Novel green net for covering high slope

By introducing the design of hollow tubes, fixing holes and friction strips into the high-slope green netting, the problem of the traditional green netting being not firmly fixed has been solved, and the green netting has been able to automatically roll down the slope and be firmly fixed, improving the efficiency of the green netting. The safety and service life of the thatch cover.

CN222375450UActive Publication Date: 2025-01-21CHINA THREE GORGES PROJECTS DEV CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421084490.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-17
Publication Date
2025-01-21
Estimated Expiration
2034-05-17

AI Technical Summary

Technical Problem

In the prior art, the green net of the high slope cover is not firmly fixed, poses safety risks and is prone to slip off due to wind blowing, resulting in the insufficiency of the cover.

Method used

A new type of green mesh is designed, which includes a green mesh, a hollow tube on the lower side, a fixing hole on the upper side, and friction strips on the left and right sides. The hollow tube is adhered to the green mesh through glue, the fixing holes are matched with nails, and the friction strips increase the friction between the green mesh and the exposed surface.

Benefits of technology

Through the gravity of the hollow tube, the green net can automatically roll down the slope and be firmly fixed to avoid slipping due to wind, which improves the stability and safety of the thatch and extends the service life of the green net.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222375450U_ABST
    Figure CN222375450U_ABST
Patent Text Reader

Abstract

The novel green net comprises a green net body, hollow pipes are arranged on the lower side of the green net body, fixing holes matched with nails are formed in the upper side of the green net body, and friction strips are arranged on the left side and the right side of the green net body respectively. Due to the fact that the hollow pipe is additionally arranged on the lower portion, the whole green net cannot be blown away by wind due to gravity, the problem that covering of a traditional high slope green net is not firm is solved, the service life of the green net is prolonged, the using effect of the green net is guaranteed, constructors do not need to cover the green net along a high slope, manpower can be saved after popularization, and the green net is economical and practical. And the personal safety of constructors is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of fixing green nets for covering high side slopes, in particular to a new type of green net for covering high side slopes. Background Art

[0002] The green net is a net woven from polyethylene, which is used to cover the bare soil surface to prevent dust from flying when strong winds blow over the bare soil surface. In the prior art, the green net is used to cover the slag and exposed surface of high slopes. When fixing the green net, it is necessary to use multiple stones to press the edge of the green net on the exposed surface. High slopes are often steep and the slag is long. There is a great safety risk in artificial compaction with stones. Because the slope is steep, it is easy to cause the fixed stones to slide after a strong wind blows, causing the green net to be blown away. At present, there is a lack of special green nets for covering exposed surfaces of high slopes on the market, so it is necessary to develop green nets for covering high slopes. Summary of the invention

[0003] The purpose of the utility model is to overcome the above-mentioned shortcomings and provide a new type of green net for covering high slopes, so as to solve the problem that the traditional high slope green net covering is not firm.

[0004] In order to solve the above technical problems, the technical solution adopted by the utility model is: a new type of green net for covering high slopes, including a green net, a hollow tube is provided on the lower side of the green net, fixing holes cooperating with nails are provided on the upper side of the green net, and friction strips are respectively provided on the left and right sides of the green net.

[0005] Preferably, the green net is a rectangular mesh structure, and the lower side of the green net is adhered to the hollow tube by glue.

[0006] Preferably, a plastic ring fixedly connected to the green net is provided on the periphery of the fixing hole.

[0007] Preferably, the friction strip comprises a friction strip base fixedly connected to the edge of the green net, and plastic fluff is provided at the bottom of the friction strip base.

[0008] Preferably, the friction strip base is a rubber strip structure.

[0009] Preferably, sealing covers are provided at both ends of the hollow tube, and the hollow tube is filled with small stones.

[0010] Beneficial effects of the utility model:

[0011] 1. The utility model makes full use of the high slope thatching characteristics of the pumped storage power station. By installing a hollow pipe under the green net, the gravity can be used to automatically roll down the slope to cover the water, which saves labor costs and is safer.

[0012] 2. The utility model installs a hollow tube at the bottom so that the entire green net will not be blown away by the wind due to gravity, thereby solving the problem of unstable covering of traditional green nets on high slopes, extending the service life of the green net and ensuring the use effect of the green net. It does not require construction workers to cover along the high slopes. After promotion, it can save manpower and ensure the personal safety of construction workers. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 This is a schematic diagram of the top view of a new type of green net used for covering high slopes after it is unfolded;

[0014] Figure 2 for Figure 1 Schematic diagram of the cross section of the hollow tube;

[0015] Figure 3 for Figure 1 Schematic diagram of the side structure of the middle friction strip. DETAILED DESCRIPTION

[0016] The present invention will be described in further detail below in conjunction with the accompanying drawings and specific embodiments.

[0017] like Figure 1-3 As shown, a new type of green net for covering high slopes includes a green net 1, a hollow tube 2 is provided on the lower side of the green net 1, a fixing hole 3 cooperating with a nail is provided on the upper side of the green net 1, and friction strips 4 are provided on the left and right sides of the green net 1 respectively.

[0018] Preferably, the green net 1 is a rectangular mesh structure, and the lower side of the green net 1 is glued to the hollow tube 2. In this embodiment, the green net and the hollow tube 2 can be firmly connected together by strong glue (such as 502 glue).

[0019] Preferably, a plastic ring 3.1 is provided around the fixing hole 3 and fixedly connected to the green net 1. The plastic ring 3.1 can stabilize the shape of the fixing hole 3 and prevent deformation.

[0020] Preferably, the friction strip 4 comprises a friction strip base 4.1 fixedly connected to the side of the green net 1, and a plastic fluff 4.2 is provided at the bottom of the friction strip base 4.1. The friction strip 4 can increase the friction between the green net 1 and the exposed surface of the cover, and enhance the covering stability of the green net 1.

[0021] Preferably, the friction strip base 4.1 is a rubber strip structure. After the friction strip base 4.1 adopts a rubber strip structure, the friction strip 4 can have the characteristic of being curled, so that the entire green net 1 can be rolled up on the surface of the hollow tube 2 for easy transportation to the slope coverage area.

[0022] Preferably, both ends of the hollow tube 2 are provided with blocking caps 2.1, and small stones are filled in the hollow tube 2. The gravity of the hollow tube 2 can prevent the green net 1 from being dislocated due to wind. If the weight is not enough, small stones can be filled in the hollow part of the hollow tube 2 to increase the weight and maintain the stability of the structure. At the same time, the blocking caps 2.1 are covered at both ends to prevent the stones from falling out.

[0023] The working principle of the utility model is as follows:

[0024] like Figure 1 As shown, a new type of green net for covering high slopes includes a green net 1 and a hollow tube 2. The hollow tube 2 is connected to one side of the green net 1 by strong glue. When the exposed surface of the high slope needs to be covered, the area of ​​the exposed surface can be measured at the construction site. After the length and width are determined, the green net 1 and the hollow tube 2 are cut. After cutting, the green net 1 and the hollow tube 2 are glued together with strong glue (it can also be customized in the factory). The green net 1 is rolled up along the hollow tube 2 in circles and carried to the edge of the high slope to be covered. Through the action of gravity, the rolled green net 1 rolls down along the slope to achieve covering. The top of the green net 1 passes through the fixing hole 3 through a small steel nail and is then nailed into the edge of the high slope to ensure that the green net 1 will not slide down the slope due to the gravity of the hollow tube 2. The friction strips 4 on both sides of the green net 1 can increase the friction between the green net and the exposed surface to be covered and enhance the stabilizing effect of the green net covering. The gravity of the hollow tube 2 below can also prevent the green net 1 from being dislocated due to wind. If the weight is not enough, small stones can be filled in the hollow part of the hollow tube 2 to increase the weight and maintain the stability of the structure. At this point, the high slope thatching is completed.

[0025] The above embodiments are only preferred technical solutions of the present invention and should not be regarded as limitations of the present invention. The protection scope of the present invention shall be the technical solutions recorded in the claims, including equivalent replacement solutions of the technical features in the technical solutions recorded in the claims. That is, equivalent replacement improvements within this scope are also within the protection scope of the present invention.

Claims

1. A new type of green net for covering high slopes, comprising a green net (1), characterized in that: The lower side of the green net (1) is provided with a hollow tube (2), the upper side of the green net (1) is provided with a fixing hole (3) that cooperates with the nail, and the left and right sides of the green net (1) are respectively provided with friction strips (4).

2. A new type of green net for high slope covering according to claim 1, characterized in that: The green net (1) is a rectangular net structure, and the lower side of the green net (1) is bonded to the hollow tube (2) by glue.

3. The new green net for high slope covering according to claim 1 is characterized in that: A plastic ring (3.1) fixedly connected to the green net (1) is provided on the periphery of the fixing hole (3).

4. The new green net for high slope covering according to claim 1 is characterized in that: The friction strip (4) comprises a friction strip base (4.1) fixedly connected to the side of the green net (1), and plastic fluff (4.2) is provided at the bottom of the friction strip base (4.1).

5. The new green net for high slope covering according to claim 4 is characterized in that: The friction strip base (4.1) is a rubber strip structure.

6. The new green net for high slope covering according to claim 1 is characterized in that: Both ends of the hollow tube (2) are also provided with blocking covers (2.1), and the hollow tube (2) is filled with small stones.