Building waste crushing device for building construction

By designing the partition plate, screen mesh, motor-driven crushing system and screw conveyor in the box, the poor crushing effect and screening problems in the existing technology are solved, and efficient crushing and sorting of construction waste is achieved. .

CN222305921UActive Publication Date: 2025-01-07HUBEI JINLANG CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421038929.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-14
Publication Date
2025-01-07
Estimated Expiration
2034-05-14

AI Technical Summary

Technical Problem

The existing construction waste crushing device for construction construction has poor crushing effect, resulting in some garbage that needs to be crushed again, and garbage of different sizes is difficult to be divided and screened, affecting subsequent utilization efficiency.

Method used

A device including a box, a partition board, a connecting frame, a screen, a spring, a motor and a sloping plate is designed, and the screen is crushed by a motor-driven cam and a T-frame, a gear and a crushing roller driven by a motor are crushed. Large pieces of garbage are used to sort and clean up garbage using screw conveyors and one-way threaded rods.

Benefits of technology

Effective crushing and separating construction waste is achieved, the crushing effect is improved, the subsequent garbage utilization process is simplified, and the treatment efficiency is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222305921U_ABST
    Figure CN222305921U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of equipment for building construction, and discloses a building waste crushing device for building construction, which comprises a box body, a partition plate is fixedly connected to the inner bottom wall of the box body, a connecting frame is rotatably connected to the inner part of the partition plate, and a screening mesh is mounted in the connecting frame. A mounting groove is formed in the side wall of the interior of the box body, first springs are fixedly connected to the top wall and the bottom wall of the interior of the mounting groove, the right side of the connecting frame extends into the mounting groove, the other end of each first spring is fixedly connected with the connecting frame, and a mounting plate is fixedly connected to the front side wall of the interior of the box body; the rear side of the mounting plate is rotationally connected with a cam, and the front side of the mounting plate is fixedly connected with a limiting shell located on the lower side of the cam. The construction waste crushing device for building construction has the advantages that construction waste is crushed and then screened, and part of waste with the poor crushing effect is subjected to secondary crushing.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction equipment, in particular to a construction waste crushing device for construction. Background Art

[0002] Construction waste refers to the slag, abandoned soil, abandoned materials, sludge and other wastes generated by construction units or individuals during the construction, laying, demolition and repair of various buildings, structures, pipe networks, etc. Because construction waste is a mixture of slag and abandoned materials, its treatment is more complicated and requires a lot of financial and material resources.

[0003] After the existing construction waste crushing device has crushed the construction waste, the crushing effect of some waste is poor and needs to be crushed again. However, construction waste of different sizes are piled together, making it difficult to screen the construction waste, resulting in time-consuming and labor-intensive re-screening of the construction waste, which is not conducive to the subsequent utilization of construction waste and affects the treatment efficiency of construction waste. Therefore, a construction waste crushing device for construction is proposed to solve the above-mentioned problems. Utility Model Content

[0004] 1. Technical issues to be solved

[0005] In view of the shortcomings of the prior art, the utility model provides a construction waste crushing device for construction, which has the advantages of screening the construction waste after crushing and secondary crushing of some waste with poor crushing effect. It solves the problem that the crushing effect of some waste is poor after the construction waste is crushed, waste of different sizes is piled up together, and re-screening is time-consuming and labor-intensive, which is not conducive to the subsequent utilization of the construction waste.

[0006] (II) Technical solution

[0007] The technical solution of the utility model for solving the above-mentioned technical problems is as follows: a construction waste crushing device for construction, comprising a box body, the inner bottom wall of the box body is fixedly connected with a partition plate, the interior of the partition plate is rotatably connected with a connecting frame, a sub-screen is installed inside the connecting frame, the inner side wall of the box body is provided with a mounting groove, the inner top wall and bottom wall of the mounting groove are both fixedly connected with a first spring, the right side of the connecting frame extends to the interior of the mounting groove, the other end of the first spring is fixedly connected to the connecting frame, the inner front side wall of the box body is fixedly connected with a mounting plate, the rear side of the mounting plate is rotatably connected with a cam, the front side of the mounting plate is fixedly connected with a limit shell located at the lower side of the cam, the interior of the limit shell is slidably connected with a T-frame, and the outer side of the T-frame is installed with a second spring located inside the limit shell.

[0008] The beneficial effects of the utility model are:

[0009] The construction waste crushing device for building construction has the advantages of screening the construction waste after crushing it and secondarily crushing some waste with poor crushing effect.

[0010] On the basis of the above technical solution, the present invention can also be improved as follows.

[0011] Furthermore, the mounting plate is L-shaped, and a first motor is fixedly connected to an inner top wall of the mounting plate, and an output shaft of the first motor is fixedly connected to the cam.

[0012] Furthermore, the inner side wall of the box body is rotatably connected to two mutually meshing crushing rollers, and the right sides of the two crushing rollers are fixedly connected to gears, and the two gears are meshed. The right side of the box body is fixedly connected to a second motor whose output shaft is fixedly connected to the gears on the rear side.

[0013] The beneficial effect of adopting the above further solution is that the construction waste placed inside the box is crushed, which is more conducive to the subsequent recycling and utilization of the construction waste.

[0014] Furthermore, a first inclined plate is fixedly connected to the inner right side wall of the box body, and a second inclined plate is fixedly connected to the inner left side wall of the box body, and the first inclined plate and the second inclined plate are staggered.

[0015] The beneficial effect of adopting the above further scheme is that it is convenient to transport the crushed building debris to the screening network for screening and classification, and it is convenient to classify and process large pieces of building waste and smaller pieces of building waste.

[0016] Furthermore, a discharge hopper is fixedly connected to the top of the box body, and a screw conveyor extending to the outside of the box body is installed on the inner bottom wall of the box body.

[0017] The beneficial effect of adopting the above further solution is that the construction waste to be crushed is put into the box from the discharge hopper and crushed, so that larger pieces of construction waste can be transported out of the box.

[0018] Furthermore, the front side wall of the box is fixedly connected to a connecting plate located at the lower side of the sub-screen, the interior of the box is fixedly connected to a third motor, the output shaft of the third motor is fixedly connected to a one-way threaded rod rotatably connected to the interior of the box, the outer side of the one-way threaded rod is threadedly connected to a brush located on the upper side of the connecting plate, the brush is slidably connected to the interior of the box, and a discharge port is opened on the right side of the box.

[0019] The beneficial effect of adopting the above further solution is that the construction waste fragments are cleaned and processed, so that the construction waste fragments are cleaned out of the interior of the box through the discharge port, which is convenient for subsequent utilization of the construction waste. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a schematic diagram of the structure of the utility model;

[0021] Figure 2 This is a front view cross-sectional view of the structure of the utility model;

[0022] Figure 3 This is a schematic diagram of the structure of the mounting plate of the utility model;

[0023] Figure 4 This is a screen diagram of the structure of the utility model.

[0024] In the figure: 1. box body; 2. partition plate; 3. connecting frame; 4. sub-screen; 5. mounting groove; 6. first spring; 7. mounting plate; 8. cam; 9. T-frame; 10. limit shell; 11. second spring; 12. first motor; 13. crushing roller; 14. gear; 15. second motor; 16. first inclined plate; 17. second inclined plate; 18. discharge hopper; 19. screw conveyor; 20. connecting plate; 21. third motor; 22. one-way threaded rod; 23. brush; 24. discharge port. DETAILED DESCRIPTION

[0025] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0026] In the embodiment, Figure 1-4 A construction waste crushing device for construction is provided. The utility model comprises a box body 1, the inner bottom wall of the box body 1 is fixedly connected with a partition plate 2, the inner part of the partition plate 2 is rotatably connected with a connecting frame 3, the inner part of the connecting frame 3 is installed with a sub-screen 4, the inner side wall of the box body 1 is provided with a mounting groove 5, the inner top wall and bottom wall of the mounting groove 5 are fixedly connected with a first spring 6, the right side of the connecting frame 3 extends to the inside of the mounting groove 5, the other end of the first spring 6 is fixedly connected to the connecting frame 3, the inner front side wall of the box body 1 is fixedly connected with a mounting plate 7, the rear side of the mounting plate 7 is rotatably connected with a cam 8, the front side of the mounting plate 7 is fixedly connected with a limiting shell 10 located at the lower side of the cam 8, the inner part of the limiting shell 10 is slidably connected with a T-shaped frame 9, the outer side of the T-shaped frame 9 is installed with a second spring 11 located inside the limiting shell 10, the bottom of the second spring 11 is fixedly connected to the inner bottom wall of the limiting shell 10, and the top of the second spring 11 is fixedly connected to the T-shaped frame 9.

[0027] Specifically, refer to Figure 3The mounting plate 7 is L-shaped, and the inner top wall of the mounting plate 7 is fixedly connected to the first motor 12 , and the output shaft of the first motor 12 is fixedly connected to the cam 8 .

[0028] In this embodiment, when construction waste is screened on the sub-screen 4, since some construction waste of different sizes may get stuck on the sub-screen 4, the first motor 12 is started, and the first motor 12 drives the cam 8 to rotate, and the cam 8 drives the T-frame to slide back and forth, so that the T-frame 9 hits the surface of the sub-screen 4, making it easier to screen and fall the construction waste on the sub-screen 4.

[0029] Specifically, refer to Figure 1 and Figure 2 The inner side wall of the box body 1 is rotatably connected with two mutually meshing crushing rollers 13, and the right sides of the two crushing rollers 13 are fixedly connected with gears 14, and the two gears 14 are meshed with each other. The right side of the box body 1 is fixedly connected with a second motor 15 whose output shaft is fixedly connected to the rear gear 14.

[0030] In this embodiment, when construction waste that needs to be crushed is put into the box 1, the second motor 15 is started, the second motor 15 drives the rear gear 14 to rotate, the rear gear 14 drives the front gear 14 to rotate, and the two gears 14 drive the two crushing rollers 13 to rotate to crush the put-in construction waste.

[0031] Specifically, refer to Figure 2 A first inclined plate 16 is fixedly connected to the right inner wall of the box body 1 , and a second inclined plate 17 is fixedly connected to the left inner wall of the box body 1 . The first inclined plate 16 and the second inclined plate 17 are arranged alternately.

[0032] In this embodiment, the crushed construction waste falls to the top of the first inclined plate 16, and slides to the top of the second inclined plate 17 due to the inclination of the first inclined plate 16. Another part of the crushed construction waste falls to the top of the second inclined plate 17, and slides to the top of the sub-screen 4 due to the inclination of the second inclined plate 17.

[0033] Specifically, refer to Figure 2 A discharge hopper 18 is fixedly connected to the top of the box body 1, and a screw conveyor 19 extending to the outside of the box body 1 is installed on the inner bottom wall of the box body 1.

[0034] In this embodiment, the construction waste to be crushed is put into the box 1 through the discharge hopper 18 for crushing. The larger construction waste slides on the top of the sub-screen 4 to the inside of the screw conveyor 19 and is transported to the outside of the box 1 by the screw conveyor 19.

[0035] Specifically, refer to Figure 2The front side wall of the box body 1 is fixedly connected with a connecting plate 20 located at the lower side of the sub-screen 4, and the interior of the box body 1 is fixedly connected with a third motor 21. The output shaft of the third motor 21 is fixedly connected with a one-way threaded rod 22 rotatably connected to the interior of the box body 1. The outer side of the one-way threaded rod 22 is threadedly connected with a brush 23 located on the upper side of the connecting plate 20. The brush 23 is slidably connected to the interior of the box body 1, and a discharge port 24 is opened on the right side of the box body 1.

[0036] In this embodiment, when the construction waste debris passes through the sub-screen 4 and falls onto the top of the connecting plate 20, the third motor 21 is started, and the third motor 21 drives the one-way threaded rod 22 to rotate, and the one-way threaded rod 22 drives the brush 23 to slide on the top of the connecting plate 20, so that the debris on the top of the connecting plate 20 is swept to the discharge port 24 and pushed out of the box 1.

[0037] Working principle:

[0038] Firstly, the construction waste is put into the box body 1 through the discharge hopper 18 and the second motor 15 is started. The second motor 15 drives the rear gear 14 to rotate, and the rear gear 14 drives the front gear 14 to rotate. The rotation of the two gears 14 drives the two crushing rollers 13 to rotate relative to each other, so as to crush the construction waste. A part of the crushed construction waste falls to the top of the second inclined plate 17, and slides to the top of the sub-screen 4 due to the inclination of the second inclined plate 17. The other part first falls to the top of the first inclined plate 16, slides to the top of the second inclined plate 17, and slides from the top of the second inclined plate 17 to the top of the sub-screen 4.

[0039] Then: start the first motor 12, the first motor 12 drives the cam 8 to rotate, the cam 8 drives the T-frame 9 to slide, the T-frame 9 slides downward first inside the limit shell 10, the first spring 6 is compressed, the T-frame 9 hits the sub-screen 4, the cam 8 rotates upward, the first spring 6 recovers, the T-frame 9 slides upward again, the T-frame 9 reciprocates, and the top of the sub-screen 4 is vibrated, so that the construction waste on the sub-screen 4 is more conducive to screening, and larger pieces of construction waste slide to the left side of the partition plate 2 and are transported out of the box body 1 through the screw conveyor 19. Smaller debris passes through the sub-screen 4 and falls to the top of the connecting plate 20. Start the third motor 21, the third motor 21 drives the one-way threaded rod 22 to rotate, and the one-way threaded rod 22 drives the brush 23 to slide to the right. The brush 23 sweeps the debris on the top of the connecting plate 20 to the discharge port 24 and pushes it out of the box body 1.

[0040] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0041] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A construction waste crushing device for construction, comprising a housing (1), characterized in that: The inner bottom wall of the box body (1) is fixedly connected to a partition plate (2), the inner part of the partition plate (2) is rotatably connected to a connecting frame (3), the inner part of the connecting frame (3) is installed with a sub-screen (4), the inner side wall of the box body (1) is provided with a mounting groove (5), the inner top wall and the bottom wall of the mounting groove (5) are both fixedly connected to a first spring (6), the right side of the connecting frame (3) extends to the inside of the mounting groove (5), the other end of the first spring (6) is fixedly connected to the connecting frame (3), the inner front side wall of the box body (1) is fixedly connected to a mounting plate (7), the rear side of the mounting plate (7) is rotatably connected to a cam (8), the front side of the mounting plate (7) is fixedly connected to a limit shell (10) located at the lower side of the cam (8), the inner part of the limit shell (10) is slidably connected to a T-shaped frame (9), and the outer side of the T-shaped frame (9) is installed with a second spring (11) located inside the limit shell (10).

2. A construction waste crushing device for construction according to claim 1, characterized in that: The mounting plate (7) is L-shaped, and a first motor (12) is fixedly connected to the inner top wall of the mounting plate (7), and an output shaft of the first motor (12) is fixedly connected to the cam (8).

3. The construction waste crushing device for construction according to claim 1, characterized in that: The inner side wall of the box body (1) is rotatably connected to two mutually meshing crushing rollers (13), the right sides of the two crushing rollers (13) are fixedly connected to gears (14), the two gears (14) are meshed, and the right side of the box body (1) is fixedly connected to a second motor (15) whose output shaft is fixedly connected to the gear (14) at the rear side.

4. The construction waste crushing device for construction according to claim 1, characterized in that: The inner right side wall of the box body (1) is fixedly connected to a first inclined plate (16), and the inner left side wall of the box body (1) is fixedly connected to a second inclined plate (17), and the first inclined plate (16) and the second inclined plate (17) are arranged in a staggered manner.

5. The construction waste crushing device for construction according to claim 1, characterized in that: A discharge hopper (18) is fixedly connected to the top of the box body (1), and a screw conveyor (19) extending to the outside of the box body (1) is installed on the inner bottom wall of the box body (1).

6. The construction waste crushing device for construction according to claim 1, characterized in that: The front side wall of the box body (1) is fixedly connected to a connecting plate (20) located at the lower side of the sub-screen (4); the interior of the box body (1) is fixedly connected to a third motor (21); the output shaft of the third motor (21) is fixedly connected to a one-way threaded rod (22) rotatably connected to the interior of the box body (1); the outer side of the one-way threaded rod (22) is threadedly connected to a brush (23) located at the upper side of the connecting plate (20); the brush (23) is slidably connected to the interior of the box body (1); and a discharge port (24) is provided on the right side of the box body (1).