Steel structure machining equipment
By using the combined structure of the first suspender, the second suspender and the third suspender in the steel structure processing equipment, improve the friction of the steel structure binding, solve the problem of sliding the steel structure caused by the insufficient friction of the traditional hanging band, which improves The safety of hanging.
Patent Information
- Application Number
- CN202421395957.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-19
- Publication Date
- 2025-01-24
- Estimated Expiration
- 2034-06-19
AI Technical Summary
When using traditional lifting belts for steel structure lifting, insufficient friction causes the steel structure to slide easily, affecting the safety of lifting.
A steel structure processing equipment is designed, which adopts a combined structure of the first sling, the second sling and the third sling. By staggering the second sling and the third sling through the reserved holes on the first sling, and sewing Threads are sewn on the upper and lower sides of the first sling to improve the friction when binding the steel structure.
By improving friction, the steel structure is avoided by sliding the steel structure during the lifting process, which improves the safety of hanging.
Smart Images

Figure CN222389381U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of steel structure processing and hoisting auxiliary devices, in particular to steel structure processing equipment. Background Art
[0002] Conventional lifting belts (synthetic fiber lifting belts) are generally made of high-strength polyester filaments, which have multiple advantages such as high strength, wear resistance, oxidation resistance, and UV resistance. At the same time, they are soft, non-conductive, and non-corrosive (no harm to the human body), and are widely used in various fields. There are many types of lifting belts. Conventional lifting belts (according to the appearance of the lifting belt) are divided into four categories: annular core-through, annular flat, double-eye core-through, and double-eye flat.
[0003] Chinese utility model patent: Publication number CN209957207U discloses a decoupling device for hoisting a steel structure column, including a lifting rope, a clamp, a fixing frame, a fixed pulley, a latch, a pin, a first pull rope and a second pull rope; the upper end of the lifting rope is connected to the crane; the clamp is connected to the lower end of the lifting rope and is clamped on the steel structure column; a through hole is correspondingly provided at the lower end of the clamp and at the positions on both sides of the clamp; a through hole is provided on the steel structure column at the position corresponding to the through hole; the pin is inserted into the through hole and the through hole to detachably connect the clamp to the steel structure column; the fixing frame is fixedly connected to the upper part of the clamp; the fixed pulley is connected to the lower part of the fixing frame and corresponds to the latch in height; the upper end of the first pull rope passes over the fixed pulley and is connected to the end of the latch on the corresponding side; the pin is detachably connected to the other end of the latch to prevent the latch from falling off; the upper end of the second pull rope is connected to the latch.
[0004] In the existing technology, CN209957207U solves the technical problems of low efficiency, large number of construction workers and high risk of traditional lifting methods. However, when it is used, the more traditional lifting belt is still used, which leads to the steel structure sliding when the steel structure is tied by the lifting belt due to the insufficient friction of the lifting belt itself. Therefore, a steel structure processing equipment is needed to solve the above problems. Utility Model Content
[0005] The utility model aims to provide steel structure processing equipment, which has the advantage of preventing the steel structure from sliding when the steel structure is hoisted, and solves the problem that the steel structure is prone to sliding when the steel structure is hoisted by a traditional hoisting belt.
[0006] To achieve the above object, the utility model provides the following technical solution: Steel structure processing equipment, including a first sling, the upper surface of the first sling is provided with second reserved holes at equal intervals, the second reserved holes are passed through by the second sling and the third sling, and also includes a mounting hole;
[0007] The mounting holes are arranged on both sides of the upper surface of the first sling; wherein, the first sling at the mounting holes is provided with a wear-resistant sleeve.
[0008] When using the steel structure processing equipment in the technical solution, the second sling and the third sling are alternately passed through the reserved holes on the first sling, and the second sling and the third sling are sewn by sewing lines, so that the second sling and the third sling are sewn to the upper and lower surfaces of the first sling. At this time, the steel structure is tied with the first sling, so that the friction force of the steel structure when tied is increased by the second sling and the third sling, and then when the steel structure is lifted by the hook passing through the wear-resistant sleeve, the steel structure can be prevented from sliding, thereby improving the safety of lifting.
[0009] Preferably, the first sling is designed with high-strength polyester filament material, and the thickness of the first sling is four times the thickness of the second sling and the third sling.
[0010] Preferably, the cross section of the second reserved hole is designed as a long strip structure, and the width of the second reserved hole matches the thickness of the second sling and the thickness of the third sling.
[0011] Preferably, the number of the second slings is three, and the three second slings are sewn and installed with the first slings respectively through sewing lines, and the second slings are designed with high-strength polyester filament material.
[0012] Preferably, there are two third slings, which are respectively sewn and installed with the first sling through sewing lines. The third sling is designed with high-strength polyester filament material, and the third sling and the second sling are staggered and distributed on the upper and lower surfaces of the first sling.
[0013] Preferably, the mounting hole adopts an elliptical structure design, and the outer side of the mounting hole is trimmed by sewing lines.
[0014] Preferably, the wear-resistant sleeve is made of high manganese steel and is clamped in the mounting hole.
[0015] Compared with the prior art, the beneficial effects of the utility model are as follows:
[0016] The utility model provides a second sling and a third sling, and passes the second sling and the third sling through the installation holes on the first sling. At the same time, the second sling and the third sling are alternately distributed on the upper and lower surfaces of the first sling. Therefore, when the steel structure is tied with the first sling, the friction force of the contact surface with the steel structure can be increased by the second sling and the third sling, thereby preventing the steel structure from sliding when hoisting, thereby achieving the effect of preventing the steel structure from sliding when hoisting. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a front view cross-sectional structural schematic diagram of the utility model;
[0018] Figure 2 It is a schematic diagram of the top view structure of the utility model;
[0019] Figure 3 This is a schematic diagram of the top view of the first sling structure of the utility model.
[0020] In the figure: 1. first sling; 2. second sling; 3. third sling; 4. wear-resistant sleeve; 5. sewing line; 6. mounting hole; 7. reserved hole. DETAILED DESCRIPTION
[0021] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0022] Example
[0023] like Figure 1 , Figure 2 and Figure 3 As shown, an embodiment of the utility model provided is: a steel structure processing device, comprising a first sling 1, the upper surface of the first sling 1 is provided with second reserved holes 7 at equal intervals, the second sling 2 and the third sling 3 pass through the second reserved holes 7, and also comprising a mounting hole 6;
[0024] Specifically, the mounting holes 6 are provided on both sides of the upper surface of the first sling 1; wherein, the first sling 1 at the mounting holes 6 is provided with a wear-resistant sleeve 4. By providing the second sling 2 and the third sling 3, and passing the second sling 2 and the third sling 3 through the mounting holes 6 on the first sling 1, and at the same time, the second sling 2 and the third sling 3 are staggeredly distributed on the upper and lower surfaces of the first sling 1, and then when the steel structure is bound by the first sling 1, the friction force of the contact surface with the steel structure can be increased by the second sling 2 and the third sling 3, thereby preventing the steel structure from sliding during hoisting, thereby achieving the effect of preventing the steel structure from sliding during hoisting.
[0025] Furthermore, the first sling 1 is designed with high-strength polyester filament material, and the thickness of the first sling 1 is four times the thickness of the second sling 2 and the third sling 3 .
[0026] Furthermore, the cross section of the second reserved hole 7 is designed in a long strip structure, and the width of the second reserved hole 7 matches the thickness of the second sling 2 and the thickness of the third sling 3 .
[0027] Furthermore, there are three second slings 2, which are sewn and installed with the first sling 1 through sewing lines 5, and the second slings 2 are designed with high-strength polyester filaments. There are two third slings 3, which are sewn and installed with the first sling 1 through sewing lines 5, and the third slings 3 are designed with high-strength polyester filaments. The third slings 3 and the second slings 2 are staggered and distributed on the upper and lower surfaces of the first sling 1.
[0028] Furthermore, the mounting hole 6 is designed with an elliptical structure, and the outer side of the mounting hole 6 is edged by a sewing line 5. The wear-resistant sleeve 4 is designed with a high manganese steel material, and the wear-resistant sleeve 4 is clamped in the mounting hole 6.
[0029] When the utility model is used, the second sling 2 and the third sling 3 are alternately passed through the reserved holes 7 on the first sling 1, and the second sling 2 and the third sling 3 are sewn through the sewing line 5, so that the second sling 2 and the third sling 3 are sewn to the upper and lower surfaces of the first sling 1. At this time, the steel structure is bound by the first sling 1, so that the friction force of the steel structure when binding is improved by the second sling 2 and the third sling 3, and then when the steel structure is lifted by the hook passing through the wear-resistant sleeve 4, the steel structure can be prevented from sliding, thereby improving the safety of lifting.
[0030] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.
Claims
1. Steel structure processing equipment, comprising a first sling (1), wherein the upper surface of the first sling (1) is provided with second reserved holes (7) at equal intervals, and a second sling (2) and a third sling (3) pass through the second reserved holes (7), characterized in that: Also includes: Mounting holes (6) are provided on both sides of the upper surface of the first sling (1); Wherein, a wear-resistant sleeve (4) is provided on the first sling (1) at the mounting hole (6).
2. The steel structure processing equipment according to claim 1, characterized in that: The first sling (1) is designed with a high-strength polyester filament material, and the thickness of the first sling (1) is four times the thickness of the second sling (2) and the third sling (3).
3. The steel structure processing equipment according to claim 1, characterized in that: The cross section of the second reserved hole (7) is designed in a long strip structure, and the width of the second reserved hole (7) matches the thickness of the second sling (2) and the thickness of the third sling (3).
4. The steel structure processing equipment according to claim 1, characterized in that: The number of the second slings (2) is three, and the three second slings (2) are respectively sewn and installed with the first sling (1) via sewing lines (5), and the second slings (2) are designed with high-strength polyester filament material.
5. The steel structure processing equipment according to claim 1, characterized in that: The number of the third slings (3) is two, and the two third slings (3) are respectively sewn and installed with the first sling (1) through sewing lines (5). The third slings (3) are designed with high-strength polyester filament material, and the third slings (3) and the second slings (2) are staggered and distributed on the upper and lower surfaces of the first sling (1).
6. The steel structure processing equipment according to claim 1, characterized in that: The mounting hole (6) is designed with an elliptical structure, and the outer side of the mounting hole (6) is trimmed by a sewing line (5).
7. The steel structure processing equipment according to claim 1, characterized in that: The wear-resistant sleeve (4) is made of high manganese steel and is clamped in the mounting hole (6).
Citation Information
Patent Citations
Unhooking device for hoisting steel structure stand column
CN209957207U