Building gap filling assembly

By designing the building gap filling component and using a combination of fixed components, adjusting components and pressure rollers, the problem that flexible materials are easily stuck during the filling process is solved, a stable and efficient filling effect is achieved, and the wall and filler are protected.

CN222376036UActive Publication Date: 2025-01-21ANHUI PROVINCE JINPENG ENERGY SAVING TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421208869.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-30
Publication Date
2025-01-21
Estimated Expiration
2034-05-30

AI Technical Summary

Technical Problem

During the filling of voids in building walls, flexible materials are prone to bend or folded, resulting in difficulty in filling, and the use of hard tools to unblock the wall and filling materials may be damaged.

Method used

A building gap filling component is designed, including two connecting frames, a fixed component, an adjusting component and a pressing roller. The connecting frame is fixed on the wall through the fixing component, the adjusting component adjusts the distance between the sliders, and the pressing roller clamps the filler and slowly Rotate it firmly into the gap.

Benefits of technology

It achieves stable filling of flexible materials, avoids material jamming, protects the wall and filling, and improves filling efficiency and quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222376036U_ABST
    Figure CN222376036U_ABST
Patent Text Reader

Abstract

The utility model discloses a building gap filling assembly which comprises two connecting frames, a wall body and a gap formed in the wall body, and fixing assemblies are arranged at the bottom ends of the two connecting frames. When a gap of a building wall needs to be filled, the connecting frame is fixed to the wall through the two fixing assemblies, filler customized according to the width of the gap is placed between the two limiting plates, then the adjusting assembly is used for adjusting the distance between the two pairs of sliding blocks, the distance between the two pressing rollers is further adjusted, and the gap between the two pressing rollers is filled. The two compression rollers can clamp the filler between the two compression rollers, then second hand wheels at the two ends of the two compression rollers are rotated at the same time, the two compression rollers rotate oppositely at the same time, the filler is slowly and stably placed in the gap, the fixing assembly is disassembled after the filler is smoothly placed in the gap, the filler is stably installed, and the situation that the filler is stuck is avoided; and gaps and fillers of the wall body are protected.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building gap filling, in particular to a building gap filling component. Background Art

[0002] Building gap filling is a crucial technical link in modern building construction and maintenance. It mainly refers to filling the gaps in the walls or structures of buildings with specific materials to achieve multiple purposes such as enhancing structural stability, improving thermal insulation, and reducing energy loss. This technology has wide applicability and flexibility in practical applications, and suitable filling materials can be selected according to different needs and scenarios.

[0003] The role of building gap filling is not limited to the aforementioned enhanced insulation and earthquake resistance, it can also effectively prevent air infiltration, improve the air tightness of the building, and further improve the quality of the indoor environment. With the continuous emergence of new materials and technologies, the options for building gap filling are becoming more and more diverse, from traditional inorganic materials to modern polymer composite materials, all of which are providing more efficient and environmentally friendly solutions for the construction industry.

[0004] Generally speaking, there are two main application scenarios for building gap filling. The first is to replace the old insulation layer or filler inside the wall that is aging, damaged or has reduced insulation effect. By using high-performance filling materials, the building's insulation performance and wall structure strength can be improved. The second is to fill the wall directly during construction or energy-saving renovation of existing buildings. Through precise calculation and filling of special materials, the building's thermal insulation and sound insulation performance can be significantly improved, providing a more comfortable living environment, and helping to improve the overall earthquake resistance of the building and achieve energy conservation and emission reduction goals.

[0005] When filling the gaps in building walls with fillers, if some flexible materials such as rubber strips, soft polyurethane foam or mineral wool are filled, special attention should be paid to the operation skills of the filling process. Since these flexible materials are relatively soft and easy to deform, if a stable vertical angle is not maintained during the insertion process, the materials are likely to bend or fold in the gaps and get stuck. The main reason for the jam is that the material generates too much friction with the gap wall in a bent state, or the material itself is folded to form an obstacle. Once the filler is stuck, the operator may tend to use hard tools, such as iron bars or plastic sticks, to clear the gap. However, this approach is very risky because hard tools may scratch or expand the gaps inside the wall during insertion and stirring, and also damage the soft filling materials, affecting their thermal insulation and sound insulation properties. Therefore, a device is needed to assist in filling the gap materials. Utility Model Content

[0006] The utility model aims to provide a building gap filling component to solve the above-mentioned deficiencies in the prior art.

[0007] In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme: a building gap filling component, comprising two connecting frames, a wall and a gap opened on the wall, the bottom ends of the two connecting frames are provided with a fixing component, the interiors of the two connecting frames are respectively provided with an adjustment component and two sliders, pressure rollers are rotatably installed between two pairs of sliders respectively arranged in the two connecting frames, the two pressure rollers are respectively arranged on both sides above the gap, one end of the two pressure rollers passes through the side walls of the two sliders and is fixedly installed with a second hand wheel.

[0008] As a further description of the above technical solution: the adjustment assembly includes a screw and a sliding rod, the screw is rotatably installed inside one of the connecting frames, and the sliding rod is fixedly installed on the inner wall of the other connecting frame, two of the sliding blocks are threadedly connected to the screw, and the other two sliding blocks are slidably connected to the sliding rod, the screw passes through the side wall of the connecting frame and is fixedly installed with a first hand wheel.

[0009] As a further description of the above technical solution: the fixing assembly includes a mounting frame, which is detachably mounted on the bottom end of the connecting frame, and the side walls on both sides of the mounting frame are threadedly mounted with bolts, one end of the two bolts are rotatably mounted with a fixing plate, and the two fixing plates are arranged on both sides of the wall.

[0010] As a further description of the above technical solution: the fixing assembly also includes two connecting plates, the two connecting plates are respectively fixedly mounted on the side walls of the two connecting frames, and suction cups are arranged at the bottom ends of the two connecting plates.

[0011] As a further description of the above technical solution: the side walls of the two fixing plates are provided with an anti-slip layer.

[0012] As a further description of the above technical solution: the top ends of the two connection frames are fixedly connected with a limiting plate.

[0013] The utility model provides a building gap filling component. It has the following beneficial effects: when it is necessary to fill the gap in the building wall, first fix the connection frame on the wall through two fixing components, place the filler customized according to the width of the gap between the two limit plates, then use the adjustment component to adjust the distance between the two pairs of sliders, further adjust the distance between the two rollers, so that the two rollers can clamp the filler in the middle, then rotate the second hand wheels at both ends of the two rollers at the same time, so that the two rollers rotate relatively at the same time, slowly and stably put the filler into the middle of the gap, disassemble the fixing component after successfully putting it in, realize the stable installation of the filler, avoid the jamming, and protect the wall gap and the filler.

[0014] It is to be understood that both the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the disclosure.

[0015] This application document provides an overview of various implementations or examples of the technology described in the present disclosure, and is not a comprehensive disclosure of the entire scope or all features of the disclosed technology. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 This is a schematic diagram of the overall three-dimensional structure of a building gap filling component proposed by the utility model;

[0017] Figure 2 A schematic diagram of a three-dimensional structure from another viewing angle of the present invention;

[0018] Figure 3 This is a schematic diagram of the three-dimensional structure of the utility model installed on a wider wall;

[0019] Figure 4 It is a schematic cross-sectional structure diagram of a side wall of a fixed plate of the utility model provided with an anti-slip layer.

[0020] Legend:

[0021] 1. Wall; 2. Gap; 3. Mounting frame; 4. Bolt; 5. Fixing plate; 6. Connecting frame; 7. Screw; 8. Sliding rod; 9. First hand wheel; 10. Sliding block; 11. Pressing roller; 12. Connecting plate; 13. Suction cup; 14. Limiting plate; 15. Second hand wheel; 16. Anti-slip layer. DETAILED DESCRIPTION

[0022] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.

[0023] Reference Figure 1-4A building gap filling component comprises two connecting frames 6, a wall 1 and a gap 2 opened on the wall 1, the bottom ends of the two connecting frames 6 are provided with a fixing component, the insides of the two connecting frames 6 are respectively provided with an adjusting component and two sliders 10, and a pressing roller 11 is rotatably installed between two pairs of sliders 10 respectively arranged inside the two connecting frames 6, and the two pressing rollers 11 are respectively arranged on both sides above the gap 2, and one end of the two pressing rollers 11 passes through the side walls of the two sliders 10 and is fixedly installed with a second hand wheel 15; when it is necessary to fill the gap 2 of the building wall 1, firstly, the two fixing components are used to adjust the gap 2, and the gap 2 is filled. Fix the connecting frame 6 on the wall 1, place the filler customized according to the width of the gap 2 between the two limit plates 14, then use the adjustment component to adjust the distance between the two pairs of sliders 10, and further adjust the distance between the two pressure rollers 11 so that the two pressure rollers 11 can clamp the filler in the middle, and then rotate the second hand wheels 15 at both ends of the two pressure rollers 11 at the same time, so that the two pressure rollers 11 rotate relative to each other at the same time, and slowly and steadily put the filler into the middle of the gap 2. After successful placement, remove the fixing component to achieve stable installation of the filler, avoid jamming, and protect the wall 1 gap 2 and the filler.

[0024] As a preferred technical solution of this embodiment, the adjustment component includes a screw rod 7 and a sliding rod 8, wherein the screw rod 7 is rotatably installed inside one of the connecting frames 6, and the sliding rod 8 is fixedly installed on the inner wall of the other connecting frame 6, wherein two of the sliding blocks 10 are threadedly connected to the screw rod 7, and the other two sliding blocks 10 are slidably connected to the sliding rod 8, and the screw rod 7 passes through the side wall of the connecting frame 6 and is fixedly installed with a first hand wheel 9; due to the different widths of the gap 2 and the filler, it is necessary to adjust the spacing between the two pressure rollers 11 at this time, and by rotating the first hand wheel 9, under the limiting and guiding action of the sliding rod 8 and the slider 10, the spacing between the two rotating shafts can be adjusted.

[0025] As a preferred technical solution of this embodiment, the fixing assembly includes a mounting frame 3, which is detachably mounted on the bottom end of the connecting frame 6, and the side walls on both sides of the mounting frame 3 are threadedly mounted with bolts 4, and one end of the two bolts 4 is rotatably mounted with fixing plates 5, and the two fixing plates 5 are arranged on both sides of the wall 1; for a narrower wall 1, the mounting frame 3 can be clamped between the two sides of the wall 1, and then the fixing plates 5 can be clamped on both sides of the wall 1 by rotating the bolts 4 to achieve the fixation and installation of the connecting frame 6.

[0026] As a preferred technical solution of this embodiment, the fixing assembly also includes two connecting plates 12, and the two connecting plates 12 are respectively fixedly installed on the side walls of the two connecting frames 6, and suction cups 13 are provided at the bottom ends of the two connecting plates 12; considering that a wider wall 1 may be encountered, the width of the mounting frame 3 cannot be installed on both sides of the wide wall 1. At this time, the mounting frame 3 is removed, and the two connecting frames 6 can be fixed by the suction cups 13 at the bottom ends of the connecting plates 12.

[0027] As a preferred technical solution of this embodiment, the side walls of the two fixing plates 5 are provided with an anti-slip layer 16 ; the provision of the anti-slip layer 16 can increase the friction between the fixing plate 5 and the wall 1 , and increase the stability of the fixing plate 5 .

[0028] As a preferred technical solution of this embodiment, the top ends of the two connection frames 6 are fixedly connected to the limiting plates 14; the two limiting plates 14 can perform a preliminary limiting on the filler.

[0029] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A building gap filling assembly, comprising two connecting frames (6), a wall (1) and a gap (2) opened on the wall (1), characterized in that: The bottom ends of the two connecting frames (6) are each provided with a fixing component, the interiors of the two connecting frames (6) are each provided with an adjusting component and two sliders (10), and a pressing roller (11) is rotatably installed between two pairs of sliders (10) respectively arranged inside the two connecting frames (6), and the two pressing rollers (11) are respectively arranged on both sides above the gap (2), and one end of the two pressing rollers (11) passes through the side walls of the two sliders (10) and is fixedly installed with a second hand wheel (15).

2. A building gap filling assembly according to claim 1, characterized in that: The adjustment assembly comprises a screw rod (7) and a slide rod (8), wherein the screw rod (7) is rotatably mounted inside one of the connection frames (6), and the slide rod (8) is fixedly mounted on the inner wall of the other connection frame (6), wherein two of the slide blocks (10) are threadedly connected to the screw rod (7), and the other two of the slide blocks (10) are slidably connected to the slide rod (8), and the screw rod (7) passes through the side wall of the connection frame (6) and is fixedly mounted with a first hand wheel (9).

3. A building gap filling assembly according to claim 1, characterized in that: The fixing assembly comprises a mounting frame (3), the mounting frame (3) being detachably mounted on the bottom end of the connection frame (6), bolts (4) being threadedly mounted on the side walls on both sides of the mounting frame (3), a fixing plate (5) being rotatably mounted on one end of each of the two bolts (4), and the two fixing plates (5) being arranged on both sides of the wall (1).

4. A building gap filling assembly according to claim 1, characterized in that: The fixing assembly further comprises two connecting plates (12), the two connecting plates (12) being fixedly mounted on the side walls of the two connecting frames (6) respectively, and suction cups (13) are arranged at the bottom ends of the two connecting plates (12).

5. A building gap filling assembly according to claim 3, characterized in that: The side walls of the two fixing plates (5) are provided with anti-slip layers (16).

6. A building gap filling assembly according to claim 1, characterized in that: The top ends of the two connection frames (6) are fixedly connected to a limiting plate (14).