20 are commonly threadedly connected with bolts 17, and the bolts 17 are inserted into and tightened in the inner wall of the T-shaped slot 21. The two groups of screw holes 11 are respectively opened through the front ends of the long plate 26 and the T-shaped plate 18.
[0023] See also Figure 1 , Figure 3 and Figure 4 The fixing mechanism shown in the figure includes a fixing plate 8 and a hole groove 19. The hole groove 19 is opened through the upper end of the limiting plate 7, the fixing plate 8 is attached to the lower end of the limiting plate 7, and the rear end of the fixing plate 8 is fixedly connected to the front end of the fence body 1, and the upper inner wall of the fixing plate 8 is slidably inserted with a plug post 14, the plug post 14 and the hole groove 19 are slidably matched, and the bottom end of the plug post 14 is fixedly connected with a pull plate 15, and a spring 16 is fixedly connected between the upper end of the pull plate 15 and the lower end of the fixing plate 8, and the spring 16 is slidably sleeved on the outer wall of the plug post 14.
[0024] See also Figure 1 In the figure, mounting plates 9 are fixedly connected at both side edges of the lower front end and the lower rear end of the fence body 1, and mounting holes 10 are penetrated at the upper ends of the four mounting plates 9; specifically, the setting of the mounting plates 9 and the mounting holes 10 facilitates the installation and fixation of the guardrail.
[0025] See also Figure 1 In the figure, a handle 3 is fixedly connected to the middle of the upper end of the fence body 2; specifically, the setting of the handle 3 facilitates the fence body 2 to be taken out from the fence body 1.
[0026] Working principle: Figure 1As shown, the height of the fence body 1 and the fence body 2 2 fixed together by two locking mechanisms is greatly increased compared with the height of the fence body 1. In order to make the installation of the fence body 1 and the fence body 2 2 more stable, first, pull the pull plate 15 downward, the pull plate 15 will drive the plug post 14 to slide downward in the inner wall of the fixed plate 8 (in this process, the spring 16 between the pull plate 15 and the fixed plate 8 will be stretched on the outer wall of the plug post 14), and the plug post 14 will slide downward in the hole groove 19 on the limit plate 7 until the plug post 14 completely leaves the hole groove 19, then the long board 2 6 and the corresponding long board 1 5 can be moved forward, the long board 1 5 will rotate forward on the corresponding connecting plate 4, and then the bolt 17 is rotated outward, the bolt 17 will rotate outward in the corresponding screw hole 20 on the long board 2 6 and the corresponding screw hole 20 on the T-shaped plate 18, and the bolt 17 will also rotate outward in the inner wall of the T-shaped plate 18 on the long board 1 5 until the bolt 17 is completely turned away When the long board 26 is in contact with the ground, the long board 26 can be slid downward, and the long board 26 will slide downward at the front end of the long board 15 (in this process, the T-shaped plate 18 on the long board 26 will slide downward in the T-shaped groove 21 on the long board 15), until the bottom end of the limit plate 7 on the long board 26 is in contact with the ground, the bolt 17 can be inserted into and tightened into one of the screw holes 11 in the group of screw holes 11 on the long board 26, and the bolt 17 will also be inserted into and tightened into one of the screw holes 11 on the T-shaped plate 18. The bolt 17 is inserted into one of the screw holes 11 in the group screw hole 11 and is also inserted and tightened into the inner wall of the T-shaped slot 21, so that the long board 2 6 and the long board 1 5 can be kept fixed again, and then the ground nail is inserted into the hole 19 on the limit plate 7 with the help of a hammer or other tools and penetrates into the ground, so that the long board 2 6 and the long board 1 5 can play a diagonal bracing role for the guardrail. Similarly, the same operation can be followed to make the other long board 2 6 and the long board 1 5 play a diagonal bracing role for the guardrail. Similarly, the two long boards 2 6 and their corresponding long boards 1 5 can be reset (i.e., they are in a stored and fixed state, which is convenient for storage and transportation) by following the opposite operation.
[0027] When it is necessary to store the fence body 2 into the fence body 1, first, turn one of the knob screws 13 outward, the knob screw 13 will rotate outward in the corresponding internal threaded tube 12, and the knob screw 13 will also rotate outward in a screw hole 3 22 located at the bottom on the corresponding fence body 2, until the knob screw 13 completely leaves the screw hole 3 22, and then turn the other knob screw 13 away from its corresponding screw hole 3 22 according to the same operation, and then the fence body 2 2 can be stored in the fence body 1, and then the two knob screws 13 are rotated in reverse order, and the two knob screws 13 will both rotate inward in the corresponding internal threaded tubes 12 at each location, and the two knob screws 13 will also be inserted and tightened in the screw holes 3 22 located at the top on the corresponding fence body 2, then the fence body 2 2 stored in the fence body 1 can be fixed in the fence body 1 to prevent the fence body 2 2 from slipping out of the fence body 1 during subsequent transportation.
[0028] It should be noted that the height of the guardrail is adjustable, which brings convenience to construction workers, and when not in use, the fence body 2 can be stored and fixed in the fence body 1, so as to facilitate storage and transportation. At the same time, the two diagonal bracing mechanisms can make the installation of the guardrail more firm and stable, reducing the safety hazards of construction operations.
[0029] It should also be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device that includes a series of elements includes not only those elements, but also other elements that are not explicitly listed, or also includes elements that are inherent to such process, method, article or device.
[0030] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A guardrail for construction engineering, comprising a guardrail body (1), characterized in that: The inner wall of the fence body 1 (1) is slidably inserted with the fence body 2 (2), and locking mechanisms are respectively provided between the two side walls of the fence body 2 (2) and the two side walls of the fence body 1 (1). The two side edges of the upper front end of the fence body 1 (1) are fixedly connected with connecting plates (4), and the lower ends of the two connecting plates (4) are provided with diagonal bracing mechanisms, and the diagonal bracing mechanisms include long plates 1 (5), and the long plates 1 (5) are rotatably connected to the lower ends of the connecting plates (4), and the long plates 1 (5) are fixedly connected to the lower ends of the connecting plates (4). The front end is fitted with a long board (6), the rear end of the long board (6) is fixedly connected with a T-shaped plate (18), the front end of the long board (5) is provided with a T-shaped groove (21), the T-shaped groove (21) and the T-shaped plate (18) are slidably matched, and an adjustment mechanism is provided between the T-shaped groove (21) and the long board (6), the lower end of the long board (6) is rotatably connected with a limit plate (7), and a fixing mechanism is provided between the limit plate (7) and the fence body (1).
2. A construction engineering guardrail according to claim 1, characterized in that: The locking mechanism comprises an internal threaded tube (12) and two screw holes (22). The internal threaded tube (12) is connected to the side wall of the fence body (1) near the upper edge, and the inner wall of the internal threaded tube (12) is threadedly connected with a knob screw (13). The two screw holes (22) are respectively opened at the upper and lower edges of the side wall of the fence body (2), and the screw hole (22) located at the bottom is threadedly matched with the knob screw (13).
3. A construction engineering guardrail according to claim 1, characterized in that: The adjustment mechanism comprises two screw holes (20) and two groups of screw holes (11). The two screw holes (20) are respectively penetrated and opened at the front ends of the long plate (6) and the T-shaped plate (18) near the lower edge, and the inner walls of the two screw holes (20) are threadedly connected with bolts (17). The bolts (17) are inserted into and tightened in the inner wall of the T-shaped groove (21). The two groups of screw holes (11) are respectively penetrated and opened at the front ends of the long plate (6) and the T-shaped plate (18).
4. A construction engineering guardrail according to claim 1, characterized in that: The fixing mechanism comprises a fixing plate (8) and a hole groove (19), wherein the hole groove (19) is formed through the upper end of the limiting plate (7), the fixing plate (8) is fitted on the lower end of the limiting plate (7), and the rear end of the fixing plate (8) is fixedly connected to the front end of the fence body (1), and a plug post (14) is slidably inserted into the inner wall of the upper end of the fixing plate (8), the plug post (14) and the hole groove (19) are slidably matched, and a pull plate (15) is fixedly connected to the bottom end of the plug post (14), and a spring (16) is fixedly connected between the upper end of the pull plate (15) and the lower end of the fixing plate (8), and the spring (16) is slidably sleeved on the outer wall of the plug post (14).
5. The construction engineering guardrail according to claim 1, characterized in that: Mounting plates (9) are fixedly connected to both side edges of the lower front end and the lower rear end of the fence body (1), and mounting holes (10) are formed through the upper ends of the four mounting plates (9).
6. A construction engineering guardrail according to claim 1, characterized in that: A handle (3) is fixedly connected to the middle of the upper end of the fence body 2 (2).