Attached frame mounting device

By designing the attachment frame installation device and using components such as introduction beams, connecting lug plates, and lifting lugs, the problems of high attachment frame installation operation difficulty, low efficiency, and poor safety in the existing technology have been solved, and efficient and safe attachment frame installation has been achieved. , suitable for super large tower cranes.

CN222374245UActive Publication Date: 2025-01-21HUNAN ZOOMLION CONSTR HOISTING MASCH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421235006.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-31
Publication Date
2025-01-21
Estimated Expiration
2034-05-31

AI Technical Summary

Technical Problem

In the prior art, the installation operation of the attachment frame is difficult, the installation efficiency is low, and the safety is low, and it is not suitable for the installation of the attachment frame of the super-large tower crane.

Method used

An attachment frame installation device was designed, including lead-in beams, first connecting lug plates, multiple sets of lifting lugs and optional supports and slings. The tower crane hook is connected to the first connecting ear plate, and multiple sets of spaced lifting lugs are used to connect to the frame beam to achieve accurate movement and fixed installation of the frame beam, avoiding the use of tools such as lever hoists.

Benefits of technology

It simplifies the installation operation of the attachment frame, improves the installation efficiency and safety, is suitable for the attachment frame installation of super large tower cranes, and ensures a smooth state during the installation process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222374245U_ABST
    Figure CN222374245U_ABST
Patent Text Reader

Abstract

The utility model relates to the field of constructional engineering, and discloses an attachment frame installation device which comprises an introduction beam, a first connecting lug plate and a plurality of sets of lifting lugs, the first connecting lug plate is arranged on the top face of the first end of the introduction beam and used for being connected with a tower crane lifting hook, and the lifting lugs are all arranged on the bottom face of the second end of the introduction beam and used for being connected with a tower crane lifting hook. The lifting lugs are arranged at intervals in the direction from the second end to the first end of the leading-in beam and used for being connected with a frame beam of the attachment frame. The attachment frame installation device is applied to attachment frame installation, the frame beam can be accurately moved to the attachment position on the outer side of the tower body, the frame beam to be installed does not need to be dragged through tools such as a lever block, the operation difficulty of installation is greatly simplified, the installation efficiency and safety are effectively improved, and the installation cost is reduced. And the method is suitable for mounting the attachment frame of the ultra-large tower crane.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the field of construction engineering, and in particular relates to an attachment frame installation device. Background Art

[0002] During the construction process, when the tower crane reaches a certain height, the structural strength cannot meet the requirements. At this time, it is necessary to install an attachment device. The function of the attachment device is to connect the tower crane to the building to reduce the free length of the upper tower body, thereby preventing the tower crane from bending and overturning due to strong winds or overload. The attachment frame is an important part of the attachment device. It is a frame surrounding the outer periphery of the tower body and serves to connect the wall attachment rods to the tower body.

[0003] In the existing technology, the attachment frame is composed of multiple frame beams connected, and the installation method is to directly connect and lift the frame beam with the tower crane hook, and then use tools such as a lever hoist to pull the frame beam to the outside of the tower body and fix it. Multiple frame beams are sequentially hoisted and spliced ​​together to form an attachment frame. However, this installation method is difficult to operate and has low installation efficiency. It is also prone to safety accidents caused by the breakage of tools such as a lever hoist. It is relatively safe, especially for the installation of the attachment frame of a super-large tower crane, where the frame beam is heavy, and this installation method is not applicable. Utility Model Content

[0004] In view of the above-mentioned deficiencies or defects in the prior art, the utility model provides an attachment frame installation device and an attachment frame installation method, aiming to solve the technical problems of high operating difficulty, low installation efficiency, low safety and poor applicability in the installation of the attachment frame.

[0005] To achieve the above object, the utility model provides an attachment frame installation device, the attachment frame installation device comprising:

[0006] Introducing beams;

[0007] A first connecting ear plate is fixedly connected to the top surface of the first end of the introduction beam by welding or integral molding, and is used to connect to the tower crane hook;

[0008] A plurality of sets of lifting ears are fixedly connected to the bottom surface of the second end of the introduction beam by welding or integral molding, and are arranged at intervals along the direction from the second end to the first end of the introduction beam. The lifting ears are used to connect with the frame beam of the attachment frame.

[0009] Optionally, the attachment frame installation device further includes:

[0010] A second connecting ear plate is arranged on the bottom surface of the first end of the introduction beam;

[0011] The support member has a first connecting end and a second connecting end which are arranged opposite to each other, wherein the first connecting end is connected to the second connecting ear plate, and the second connecting end extends downwardly and obliquely toward the second end away from the introduction beam and is used to be connected to the tower crane hook.

[0012] Optionally, a distance between the first connection end and the second connection end is adjustable.

[0013] Optionally, the support member comprises:

[0014] Intermediate connecting rod;

[0015] A joint, one end of which is connected to the first end of the intermediate connecting rod and the connection position is adjustable along the axial direction of the intermediate connecting rod, and the other end of which is the first connecting end;

[0016] The main support rod has one end connected to the second end of the intermediate connecting rod and the connection position is adjustable along the axial direction of the intermediate connecting rod, and the other end is the second connecting end.

[0017] Optionally, the intermediate connecting rod is a screw rod, and the first end and the second end of the intermediate connecting rod are respectively screwed with a first locking nut and a second locking nut, one end of the joint is screwed with the first end of the intermediate connecting rod and cooperates with the first locking nut stop, and one end of the main support rod is screwed with the second end of the intermediate connecting rod and cooperates with the second locking nut stop.

[0018] Optionally, the attachment frame installation device further comprises a sling, one end of which is selectively connected to any one of the plurality of groups of lifting ears, and the other end of which is used to be connected to the frame beam.

[0019] Optionally, one end of the sling is detachably connected to the lifting ear via a shackle.

[0020] Optionally, each group of the lifting ears includes a plurality of the lifting ears arranged in a matrix, and the attachment frame mounting device includes a plurality of the lifting ropes, the plurality of the lifting ropes are intertwined with each other and one end of the plurality of the lifting ears in a group of the lifting ears is connected one by one.

[0021] Optionally, the attachment frame mounting device includes a plurality of the first connecting ear plates arranged in a matrix.

[0022] Optionally, the introduction beam is an H-shaped steel structure.

[0023] Through the above technical scheme, during the installation of the attachment frame, the first connecting ear plate is connected to the tower crane hook, and the frame beam to be installed can be selected to be connected to a group of lifting ears according to its weight. In this way, the introduced beam is lifted by the tower crane hook and the second end of the introduced beam is extended into the tower body of the tower crane, so that the frame beam to be installed can be driven to move accurately to the attachment position outside the tower body, and there is no need to use tools such as hand hoists to pull the frame beam to be installed, which greatly simplifies the installation operation difficulty, effectively improves the installation efficiency and safety, and is suitable for the installation of attachment frames of super-large tower cranes; in addition, multiple groups of lifting ears are provided and are arranged at intervals in the direction from the second end to the first end of the introduced beam. With this arrangement, a suitable group of lifting ears can be selected for connection according to the weight of the frame beam to be installed, so that the first end and the second end of the introduced beam can be easily kept horizontal during the lifting process, so that the overall structure formed by the connection of the attachment frame installation device, the tower crane hook and the frame beam to be installed can be easily kept in a stable state during the lifting process.

[0024] Other features and advantages of the present invention will be described in detail in the subsequent specific implementation section. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the following specific embodiments, they are used to explain the present invention, but do not constitute a limitation to the present invention. In the accompanying drawings:

[0026] Figure 1 This is a structural schematic diagram of an attachment frame installation device applied to frame beam installation in one embodiment of the utility model;

[0027] Figure 2 for Figure 1 Structural diagram of the middle attachment frame installation device Figure 1 ;

[0028] Figure 3 for Figure 2 A side view of the middle attachment frame mounting device;

[0029] Figure 4 for Figure 1 Structural diagram of the middle attachment frame installation device Figure 2 ;

[0030] Figure 5 for Figure 4 Schematic diagram of the structure of the middle support.

[0031] Description of reference numerals:

[0032] 100 Introducing beams

[0033] 200 First connecting ear plate

[0034] 300 Lifting Lug

[0035] 400 Second connecting ear plate

[0036] 500 Support

[0037] 501 Intermediate connecting rod 502 Connector

[0038] 503 Main support

[0039] 600 Sling

[0040] 700 Tower Crane Hook

[0041] 800 frame beam

[0042] 900 Shackle DETAILED DESCRIPTION

[0043] The specific implementation of the present invention is described in detail below in conjunction with the accompanying drawings. It should be understood that the specific implementation described here is only used to illustrate and explain the present invention, and is not used to limit the present invention.

[0044] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features thereof may be combined with each other.

[0045] In the present invention, unless otherwise specified, directional words such as "up, down, top, bottom" are usually used with reference to the directions shown in the drawings or are used to describe the relative positional relationships of components in the vertical, perpendicular or gravity direction.

[0046] The present invention will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0047] The utility model firstly provides an attachment frame installation device.

[0048] In one embodiment, referring to Figure 1 To Attachment Figure 4 As shown, the attachment frame installation device includes an introduction beam 100, a first connecting ear plate 200 and a plurality of lifting ears 300. The first connecting ear plate 200 is fixedly connected to the top surface of the first end of the introduction beam 100 by welding or integral molding, and is used to be connected to the tower crane hook 700. The plurality of lifting ears 300 are fixedly connected to the bottom surface of the second end of the introduction beam 100 by welding or integral molding, and are arranged at intervals along the direction from the second end to the first end of the introduction beam 100. The lifting ears 300 are used to be connected to the frame beam 800 of the attachment frame.

[0049] In this embodiment, during the installation of the attachment frame, the first connecting ear plate 200 is connected to the tower crane hook 700, and the frame beam to be installed can be connected to a group of lifting ears according to the weight. In this way, the introduction beam 100 is lifted by the tower crane hook 700 and the second end of the introduction beam 100 is extended into the tower body of the tower crane, which can drive the frame beam 800 to be installed to be accurately moved to the attachment position outside the tower body. There is no need to use tools such as hand hoists to pull the frame beam to be installed, which greatly simplifies the installation operation difficulty, effectively improves the installation efficiency and safety, and is suitable for the installation of attachment frames of super-large tower cranes.

[0050] In addition, since the weights of multiple frame beams are inconsistent, in the present embodiment, a plurality of lifting ears 300 are provided and are arranged at intervals along the direction from the second end to the first end of the introduction beam 100. In this way, a suitable group of lifting ears 200 can be selected for connection according to the weight of the frame beam to be installed, so that the first end and the second end of the introduction beam 100 can be easily kept horizontal during the lifting process, thereby making it easy to maintain a stable state for the overall structure formed by the attachment frame installation device, the tower crane hook 700 and the frame beam 800 to be installed during the lifting process.

[0051] In actual application, a heavier frame beam can be connected to a group of lugs 200 near the first end of the introduction beam 100, and a lighter frame beam can be connected to a group of lugs 200 far from the first end of the introduction beam 100. For example, referring to the accompanying drawings, the lugs 300 are arranged in two groups, one group of lugs 300 is arranged near the first end of the introduction beam 100, and the other group of lugs 300 is arranged far from the first end of the introduction beam 100. A plurality of frame beams are divided into two groups according to weight, one group is lighter, and the other group is heavier. The lighter frame beam is connected to the group of lugs 300 arranged near the first end of the introduction beam 100 during installation, and the heavier frame beam is connected to the group of lugs 300 arranged far from the first end of the introduction beam 100 during installation.

[0052] Specifically, the first connecting ear plate 200 can be fastened to the tower crane hook 700 via a pin shaft, thereby achieving a fastened connection between the first end of the introduction beam 100 and the tower crane hook 700 .

[0053] It should be noted that the structure of the tower crane hook is well known to those skilled in the art and does not constitute the core of the improvement, so its specific structure will not be described in detail here.

[0054] In one embodiment, the attachment frame installation device also includes a second connecting ear plate 400 and a support member 500, the second connecting ear plate 400 is arranged on the bottom surface of the first end of the introduction beam 100, and the support member 500 has a first connecting end and a second connecting end that are relatively arranged, the first connecting end is connected to the second connecting ear plate 400, and the second connecting end extends downwardly in a direction away from the second end of the introduction beam 100, and is used to connect to the tower crane hook 700.

[0055] In this embodiment, the support member 500 is used to connect with the tower crane hook and support the bottom surface of the first end of the introduction beam 100. Such a configuration can effectively improve the structural strength and stability of the connection between the introduction beam 100 and the tower crane hook.

[0056] Specifically, the first connection end of the support member 500 may be fastened to the second connection ear plate 400 via a pin, and the second connection end of the support member 500 may be fastened to the tower crane hook 700 via a pin.

[0057] In one embodiment, the distance between the first connection end and the second connection end is adjustable, so as to effectively improve the versatility of the support member 500 and be applicable to the connection between the introduction beam 100 and tower crane hooks 700 of different specifications.

[0058] In one embodiment, referring to Figure 5 As shown, the support member 500 includes an intermediate connecting rod 501, a joint 502 and a main support rod 503, one end of the joint 502 is connected to the first end of the intermediate connecting rod 501 and the connection position is adjustable along the axial direction of the intermediate connecting rod 501, and the other end is the first connection end, one end of the main support rod 503 is connected to the second end of the intermediate connecting rod 501 and the connection position is adjustable along the axial direction of the intermediate connecting rod 501, and the other end is the second connection end.

[0059] It can be understood that by adjusting the connection position of the joint 502 on the first end of the intermediate connecting rod 501 and / or adjusting the connection position of the main support rod 503 on the second end of the intermediate connecting rod 501, the distance between the first connecting end and the second connecting end can be adjusted.

[0060] In one embodiment, referring to Figure 5 As shown, the middle connecting rod 501 is a screw rod, and the first end and the second end of the middle connecting rod 501 are respectively screwed with a first locking nut and a second locking nut, one end of the joint 502 is screwed with the first end of the middle connecting rod 501 and cooperates with the first locking nut stop, and one end of the main support rod 503 is screwed with the second end of the middle connecting rod 501 and cooperates with the second locking nut stop.

[0061] It can be understood that when it is necessary to adjust the threaded position of the joint 502 in the direction close to the second end of the intermediate connecting rod 501, the first locking nut can be screwed to make the first locking nut disengage from the stopper of the joint 502. At this time, the joint 502 can be moved in the direction close to the second end of the intermediate connecting rod 501 by screwing the joint 502. When the adjustment is in place, the first locking nut can be screwed in the reverse direction to make the first locking nut stop again with the joint 502. Similarly, when it is necessary to adjust the threaded position of the main support rod 503 in the direction close to the first end of the intermediate connecting rod 501, the second locking nut can be screwed to make the second locking nut disengage from the stopper of the main support rod 503. At this time, the main support rod 503 can be moved in the direction close to the first end of the intermediate connecting rod 501 by screwing the main support rod 503. When the adjustment is in place, the second locking nut can be screwed in the reverse direction to make the second locking nut stop again with the main support rod 503.

[0062] In one embodiment, referring to Figure 1 To Attachment Figure 3 As shown, the attachment frame installation device also includes a sling 600, one end of which is selectively connected to any one of the multiple sets of lifting ears 300, and the other end is used to connect to the frame beam. In this way, the introduction beam 100 is lifted by the tower crane hook 700, and the movement of the introduction beam 100 can drive the frame beam to move through the sling 600.

[0063] In this embodiment, the sling 600 may be a rope made of materials such as a steel wire rope or synthetic fiber, and has good toughness and structural strength.

[0064] In one embodiment, referring to Figure 1 To Attachment Figure 4 As shown, one end of the sling 600 is detachably connected to the lifting lug 300 via a shackle 900. This arrangement facilitates the sling 600 to be assembled, unassembled and replaced.

[0065] It can be understood that the shackle 900 is a connecting component well known to those skilled in the art. During the installation process, one end of the sling 600 can be pre-bound with the shackle 900. Through the characteristics of the shackle 900 that can be quickly installed and disassembled, the sling 600 and the lifting ear 300 can be quickly installed and disassembled.

[0066] Of course, in other embodiments, one end of the sling 600 can be directly connected to the lifting ear 300 by bundling.

[0067] In one embodiment, each group of ears 300 includes a plurality of ears 300 arranged in a matrix, and the attachment frame mounting device includes a plurality of slings 600, which are intertwined with each other and one end of which is connected one by one to a plurality of ears 300 in a group of ears 300.

[0068] Such arrangement can effectively improve the reliability, structural strength and stability of the introduction beam 100 in lifting the frame beam through the sling 600, so that the attachment frame installation device is suitable for the installation of heavier attachment frames.

[0069] For example, each group of lifting ears 300 may include four lifting ears 300 arranged in a matrix, and the attachment frame installation device may include four lifting ropes 600, which are intertwined and have one end connected to the four lifting ears 300 arranged in a matrix.

[0070] In one embodiment, the attachment frame installation device includes a plurality of first connection ear plates 200 arranged in a matrix. In this way, the plurality of first connection ear plates 200 arranged in a matrix are fastened to the ear plates on the tower crane hook by pins, respectively, so that the strength and reliability of the connection between the attachment frame installation device and the tower crane hook can be effectively improved.

[0071] For example, the attachment frame installation device may include four first connection ear plates 200 arranged in a matrix, and the four first connection ear plates 200 are respectively fastened to four ear plates on the tower crane hook through pins.

[0072] In one embodiment, referring to Figure 3 As shown, the introduction beam 100 is an H-shaped steel structure.

[0073] It can be understood that the H-shaped steel structure is a load-bearing structure, and its bending resistance can meet the requirements of the lifting capacity, so that the attachment frame installation device can be suitable for the installation of heavier attachment frames.

[0074] For ease of understanding, the application of the above-mentioned attachment frame installation device in the attachment frame installation method is described below.

[0075] Attachment frame installation methods may include:

[0076] Step S1. Connect the first connecting ear plate 200 and the tower crane hook 700, specifically, fasten them by means of pin-through connection;

[0077] Step S2. According to the weight of the frame beam 800 to be installed, one of the multiple sets of lifting lugs 300 is selected to be connected to the frame beam 800 to be installed. Specifically, a lighter frame beam is connected to a set of lifting lugs 300 far from the first end of the introduction beam 100, and a heavier frame beam is connected to a set of lifting lugs 300 close to the first end of the introduction beam 100. In actual application, the selection can be made according to actual conditions;

[0078] Step S3. The introduction beam 100 is hoisted by the tower crane hook so that the second end of the introduction beam 100 extends into the tower body of the tower crane, thereby driving the frame beam 800 to be installed to move to the outer attachment position of the tower body, and the frame beam 800 to be installed is fixedly installed. Specifically, the fixed installation of the frame beam 800 can be a fixed installation of the frame beam and the wall attachment rod, a fixed installation with the tower body, or a fixed connection with the installed frame beam;

[0079] Step S4. Repeat steps S2 and S3 until a plurality of frame beams are fixedly installed at the outer attachment position of the tower body and connected to each other to form an attachment frame.

[0080] Specifically, step S3 may further include:

[0081] When the tower crane hook lifts the introduction beam 100 , the counterweight is added or reduced on the end of the tower crane hook 700 away from the introduction beam 100 so as to keep the introduction beam 100 in a horizontally arranged balanced state.

[0082] Such an arrangement can ensure that during the lifting process, the attachment frame is in a horizontally arranged balanced state, so as to achieve accurate movement to the outer attachment position of the tower body.

[0083] Specifically, the counterweight may be installed on a lug plate provided on an end of the tower crane hook 700 away from the introduction beam 100 .

[0084] Specifically, step S2 may further include:

[0085] A plurality of slings 600 are wound around each other and one end is connected to a plurality of lifting ears 300 in a group of lifting ears 300 one by one, and the other end is connected to the frame beam to be installed, and the extension line of the part where the plurality of slings 600 are wound around each other passes through the center of gravity of the frame beam to be installed.

[0086] Such an arrangement can further ensure that during the lifting process, the attachment frame can be stably in a horizontally arranged balanced state, so as to be accurately moved to the outer attachment position of the tower body without the need for additional adjustments through other tools.

[0087] The above are only preferred implementation modes of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

[0088] It should also be noted that the various specific technical features described in the above specific embodiments can be combined in any suitable manner without contradiction. In order to avoid unnecessary repetition, the present utility model will not further describe various possible combinations.

[0089] In addition, various embodiments of the present invention may be arbitrarily combined, and as long as they do not violate the concept of the present invention, they should also be regarded as the contents disclosed by the present invention.

Claims

1. An attachment frame installation device, characterized in that: The attachment frame installation device comprises: Introduce beam (100); A first connecting ear plate (200) is fixedly connected to the top surface of the first end of the introduction beam (100) by welding or integral molding, and is used for connecting to a tower crane hook (700); A plurality of groups of lifting ears (300) are fixedly connected to the bottom surface of the second end of the introduction beam (100) by welding or integral molding, and are arranged at intervals along the direction from the second end to the first end of the introduction beam (100). The lifting ears (300) are used to be connected to the frame beam (800) of the attachment frame.

2. The attachment frame installation device according to claim 1, characterized in that: The attachment frame installation device also includes: A second connecting ear plate (400) is arranged on the bottom surface of the first end of the introduction beam (100); The support member (500) has a first connecting end and a second connecting end which are arranged opposite to each other, wherein the first connecting end is connected to the second connecting ear plate (400), and the second connecting end extends downwardly in a direction away from the second end of the introduction beam (100) and is used to be connected to the tower crane hook (700).

3. The attachment frame installation device according to claim 2, characterized in that: The distance between the first connection end and the second connection end is adjustable.

4. The attachment frame installation device according to claim 3, characterized in that: The support member (500) comprises: An intermediate connecting rod (501); A joint (502), one end of which is connected to the first end of the intermediate connecting rod (501) and the connection position is adjustable along the axial direction of the intermediate connecting rod (501), and the other end of which is the first connecting end; The main support rod (503) has one end connected to the second end of the intermediate connecting rod (501) and the connection position is adjustable along the axial direction of the intermediate connecting rod (501), and the other end is the second connecting end.

5. The attachment frame installation device according to claim 4, characterized in that: The intermediate connecting rod (501) is a screw rod, and the first end and the second end of the intermediate connecting rod (501) are respectively screwed with a first locking nut and a second locking nut, one end of the joint (502) is screwed with the first end of the intermediate connecting rod (501) and cooperates with the first locking nut stop, and one end of the main support rod (503) is screwed with the second end of the intermediate connecting rod (501) and cooperates with the second locking nut stop.

6. The attachment frame installation device according to claim 1, characterized in that: The attachment frame installation device also includes a sling (600), one end of which is selectively connected to any one of the multiple groups of lifting ears (300), and the other end of which is used to be connected to the frame beam (800).

7. The attachment frame installation device according to claim 6, characterized in that: One end of the sling (600) is detachably connected to the lifting ear (300) via a shackle (900).

8. The attachment frame installation device according to claim 6, characterized in that: Each group of the lifting ears (300) comprises a plurality of the lifting ears (300) arranged in a matrix, and the attachment frame installation device comprises a plurality of the lifting ropes (600), wherein the plurality of the lifting ropes (600) are intertwined with each other and one end of the plurality of the lifting ears (300) in a group of the lifting ears (300) is connected one by one.

9. The attachment frame installation device according to claim 1, characterized in that: The attachment frame installation device comprises a plurality of the first connection ear plates (200) arranged in a matrix.

10. The attachment frame installation device according to claim 1, characterized in that: The introduction beam (100) is an H-shaped steel structure.