Pump station simulation training platform
Through the design of the pumping station simulation training platform, using the water collection, water adjustment and PLC controller to simulate sewage circulation and failure start and stop, solve the problem of lack of pumping station operation and maintenance training platform in existing technology, and achieve more efficient training. And fault treatment.
Patent Information
- Application Number
- CN202420562824.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-21
- Publication Date
- 2025-01-24
- Estimated Expiration
- 2034-03-21
AI Technical Summary
The existing technology lacks an effective pump station operation and maintenance training platform, resulting in a shortage of professional and technical personnel and a long pump station fault handling cycle.
A pumping station simulation training platform is designed, including water tanks, water -adjusting water tanks, submersible pumps, electric gate valves and PLC controllers. It provides practical training environment by simulating sewage circulation and failure to start and stop.
The more realistic simulation of the trainer has been realized, the fault treatment cycle has been shortened, and the quality of the training efficiency and the quality of professional and technical personnel is improved.
Smart Images

Figure CN222394454U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of sewage pump station simulation devices, in particular to a pump station simulation training platform. Background Art
[0002] Sewage pumping stations are an important part of the sewage system. During the daily operation of the pumping station, a large amount of garbage enters the pumping station along with sewage through the sewage pipe network, resulting in serious garbage blockage in the pumping station, which seriously damages the grilles and water pumps in the pumping station and other common operating failures. The rainwater and sewage pumping station plays an important role in urban flood control and drainage, and sewage transportation. However, there is a lack of professional and technical personnel in the society for the operation and maintenance of pumping stations. After further investigation, we can find that it is mainly caused by the following three reasons:
[0003] 1. Rainwater and sewage pumping stations are municipal facilities and are generally managed by relevant municipal units. There are not many such units and they belong to a niche industry, so there is a shortage of corresponding technical personnel in society.
[0004] 2. The construction cost of rainwater and sewage pumping stations is relatively high, and there is no professional practical training platform on the market, so there are few opportunities for such professional and technical personnel to learn and practice.
[0005] 3. The operation and maintenance of the rainwater and sewage pumping station involves professional equipment such as water pumps, high and low voltage power distribution systems, screen machines, valves, etc., which are highly comprehensive and professional.
[0006] In the training process of pump station maintenance personnel, new employees often have to wait until a pump station failure occurs before they can have the opportunity for practical training. Moreover, since the probability of failures varies, it takes a very long time for new employees to fully understand the types of pump station failures outside of books and actually perform maintenance.
[0007] Therefore, if a training device that simulates common faults in pump station operation can be designed, the pump station operation can be carried out, which basically covers all pump station operation operations and conventional pump station facility maintenance operations. By designing fault simulation, new employees can understand relevant knowledge firsthand during the training process, realize hands-on operation, and conduct targeted simulation assessments. Utility Model Content
[0008] In order to overcome the above-mentioned deficiencies of the prior art, the utility model provides a pump station simulation training platform.
[0009] The technical solution of the utility model is as follows: a pump station simulation training platform, including a water collecting tank, a regulating water tank, a water outlet pipe, a water inlet pipe, a submersible pump, an electric gate valve and a PLC controller. The water collecting tank is provided with a partition and a grille for dividing the water collecting tank into an inlet side and an outlet side. The submersible pump is arranged on the outlet side and connected with one end of the outlet pipe, and the other end of the outlet pipe is connected with the regulating water tank. Both ends of the inlet pipe are respectively connected with the inlet side and the regulating water tank. The inlet pipe is provided with an electric gate valve, and the PLC controller controls the start and stop of the submersible pump and the electric gate valve.
[0010] By adopting the above technical solution, the submersible pump and electric gate valve are controlled by the PLC controller to start and stop, so that the water in the water collecting tank and regulating water tank simulates sewage circulation. The submersible pump pumps the water on the outlet side into the outlet pipe to the regulating water tank. The electric gate valve is started and stopped to make the water in the regulating water tank flow back to the inlet side of the water collecting tank, and the water on the inlet side enters the outlet side through the grille, completing the sewage circulation and continuously entering the pump station.
[0011] The water volume in the regulating water tank is adjusted to simulate the change in the water flow rate at the collecting tank.
[0012] The trainers conduct practical training and eliminate faults based on the fault command signals that appear during the operation of the simulated pump station.
[0013] The utility model is further configured as follows: the platform further comprises a sewage pipe, and a dry sewage pump and a manual gate valve arranged on the sewage pipe; one end of the sewage pipe is connected to the water collecting tank, and the other end is connected to the water outlet pipe.
[0014] By adopting the above technical solution, the cleaning process of the pump station is simulated through the sewage pipe. The submersible pump is turned off, and the dry sewage pump and the manual gate valve are opened to discharge the simulated sewage on the outlet side. The discharged water continues to circulate back to the regulating water tank through the outlet pipe.
[0015] The utility model is further configured as follows: the outlet pipe is provided with a one-way valve and a manual gate valve for opening and closing the outlet pipe between the sewage pipe and the submersible pump; the sewage pipe is provided with a one-way valve and a manual gate valve for opening and closing the sewage pipe.
[0016] By adopting the above technical solution, the opening and closing of different pipelines are controlled between the pump station circulation and the pump station drainage maintenance.
[0017] The utility model is further configured as follows: an electromagnetic flowmeter is arranged between the water outlet pipe and the regulating water tank, and the water collecting tank and the regulating water tank are both provided with an emptying port and a manual ball valve for opening and closing the emptying port at the upper and bottom parts.
[0018] The above technical solution is adopted to simulate the statistics of water inlet and outlet flow of the pump station, and the drain port is convenient for the overall emptying, cleaning and maintenance of the water collection tank and regulating tank.
[0019] A further configuration of the utility model is that an overflow pipe is provided between the water collecting tank and the regulating water tank.
[0020] The above technical solution is adopted to prevent the water in the regulating water tank from overflowing during the simulation operation.
[0021] A further configuration of the utility model is as follows: the platform further comprises a gantry crane arranged above the water collecting tank, and a climbing ladder is arranged on the outside of the water collecting tank.
[0022] By adopting the above technical solution, a small gantry crane is set up to enable the trainees to carry out practical training on the lifting and maintenance of submersible pumps and other equipment, and a climbing ladder is set up to facilitate the trainees to enter and exit the water collecting tank for maintenance training.
[0023] Further configuration of the utility model: a liquid level meter is arranged on the water outlet side, the grille comprises a grille frame, a plurality of gate members, and an electrically controlled driving element, the grille frame is provided with a plurality of water gates connecting the water inlet side and the water outlet side, the gate members are arranged at the water gates and are mechanically connected to the electrically controlled driving element, the PLC controller is connected to the electrically controlled driving element by signal, and drives each gate member to open and close each water gate to control the flow rate.
[0024] By adopting the above technical scheme, through the use of electronically controlled driving elements such as servo motors driving gate parts to flip and open and close the sluice gates, and cylinders driving gate parts to lift and lower and open and close the sluice gates, the situation in which the pump station grille is blocked by debris carried by sewage and the flow rate on the outlet side is reduced is simulated, so that the trainees can conduct practical training under conditions closer to the actual working conditions.
[0025] Compared with the prior art, the beneficial effects of the utility model are: the pump station simulation training platform designed in this application realizes the pump station operation simulation through the setting of equipment such as water collecting tanks and regulating tanks. Under the intuitive water flow, water volume changes, and equipment failure start and stop simulation, the trainees can undergo more realistic practical simulation, thereby achieving designable, simulated training and assessment of fault condition plans. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 The structure of the embodiment of the utility model Figure 1 ;
[0027] Figure 2 The structure of the embodiment of the utility model Figure 2 ;
[0028] Figure 3 The structure of the embodiment of the utility model Figure 3 ;
[0029] Figure 4 The structure of the embodiment of the utility model Figure 4 ;
[0030] Among them, 1-water collecting tank, 11-water inlet side, 12-water outlet side, 13-partition, 14-grid, 141-grid machine, 142-gate member, 143-electrically controlled drive element, 2-adjusting water tank, 21-drain port, 22-manual ball valve, 23-overflow pipe, 3-outlet pipe, 31-submersible pump, 32-check valve, 33-electromagnetic flowmeter, 4-inlet pipe, 41-electric gate valve, 5-sewage pipe, 51-dry sewage pump, 52-manual gate valve, 6-gantry crane.
[0031] In order to better illustrate this embodiment, some parts of the drawings may be omitted, enlarged or reduced, and do not represent the size of the actual product. In addition, the drawings are only used for illustrative purposes and cannot be understood as limitations on this patent. DETAILED DESCRIPTION
[0032] In order to make the technical solution and advantages of the present application clearer, the technical solution of the present application will be further described in detail in detail and in detail in conjunction with the accompanying drawings. It can be understood that the specific embodiments described here are only partial embodiments of the present application, which are only used to explain the present application, not to limit the present application. It should be noted that, for the convenience of description, only the parts related to the present application are shown in the accompanying drawings, and other related parts can refer to the general design. In the absence of conflict, the embodiments in the present application and the technical features in the embodiments can be combined with each other to obtain new embodiments.
[0033] The utility model is described in detail below in conjunction with the accompanying drawings. Figure 1-4 As shown,
[0034] A pump station simulation training platform includes a water collecting tank 1, a regulating water tank 2, a water outlet pipe 3, a water inlet pipe 4, a submersible pump 31, an electric gate valve 41 and a PLC controller. The water collecting tank 1 is provided with a partition 13 and a grille 14 for dividing the water collecting tank 1 into an inlet side 11 and an outlet side 12. The submersible pump 31 is arranged on the outlet side 12 and is connected with one end of the water outlet pipe 3. The other end of the water outlet pipe 3 is connected with the regulating water tank 2. Both ends of the water inlet pipe 4 are respectively connected with the inlet side 11 and the regulating water tank. The water inlet pipe 4 is provided with an electric gate valve 41. The PLC controller controls the start and stop of the submersible pump 31 and the electric gate valve 41.
[0035] The submersible pump 31 and the electric gate valve 41 are started and stopped by the PLC controller, so that the water in the water collecting tank 1 and the regulating water tank 2 simulates sewage circulation. The submersible pump 31 pumps the water on the outlet side 12 into the outlet pipe 3 to the regulating water tank 2. The electric gate valve 41 is started and stopped, so that the water in the regulating water tank 2 flows back to the inlet side 11 of the water collecting tank 1, and the water on the inlet side 11 enters the outlet side 12 through the grille, completing the scene of sewage circulation continuously entering the pump station.
[0036] The water volume of regulating water tank 2 is adjusted to simulate the change of water inlet flow at water collecting tank 1.
[0037] The trainers conduct practical training and eliminate faults based on the fault command signals that appear during the operation of the simulated pump station.
[0038] The platform further comprises a sewage pipe 5 , and a dry sewage pump 51 and a manual gate valve 52 arranged on the sewage pipe 5 . One end of the sewage pipe 5 is connected to the water collecting tank 1 , and the other end is connected to the water outlet pipe 3 .
[0039] Through the sewage pipe 5 set up, the cleaning process of the pump station is simulated, the submersible pump 31 is turned off, the dry sewage pump 51 and the manual gate valve 52 are opened, and the simulated sewage on the outlet side 12 is discharged. The discharged water continues to return to the regulating water tank 2 through the outlet pipe 3 for circulation.
[0040] Further configuration of the utility model: the outlet pipe 3 is provided with a one-way valve 32 and a manual gate valve 52 for opening and closing the outlet pipe 3 between the sewage pipe 5 and the submersible pump 31; the sewage pipe is provided with a one-way valve 32 and a manual gate valve 52 for opening and closing the sewage pipe.
[0041] The outlet pipe 3 is provided with an electromagnetic flowmeter 33 between the sewage pipe 5 and the regulating water tank 2. The upper and lower parts of the water collecting tank 1 and the regulating water tank 2 are both provided with an emptying port 21 and a manual ball valve 22 for opening and closing the emptying port.
[0042] The platform further comprises a gantry crane 6 arranged above the water collecting tank 1 , and a climbing ladder is arranged outside the water collecting tank 1 .
[0043] By providing a small gantry crane 6, the trainees can carry out practical training on the lifting and maintenance of equipment such as the submersible pump 31, and a climbing ladder is provided to facilitate the trainees to enter and exit the water collecting tank 1 for maintenance training.
[0044] The water outlet side 12 is provided with a liquid level meter, the grille includes a grille frame 141, a plurality of gate members 142, and an electric control drive element 143, the grille frame 141 is provided with a plurality of water gates connecting the water inlet side 11 and the water outlet side 12, the gate members 142 are arranged at the water gates and are mechanically connected to the electric control drive element 143, the PLC controller is connected to the electric control drive element 143 by signal, and drives each gate member 142 to open and close each water gate to control the flow rate.
[0045] By means of electronically controlled drive elements 143, such as servo motors driving gate members 142 to flip and open and close the water gates, or by means of air cylinders driving gate members 142 to lift and lower and open and close the water gates, the pump station grille is simulated to be clogged with debris carried by sewage, resulting in a reduction in flow on the outlet side 12, thereby enabling trainees to conduct practical training under conditions closer to the actual working conditions.
[0046] The pump station simulation training platform designed in this application realizes the operation simulation of the pump station through the setting of water collecting tank 1, regulating water tank and other equipment. Under the intuitive water flow, water volume change, equipment failure start and stop simulation, the trainees can conduct more realistic practical simulation, so as to achieve the design, simulation and assessment of fault condition schemes.
[0047] So far, the technical solution of the present application has been described in conjunction with the preferred embodiments shown in the accompanying drawings. Those skilled in the art should understand that the scope of protection of the present application is obviously not limited to these specific embodiments. Without departing from the principles of the present application, those skilled in the art can make equivalent changes or substitutions to the relevant technical features, and the technical solutions after these changes or substitutions will fall within the scope of protection of the present application.
Claims
1. A pump station simulation training platform, characterized by: It includes a water collecting tank, a regulating water tank, a water outlet pipe, a water inlet pipe, a submersible pump, an electric gate valve and a PLC controller. The water collecting tank is provided with a partition and a grille for dividing the water collecting tank into an inlet side and an outlet side. The submersible pump is arranged on the outlet side and connected with one end of the outlet pipe, and the other end of the outlet pipe is connected with the regulating water tank. Both ends of the water inlet pipe are respectively connected with the inlet side and the regulating water tank. The water inlet pipe is provided with an electric gate valve. The PLC controller controls the start and stop of the submersible pump and the electric gate valve.
2. A pump station simulation training platform according to claim 1, characterized in that: The platform also includes a sewage pipe, and a dry sewage pump and a manual gate valve arranged on the sewage pipe. One end of the sewage pipe is connected to the water collecting tank, and the other end is connected to the water outlet pipe.
3. A pump station simulation training platform according to claim 2, characterized in that: The outlet pipe is provided with a one-way valve and a manual gate valve for opening and closing the outlet pipe between the sewage pipe and the submersible pump; the sewage pipe is provided with a one-way valve and a manual gate valve for opening and closing the sewage pipe.
4. A pump station simulation training platform according to claim 1, characterized in that: An electromagnetic flowmeter is arranged between the water outlet pipe and the regulating water tank, and the upper and bottom parts of the water collecting tank and the regulating water tank are both provided with an emptying port and a manual ball valve for opening and closing the emptying port.
5. A pump station simulation training platform according to claim 1, characterized in that: An overflow pipe is arranged between the water collecting tank and the regulating water tank.
6. A pump station simulation training platform according to claim 4, characterized in that: The platform also includes a gantry crane arranged above the water collecting tank, and a climbing ladder is arranged on the outside of the water collecting tank.
7. A pump station simulation training platform according to any one of claims 1 to 5, characterized in that: A liquid level meter is provided on the water outlet side, the grille includes a grille frame, a plurality of gate members, and an electrically controlled driving element, the grille frame is provided with a plurality of water gates connecting the water inlet side and the water outlet side, the gate members are provided at the water gates and are mechanically connected to the electrically controlled driving element, the PLC controller is connected to the electrically controlled driving element by signal, and drives each gate member to open and close each water gate to control the flow rate.