Building engineering construction pipeline

The construction pipeline addresses installation instability and reinforcement gaps by using mounting rods, support plates, connecting flanges, and reinforcement columns, achieving stable and secure connections and adjustments.

CN222255326UActive Publication Date: 2024-12-27GANSU MIDDLE ROAD TONGJIAN TUNNEL ENGINEERING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420990484.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-08
Publication Date
2024-12-27
Estimated Expiration
2034-05-08

AI Technical Summary

Technical Problem

Existing construction pipelines lack suitable safety support mechanisms, making installation unstable and inconvenient to adjust, and lack reinforcement mechanisms between adjacent pipelines, leading to tilting under external influences.

Method used

The construction pipeline features mounting rods with sleeves and support plates, connecting flanges with sealing gaskets, anti-skid rubber pads, and reinforcement columns with detachable mechanisms to enhance stability and facilitate quick adjustments and secure connections.

Benefits of technology

The design provides stable, quick, and secure installation and adjustment of pipelines, ensuring stability and reinforcement between adjacent units, enhancing overall installation convenience and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222255326U_ABST
    Figure CN222255326U_ABST
Patent Text Reader

Abstract

The utility model discloses a building engineering construction pipeline which comprises a plurality of pipe bodies, mounting rods are arranged on the periphery of the outer end face of each pipe body, a plurality of groups of mounting rods are arranged, mounting sleeves are arranged at the outer side ends of the mounting rods, supporting plates are detachably arranged at the outer side ends of the mounting sleeves, and the supporting plates are detachably arranged on the outer side ends of the supporting plates. A plurality of groups of supporting plates are arranged, the models of the supporting plates are different, mounting seats are arranged on the supporting plates, first mounting holes are formed in the mounting seats, second mounting holes corresponding to the first mounting holes are formed in the mounting sleeves, and the first mounting holes and the second mounting holes are connected through bolts; supporting rods are arranged at the top ends of the multiple mounting rods, clamping plates are arranged on the multiple supporting rods, clamping bases corresponding to the clamping plates are arranged on the inner walls of the multiple mounting sleeves, the multiple clamping bases are arranged at intervals, and through the design of the mounting sleeves and the supporting plates, overall mounting and adjusting are facilitated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction pipelines, and more specifically, to a building engineering construction pipeline. Background Art

[0002] During the construction process, it is generally necessary to construct pipelines, which transport tap water, wastewater or natural gas required for production and life. When the existing construction pipelines are used, for different external installation environments, when the construction pipelines are installed corresponding to the external environment, there is a lack of suitable safety support mechanisms, and the installation stability needs to be improved. When the device is in use, when the installation support mechanism is adjusted according to different installation requirements, the adjustment operation is relatively troublesome and inconvenient for quick adjustment. In addition, when the device is in use, after multiple pipelines are assembled together, there is a lack of suitable reinforcement mechanisms between adjacent pipelines, which are easily tilted due to external influences. Utility Model Content

[0003] 1. Technical issues to be resolved

[0004] In view of the problems existing in the prior art, the utility model provides a construction pipeline for a building project to solve the technical problem mentioned in the background technology that when the construction pipeline is installed in accordance with different external installation environments, there is a lack of a suitable safety support mechanism.

[0005] (II) Technical solution

[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a construction engineering construction pipeline, including a pipe body, wherein the pipe body is provided with multiple, multiple outer end surfaces of the pipe bodies are provided with mounting rods, multiple groups of the mounting rods are provided, multiple groups of the outer ends of the mounting rods are provided with mounting sleeves, multiple outer ends of the mounting sleeves are removable and provided with support plates, multiple groups of the support plates are provided, and the multiple groups of the support plates are provided with different models, multiple groups of the support plates are provided with mounting seats, multiple mounting seats are provided with first mounting holes, multiple mounting sleeves are provided with second mounting holes corresponding to the first mounting holes, the first mounting holes and the second mounting holes are connected by bolts, multiple mounting rods are provided with support rods at the top ends, multiple support rods are provided with clamping plates, multiple mounting sleeves are provided with clamping seats on their inner walls corresponding to the clamping plates, and multiple clamping seats are arranged at intervals.

[0007] The utility model is further configured that both left and right sides of the outer end faces of the plurality of tube bodies are provided with connecting flanges, connecting holes are opened on the two connecting flanges, and a plurality of connecting holes are arranged in the circumferential direction to facilitate the connection between the tube bodies.

[0008] The utility model is further configured such that a plurality of the connecting flanges are each provided with a sealing gasket, and a plurality of the sealing gaskets are each provided with through holes corresponding to the plurality of the connecting holes, so as to ensure the sealing of the connecting parts.

[0009] The utility model is further configured such that the outer ends of the plurality of groups of support plates are all provided with anti-skid rubber pads, and the plurality of groups of anti-skid rubber pads are configured with different models to facilitate stable support in different working conditions.

[0010] The utility model is further configured that a plurality of reinforcing columns are provided on both sides of the outer end surfaces of the tube bodies, a plurality of the reinforcing columns are provided in the circumferential direction, and reinforcing mechanisms are provided between adjacent reinforcing columns to strengthen the connection.

[0011] The utility model is further configured such that the plurality of reinforcing mechanisms each include a reinforcing seat, a reinforcing rod and a reinforcing sleeve, and two of the reinforcing seat and two of the reinforcing rod are provided. The reinforcing seat is detachably provided on the reinforcing column, the reinforcing rod is installed on the reinforcing seat, and the reinforcing sleeve is installed on the outer ends of the two reinforcing rods to facilitate the reinforced connection.

[0012] The utility model is further configured such that a plurality of the reinforcing columns are each provided with a fixing ring corresponding to the reinforcing seat, a plurality of the reinforcing seats are each provided with a first threaded hole, a plurality of the reinforcing columns are each provided with a second threaded hole corresponding to the first threaded hole, and the first threaded hole and the second threaded hole are connected by bolts to achieve locking of the reinforcing seat installation.

[0013] The utility model is further configured such that a plurality of the reinforcement sleeves are symmetrically provided with first locking holes, a plurality of the reinforcement rods are provided with second locking holes corresponding to the first locking holes, and the first locking holes and the second locking holes are connected by bolts to achieve locking of the reinforcement sleeve installation.

[0014] (III) Beneficial effects

[0015] Compared with the prior art, the utility model provides a construction pipeline for a building project, which has the following

[0016] Beneficial effects:

[0017] 1. Through the design of the mounting sleeve and the support plate, the support plate is installed through the mounting seat corresponding to the mounting sleeve, the first mounting hole and the second mounting hole are connected by bolts, and the mounting sleeve and the mounting rod are installed in coordination, which is convenient for strengthening the support of the overall installation of the pipe body and facilitating the overall installation and adjustment.

[0018] 2. Through the design of the card plate and the card seat, the installation rod drives the support rod to slide, and the support rod drives the card plate to slide. The card plate and the card seat are tightly pressed together, which is convenient for adjusting the position of the installation sleeve according to needs, convenient for adjusting the length of the support mechanism, and convenient for quick adjustment.

[0019] 3. Through the design of the reinforcement mechanism, the reinforcement mechanism corresponds to the reinforcement column on the pipe body and is detachably arranged. The reinforcement seat and the reinforcement rod are fixed to the reinforcement column by bolts between the first threaded hole and the second threaded hole. The reinforcement sleeve slides relative to the reinforcement rod. After the connection is completed, the position of the reinforcement sleeve is locked to facilitate the reinforcement connection between adjacent pipe bodies. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a schematic diagram of the overall structure of a construction pipeline optimized for a building project;

[0021] Figure 2 This is a schematic diagram of an optimal pipe body structure for a construction engineering pipeline;

[0022] Figure 3 A schematic diagram of the matching structure of a support plate, a mounting seat and a non-slip rubber pad preferably used for a construction pipeline;

[0023] Figure 4 A cross-sectional view of the internal structure of an installation sleeve preferably used for a construction engineering pipeline;

[0024] Figure 5 The present invention is an exploded diagram of the coordinated structure of a reinforcement seat, reinforcement rod and reinforcement sleeve optimized for a construction engineering pipeline.

[0025] In the figure: 1. tube body; 2. mounting rod; 3. mounting sleeve; 4. support plate; 5. mounting seat; 6. first mounting hole; 7. second mounting hole; 8. support rod; 9. clamping plate; 10. clamping seat; 11. connecting flange; 12. connecting hole; 13. sealing gasket; 14. through hole; 15. non-slip rubber pad; 16. reinforcement column; 17. reinforcement seat; 18. reinforcement rod; 19. reinforcement sleeve; 20. fixing ring; 21. first threaded hole; 22. second threaded hole; 23. first locking hole; 24. second locking hole. DETAILED DESCRIPTION

[0026] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present utility model will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0027] It should be noted that, unless otherwise specified, all technical and scientific terms used in this application have the same meanings as commonly understood by ordinary technicians in the technical field to which this application belongs.

[0028] In the present invention, unless otherwise specified, directions such as "up" and "down" are usually used in reference to the directions shown in the drawings, or in reference to the vertical, perpendicular or gravity direction; similarly, for ease of understanding and description, "left" and "right" are usually used in reference to the left and right shown in the drawings; "inside" and "outside" refer to the inside and outside relative to the outline of each component itself, but the above-mentioned directions are not used to limit the present invention.

[0029] See also Figure 1-4 A construction pipeline for a building project comprises a pipe body 1, the pipe body 1 is provided with a plurality of mounting rods 2, the outer end surfaces of the plurality of pipe bodies 1 are all provided with mounting rods 2, the mounting rods 2 are provided with a plurality of groups, the outer ends of the plurality of mounting rods 2 are provided with mounting sleeves 3, the outer ends of the plurality of mounting sleeves 3 are all detachably provided with support plates 4, the support plates 4 are provided with a plurality of groups, the plurality of support plates 4 are provided with different models, the plurality of support plates 4 are provided with mounting seats 5, the plurality of mounting seats 5 are provided with a first mounting hole 6, the plurality of mounting sleeves 3 are provided with a second mounting hole 7 corresponding to the first mounting hole 6, the first mounting hole 6 and the second mounting hole 7 are connected by bolts, the tops of the plurality of mounting rods 2 are provided with support rods 8, the plurality of support rods 8 are provided with clamping plates 9, the inner walls of the plurality of mounting sleeves 3 are provided with clamping seats 10 corresponding to the clamping plates 9, and the clamping seats 10 are arranged at intervals.

[0030] In this embodiment, the mounting sleeve 3 is installed relative to the mounting rod 2, and a suitable type of support plate 4 is selected. The mounting seat 5 of the support plate 4 is installed corresponding to the mounting sleeve 3, the first mounting hole 6 and the second mounting hole 7 are aligned, and the bolts are passed through and tightened to fix.

[0031] More specifically, when the support length needs to be adjusted, the mounting sleeve 3 is rotated to drive the internal holder 10 to rotate to a position where it does not conflict with the clamping plate 9, and the mounting sleeve 3 is adjusted to a suitable position. After adjustment, it is rotated to reset, and the clamping plate 9 and the holder 10 cooperate to achieve a tight fit in the adjusted state.

[0032] See also Figure 1 and Figure 2 As an implementation method of the tube body 1: multiple tube bodies 1 are provided with connecting flanges 11 on both sides of the left and right sides of the outer end surfaces, and connecting holes 12 are opened on the two connecting flanges 11. There are multiple connecting holes 12 arranged in the circumferential direction, and multiple connecting flanges 11 are provided with sealing gaskets 13. The multiple sealing gaskets 13 are provided with through holes 14 corresponding to the multiple connecting holes 12.

[0033] Specifically, the pipe bodies 1 are connected and locked by connecting flanges 11 . Before connection, the sealing gasket 13 is aligned with the installation through holes 14 and the connecting holes 12 corresponding to the connecting flanges 11 , and bolts are passed through the two connecting holes 12 and tightened.

[0034] See also Figure 1 and Figure 3As an implementation of the anti-skid rubber pad 15: the outer ends of multiple groups of support plates 4 are all provided with anti-skid rubber pads 15, and the multiple groups of anti-skid rubber pads 15 are set with different models.

[0035] Specifically, a suitable type of anti-skid rubber pad 15 is selected according to the type of the support plate 4, and the anti-skid rubber pad 15 and the support plate 4 are fixed and bonded by glue.

[0036] See also Figure 1 , Figure 2 and Figure 5 As an implementation method of the reinforcement mechanism: a plurality of reinforcement columns 16 are provided on both sides of the outer end surfaces of the tube bodies 1, and a plurality of reinforcement columns 16 are provided in the circumferential direction. A reinforcement mechanism is provided between adjacent reinforcement columns 16, and the plurality of reinforcement mechanisms include a reinforcement seat 17, a reinforcement rod 18 and a reinforcement sleeve 19. Two reinforcement seats 17 and two reinforcement rods 18 are provided. The reinforcement seat 17 is detachably arranged on the reinforcement column 16, the reinforcement rod 18 is installed on the reinforcement seat 17, and the reinforcement sleeve 19 is installed on the outer ends of the two reinforcement rods 18. A fixing ring 20 is provided on each of the plurality of reinforcement columns 16 corresponding to the reinforcement seat 17, a first threaded hole 21 is provided on each of the plurality of reinforcement seats 17, a second threaded hole 22 is provided on each of the plurality of reinforcement columns 16 corresponding to the first threaded hole 21, and the first threaded hole 21 and the second threaded hole 22 are connected by bolts, a first locking hole 23 is symmetrically provided on each of the plurality of reinforcement sleeves 19, a second locking hole 24 is provided on each of the plurality of reinforcement rods 18 corresponding to the first locking hole 23, and the first locking hole 23 and the second locking hole 24 are connected by bolts.

[0037] Specifically, the reinforcement seat 17 is installed corresponding to the reinforcement column 16, the fixing ring 20 limits the installation, the first threaded hole 21 and the second threaded hole 22 are aligned, the bolts are passed through and tightened, and the reinforcement sleeve 19 slides relative to the two reinforcement rods 18. After the tube body 1 is assembled, the reinforcement sleeve 19 is slid to a suitable position, the first locking hole 23 and the second locking hole 24 are aligned, and the bolts are passed through and tightened.

[0038] In summary, the overall equipment is in use:

[0039] When the tube body 1 is in the adjustment state, the whole is adjusted according to the installation environment, and a suitable support plate 4 and anti-skid rubber pad 15 are selected. The anti-skid rubber pad 15 and the support plate 4 are fixed and bonded by glue. The mounting seat 5 and the mounting sleeve 3 on the support plate 4 are installed in coordination, and the bolts are passed through the first mounting hole 6 and the second mounting hole 7 to be tightened and fixed. The mounting sleeve 3 is rotated, and the internal seat 10 and the clamping plate 9 of the mounting sleeve 3 no longer conflict. The position of the mounting sleeve 3 is adjusted. After adjusting to the appropriate position, it is rotated to reset, and the clamping plate 9 and the seat 10 cooperate to tighten and limit.

[0040] When in the assembled state, the sealing gasket 13 is installed corresponding to the connecting flange 11, the through hole 14 is aligned with the connecting hole 12, and the bolts are passed through the connecting holes 12 of two adjacent connecting flanges 11 and tightened to achieve an integral connection and ensure a sealing effect at the connection.

[0041] When in the enhanced protection state, before connection, the reinforcement seat 17 is installed at the appropriate position of the reinforcement column 16, the fixing ring 20 limits the installation, and the mounting sleeve 3 is slidably installed on the outer ends of two adjacent mounting rods 2. After the tube body 1 is locked, the mounting sleeve 3 is slid to the appropriate position, the first locking hole 23 and the second locking hole 24 are aligned, and the bolts are passed through and tightened to strengthen the protection of the connection.

[0042] In all the schemes mentioned above, the connection between two parts can be selected according to actual conditions by welding, bolt and nut matching connection, bolt or screw connection or other well-known connection methods, which are not described here one by one. In the above, all fixed connections are preferably welded. Although the embodiments of the utility model have been shown and described, it can be understood by ordinary technicians in this field that various changes, modifications, substitutions and variations can be made to these embodiments without departing from the principle and spirit of the utility model. The scope of the utility model is defined by the attached claims and their equivalents.

Claims

1. A construction pipeline for a building project, comprising a pipe body (1), wherein a plurality of pipe bodies (1) are provided, and wherein: The outer end surfaces of the plurality of tube bodies (1) are all provided with mounting rods (2) around them. The mounting rods (2) are provided in multiple groups. The outer ends of the plurality of mounting rods (2) are all provided with mounting sleeves (3). The outer ends of the plurality of mounting sleeves (3) are all detachably provided with support plates (4). The support plates (4) are provided in multiple groups. The plurality of supporting plates (4) are provided in different models. The plurality of supporting plates (4) are all provided with mounting seats (5). The plurality of mounting seats (5) are all provided with first mounting holes (6). The plurality of mounting sleeves (3) are all provided with second mounting holes (7) corresponding to the first mounting holes (6). The first mounting holes (6) and the second mounting holes (7) are connected by bolts. The top ends of the plurality of mounting rods (2) are all provided with support rods (8). The plurality of supporting rods (8) are all provided with clamping plates (9). The inner walls of the plurality of mounting sleeves (3) are all provided with clamping seats (10) corresponding to the clamping plates (9). The clamping seats (10) are arranged in multiple intervals.

2. A construction engineering pipeline according to claim 1, characterized in that: The outer end surfaces of the plurality of tube bodies (1) are each provided with a connecting flange (11) on both sides thereof, and the two connecting flanges (11) are each provided with a connecting hole (12), and a plurality of the connecting holes (12) are provided in the circumferential direction.

3. A construction engineering construction pipeline according to claim 2, characterized in that: The plurality of connection flanges (11) are each provided with a sealing gasket (13), and the plurality of sealing gaskets (13) are each provided with a through hole (14) corresponding to the plurality of connection holes (12).

4. A construction engineering pipeline according to claim 1, characterized in that: multiple groups The outer ends of the support plates (4) are each provided with an anti-skid rubber pad (15), and the plurality of groups of the anti-skid rubber pads (15) are provided with different models.

5. A construction engineering construction pipeline according to claim 1, characterized in that: Reinforcement columns (16) are provided on both sides of the outer end surfaces of the plurality of tube bodies (1), a plurality of the reinforcement columns (16) are provided in the circumferential direction, and a reinforcement mechanism is provided between adjacent reinforcement columns (16).

6. A construction engineering pipeline according to claim 5, characterized in that: The plurality of reinforcing mechanisms each comprise a reinforcing seat (17), a reinforcing rod (18) and a reinforcing sleeve (19); two of each of the reinforcing seat (17) and the reinforcing rod (18) are provided; the reinforcing seat (17) is detachably provided on the reinforcing column (16); the reinforcing rod (18) is installed on the reinforcing seat (17); and the reinforcing sleeve (19) is installed on the outer ends of the two reinforcing rods (18).

7. A construction pipeline for construction engineering according to claim 6, characterized in that: A fixing ring (20) is provided on each of the plurality of reinforcing columns (16) corresponding to the reinforcing seat (17), a first threaded hole (21) is provided on each of the plurality of reinforcing seats (17), a second threaded hole (22) is provided on each of the plurality of reinforcing columns (16) corresponding to the first threaded hole (21), and the first threaded hole (21) and the second threaded hole (22) are connected by bolts.

8. A construction pipeline for building engineering according to claim 6, characterized in that: A plurality of the reinforcing sleeves (19) are symmetrically provided with first locking holes (23), a plurality of the reinforcing rods (18) are provided with second locking holes (24) corresponding to the first locking holes (23), and the first locking holes (23) and the second locking holes (24) are connected by bolts.