Displacement monitoring and early warning device for high-rise corridor control platform

By designing a combination device of beam support and sensors on the high-rise corridor control platform, the problem of low displacement monitoring accuracy in the existing technology is solved, high-precision displacement monitoring and early warning are achieved, the structure's seismic resistance is enhanced, and the structure is ensured. Safety and maintenance efficiency of buildings.

CN222258194UActive Publication Date: 2024-12-27XIAMEN BIAD CONSTR DESIGN
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323430916.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-15
Publication Date
2024-12-27
Estimated Expiration
2033-12-15

AI Technical Summary

Technical Problem

The displacement monitoring accuracy of the existing high-rise corridor control platform is not high, making it difficult to effectively monitor and early warning, affecting the safety performance and maintenance management of buildings.

Method used

A monitoring and early warning device including beam support, lower hanging plate, vertical displacement sensor and horizontal displacement sensor was designed. The beam support consists of concrete beef legs and steel structure beef legs. The sensor is fixed on the beam support and the lower hanging plate is connected to control. Platform, sensors detect vertical and horizontal displacements and enhance structural strength and seismic resistance through oblique braces.

Benefits of technology

It realizes high-precision monitoring of the displacement of the high-rise corridor control platform, promptly sends out early warning signals, extends pedestrian escape time, and infers structural damage by analyzing the displacement, which facilitates maintenance and detection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222258194U_ABST
    Figure CN222258194U_ABST
Patent Text Reader

Abstract

The utility model discloses a displacement monitoring and early warning device for a high-rise corridor control platform, one side of the control platform is connected with a first building, the monitoring and early warning device comprises a beam support, a lower hanging plate, a vertical displacement sensor and a horizontal displacement sensor, the beam support is fixedly arranged on a second building, and the lower hanging plate is fixedly arranged on the second building. The vertical displacement sensor is fixedly arranged on the upper surface of the beam support, the horizontal displacement sensor is fixedly arranged on the side face of the beam support, the other side of the control platform is arranged on the vertical displacement sensor, and the two ends of the lower hanging plate are fixedly connected with the control platform and the horizontal displacement sensor respectively. The vertical displacement sensor detects the displacement of the control platform in the vertical direction, and the horizontal displacement sensor detects the displacement of the control platform in the horizontal direction. The utility model has the advantage that the monitoring precision of the horizontal displacement and the vertical displacement of the control platform is higher.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction, in particular to a displacement monitoring and early warning device for a high-rise corridor control platform. Background Art

[0002] With the development of modern building structures and theories, more and more local large cantilever structures are used to meet specific building functions. In the context of intelligent construction, in order to achieve safety and quality management throughout the project operation cycle, it is the goal of structural engineers to improve the safety performance and monitoring level of buildings. For the operation cycle of completed projects, monitoring and early warning technologies are particularly prominent. For cantilevered corridors of high-rise structures, by monitoring and analyzing the vertical and horizontal displacements of specific locations of the corridor, when the monitoring value reaches the critical value, it can automatically transmit alarm information to buy time for pedestrians on the corridor to escape. Secondly, by analyzing the displacement of the corridor and combining it with the structural characteristics of the corridor itself, the damage to the main structure can be inferred, which is convenient for maintenance personnel in the later stage.

[0003] The control platform of the corridor is usually set between the first building and the second building, the monitoring and early warning device is fixedly set on the second building, one side of the control platform is connected to the first building, and the other side of the control platform is located on the monitoring and early warning device. Referring to patent CN 204356892 U, the monitoring and early warning device of the existing control platform is set in the middle position of the corridor control platform, and the monitoring accuracy of the displacement of the corridor control platform is not high, which needs to be improved. Utility Model Content

[0004] The utility model aims to provide a monitoring and early warning device which is applied to a high-rise corridor control platform and has high displacement monitoring accuracy for the corridor control platform.

[0005] The utility model proposes a displacement monitoring and early warning device for a high-rise corridor control platform, wherein one side of the control platform is connected to a first building, and the monitoring and early warning device comprises a beam support, a lower hanging plate, a vertical displacement sensor and a horizontal displacement sensor, wherein the beam support is fixedly arranged on a second building, the vertical displacement sensor is fixedly arranged on the upper surface of the beam support, the horizontal displacement sensor is fixedly arranged on the side of the beam support, the other side of the control platform is arranged on the vertical displacement sensor, the two ends of the lower hanging plate are respectively fixedly connected to the control platform and the horizontal displacement sensor, the vertical displacement sensor detects the displacement of the control platform in the vertical direction, and the horizontal displacement sensor detects the displacement of the control platform in the horizontal direction.

[0006] Preferably, the beam support includes a concrete corbel and a steel structure corbel, the concrete corbel is fixed to the shear wall of the second building, and the steel structure corbel is arranged on the side of the concrete corbel away from the shear wall of the second building, and the concrete corbel includes a plurality of horizontal bars, a plurality of vertical stirrups, a plurality of longitudinal bars and a concrete layer, and the horizontal bars, vertical stirrups and longitudinal bars are perpendicular to each other.

[0007] Preferably, the horizontal bars are evenly distributed along the vertical direction, the longitudinal bars are evenly distributed along the width direction of the horizontal bars, and the vertical stirrups are evenly distributed along the length direction of the horizontal bars.

[0008] Preferably, the width dimension of the concrete corbel is "A", the width dimension of the control platform is "L", and meets 20A <L<30A。

[0009] Preferably, the control platform includes a plurality of steel beams and a plurality of horizontal supports, the plurality of steel beams form a mesh structure, a plurality of connecting plates are fixedly provided on the steel beams, and both ends of the horizontal supports are fixedly connected to two connecting plates respectively.

[0010] Preferably, the lower hanging plate is vertically arranged, the bottom end of the lower hanging plate is fixedly connected to the horizontal displacement sensor, the top end of the lower hanging plate is connected to the steel beam on the side of the control platform close to the second building, and the top end of the lower hanging plate is locked and fixed to the steel beam by a fixing piece.

[0011] Preferably, a corner brace is fixedly provided at the bottom end of the steel beam.

[0012] Preferably, frame columns are provided on the first building, and diagonal braces are provided between two adjacent control platforms, the bottom end of the diagonal brace is fixed at the connection between the bottom control platform and the frame columns, and the top end of the diagonal brace is fixed at the middle position of the top control platform.

[0013] From the above description of the utility model, it can be seen that the utility model has the following beneficial effects:

[0014] 1. The monitoring and early warning device installed at the bottom of one side of the control platform has a high monitoring accuracy for the horizontal and vertical displacements of the control platform. When the vertical displacement or horizontal displacement of the control platform reaches the alarm limit, an early warning signal will be issued, which can buy time for pedestrians on the corridor to escape. At the same time, the early warning signal will be transmitted to the central control console. Through the analysis of the corridor displacement and the structural characteristics of the corridor itself, the damage of the main structure can be inferred, which is convenient for management personnel to identify and the next step of inspection and maintenance.

[0015] 2. A diagonal brace is fixed at the bottom of the control platform, through which the force received by the middle position of the control platform is transmitted to the frame column, thereby enhancing the structural strength and earthquake resistance of the control platform. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 is a schematic diagram of the locations of a control platform, a first building, and a second building in an embodiment;

[0017] Figure 2 It is a plan view of a displacement monitoring and early warning device for a high-rise corridor control platform in an embodiment;

[0018] Figure 3 It is a vertical view of a displacement monitoring and early warning device for a high-rise corridor control platform in an embodiment;

[0019] Figure 4 is an elevation view of a concrete corbel of an embodiment;

[0020] Figure 5 is a schematic diagram of the structure of horizontal reinforcement, vertical stirrups and longitudinal reinforcement in an embodiment;

[0021] Figure 6 is a plan view of the concrete corbel of the embodiment;

[0022] Figure 7 is an elevation view of a monitoring and early warning device of an embodiment;

[0023] Figure 8 It is a plan view of the monitoring and early warning device of the embodiment.

[0024] Figure numerals: 1. control platform; 11. steel beam; 12. horizontal support; 13. connecting plate; 14. corner brace; 15. diagonal brace; 2. first building; 21. frame column; 3. second building; 31. shear wall; 4. monitoring and early warning device; 41. beam support; 411. concrete corbel; 412. steel structure corbel; 42. lower hanging plate; 43. vertical displacement sensor; 44. horizontal displacement sensor; 5. horizontal reinforcement; 6. vertical stirrups; 7. longitudinal reinforcement; 8. concrete layer. DETAILED DESCRIPTION

[0025] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present invention clearer and more understandable, the following is a summary of the technical problems, technical solutions and beneficial effects to be solved by the present invention. Figure 1-8 It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0026] Reference Figure 1 , Figure 2 and Figure 3, A displacement monitoring and warning device for a high-rise corridor control platform. The control platform 1 is horizontally arranged between the first building 2 and the second building 3. A frame column 21 is vertically arranged in the first building 2. One side of the control platform 1 is fixed on the frame column 21 of the first building 2. The monitoring and warning device 4 is fixedly arranged on the shear wall 31 of the second building 3. The other side of the control platform 1 is arranged on the monitoring and warning device 4. Thus, the displacement of the control platform 1 is monitored by the monitoring and warning device 4.

[0027] Refer to Figure 4-Figure 7 , The monitoring and warning device 4 includes a beam bracket 41, a hanging plate 42, a plurality of vertical displacement sensors 43 and a plurality of horizontal displacement sensors 44. The beam bracket 41 includes a concrete corbel 411 and a steel structure corbel 412. One side of the concrete corbel 411 is fixedly arranged at the shear wall 31 of the second building 3. The steel structure corbel 412 is on the side of the concrete corbel 411 away from the shear wall 31 of the second building 3. The concrete corbel 411 is composed of a plurality of horizontal bars 5, a plurality of vertical stirrups 6, a plurality of longitudinal bars 7 and a concrete layer 8. Among them, both the horizontal bars 5 and the longitudinal bars 7 are in a "U" shape, and the vertical stirrups 6 are in a "square" shape. The longitudinal bars 7 are vertically arranged so that the plane where the longitudinal bars 7 are located is a vertical plane, and the distance between adjacent two longitudinal bars 7 is kept the same. A plurality of vertical stirrups 6 are arranged inside the longitudinal bars 7 and are evenly distributed along the length direction of the longitudinal bars 7. Each vertical stirrup 6 is welded and fixed to the longitudinal bars 7. In addition, a plurality of horizontal bars 5 are evenly distributed in the vertical direction, and each horizontal bar 5 is welded and fixed to the vertical stirrups and the longitudinal bars 7. One end of a plurality of longitudinal bars 7 and horizontal bars 5 penetrates into the shear wall 31 of the second building 3. A plurality of horizontal bars 5, a plurality of vertical stirrups 6 and a plurality of longitudinal bars 7 are concreted to form a concrete layer 8. The plurality of horizontal bars 5, a plurality of vertical stirrups 6 and a plurality of longitudinal bars 7 form a three-way steel cage structure, thereby making the concrete corbel 411 have stronger structural strength. And by adding the concrete corbel 411 and the steel structure corbel 412, when the control platform 1 has excessive vertical displacement, it can bear part of the shear force of the control platform 1, increasing the structural ductility and safety margin. The structure is simple, convenient for construction, and easy to maintain and replace.

[0028] Refer to Figure 2 and Figure 7The control platform 1 includes a plurality of steel beams 11 and a plurality of horizontal supports 12. The plurality of steel beams 11 are arranged in a mesh structure, and the steel beams 11 are welded and fixed to each other. A connecting plate 13 is provided at the bottom end of each steel beam 11, and the two ends of the horizontal support 12 are fixedly connected to the two connecting plates 13, respectively, so that a "M"-shaped structure is formed between the four horizontal supports 12 and the steel beams 11 fixed to the same connecting plate 13. The setting of the connecting plate 13 increases the welding area of ​​the horizontal support 12 and enhances the connection strength between the horizontal support 12 and the steel beam 11. When fixing, one end of the steel beam 11 is fixedly connected to the frame column 21 in the first building 2, and the steel beam 11 is kept in a horizontal state. A corner brace 14 is provided at one end of the bottom of some steel beams 11. The setting of the corner brace 14 improves the stability of the installation of each steel beam 11 structure. In order to ensure that the beam support 41 can ensure the stability of the control platform 1, the width of the control platform 1 is set to "L", the width of the concrete corbel 411 is set to "A", and the relationship between the width of the control platform 1 and the width of the concrete corbel 411 satisfies 20A. <L<30A。

[0029] Reference Figure 7 and Figure 8 In the monitoring and early warning device 4, the vertical displacement sensor 43 is arranged above the steel structure bracket 412, the steel beam 11 on the side close to the second building 3 in the control platform 1 is fixedly arranged on the vertical displacement sensor 43, the horizontal displacement sensor 44 is horizontally fixedly arranged on one side of the steel structure bracket 412, and the lower hanging plate 42 is vertically arranged so that the bottom end of the lower hanging plate 42 is fixed to the horizontal displacement sensor 44, and the top end of the lower hanging plate 42 is fixed to the steel beam 11 on the side close to the second building 3 in the control platform 1.

[0030] The vertical displacement sensor 43 and the horizontal displacement sensor 44 are set with a critical value of the early warning signal. When the control platform 1 undergoes vertical displacement, the force is transmitted to the vertical displacement sensor 43. When the vertical displacement sensor 43 detects that the vertical displacement of the control platform 1 exceeds the set critical value, the vertical displacement sensor 43 will send out an early warning signal. When the control platform 1 undergoes horizontal displacement, the horizontal displacement is transmitted to the horizontal displacement sensor 44 through the lower hanging plate 42 fixedly connected thereto. When the horizontal displacement sensor 44 detects that the horizontal displacement of the control platform 1 exceeds the set critical value, the horizontal displacement sensor 44 will also send out an early warning signal. In this way, pedestrians on the corridor can gain time to escape, and at the same time, the early warning signal is transmitted to the central control console. By analyzing the displacement of the corridor and combining the structural characteristics of the corridor itself, the damage of the main structure can be inferred, which is convenient for management personnel to identify and conduct the next step of inspection and maintenance.

[0031] Reference Figure 2 and Figure 3In order to further enhance the structural strength of the control platform 1, a diagonal brace 15 is fixedly provided at the bottom end of the control platform 1, and the top end of the diagonal brace 15 is fixed to the middle position of the bottom of the control platform 1. The bottom end of the diagonal brace 15 is welded and fixed to the connection between the next layer of control platform 1 and the frame column 21. The force received by the middle position of the control platform 1 is transmitted to the frame column 21 through the diagonal brace 15, thereby enhancing the structural strength and seismic resistance of the control platform 1.

[0032] The specific implementation principle of the embodiment of the present application is as follows: according to the working conditions of different control platform 1, the alarm limit values ​​of the vertical displacement sensor 43 and the horizontal displacement sensor 44 are adjusted respectively. When the control platform 1 undergoes vertical displacement, the control platform 1 generates a force on the vertical displacement sensor 43 located at its bottom. When the vertical displacement sensor 43 detects that the amount of vertical displacement of the control platform 1 reaches the alarm limit value, the vertical displacement sensor will send out an early warning signal; when the control platform 1 undergoes horizontal displacement, the control platform 1 will transfer the amount of its horizontal displacement to the horizontal displacement sensor 44 through the lower hanging plate 42, and thus the horizontal displacement sensor 44 will also send out an early warning signal. The vertical displacement and horizontal displacement of the control platform 1 are monitored separately, thereby having a higher monitoring accuracy for the displacement monitoring of the control platform 1; when the vertical displacement sensor 43 or the horizontal displacement sensor 44 sends out an early warning signal, it can buy time for the pedestrians on the corridor to escape, and at the same time transmit the early warning signal to the central control console. By analyzing the displacement of the corridor and combining the structural characteristics of the corridor itself, the damage of the main structure can be inferred, which is convenient for the management personnel to identify and conduct the next step of detection and maintenance.

[0033] The utility model is described above by way of example in conjunction with the accompanying drawings. It is obvious that the specific implementation of the utility model is not limited to the above-mentioned method. As long as various non-substantial improvements are made using the method concept and technical solution of the utility model, or the concept and technical solution of the utility model are directly applied to other occasions without improvement, they are all protected by the utility model.

Claims

1. A displacement monitoring and early warning device for a high-rise corridor control platform, wherein one side of the control platform is connected to a first building, characterized in that: The monitoring and early warning device includes a beam support, a lower hanging plate, a vertical displacement sensor and a horizontal displacement sensor. The beam support is fixedly arranged on the second building, the vertical displacement sensor is fixedly arranged on the upper surface of the beam support, the horizontal displacement sensor is fixedly arranged on the side of the beam support, the other side of the control platform is arranged on the vertical displacement sensor, the two ends of the lower hanging plate are respectively fixedly connected to the control platform and the horizontal displacement sensor, the vertical displacement sensor detects the displacement of the control platform in the vertical direction, and the horizontal displacement sensor detects the displacement of the control platform in the horizontal direction.

2. The displacement monitoring and early warning device for a high-rise corridor control platform according to claim 1 is characterized in that: The beam support includes a concrete corbel and a steel structure corbel, the concrete corbel is fixed on the shear wall of the second building, the steel structure corbel is arranged on the side of the concrete corbel away from the shear wall of the second building, the concrete corbel includes a plurality of horizontal bars, a plurality of vertical stirrups, a plurality of longitudinal bars and a concrete layer, and the horizontal bars, vertical stirrups and longitudinal bars are perpendicular to each other.

3. The displacement monitoring and early warning device for a high-rise corridor control platform according to claim 2 is characterized in that: The horizontal reinforcements are evenly distributed along the vertical direction, the longitudinal reinforcements are evenly distributed along the width direction of the horizontal reinforcements, and the vertical stirrups are evenly distributed along the length direction of the horizontal reinforcements.

4. The displacement monitoring and early warning device for a high-rise corridor control platform according to claim 2 is characterized in that: The width of the concrete corbel is "A", the width of the control platform is "L", and meets 20A <L<30A。 5. The displacement monitoring and early warning device for a high-rise corridor control platform according to claim 1 is characterized in that: The control platform includes a plurality of steel beams and a plurality of horizontal supports. The plurality of steel beams form a mesh structure. A plurality of connecting plates are fixedly arranged on the steel beams. The two ends of the horizontal supports are respectively fixedly connected to two connecting plates.

6. The displacement monitoring and early warning device for a high-rise corridor control platform according to claim 5 is characterized in that: The lower hanging plate is arranged vertically, the bottom end of the lower hanging plate is fixedly connected to the horizontal displacement sensor, the top end of the lower hanging plate is connected to the steel beam on the side of the control platform close to the second building, and the top end of the lower hanging plate is locked and fixed to the steel beam by a fixing piece.

7. The displacement monitoring and early warning device for a high-rise corridor control platform according to claim 5 is characterized in that: A corner brace is fixedly arranged at the bottom end of the steel beam.

8. The displacement monitoring and early warning device for a high-rise corridor control platform according to claim 1 is characterized in that: The first building is provided with frame columns, and diagonal braces are provided between two adjacent control platforms. The bottom end of the diagonal brace is fixed at the connection between the bottom control platform and the frame columns, and the top end of the diagonal brace is fixed at the middle position of the top control platform.