Building engineering construction trowelling device

By designing a combination of water pump and water outlet in the construction screeding device, the moisture of the concrete is replenished and the problem of incomplete concrete condensation is solved. The foldable handle design facilitates the storage and protection of the device and extends the time. service life.

CN222376023UActive Publication Date: 2025-01-21崔磊
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202420325668.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-21
Publication Date
2025-01-21
Estimated Expiration
2034-02-21

AI Technical Summary

Technical Problem

The existing construction smoothing device cannot replenish moisture during the smoothing process, resulting in imperfect concrete solidification, insufficient strength, and reduced durability. At the same time, the device is inconvenient to store and is prone to damage due to collision.

Method used

A construction smoothing device including a bottom plate and a bottom bracket is designed. One side of the bottom bracket is equipped with an outlet channel and a solenoid valve. The water is pumped out through a water pump and reaches the outlet channel through the outlet pipe to achieve water replenishment. At the same time, the device The foldable main and secondary grips are designed for easy storage and protection.

Benefits of technology

Through moisture replenishment, the concrete is ensured to have sound coagulation, sufficient strength and improved durability; at the same time, the foldable design of the device facilitates storage, reduces damage caused by bumps, and extends the service life.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222376023U_ABST
    Figure CN222376023U_ABST
Patent Text Reader

Abstract

The utility model discloses a building engineering construction trowelling device, relates to engineering construction trowelling technical field, including bottom plate and collet, one side inside the collet is equipped with a plurality of water outlet grooves, and one end of a plurality of water outlet grooves is fixedly equipped with a solenoid valve inside the collet. The building engineering construction trowelling device comprises a bottom support, a plurality of water outlet grooves are formed in the bottom support, an auxiliary box is fixedly installed in the bottom support, one side of the auxiliary box is communicated with one ends of the water outlet grooves, a water outlet pipe is fixedly installed at the top of the auxiliary box, and an auxiliary holding rod is fixedly installed at one end of the water outlet pipe. Water is pumped out from the interior of a water storage barrel, reaches the interiors of a main holding rod and an auxiliary holding rod through a connecting pipe and then reaches the interior of an auxiliary box through a water outlet pipe, an electromagnetic valve is opened, the water can flow out of a water outlet groove, a bottom support is assisted in trowelling concrete, and the problems that the concrete is unsound in condensation, insufficient in strength and reduced in durability are prevented.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of engineering construction leveling, in particular to a construction engineering construction leveling device. Background Art

[0002] Construction engineering refers to the process of building a building. Different construction tools are needed in this process to complete the construction process faster. In the process of building construction, concrete often needs to be poured. After pouring the concrete, it needs to be smoothed. At this time, a trowel is needed to smooth the freshly poured concrete.

[0003] The Chinese patent with patent application number 202221040503.8 proposes a splicing type construction engineering construction device, including a smoothing structure and a splicing structure; the telescopic rod is extended and retracted in the fixed cylinder, and the clamping piece clamps and fixes the telescopic rod, so that the smoothing plate can smooth the concrete poured at a longer distance. When the area of ​​concrete pouring is large, the smoothing plate needs to be lengthened, and the connecting plate is manually held and moved from top to bottom and placed on the U-shaped notch. The rotating screws on both sides of the U-shaped notch enter into the horizontal holes from the vertical holes of the T-shaped holes on both sides of the U-shaped plate, and the rotating screws at the upper ends of the U-shaped notch enter into the elliptical holes on the upper ends of the U-shaped plate. The rotating plates are rotated respectively, and the rotating screws move downward, and the rotating plates are converted from a vertical state to a horizontal state, and then the connecting plates are spliced ​​at both ends of the smoothing plate. When the area of ​​concrete pouring is small and needs to be disassembled, the rotating plate is converted from a horizontal state to a vertical state, and the connecting plates are successively removed from both ends of the smoothing plate, which is very convenient to use.

[0004] However, after the improvement, the above patent still has the problem that the concrete is not fully coagulated, the strength is insufficient, and the durability is reduced because the water is not replenished during the leveling process. In addition, the device is inconvenient to store and is easily damaged due to bumps, which reduces the service life. Utility Model Content

[0005] In view of the deficiencies in the prior art, the utility model provides a construction leveling device for building engineering, which solves the problems raised in the above-mentioned background technology.

[0006] To achieve the above objectives, the utility model is implemented through the following technical solutions: a construction engineering smoothing device, including a base plate and a base support, a plurality of water outlet grooves are opened inside one side of the base support, and a solenoid valve is fixedly installed at one end of the plurality of water outlet grooves and located inside the base support, an auxiliary box is fixedly installed inside the base support, one side of the auxiliary box is communicated with one end of the plurality of water outlet grooves, a water outlet pipe is fixedly installed on the top of the auxiliary box, a secondary grip is fixedly installed at one end of the water outlet pipe, a hose is fixedly installed at one end of the secondary grip, a main grip is fixedly installed at the other end of the hose, two blocks are fixedly installed on the outer wall of one end of the main grip, and the interior of the auxiliary box is set as a slope surface.

[0007] Preferably, two small bases are fixedly installed at the top center position of the base, and the two small bases are rotatably connected to one end of the auxiliary handle. By rotatably connecting the auxiliary handle and the two small bases, the rotation angle of the base can be adjusted to facilitate smoothing of the concrete.

[0008] Preferably, a water storage barrel is fixedly installed on the top of the base plate, a square box is fixedly installed on one side of the water storage barrel and located on the top of the base plate, a water pump is fixedly installed inside the square box, the input end of the water pump extends to the inside of the water storage barrel, a connecting pipe is fixedly installed on the output end of the water pump, a connecting head is fixedly installed on one end of the connecting pipe, two card slots are provided inside the connecting head, the card block is inserted into the inside of the card slot and slidably connected thereto, and the connecting head can be conveniently disassembled and stored by being clamped between the connecting head and the main handle.

[0009] Preferably, a second connecting block is fixedly installed on the outer wall of one end of the main handle, and a first connecting block is fixedly installed on the outer wall of one end of the auxiliary handle, two sliding grooves are provided inside the first connecting block, springs are fixedly installed inside the two sliding grooves, plug blocks are fixedly installed on one end of the two springs, and pressing blocks are fixedly installed on one side of the two plug blocks, and the plug blocks are inserted into the interior of the second connecting block and slidably connected thereto, and the main handle and the auxiliary handle can be folded and assembled at will by clamping the first connecting block and the second connection, so that they are convenient for storage.

[0010] Preferably, a barrel cover is provided on the top of the water storage barrel, and the barrel cover is inserted into the interior of the water storage barrel and threadedly connected thereto, a first clamping frame is fixedly installed on the top of the water storage barrel, and the outer wall of one end of the connecting pipe is clamped with the interior of the first clamping frame, and two second clamping frames are fixedly installed on one side of the water storage barrel, the interior of one of the second clamping frames is clamped with the outer wall of the auxiliary grip, and the interior of the other second clamping frame is clamped with the outer wall of the main grip, one end of the connecting pipe is clamped with the interior of the first clamping frame, so that the outer wall of the auxiliary grip is clamped with the interior of one of the second clamping frames, and then the main grip is folded so that the outer wall of the main grip is clamped with the interior of the other second clamping frame for storage.

[0011] Preferably, an armrest is fixedly mounted on one end of the base plate, and four rollers are rotatably mounted on the bottom of the base plate to facilitate movement of the device.

[0012] The utility model provides a construction engineering construction leveling device, which has the following beneficial effects:

[0013] 1. The construction smoothing device for construction engineering projects starts the water pump to pump water out from the inside of the water storage barrel, and reaches the inside of the main grip and the auxiliary grip through the connecting pipe, and then reaches the inside of the auxiliary box through the outlet pipe. When the solenoid valve is opened, water can flow out of the water outlet trough to assist the bottom support in smoothing the concrete, thereby preventing the concrete from having problems such as incomplete coagulation, insufficient strength, and reduced durability.

[0014] 2. The construction smoothing device for the building project, when the limit between the main grip and the connecting head is released, one end of the connecting pipe is clamped into the inside of the first clamping frame, the outer wall of the auxiliary grip is clamped into the inside of one of the second clamping frames, and then the main grip is folded, so that the outer wall of the main grip is clamped into the inside of another second clamping frame, and the smoothing device is stored to prevent the device from being damaged due to bumps due to occupying a large space. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a schematic diagram of the structure of the utility model;

[0016] Figure 2 For this utility model Figure 1 A in the enlarged view;

[0017] Figure 3 This is a schematic diagram of the structure of the utility model after deformation;

[0018] Figure 4 For this utility model Figure 3 The enlarged view of point B in the figure;

[0019] Figure 5 This is a top view of the bottom bracket of the utility model;

[0020] Figure 6 For this utility model Figure 5 The enlarged view of point C in the figure;

[0021] Figure 7 This is a front cross-sectional view of the utility model;

[0022] Figure 8 It is a side sectional view of the utility model;

[0023] Fig. 9 For this utility model Figure 8 The enlarged view of point D in the figure;

[0024] Fig.10 For this utility model Figure 8 Enlarged view of point E in FIG.

[0025] In the figure: 1. bottom plate; 2. roller; 3. handrail; 4. water storage bucket; 5. square box; 6. bucket cover; 7. first clamping frame; 8. second clamping frame; 9. connecting pipe; 10. connecting head; 11. main grip; 12. auxiliary grip; 13. clamping block; 14. water outlet pipe; 15. bottom support; 16. small base; 17. auxiliary box; 18. water outlet trough; 19. solenoid valve; 20. water pump; 21. first connecting block; 22. second connecting block; 23. sliding groove; 24. spring; 25. plug-in block; 26. pressing block; 27. clamping slot; 28. hose. DETAILED DESCRIPTION

[0026] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.

[0027] Embodiment 1

[0028] See also Figures 1 to 10 The utility model provides a technical solution: a construction engineering leveling device, including a base plate 1 and a base support 15, a plurality of water outlet grooves 18 are opened inside one side of the base support 15, and a solenoid valve 19 is fixedly installed at one end of the plurality of water outlet grooves 18 and located inside the base support 15, an auxiliary box 17 is fixedly installed inside the base support 15, one side of the auxiliary box 17 is communicated with one end of the plurality of water outlet grooves 18, a water outlet pipe 14 is fixedly installed on the top of the auxiliary box 17, a secondary grip 12 is fixedly installed on one end of the water outlet pipe 14, a hose 28 is fixedly installed on one end of the secondary grip 12, a main grip 11 is fixedly installed on the other end of the hose 28, two blocks 13 are fixedly installed on the outer wall of one end of the main grip 11, the interior of the auxiliary box 17 is set as a slope surface, and two small bases 16 are fixedly installed at the top center of the base support 15, and the two small bases 16 are rotatably connected with one end of the secondary grip 12.

[0029] A water storage barrel 4 is fixedly installed on the top of the base plate 1, and a square box 5 is fixedly installed on one side of the water storage barrel 4 and located on the top of the base plate 1. A water pump 20 is fixedly installed inside the square box 5. The input end of the water pump 20 extends to the inside of the water storage barrel 4, and a connecting pipe 9 is fixedly installed on the output end of the water pump 20. A connecting head 10 is fixedly installed on one end of the connecting pipe 9. Two card slots 27 are provided inside the connecting head 10. The card block 13 is inserted into the inside of the card slot 27 and is slidably connected thereto. The connecting head 10 can be easily disassembled and stored by being clamped with the main handle 11.

[0030] A second connecting block 22 is fixedly installed on the outer wall of one end of the main handle 11, and a first connecting block 21 is fixedly installed on the outer wall of one end of the auxiliary handle 12. Two sliding grooves 23 are provided inside the first connecting block 21, and springs 24 are fixedly installed inside the two sliding grooves 23. An insert block 25 is fixedly installed at one end of the two springs 24, and a pressing block 26 is fixedly installed on one side of the two insert blocks 25. The insert block 25 is inserted into the interior of the second connecting block 22 and is slidably connected thereto. By clamping the first connecting block 21 and the second connecting block 22, the main handle 11 and the auxiliary handle 12 can be folded and assembled at will for easy storage.

[0031] A barrel cover 6 is provided on the top of the water storage barrel 4, and the barrel cover 6 is inserted into the interior of the water storage barrel 4 and threadedly connected thereto. A first clamping frame 7 is fixedly installed on the top of the water storage barrel 4, and the outer wall of one end of the connecting pipe 9 is clamped with the interior of the first clamping frame 7. Two second clamping frames 8 are fixedly installed on one side of the water storage barrel 4, and the interior of one of the second clamping frames 8 is clamped with the outer wall of the auxiliary grip 12, and the interior of the other second clamping frame 8 is clamped with the outer wall of the main grip 11. One end of the connecting pipe 9 is clamped into the interior of the first clamping frame 7, so that the outer wall of the auxiliary grip 12 is clamped into the interior of one of the second clamping frames 8, and then the main grip 11 is folded, so that the outer wall of the main grip 11 is clamped into the interior of the other second clamping frame 8 for storage.

[0032] An armrest 3 is fixedly mounted at one end of the base plate 1, and four rollers 2 are rotatably mounted at the bottom of the base plate 1 to facilitate movement of the device.

[0033] In summary, when the construction engineering construction leveling device is used, the main grip 11 is held, the bottom bracket 15 is placed on the concrete surface to be leveled, the water pump 20 is started, water is pumped out from the inside of the water storage barrel 4, and reaches the inside of the main grip 11 and the auxiliary grip 12 through the connecting pipe 9, and then reaches the inside of the auxiliary box 17 through the outlet pipe 14, and the solenoid valve 19 is opened, and the water can flow out from the water outlet trough 18, and the auxiliary bottom bracket 15 is used to level the concrete. When the use is finished, the main grip 11 is turned 30 degrees to the left, so that the main grip 1 1 and the connector 10 are released, one end of the connecting pipe 9 is clamped into the inside of the first clamping frame 7, the two pressing blocks 26 are pressed, so that the two plug blocks 25 release the limit on the second connecting block 22, and after the hose 28 is straightened, the outer wall of the auxiliary grip 12 is clamped into the inside of one of the second clamping frames 8, and then the main grip 11 is folded, so that the outer wall of the main grip 11 is clamped into the inside of the other second clamping frame 8, and the smoothing device is stored to prevent the device from being damaged due to easy bumps due to occupying a large space.

[0034] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A construction engineering leveling device, comprising a base plate (1) and a base support (15), characterized in that: A plurality of water outlet grooves (18) are provided inside one side of the base (15), and a solenoid valve (19) is fixedly installed at one end of each of the water outlet grooves (18) and located inside the base (15). An auxiliary box (17) is fixedly installed inside the base (15), and one side of the auxiliary box (17) is in communication with one end of each of the water outlet grooves (18). A water outlet pipe (14) is fixedly installed on the top of the auxiliary box (17), and a secondary grip (12) is fixedly installed at one end of the water outlet pipe (14), and a hose (28) is fixedly installed at one end of the secondary grip (12), and a main grip (11) is fixedly installed at the other end of the hose (28), and two blocks (13) are fixedly installed on the outer wall of one end of the main grip (11), and the interior of the auxiliary box (17) is arranged as a slope surface.

2. A construction engineering construction leveling device according to claim 1, characterized in that: Two small bases (16) are fixedly installed at the top center of the base (15), and the two small bases (16) are rotatably connected to one end of the auxiliary handle (12).

3. A construction engineering construction leveling device according to claim 1, characterized in that: A water storage barrel (4) is fixedly mounted on the top of the bottom plate (1); a square box (5) is fixedly mounted on one side of the water storage barrel (4) and located on the top of the bottom plate (1); a water pump (20) is fixedly mounted inside the square box (5); an input end of the water pump (20) extends into the interior of the water storage barrel (4); a connecting pipe (9) is fixedly mounted on the output end of the water pump (20); a connecting head (10) is fixedly mounted on one end of the connecting pipe (9); two card slots (27) are provided inside the connecting head (10); the card block (13) is inserted into the interior of the card slot (27) and is slidably connected thereto.

4. A construction engineering construction leveling device according to claim 1, characterized in that: A second connecting block (22) is fixedly mounted on the outer wall of one end of the main handle (11), and a first connecting block (21) is fixedly mounted on the outer wall of one end of the auxiliary handle (12). Two sliding grooves (23) are provided inside the first connecting block (21), and springs (24) are fixedly mounted inside the two sliding grooves (23). An insert block (25) is fixedly mounted on one end of the two springs (24), and a pressing block (26) is fixedly mounted on one side of the two insert blocks (25). The insert block (25) is inserted into the second connecting block (22) and is slidably connected thereto.

5. A construction engineering construction leveling device according to claim 3, characterized in that: The top of the water storage barrel (4) is provided with a barrel cover (6), the barrel cover (6) is inserted into the interior of the water storage barrel (4) and is threadedly connected thereto, a first clamping frame (7) is fixedly installed on the top of the water storage barrel (4), the outer wall of one end of the connecting pipe (9) is clamped with the interior of the first clamping frame (7), and two second clamping frames (8) are fixedly installed on one side of the water storage barrel (4), the interior of one of the second clamping frames (8) is clamped with the outer wall of the auxiliary gripping rod (12), and the interior of the other second clamping frame (8) is clamped with the outer wall of the main gripping rod (11).

6. A construction engineering construction leveling device according to claim 1, characterized in that: A handrail (3) is fixedly mounted on one end of the base plate (1), and four rollers (2) are rotatably mounted on the bottom of the base plate (1).

Citation Information

Patent Citations

  • Splicing type building engineering construction device

    CN217537938U