Connecting tool for stably lifting large-span steel corridor and bracket beam
By introducing lifting units and adjustment units during the lifting process of bull leg, the problems of shaking and inaccurate installation of bull leg are solved, and the steady improvement and precise installation of large-span steel corridors and bull leg beams are achieved, and construction efficiency is improved.
Patent Information
- Application Number
- CN202421065308.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-15
- Publication Date
- 2025-01-07
- Estimated Expiration
- 2034-05-15
AI Technical Summary
The ox legs shaking during the lifting of the steel corridor, which affects the installation efficiency and cannot be accurately adjusted at the designated location, resulting in inconvenience in construction.
A connecting tool including a lifting unit and an adjustment unit is designed. The lifting unit is used to lift the cow legs. The adjusting unit realizes the precise adjustment of the cow legs through the motor-driven screw and screw sleeve to ensure that the cow legs are simultaneously lifted on the main body of the corridor. Install smoothly during the installation.
It improves the installation efficiency and accuracy of cow legs, reduces shaking, ensures steady improvement and fixation of cow legs and the main body of the corridor, and simplifies the construction process.
Smart Images

Figure CN222314631U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of construction equipment, in particular to a connecting tool used for steadily lifting a large-span steel corridor and a corbel beam. Background Art
[0002] In the field of construction, steel structure corridors have the advantages of high strength, light weight, good plasticity and toughness, and their overall strength and performance are better than concrete. Therefore, more and more high-rise buildings use steel corridors. The bottom of the steel corridor structure mostly uses corbel supports, and the common forms of corbels are cast-in-place reinforced concrete corbels or steel corbels wrapped with concrete.
[0003] The existing equipment has the following disadvantages: since the corbels protrude outward from the high-rise building, the corbels will interfere with the movement of the corridor when the steel corridor structure is hoisted, so the corbels need to be installed in a manner that the corbels are lifted synchronously with the steel corridor. However, the corbels can only be hoisted with the steel corridor structure to the vicinity of the designated installation position, and subsequent precise adjustment is required. In the traditional hoisting method, the corbels shake to a certain extent when moving up and adjusting, which makes it inconvenient for the staff to adjust the corbels, affecting the subsequent installation efficiency of the corbels.
[0004] Therefore, the present application now proposes a connection tooling for steadily lifting large-span steel corridors and corbel beams to solve the above-mentioned problems. Utility Model Content
[0005] The purpose of the utility model is to provide a connecting tooling for steadily lifting a large-span steel corridor and a corbel beam, so as to solve the problem that the above-mentioned corbel can only be hoisted with the steel corridor structure to the vicinity of the designated installation position, and requires subsequent precise adjustment, while in the traditional hoisting method, the corbel has a certain shaking when moving up and adjusting, which is inconvenient for the staff to adjust the corbel, affecting the installation efficiency of the corbel.
[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solution: a connecting tool for steadily lifting a large-span steel corridor and a corbel beam, comprising a corridor body and a corbel hoisted below the corridor body and lifted synchronously with the corridor body, and also comprising:
[0007] A hoisting unit, arranged below the corridor body, for hoisting the corbel;
[0008] An adjusting unit is arranged on the corridor body and connected to the hoisting unit, and is used for fine-tuning the installation position of the corbel.
[0009] Among them, the lifting unit includes fixing rings symmetrically arranged at the four corners of the adjusting unit, steel wire ropes arranged on the fixing rings and support rods passed through the corbels, the steel wire ropes are sleeved on the support rods, and the support rods are threadedly connected to a first nut for fixing the steel wire ropes.
[0010] Wherein, the adjustment unit includes a fixed frame arranged at the lower end of the corridor body, an adjustment device arranged on the fixed frame, and a hanging plate arranged on the fixed frame and connected to the adjustment device. The hanging plate is fixedly connected to the adjustment device through a fixing device, and a threaded hole for fixing the fixing ring is opened on the hanging plate.
[0011] Among them, the adjusting device includes a motor fixed on the fixed frame, a screw arranged at the power output end of the motor and rotatably connected to the fixed frame, and a screw sleeve threadedly connected to the screw, and a fixing frame is fixedly arranged on one side of the lifting plate close to the screw sleeve, and the fixing frame is fixedly connected to the screw sleeve through a fixing device.
[0012] Among them, the fixing device includes a fixing rod inserted through the fixing frame and the screw sleeve, threaded sections fixed at both ends of the fixing rod and a second nut threadedly connected to the threaded sections for fixing the fixing rod to the fixing frame, a limiting groove for placing the fixing rod is opened at a position of the fixing frame corresponding to the fixing rod, and a through groove for the fixing rod to be transmitted is opened at a position of the screw sleeve corresponding to the fixing rod.
[0013] Among them, a guiding device for guiding the screw sleeve is arranged on the fixed frame, and the guiding device includes a guiding rod arranged on the fixed frame and a slider sleeved on the guiding rod, and the fixed frame is provided with a mounting groove for placing the screw sleeve and the slider at the position corresponding to the screw sleeve and the slider, and the slider is provided with a through groove at the position corresponding to the fixed rod.
[0014] Wherein, lifting ears for facilitating the installation of the support rod are fixed on both sides of the corbel.
[0015] Wherein, a support frame is fixed to the lower end of the corridor body, and a placement groove for placing the fixing frame is opened at the position of the support frame corresponding to the fixing frame.
[0016] Wherein, a fixing plate is fixed at a position of the placement groove close to the side of the support frame, and a rubber bearing for buffering the corridor body is fixed at the lower end of the fixing plate.
[0017] Wherein, a bearing embedded part is arranged at the position of the upper end of the corbel corresponding to the rubber bearing.
[0018] Compared with the prior art, the beneficial effects of the utility model are:
[0019] The utility model fixes the assembly plate on the corbel, and then fixes another set of splicing plates on the wall of the high-rise building to be installed, and then examines the bolt holes on the splicing plates to check the number and relative spacing of the holes, and waits for the corridor to be officially lifted, lifts the corridor body to a height of 2m above the ground and hovers, providing installation and operation space for installing the corbel and forklift, and the forklift transports the corbel to the bottom of the reserved corbel and lower chord beam of the corridor body, and then hoists the corbel and the lower end of the corridor body through the hoisting unit, and then when the hydraulic lifter drives the corridor body to move upward, the corbel is driven by the hoisting unit to be lifted synchronously with the corridor body, and waits to be lifted to the reserved corbel elevation position. Lift and hover, the hovering position is no more than 50mm lower than the value of the reserved corbel. When connecting the wire rope to the corbel, insert the support rod into the through hole on the lifting ear, and then put the bottom of the wire rope on both sides of the support rod, and then fix the wire rope to the support rod through the first nut. The four wire ropes have the same length, so the corbel can be more stable when it is lifted, so that the splicing plate on the corbel can be docked with the bolt holes on the splicing plate on the wall, and the splicing plate is fixed by bolts, and then the corbel is poured with concrete to complete the installation pre-fixation of the corbel, and then the corridor body is fixed on the corbel to complete the installation and fixation of the corridor body. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 This is a schematic diagram of the main structure in one embodiment of the utility model;
[0021] Figure 2 This is a schematic structural diagram of an embodiment of the utility model in a front view;
[0022] Figure 3 It is a schematic diagram of the structure of a side view in one embodiment of the utility model;
[0023] Figure 4 This is a structural schematic diagram of the installation position of the hoisting unit and the adjustment unit on the corridor body in one embodiment of the utility model;
[0024] Figure 5 It is a schematic structural diagram of an exploded view in one embodiment of the utility model;
[0025] Figure 6 It is a structural schematic diagram of the upper part of the explosion diagram in one embodiment of the utility model;
[0026] Figure 7 It is a structural schematic diagram of the installation position of the placement slot in one embodiment of the utility model.
[0027] In the figure: 1. corridor body; 11. support frame; 111. placement groove; 12. fixing plate; 2. lifting unit; 21. fixing ring; 22. wire rope; 23. support rod; 24. first nut; 3. bracket; 31. lifting ear; 4. adjustment unit; 41. motor; 42. screw; 43. screw sleeve; 44. slider; 441. through groove; 45. guide rod; 46. lifting plate; 461. fixing frame; 4611. installation groove; 4612. limit groove; 47. fixing device; 471. fixing rod; 472. threaded section; 473. second nut; 48. fixing frame; 5. rubber bearing. DETAILED DESCRIPTION
[0028] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0029] Embodiment 1
[0030] See also Figure 1-3 The utility model provides a technical solution: a connecting tool for steadily lifting a large-span steel corridor and a corbel beam, comprising a corridor body 1 and a corbel 3 hoisted below the corridor body 1 and lifted synchronously with the corridor body 1, and also comprising:
[0031] A hoisting unit 2 is arranged below the corridor body 1 and is used to hoist the corbel 3;
[0032] The adjusting unit 4 is arranged on the corridor body 1 and connected to the hoisting unit 2 , and is used for fine-tuning the installation position of the corbel 3 .
[0033] It should be noted that during work, the assembly plate is fixed to the corbel 3, and then another set of splicing plates is fixed to the wall of the high-rise building to be installed, and then the bolt holes on the splicing plate are reviewed to check the number and relative spacing of the holes. When the corridor is officially lifted, the corridor body 1 is lifted to a height of 2m above the ground and suspended to provide installation and operation space for the corbel 3 and forklift. The forklift transports the corbel 3 to the reserved corbel 3 and lower chord beam of the corridor body 1, and then the corbel 3 and the lower end of the corridor body 1 are lifted by the lifting unit 2, and then the corridor body 1 is driven by the hydraulic lifter. When the body 1 moves up, the corbel 3 is lifted synchronously with the corridor main body 1 under the drive of the lifting unit 2, and is lifted and hovered at the reserved corbel 3 elevation position, and the hovering position is no more than 50mm lower than the reserved corbel 3, and then the position of the corbel 3 is fine-tuned by the adjustment unit 4, so that the splicing plate on the corbel 3 is butted with the bolt holes on the splicing plate on the wall, and the splicing plate is fixed by bolts, and then the corbel 3 is poured with concrete to complete the installation pre-fixation of the corbel 3, and then the corridor main body 1 is fixed on the corbel 3, and the installation and fixation of the corridor main body 1 is completed.
[0034] In one embodiment, the hoisting unit 2 includes a fixing ring 21 symmetrically arranged at the lower end of the corridor body 1, a steel wire rope 22 arranged on the fixing ring 21, and a support rod 23 passed through the corbel 3, the steel wire rope 22 is sleeved on the support rod 23, and the support rod 23 is threadedly connected with a first nut 24 for fixing the steel wire rope 22.
[0035] In this design, four fixing rings 21 are fixed to the lower end of the corridor body 1, and then the wire rope 22 is fixed to the fixing ring 21, and then four lifting rings are installed on the corbel 3, the support rod 23 is inserted between the two lifting rings, the bottom of the wire rope 22 is sleeved on the support rod 23, and then the wire rope 22 is fixed between the first nut 24 and the lifting ring through the first nut 24, so that the corbel 3 is connected to the corridor body 1, and an electric hoist is installed on the corridor body 1, and after the corbel 3 is hoisted to the reserved corbel 3 elevation position, the electric hoist is connected to the corbel 3, and then the lateral position of the corbel 3 is adjusted by the electric hoist, so that the corbel 3 moves to the side close to the reserved splicing plate, and then the splicing plate on the corbel 3 is connected and fixed to the splicing plate at the elevation position on the high-rise building.
[0036] Embodiment 2
[0037] See also Figure 4-7 In one embodiment, the adjustment unit 4 includes a fixed frame 48 arranged at the lower end of the corridor body 1, an adjustment device arranged on the fixed frame 48, and a hanging plate 46 arranged on the fixed frame 48 and connected to the adjustment device. The hanging plate 46 is fixedly connected to the adjustment device through a fixing device 47, and a threaded hole for fixing the fixing ring 21 is opened on the hanging plate 46.
[0038] In this design, a fixed frame 48 is installed at the lower end of the corridor body 1, and then an adjusting device is installed on the fixed frame 48. After the corbel 3 is hoisted to the reserved corbel 3 elevation position, the adjusting device adjusts the installation position of the hoisting plate 46, and the hoisting plate 46 drives the corbel 3 at the lower end of the wire rope 22 to move horizontally.
[0039] In one embodiment, the adjusting device includes a motor 41 fixed on a fixed frame 48, a screw 42 arranged at the power output end of the motor 41 and rotatably connected to the fixed frame 48, and a screw sleeve 43 threadedly connected to the screw 42. A fixing frame 461 is fixedly arranged on one side of the lifting plate 46 close to the screw sleeve 43, and the fixing frame 461 is fixedly connected to the screw sleeve 43 through a fixing device 47.
[0040] With this design, the position of the motor 41 can be designed according to the construction conditions on site so that the motor 41 does not affect the upward movement of the corridor body 1. Since the electric hoist cannot ensure the horizontal movement of the corbel 3 when pulling the corbel 3 to move, there is a certain inconvenience when adjusting. Therefore, the electric hoist is replaced with an adjustment device, and the motor 41 is started. The screw 42 drives the screw sleeve 43 to move. Under the action of the fixing device 47, the screw sleeve 43 drives the lifting plate 46 to move, so that the lifting plate 46 can drive the corbel 3 to move horizontally, which is convenient for adjusting the position of the corbel 3.
[0041] In one embodiment, the fixing device 47 includes a fixing rod 471 passed through the fixing frame 461 and the screw sleeve 43, a threaded section 472 fixed at both ends of the fixing rod 471, and a second nut 473 threadedly connected to the threaded section 472 for fixing the fixing rod 471 to the fixing frame 461, a limiting groove 4612 for placing the fixing rod 471 is opened at the position of the fixing frame 461 corresponding to the fixing rod 471, and a through groove 441 for the fixing rod 471 to be transmitted is opened at the position of the screw sleeve 43 corresponding to the fixing rod 471.
[0042] With such a design, when fixing the fixing frame 461 and the screw sleeve 43, align the limiting groove 4612 with the through groove 441 on the screw sleeve 43, and then insert the fixing rod 471 into the limiting groove 4612 and the through groove 441, and then after the position of the fixing rod 471 is installed, fix the second nut 473 on the threaded segment 472, so as to fix the fixing rod 471 on the fixing frame 461, realize the connection and fixation of the hanging plate 46 and the screw sleeve 43, and realize the connection between the hanging unit 2 and the adjusting device.
[0043] In one embodiment, a guiding device for guiding the screw sleeve 43 is provided on the fixed frame 48, and the guiding device includes a guiding rod 45 provided on the fixed frame 48 and a slider 44 sleeved on the guiding rod 45. A mounting groove 4611 for placing the screw sleeve 43 and the slider 44 is opened at the position of the fixed frame 461 corresponding to the screw sleeve 43 and the slider 44, and a through groove 441 is opened at the position of the slider 44 corresponding to the fixed rod 471.
[0044] In this design, the slider 44 is slidably sleeved on the guide rod 45, and then the slider 44 is fixed to the fixing frame 461 through the fixing rod 471. Then, when the screw 42 drives the screw sleeve 43 to move, the slider 44 slides on the guide rod 45 with the screw sleeve 43, which can improve the stability of the movement of the fixing frame 461.
[0045] In one embodiment, hanging ears 31 are fixed on both sides of the corbel 3 for facilitating installation of the support rod 23 .
[0046] With such a design, when connecting the steel wire rope 22 to the corbel 3, the support rod 23 is inserted into the through hole on the lifting ear 31, and then the bottom of the steel wire rope 22 is sleeved on both sides of the support rod 23, and then the steel wire rope 22 and the support rod 23 are fixed by the first nut 24. The four steel wire ropes 22 have the same length, so that the corbel 3 can be more stable when it is lifted.
[0047] In one embodiment, a support frame 11 is fixed to the lower end of the corridor body 1 , and a placement groove 111 for placing the fixing frame 48 is opened at the position of the support frame 11 corresponding to the fixing frame 48 .
[0048] With such a design, the placement groove 111 can store the fixing frame 48 , and when the extended length of the motor 41 affects the upward movement of the corridor body 1 , the motor 41 can be fixed inside the placement groove 111 .
[0049] In one embodiment, a fixing plate 12 is fixed to the side of the support frame 11 near the placement groove 111 , and a rubber support 5 for buffering the corridor body 1 is fixed to the lower end of the fixing plate 12 .
[0050] With such a design, the corbel 3 and the corridor body 1 are supported by the rubber bearings 5 , and the rubber bearings 5 have a good buffering effect to protect the corridor body 1 .
[0051] In one embodiment, a bearing embedded part is arranged at the position of the upper end of the corbel 3 corresponding to the rubber bearing 5 .
[0052] With this design, the embedded support is supported by the U-shaped channel steel at the bottom and the steel plate at the top, which can lift the space between the rubber support 5 and the corbel 3, so that there is a certain gap between the rubber support 5 and the corbel 3, which is convenient for the subsequent concrete pouring work.
[0053] In addition, if there are descriptions involving "first", "second", etc. in the embodiments, the descriptions of "first", "second", etc. are only for descriptive purposes and cannot be understood as indicating or implying the importance of the relative description or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" or "second" may explicitly or implicitly include at least one of the features.
Claims
1. A connecting tool for steadily lifting a large-span steel corridor and a corbel beam, comprising a corridor body (1) and a corbel (3) hoisted below the corridor body (1) and lifted synchronously with the corridor body (1), characterized in that: Also includes: A hoisting unit (2) is arranged below the corridor body (1) and is used to hoist the corbel (3); An adjustment unit (4) is arranged on the corridor body (1) and connected to the hoisting unit (2), and is used to finely adjust the installation position of the corbel (3).
2. The connecting tool for steadily lifting a large-span steel corridor and a corbel beam according to claim 1, characterized in that: The hoisting unit (2) comprises fixing rings (21) symmetrically arranged at the four corners of the adjusting unit (4), steel wire ropes (22) arranged on the fixing rings (21), and a support rod (23) passed through the bracket (3); the steel wire rope (22) is sleeved on the support rod (23), and a first nut (24) for fixing the steel wire rope (22) is threadedly connected on the support rod (23).
3. The connecting tool for steadily lifting a large-span steel corridor and a corbel beam according to claim 2, characterized in that: The adjustment unit (4) comprises a fixing frame (48) arranged at the lower end of the corridor body (1), an adjustment device arranged on the fixing frame (48), and a hanging plate (46) arranged on the fixing frame (48) and connected to the adjustment device, wherein the hanging plate (46) is fixedly connected to the adjustment device via a fixing device (47), and a threaded hole for fixing the fixing ring (21) is provided on the hanging plate (46).
4. The connecting tool for steadily lifting a large-span steel corridor and a corbel beam according to claim 3, characterized in that: The adjusting device comprises a motor (41) fixed on the fixing frame (48), a screw (42) arranged at a power output end of the motor (41) and rotatably connected to the fixing frame (48), and a screw sleeve (43) threadedly connected to the screw (42); a fixing frame (461) is fixedly arranged on one side of the hanging plate (46) close to the screw sleeve (43); and the fixing frame (461) is fixedly connected to the screw sleeve (43) via a fixing device (47).
5. The connecting tool for steadily lifting a large-span steel corridor and a corbel beam according to claim 4, characterized in that: The fixing device (47) comprises a fixing rod (471) inserted through the fixing frame (461) and the screw sleeve (43), threaded sections (472) fixed at both ends of the fixing rod (471), and a second nut (473) threadedly connected to the threaded section (472) for fixing the fixing rod (471) to the fixing frame (461); a limiting groove (4612) for placing the fixing rod (471) is provided at a position of the fixing frame (461) corresponding to the fixing rod (471); and a through groove (441) for the fixing rod (471) to be inserted is provided at a position of the screw sleeve (43) corresponding to the fixing rod (471).
6. The connecting tool for steadily lifting a large-span steel corridor and a corbel beam according to claim 5, characterized in that: The fixed frame (48) is provided with a guide device for guiding the screw sleeve (43), and the guide device comprises a guide rod (45) arranged on the fixed frame (48) and a slider (44) sleeved on the guide rod (45); the fixed frame (461) is provided with a mounting groove (4611) for placing the screw sleeve (43) and the slider (44) at a position corresponding to the screw sleeve (43) and the slider (44); and the slider (44) is provided with a through groove (441) at a position corresponding to the fixed rod (471).
7. The connecting tool for steadily lifting a large-span steel corridor and a corbel beam according to claim 2, characterized in that: Lifting ears (31) for facilitating installation of the support rod (23) are fixed on both sides of the bracket (3).
8. The connecting tool for steadily lifting a large-span steel corridor and a corbel beam according to claim 3, characterized in that: A support frame (11) is fixed to the lower end of the corridor body (1), and a placement groove (111) for placing the fixing frame (48) is provided on the support frame (11) at a position corresponding to the fixing frame (48).
9. The connecting tool for steadily lifting a large-span steel corridor and a corbel beam according to claim 8, characterized in that: A fixing plate (12) is fixed to the placement groove (111) at a position close to the side of the support frame (11), and a rubber support (5) for buffering the corridor body (1) is fixed to the lower end of the fixing plate (12).
10. The connecting tool for steadily lifting a large-span steel corridor and a corbel beam according to claim 9, characterized in that: A support embedded part is arranged at the position of the upper end of the bracket (3) corresponding to the rubber support (5).