Thermal insulation material pouring device of thermal insulation pipeline
By designing a pouring device including adjustable pouring components and moving tight devices, the existing high -voltage pouring machine has been solved in the problem of incomplete pouring and poor adaptability in the large diameter insulation pipe treatment. And stronger adaptability.
Patent Information
- Application Number
- CN202420995909.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-09
- Publication Date
- 2025-01-28
- Estimated Expiration
- 2034-05-09
AI Technical Summary
When existing high-pressure casting machines deal with large-diameter insulation pipes, it is difficult for the casting head to uniformly foam the inner and outer pipes, which can easily lead to cavity and loopholes inside the insulation pipes. At the same time, when the diameter changes, the overall adaptability is poor.
Design a pouring device including fixed board, foam storage structure, high -pressure pump and adjustable pouring component. This device can be adjusted according to the diameter and specifications of the thermal insulation pipe through the detachable assembly tube and the tight device of the movement to ensure that the pouring is uniform and stable.
The uniform pouring of the large diameter insulation pipe is realized, the occurrence of cavity and vulnerabilities are reduced, and the adaptability of the device can be improved, which can flexibly cope with the insulation pipes of different diameter.
Smart Images

Figure CN222406840U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of heat preservation material pouring, in particular to a heat preservation material pouring device for a heat preservation pipeline. Background Art
[0002] Polyurethane thermal insulation pipe is the most common thermal insulation pipe at present. Polyurethane foam thermal insulation pipe is usually made by directly pouring foaming slurry between the inner pipe and the outer pipe to form foam in one time. The pouring of foaming slurry is usually completed by a high-pressure pouring machine. The current common high-pressure pouring machine is composed of a bucket for holding pouring raw materials, a pump for conveying pouring raw materials, and a pouring head for mixing pouring raw materials and injecting pouring slurry between the inner pipe and the outer pipe. When using this high-pressure pouring machine, the pouring head is usually held manually and one end of the pouring head is inserted into the pouring hole opened in the outer pipe. However, some insulation pipes are relatively large in length and diameter, so the pouring head for pouring alone can only pour the foam evenly on one side of the inside of the insulation pipe. Moreover, because the foam will be viscous after pouring, the range of foam flow inside the insulation pipe will also be relatively small, which can easily lead to cavities and holes in the insulation pipe produced and processed.
[0003] The patent publication number is CN220482364U, and the patent name is "A high-pressure pouring machine for an insulated pipe". The technical solution disclosed in the patent solves the above-mentioned technical problems. However, when the diameter of the insulated pipe changes, it is not convenient to adjust the position of the pouring pipe as needed, and the specifications of the two hoops need to be replaced again, and the overall adaptability is poor. Utility Model Content
[0004] The utility model aims to provide a device for pouring heat-insulating materials for heat-insulating pipes, which is convenient for adjusting the position of the pouring pipe according to needs, convenient for fixing the heat-insulating pipe and has strong adaptability.
[0005] The technical solution adopted by the utility model is:
[0006] A heat preservation material pouring device for a heat preservation pipe comprises a fixed plate, a foam storage structure and a high-pressure pump are fixed on the top of the fixed plate, a foam pouring assembly is arranged on the side of the fixed plate, the foam pouring assembly comprises an installation box, a box door that can be opened and closed is installed on one side of the installation box, a pouring box is fixed on the top of the installation box, a mounting pipe is connected to the bottom of the pouring box, a mounting plate is connected to the bottom of the mounting pipe, the mounting plate is detachably fixed to the bottom of the mounting pipe, a plurality of spaced assembly pipe groups are connected to the bottom of the installation plate, and the assembly pipe group comprises four The assembly tube bodies are arranged evenly at intervals in the circumferential direction, and a pouring tube is detachably fixed on the assembly tube body of one of the assembly tube groups, a pouring head is fixed at the bottom of the pouring tube, and sealing covers are detachably fixed on the assembly tube bodies of the remaining assembly tube groups; a support plate is provided under the mounting plate, a vertical telescopic rod is fixed at the bottom of the support plate, and a tightening device that can move left and right is installed on the support plate; the feed end of the high-pressure pump is connected to the bottom of the foaming storage structure through a first conveying pipe, and the discharge end of the high-pressure pump is connected to the feed end of the pouring box through a second conveying pipe.
[0007] The tightening device includes a symmetrical vertical plate that can move left and right along the supporting plate, and a tightening assembly that can move left and right is installed on the vertical plate. A first screw is fixed to the bottom of the vertical plate, and a strip hole corresponding to the first screw is provided on the supporting plate. The bottom of the first screw is threadedly connected with a first locking nut, and the first locking nut is tightened to the bottom of the supporting plate.
[0008] The top of the support plate is provided with scales corresponding to the strip-shaped holes.
[0009] The tightening assembly comprises a tightening bolt which is threadedly connected to the side surface of the vertical plate, a side tightening block is fixed to the inner end of the tightening bolt, and a silicone pad is fixed to the inner side of the side tightening block.
[0010] A second screw is fixed to the top of the vertical plate, and an upper tightening block that can move up and down is provided on the second screw. A through hole is provided on the upper tightening block, and the inner diameter of the through hole is larger than the outer diameter of the second screw. The top end of the second screw extends out of the through hole and is threadedly connected with a second locking nut, and the second locking nut is tightened on the top of the upper tightening block, and a silicone pad is fixed to the bottom of the upper tightening block.
[0011] A sliding block is fixed on the side of the supporting plate, and a vertical sliding rail corresponding to the sliding block is fixed on the inner side of the installation box.
[0012] Limit blocks are fixed on the top and bottom of the slide rail, and buffer pads corresponding to the slide block are fixed on the limit blocks.
[0013] The bottom of the fixed plate is fixed with a supporting leg; the first conveying pipe is equipped with a conveying pump, which is detachably fixed to the bottom of the fixed plate.
[0014] The foaming storage structure in the utility model is used to store the heat-insulating material for pouring, and the high-pressure pump is used to pressurize the heat-insulating material and convey it to the pouring box of the foaming pouring component. The foaming pouring component includes an installation box, and a box door that can be opened and closed is installed on one side of the installation box, which is convenient for placing the heat-insulating pipe to be processed and also convenient for installing and repairing other parts. The installation plate is connected with the pouring box through the installation pipe, and the installation plate can be detachably fixed to the bottom of the installation pipe, which is convenient for installation and disassembly. The bottom of the installation plate is connected with several spaced assembly pipe groups, which is convenient for adjusting the position of the pouring pipe according to needs, and has strong adaptability. The assembly pipe group includes It includes four assembly tube bodies evenly spaced along the circumference of the mounting plate, one of the assembly tube bodies of which is detachably fixed with a pouring tube, the bottom of which is fixed with a pouring head for evenly pouring between the inner tube and the outer tube of the insulation tube, and the assembly tube bodies of the other assembly tube groups are detachably fixed with sealing covers for sealing. When in use, the sealing covers are removed and the pouring tubes are installed; the support plate is used for placing the insulation tube to be processed, the telescopic rod is used for driving the support plate to move up and down for even pouring, the tightening device can move left and right for easy fixation of the insulation tube and to adapt to insulation tubes of different diameters. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a schematic diagram of the structure of the utility model;
[0016] Figure 2 It is a cross-sectional view of the utility model;
[0017] Figure 3 It is a schematic diagram of the structure of the installation disk;
[0018] Figure 4 A schematic diagram of the structure of the support plate. DETAILED DESCRIPTION
[0019] like Figure 1-Figure 4As shown, a device for pouring heat-insulating materials for heat-insulating pipes comprises a fixed plate 6, a foam storage structure 7 and a high-pressure pump 8 are fixed on the top of the fixed plate 6, the foam storage structure 7 is used to store heat-insulating materials for pouring, the high-pressure pump 8 is used to pressurize and convey the heat-insulating materials, a foam pouring assembly is arranged on the side of the fixed plate 6, the foam pouring assembly comprises an installation box 2, a box door 1 which can be opened and closed is arranged on one side of the installation box 2, which is convenient for placing the heat-insulating pipe to be processed, and is also convenient for installing and repairing other parts, etc. 2 is fixed with a pouring box 10 at the top, a mounting pipe 11 is connected to the bottom of the pouring box 10, a mounting plate 12 is connected to the bottom of the mounting pipe 11, the mounting plate 12 is connected to the pouring box 10 through the mounting pipe 11, the mounting plate 12 is detachably fixed to the bottom of the mounting pipe 11, and is convenient for installation and removal. The bottom of the mounting plate 12 is connected with several spaced assembly pipe groups, which is convenient for adjusting the position of the pouring pipe 15 as needed, and has strong adaptability. The assembly pipe group includes four assembly pipe bodies 1 evenly spaced along the circumference of the mounting plate 12. 3, a pouring pipe 15 is detachably fixed on the assembly pipe body 13 of one assembly pipe group, and a pouring head 16 is fixed at the bottom of the pouring pipe 15, which is used to evenly pour between the inner pipe 30 and the outer sleeve 29 of the insulation pipe, and a sealing cover 14 is detachably fixed on the assembly pipe body 13 of the other assembly pipe groups, which plays a sealing role. When in use, the sealing cover 14 is removed and the pouring pipe 15 is installed; a support plate 25 is provided below the mounting plate 12, and the support plate 25 is used to place the insulation pipe to be processed, and the support plate 25 A vertical telescopic rod 24 is fixed at the bottom, and the telescopic rod 24 is used to drive the support plate 25 to move up and down, so as to facilitate uniform pouring. The telescopic rod 24 can use conventional telescopic devices such as electric push rods and hydraulic rods. A tightening device that can move left and right is installed on the support plate 25, which is convenient for fixing the insulation pipe and adapting to insulation pipes of different diameters; the feed end of the high-pressure pump 8 is connected to the bottom of the foaming storage structure 7 through the first conveying pipe 5, and the discharge end of the high-pressure pump 8 is connected to the feed end of the pouring box 10 through the second conveying pipe 9.
[0020] The tightening device includes a symmetrical vertical plate 26 that can move left and right along the support plate 25, and a tightening component that can move left and right is installed on the vertical plate 26. A first screw rod 23 is fixed to the bottom of the vertical plate 26, and a strip hole 21 corresponding to the first screw rod 23 is provided on the support plate 25. The bottom of the first screw rod 23 is threadedly connected with a first locking nut 22, and the first locking nut 22 is tightened on the bottom of the support plate 25. When it is necessary to adjust the position of the vertical plate 26 according to the diameter of the insulation pipe, loosen the first locking nut 22, move the vertical plate 26 left and right to a suitable position, and then tighten the first locking nut 22.
[0021] The top of the support plate 25 is provided with scales 34 corresponding to the strip-shaped holes 21 , so as to facilitate adjusting the two vertical plates 26 to the same position.
[0022] The tightening assembly includes a tightening bolt 27 threadedly connected to the side of the vertical plate 26, a side tightening block 28 is fixed to the inner end of the tightening bolt 27, and a silicone pad is fixed to the inner side of the side tightening block 28. When the insulation pipe to be processed is put in place, the position of the side tightening block 28 and the silicone pad is adjusted by rotating the tightening bolt 27 so that the silicone pad of the side tightening block 28 is tightened against the outside of the insulation pipe.
[0023] A second screw rod 33 is fixed to the top of the vertical plate 26, and an upper tightening block 31 which can move up and down is provided on the second screw rod 33. A through hole is provided on the upper tightening block 31, and the inner diameter of the through hole is larger than the outer diameter of the second screw rod 33. The top end of the second screw rod 33 extends to the outside of the through hole and is threadedly connected with a second locking nut 32. The second locking nut 32 is tightened on the top of the upper tightening block 31, and a silicone pad is fixed on the bottom of the upper tightening block 31 for tightening on the top of the outer sleeve 29 of the insulation pipe, thereby further stably setting the insulation pipe on the support plate 25.
[0024] A slider 20 is fixed to the side of the support plate 25, and a vertical slide rail 19 corresponding to the slider 20 is fixed to the inner side of the installation box 2. When the telescopic rod 24 drives the support plate 25 to move up and down, the slider 20 slides up and down along the slide rail 19, so that the support plate 25 can move up and down more stably.
[0025] Limiting blocks 17 are fixed to the top and bottom of the slide rail 19 to play a limiting role. Buffer pads 18 corresponding to the slider 20 are fixed to the limiting blocks 17 to protect the slider 20.
[0026] A supporting leg 3 is fixed to the bottom of the fixed plate 6 for supporting purpose. A feed pump 4 is installed on the first delivery pipe 5 for delivering the thermal insulation material in the foaming storage structure 7 to the high-pressure pump 8 for pressurization. The delivery pump can be detachably fixed to the bottom of the fixed plate 6 for easy installation and disassembly.
[0027] Before use, open the door 1, select a suitable assembly tube group according to the specifications of the insulation tube, remove the sealing cover 14 on the assembly tube body 13 of the corresponding assembly tube group, install the pouring tube 15, and the assembly tube bodies 13 of the remaining assembly tube groups are all installed with sealing covers 14 for sealing. According to the outer diameter of the insulation tube and the scale 34 on the support plate 25, adjust the vertical plate 26 to a symmetrical position, and there is a gap between the vertical plate 26 and the outer diameter of the insulation tube to be processed. The bottom between the inner tube 30 and the outer sleeve 29 of the insulation tube to be processed is closed, and it is placed in the middle of the support plate 25, and then the tightening bolt 27 is turned to adjust the position of the side tightening block 28 and the silicone pad so that the silicone pad of the side tightening block 28 is pressed against the outside of the insulation tube to complete the fixation of the insulation tube, and close the door 1; the telescopic rod 24 is extended to drive the support plate 25 and the insulation tube to be processed. The processed insulation pipe moves upward to the highest position, the pouring pipe 15 extends into the lower part between the inner pipe 30 and the outer sleeve 29, the delivery pump and the high-pressure pump 8 are powered on, and the insulation material in the foaming storage structure 7 is sequentially delivered to the pouring box 10 through the delivery of the delivery pump and the pressurization of the high-pressure pump 8, and then injected into the space between the inner pipe 30 and the outer sleeve 29 from the pouring head 16 of the pouring pipe 15, the telescopic rod 24 contracts, driving the support plate 25 and the insulation pipe to be processed to move downward gradually, so that the filling cavity between the inner pipe 30 and the outer sleeve 29 is filled more evenly from bottom to top in sequence, after the filling is completed, the telescopic rod 24, the delivery pump, and the high-pressure pump 8 stop working, the box door 1 is opened, the tightening bolt 27 is turned, and the position of the side tightening block 28 and the silicone pad is adjusted, so that there is a gap between the silicone pad of the side tightening block 28 and the outer side of the insulation pipe, and the insulation pipe is taken out.
[0028] The above embodiments are intended to illustrate the present invention, not to limit the present invention. Any solution that is a simple transformation of the present invention falls within the protection scope of the present invention.
Claims
1. A heat preservation material pouring device for a heat preservation pipe, comprising a fixed plate, a foam storage structure and a high-pressure pump are fixed on the top of the fixed plate, and a foam pouring assembly is provided on the side of the fixed plate, characterized in that: The foaming pouring component includes an installation box, a box door that can be opened and closed is installed on one side of the installation box, a pouring box is fixed on the top of the installation box, a mounting pipe is connected to the bottom of the pouring box, a mounting plate is connected to the bottom of the installation pipe, the installation plate is detachably fixed to the bottom of the installation pipe, and the bottom of the installation plate is connected to several spaced assembly pipe groups, the assembly pipe group includes four assembly pipe bodies evenly spaced along the circumference of the installation plate, one of the assembly pipe groups has a pouring pipe detachably fixed on its assembly pipe body, a pouring head is fixed on the bottom of the pouring pipe, and sealing covers are detachably fixed on the assembly pipe bodies of the remaining assembly pipe groups; a support plate is provided below the installation plate, a vertical telescopic rod is fixed to the bottom of the support plate, and a tightening device that can move left and right is installed on the support plate; a feed end of the high-pressure pump is connected to the bottom of the foaming storage structure through a first conveying pipe, and a discharge end of the high-pressure pump is connected to the feed end of the pouring box through a second conveying pipe.
2. The heat-insulating material pouring device for the heat-insulating pipe according to claim 1, characterized in that: The tightening device includes a symmetrical vertical plate that can move left and right along the supporting plate, and a tightening assembly that can move left and right is installed on the vertical plate. A first screw is fixed to the bottom of the vertical plate, and a strip hole corresponding to the first screw is provided on the supporting plate. The bottom of the first screw is threadedly connected with a first locking nut, and the first locking nut is tightened to the bottom of the supporting plate.
3. The heat-insulating material pouring device for the heat-insulating pipe according to claim 2, characterized in that: The top of the support plate is provided with scales corresponding to the strip-shaped holes.
4. The heat-insulating material pouring device for the heat-insulating pipe according to claim 2, characterized in that: The tightening assembly comprises a tightening bolt which is threadedly connected to the side surface of the vertical plate, a side tightening block is fixed to the inner end of the tightening bolt, and a silicone pad is fixed to the inner side of the side tightening block.
5. The device for pouring heat-insulating material for heat-insulating pipe according to claim 4, characterized in that: A second screw is fixed to the top of the vertical plate, and an upper tightening block that can move up and down is provided on the second screw. A through hole is provided on the upper tightening block, and the inner diameter of the through hole is larger than the outer diameter of the second screw. The top end of the second screw extends out of the through hole and is threadedly connected with a second locking nut, and the second locking nut is tightened on the top of the upper tightening block, and a silicone pad is fixed to the bottom of the upper tightening block.
6. The device for pouring heat-insulating material for heat-insulating pipe according to claim 1, characterized in that: A sliding block is fixed on the side of the supporting plate, and a vertical sliding rail corresponding to the sliding block is fixed on the inner side of the installation box.
7. The device for pouring heat-insulating material for heat-insulating pipe according to claim 1, characterized in that: Limit blocks are fixed on the top and bottom of the slide rail, and buffer pads corresponding to the slide block are fixed on the limit blocks.
8. The device for pouring heat-insulating material for heat-insulating pipe according to claim 1, characterized in that: The bottom of the fixed plate is fixed with a supporting leg; the first conveying pipe is equipped with a conveying pump, which is detachably fixed to the bottom of the fixed plate.
Citation Information
Patent Citations
High-pressure casting machine for thermal insulation pipe
CN220482364U