Mounting platform and sewage treatment workstation

By designing a installation platform that includes placing frames and standing frames, the problem that large sewage treatment equipment cannot be directly placed on the foundation is solved, and the suspended placement and operating convenience of the equipment is realized.

CN222414252UActive Publication Date: 2025-01-28SUZHOU JIECHANG ENVIRONMENTAL PROTECTION TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323635166.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-29
Publication Date
2025-01-28
Estimated Expiration
2033-12-29

AI Technical Summary

Technical Problem

Because large sewage treatment equipment is equipped with additional equipment at the bottom, it cannot be placed directly on the foundation. It is necessary to design a simple and compact installation platform to achieve the installation and placement of equipment while avoiding interference with additional equipment.

Method used

Design a installation platform that includes placing frames and standing racks. The placement rack is composed of top placing frames, bottom support racks and connecting parts. Setting channels under the top of the top putting frame to accommodate the additional equipment. It is convenient for staff to operate.

Benefits of technology

The suspension of the sewage treatment equipment is achieved, the interference of the additional equipment is avoided, and the convenient operation platform is provided to the installation, maintenance and control of large sewage treatment equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222414252U_ABST
    Figure CN222414252U_ABST
Patent Text Reader

Abstract

The utility model provides a mounting platform and a sewage treatment workstation, the mounting platform comprises a placing frame and a standing frame, the standing frame is arranged next to one side of the placing frame, and the standing frame is provided with a stair part and a walking platform connected with the top end of the stair part; the placing frame comprises a top placing frame, a bottom supporting frame and a plurality of connecting pieces connecting the top placing frame and the bottom supporting frame, a placing channel is formed in the portion, below the top placing frame, of the placing frame, and the placing channel penetrates through the other end of the placing frame from one end of the placing frame; the bottom supporting frame is divided into a left part and a right part which are located on the two sides of the containing channel respectively, and the connecting pieces are also arranged on the two sides of the containing channel respectively. Sewage treatment equipment of the sewage treatment workstation is placed on the top placement frame, and a base of the sewage treatment equipment is hidden in the top placement frame. The mounting platform can realize the mounting of the sewage treatment equipment with additional equipment at the bottom, and the whole structure is simple and compact.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of sewage treatment, in particular to a mounting platform and a sewage treatment workstation. Background Art

[0002] In the sewage treatment industry, most large-scale sewage treatment equipment can be placed directly on the foundation. At this time, it is only necessary to level and compact the foundation before the large-scale sewage treatment equipment can be placed.

[0003] As for Figure 1 The sewage treatment equipment 100 shown in the figure cannot be placed directly on the foundation because the additional equipment 200 matching the equipment is arranged at the bottom of the sewage treatment equipment 100. At this time, how to design a simple and compact installation platform suitable for the installation and placement of this type of sewage treatment equipment 100 while not interfering with the additional equipment 200 is a practical problem that needs to be solved when installing the sewage treatment equipment 100. Utility Model Content

[0004] In order to solve the above technical problems, the utility model proposes a mounting platform and a sewage treatment workstation with a new structure, so as to realize the installation and placement of equipment through a mounting platform with a simple and compact structure, and can effectively solve the problem of interference between the mounting platform and additional equipment.

[0005] To this end, as the first aspect of the utility model, the utility model proposes an installation platform, which includes a placement frame and a standing frame, the standing frame is arranged next to one side of the placement frame, the standing frame is provided with a stair portion and a walking platform connected to the top of the stair portion; the placement frame includes a top placement frame, a bottom support frame and a plurality of connecting members connecting the top placement frame and the bottom support frame, the placement frame leaves a placement channel under the top placement frame, the placement channel runs through one end of the placement frame to the other end of the placement frame, the bottom support frame is divided into left and right parts and separated on both sides of the placement channel, and the connecting members are also separated on both sides of the placement channel.

[0006] Preferably, the walking platform is arranged close to one side of the placement rack and extends from one end of the placement rack to the other end. The stair part is inclined at the side of one end of the placement rack and is connected to one end of the walking platform through the top end, so that it is convenient for the staff to walk onto the walking platform from the stair part beside one end of the placement rack. The overall span of the walking platform is large, and the staff standing on the installation platform can conveniently perform corresponding operations on the placed equipment.

[0007] Preferably, a platform fence is provided at the outer edge of the walking platform, and a stair fence is also provided at the outer edge of the stair part. The inclination of the stair fence is consistent with that of the stair part and is also connected to the platform fence at the top.

[0008] Preferably, the top placement rack is provided with a placement seat plate for placing the base of the device to be placed, and the top surface of the placement seat plate is lower than the top surface of the top placement rack at the periphery so as to be hidden in the space surrounded by the top placement rack. In this way, the base of the device to be placed can also be hidden in the space surrounded by the top placement rack, avoiding exposure, so that the device to be placed is integrated with the placement rack as a whole after placement, without being abrupt.

[0009] In some embodiments, when the placement rack is a single-body placement rack, the top placement rack is formed into a rectangular or square frame, and the placement seat plate is arranged at the inner angle of two adjacent outer frame edges on the frame, and the top surface of the placement seat plate is lower than the top surface of the two adjacent outer frame edges. Providing the placement seat plate at the inner angle of two adjacent outer frame edges is equivalent to providing it at the top corner of the placement rack, and the whole can provide stable and balanced support for the equipment to be placed.

[0010] Preferably, the two adjacent outer frame edges are further provided with inner frame edges connecting the two, and the placement seat plate overlaps the two adjacent outer frame edges and the inner frame edge, thereby making the overall connection firm and reliable, and the placement seat plate has a stronger bearing capacity.

[0011] Preferably, the bottom support frame is divided by the placement channel into a left open bottom frame and a right open bottom frame with oppositely disposed open ends, and inner frame edges are also disposed on two adjacent outer frame edges on the left and right open bottom frames, and connecting members are disposed at the ends of the upper and lower inner frame edges and at the corners of the placement frame to connect the top placement frame and the bottom support frame. The overall structure of the placement frame arranged in this structure is simple and compact, and the supporting strength is also sufficient, which can be suitable for the reliable placement of large equipment.

[0012] In some embodiments, when the placement rack is a multi-body placement rack, the top placement rack is formed into a rectangular or square frame, and the frame includes a plurality of regularly arranged single frames. Two adjacent single frames are connected by a top connecting piece, and the single frames located on the same outer side or the same outer end of the frame share an outer frame edge, thereby effectively simplifying the components and making the top placement rack structure more concise.

[0013] Preferably, the shape and size of the bottom support frame match the shape and size of the top placement rack, and the bottom support frame includes a left open bottom frame and a right open bottom frame which are divided by a placement channel and are arranged opposite to each other at open ends, and inner frame edges are also arranged on two adjacent outer frame edges on the left and right open bottom frames, and connecting parts are arranged at the ends of the inner frame edges arranged above and below and at the corners of the placement rack to connect the top placement rack and the bottom support frame.

[0014] Preferably, the middle positions of the upper and lower outer frame edges arranged along the length direction of the placement rack are also connected with connecting pieces. Because the upper and lower outer frame edges arranged along the length direction of the placement rack have a large overall span, in order to increase its strength, a connecting piece is arranged in the middle position thereof.

[0015] As the second aspect of the utility model, the utility model proposes a sewage treatment workstation, which includes the installation platform and sewage treatment equipment. The sewage treatment equipment is provided with a base. The sewage treatment equipment is placed on the top of the placement rack through the base. The base is hidden in the top of the placement rack. One side of the sewage treatment equipment is arranged close to the standing rack and an electric control operation box is also provided on this side.

[0016] Preferably, the base of the sewage treatment equipment is placed on a placement base plate and is hidden in a space surrounded by two adjacent outer frame edges and an inner frame edge on the top placement rack.

[0017] Compared with the prior art, the installation platform can be used to place the sewage treatment equipment in the air on the top shelf of the installation platform, and the auxiliary equipment under the sewage treatment equipment can be placed in the placement channel and directly placed on the foundation. It can be seen that the installation platform of the utility model can realize the perfect installation and placement of the sewage treatment equipment and auxiliary equipment.

[0018] In the utility model, a standing frame is specially provided. Through the provision of the standing frame, even if it is a large-scale sewage treatment equipment, since the placement height is increased after it is placed, in order to facilitate installation, maintenance or operation, the staff can also walk up from the stair part of the standing frame to reach the walking platform whose height matches the placement height of the sewage treatment equipment, and then perform corresponding operations.

[0019] In the utility model, the installation platform is assembled as a whole through the frame, connecting parts and other parts, and the overall structure is simple and compact. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a schematic diagram of the combined three-dimensional structure of a large-scale sewage treatment equipment and its additional equipment;

[0021] Figure 2 It is a three-dimensional structural schematic diagram of a sewage treatment workstation in the first embodiment of the utility model;

[0022] Figure 3 It is a schematic diagram of the three-dimensional structure of the placement rack of the sewage treatment workstation in the first embodiment of the utility model.

[0023] Figure 4 It is a schematic diagram of the three-dimensional structure of the sewage treatment workstation in the second embodiment of the utility model.

[0024] Figure 5 It is a schematic diagram of the three-dimensional structure of the placement rack of the sewage treatment workstation in the second embodiment of the utility model.

[0025] Reference numerals

[0026] Top placement frame 1, bottom support frame 2, connector 3, platform fence 4, staircase fence 5, placement seat plate 6, base 7, outer frame edge 8, inner frame edge 9, left opening bottom frame 10, right opening bottom frame 11, top connector 12;

[0027] Sewage treatment equipment 100, additional equipment 200, placement rack 300, placement channel 400, staircase 500, walking platform 600, standing rack 700, and electric control operation box 800. DETAILED DESCRIPTION

[0028] To solve Figure 1 The installation of the large sewage treatment equipment 100 (with additional equipment 200 at the bottom) shown in the figure, the main concept of the utility model is: to set up a placement rack 300 that can suspend the sewage treatment equipment 100. Because the sewage treatment equipment 100 can be suspended on the placement rack 300, a placement channel 400 is set in the placement rack 300, so that the placement channel 400 can accommodate the additional equipment 200, so that the additional equipment 200 can be directly placed on the foundation. At the same time, considering the problem that the sewage treatment equipment 100 is placed in the air due to the increase in placement height and is inconvenient for staff to operate, a standing frame 700 with a staircase portion 500 and a walking platform 600 is provided on one side of the placement rack 300.

[0029] The following will be combined with the accompanying drawings to clearly describe the technical solutions in the specific embodiments of the utility model. Obviously, the described embodiments are part of the embodiments of the present application, rather than all the embodiments. All other embodiments obtained by ordinary technicians in this field based on the following embodiments are within the scope of protection of the utility model.

[0030] Embodiment 1

[0031] refer to Figure 1-Figure 3 This embodiment discloses a mounting platform and a sewage treatment workstation provided with the mounting platform. In this embodiment, the mounting platform is mainly used for the installation of a large sewage treatment equipment 100. Specifically, the sewage treatment workstation includes a mounting platform and a sewage treatment equipment 100 suspended on the mounting platform.

[0032] In this embodiment, the installation platform includes a placing frame 300 and a standing frame 700. The standing frame 700 is arranged on one side of the placing frame 300. The standing frame 700 is provided with a staircase 500 and a walking platform 600 connected to the top of the staircase 500. One side of the sewage treatment equipment 100 is arranged close to the standing frame 700 and is also provided with an electric control operation box 800. It can be seen that the electric control operation box 800 is arranged close to the standing frame 700, and the staff can operate the electric control operation box 800 on the standing frame 700 to avoid being unable to operate the sewage treatment equipment 100 due to the height being too high after being suspended. The sewage treatment equipment 100 can also be installed, repaired, etc. through the standing frame 700.

[0033] In this embodiment, in order to realize the installation and placement of the sewage treatment equipment 100, the placement rack 300 is a single-body placement rack, wherein the single-body placement rack can be understood as a frame structure for placing a sewage treatment equipment. The placement rack 300 includes a top placement rack 1, a bottom support rack 2, and a plurality of connectors 3 connecting the top placement rack 1 and the bottom support rack 2. The placement rack 300 leaves the placement channel 400 below the top placement rack 1, and the placement channel 400 runs through the other end of the placement rack 300 from one end of the placement rack 300, and the bottom support rack 2 is divided into left and right parts and is separated on both sides of the placement channel 400, and the connector 3 is also arranged on both sides of the placement channel 400. The top placement rack 1 is used to suspend the sewage treatment equipment 100, and the placement channel 400 below the top placement rack 1 can be used to accommodate additional equipment 200.

[0034] In this embodiment, the walking platform is arranged next to one side of the placement rack and extends from one end of the placement rack to the other end. The staircase part is inclined beside one end of the placement rack and connected to one end of the walking platform through the top end.

[0035] Specifically, for the structural optimization of the installation platform, in this embodiment, the walking platform 600 is arranged next to one side of the placement rack 300 and extends from one end to the other end of the placement rack 300, and the staircase portion 500 is arranged obliquely beside one end of the placement rack 300 and connected to one end of the walking platform 600 through the top. It can be seen that the span of the walking platform 600 of the standing frame 700 basically matches the span of the placement rack 300, so that after the sewage treatment equipment 100 is placed, the span of the walking platform 600 also matches the span of the sewage treatment equipment 100, so that the standing area of ​​the walking platform 600 is sufficient, allowing multiple people to stand and operate.

[0036] Because of the certain height, in order to prevent the occurrence of safety accidents, the outer edge of the walking platform 600 is surrounded by a platform fence 4, and the outer edge of the stair part 500 is also provided with a stair fence 5. The inclination of the stair fence 5 is consistent with the stair part 500 and is also connected to the platform fence 4 at the top. It can be seen that the outer side of the standing frame 700 is basically provided with a fence for protection, and the overall structure is simple and compact.

[0037] For the optimization of the placement rack 300, in this embodiment, the top placement rack 1 is provided with a placement seat plate 6 for placing the base 7 of the sewage treatment equipment 100, and the top surface of the placement seat plate 6 is lower than the top surface of the top placement rack 1 at the periphery so as to be hidden in the space surrounded by the top placement rack 1. Specifically, the top placement rack 1 is constructed as a rectangular or square frame, and the placement seat plate 6 is arranged at the inner angle of two adjacent outer frame edges 8 on the frame, and the top surface of the placement seat plate 6 is lower than the top surface of the two adjacent outer frame edges 8. The two adjacent outer frame edges 8 are also provided with an inner frame edge 9 connecting the two, and the placement seat plate 6 overlaps with the two adjacent outer frame edges 8 and the inner frame edge 9. In this embodiment, the outer frame edge 8 and the inner frame edge 9 are both made of channel steel, and the two groove edges of the outer frame edge 8 are in the top placement rack 1, thereby keeping the outside of the top placement rack 1 flat and without any abrupt parts.

[0038] The bottom support frame 2 is divided into a left open bottom frame 10 and a right open bottom frame 11 with their open ends facing each other by the placement channel 400. Inner frame edges 9 are also provided on the two adjacent outer frame edges 8 on the left and right open bottom frames, and the connecting member 3 is provided at the ends of the inner frame edges 9 provided above and below and at the corners of the placement frame 300 to connect the top placement frame 1 and the bottom support frame 2. It should be noted that the outer frame edge 8, the inner frame edge 9, and the connecting member 3 can all be made of channel steel.

[0039] When installing and placing the large-scale sewage treatment equipment 100, the base 7 of the sewage treatment equipment 100 is placed on the placement seat plate 6, and is hidden in the space surrounded by two adjacent outer frame edges 8 and inner frame edges 9 on the top placement rack 1. In this way, a small gap is basically formed between the sewage treatment equipment 100 and the top placement rack 1 after placement, making the entire sewage treatment workstation more regular and compact.

[0040] It can be seen that the placement rack 300 in this embodiment is constructed by the frame structure and the connecting member 3, and the overall structure is simple and compact.

[0041] Embodiment 2

[0042] refer to Figure 1 , Figure 4 and Figure 5In this embodiment, the installation platform can be used to install and place multiple sewage treatment equipment, and the multiple here can be understood as two or more.

[0043] Specifically, Figure 4-5 The two shown are described in detail. Different from the first embodiment, in this embodiment, the top placement rack 1 is constructed as a rectangular frame. It should be noted that, of course, in other embodiments, it can also be constructed as a directional frame.

[0044] The frame includes a plurality of regularly arranged monomer frames, wherein the monomer frames can be understood as frame structures capable of installing and placing a plurality of sewage treatment equipment 100. Two adjacent monomer frames are connected by top connectors 12, and the monomer frames located at the same outer side or the same outer end of the frame share an outer frame edge 8. This can reduce the repeated overlapping arrangement of the outer frame edges 8, thereby simplifying the structure.

[0045] The shape and size of the bottom support frame 2 match the shape and size of the top placement frame 1, and the bottom support frame 2 includes a left open bottom frame 10 and a right open bottom frame 11 which are divided by the placement channel 400 into open ends and are arranged opposite to each other, and two adjacent outer frame edges 8 on the left and right open bottom frames are also provided with inner frame edges 9, and the connecting member 3 is provided at the ends of the upper and lower inner frame edges 9 and the corners of the placement frame 300 to connect the top placement frame 1 and the bottom support frame 2. The middle position of the upper and lower outer frame edges arranged along the length direction of the placement frame 300 is also connected with the connecting member 3 to increase the support strength.

[0046] The installation platform in this embodiment can realize the installation and placement of two sewage treatment equipment 100, and the structure is simplified in design and partially strengthened, which is suitable for the installation of multiple sewage treatment equipment 100 of different sizes.

[0047] The embodiments of the present application are described above in conjunction with the accompanying drawings, but the present application is not limited to the above-mentioned specific implementation methods. The above-mentioned specific implementation methods are merely illustrative and not restrictive. Under the guidance of the present application, ordinary technicians in this field can also make many forms without departing from the purpose of the present application and the scope of protection of the claims, all of which are within the protection of the present application.

Claims

1. A mounting platform, characterized in that: The utility model comprises a placing frame and a standing frame, wherein the standing frame is arranged adjacent to one side of the placing frame, and the standing frame is provided with a staircase portion and a walking platform connected to the top of the staircase portion; the placing frame comprises a top placing frame, a bottom supporting frame and a plurality of connecting members connecting the top placing frame and the bottom supporting frame, and the placing frame leaves a placing channel below the top placing frame, and the placing channel runs through one end of the placing frame and the other end of the placing frame, and the bottom supporting frame is divided into left and right parts and located on both sides of the placing channel, and the connecting members are also located on both sides of the placing channel.

2. The installation platform according to claim 1, characterized in that: The walking platform is arranged close to one side of the placement rack and extends from one end of the placement rack to the other end. The staircase part is inclinedly arranged beside one end of the placement rack and connected to one end of the walking platform through the top end.

3. The installation platform according to claim 2, characterized in that: A platform fence is arranged at the outer edge of the walking platform, and a stair fence is also arranged at the outer edge of the stair part. The inclination of the stair fence is consistent with that of the stair part and is also connected with the platform fence at the top.

4. The installation platform according to claim 1, characterized in that: The top placement rack is provided with a placement seat plate for placing the base of the equipment to be placed, and the top surface of the placement seat plate is lower than the top surface of the top placement rack at the periphery so as to be hidden in the space surrounded by the top placement rack.

5. The installation platform according to claim 4, characterized in that: When the placement rack is a single-body placement rack, the top placement rack forms a rectangular or square frame, the placement seat plate is arranged at the inner angle of two adjacent outer frame edges on the frame, and the top surface of the placement seat plate is lower than the top surface of the two adjacent outer frame edges; the two adjacent outer frame edges are also provided with an inner frame edge connecting the two, and the placement seat plate overlaps the two adjacent outer frame edges and the inner frame edge.

6. The installation platform according to claim 5, characterized in that: The bottom support frame is divided by the placement channel into a left open bottom frame and a right open bottom frame with open ends arranged opposite to each other, and inner frame edges are also arranged on two adjacent outer frame edges on the left and right open bottom frames, and connecting parts are arranged at the upper and lower ends of the inner frame edges and at the corners of the placement frame to connect the top placement frame and the bottom support frame.

7. The installation platform according to claim 4, characterized in that: When the placement rack is a multi-body placement rack, the top placement rack is formed into a rectangular or square frame, and the frame includes a plurality of regularly arranged single frames, two adjacent single frames are connected by a top connecting piece, and the single frames located on the same outer side or the same outer end of the frame share an outer frame edge.

8. The installation platform according to claim 7, characterized in that: The shape and size of the bottom support frame match the shape and size of the top placement rack. The bottom support frame includes a left open bottom frame and a right open bottom frame which are divided into open ends by a placement channel and are arranged opposite to each other. Inner frame edges are also arranged on two adjacent outer frame edges on the left and right open bottom frames. Connectors are arranged at the upper and lower ends of the inner frame edges and at the corners of the placement rack to connect the top placement rack and the bottom support frame. Connectors are also connected to the middle positions of the upper and lower outer frame edges arranged along the length direction of the placement rack.

9. A sewage treatment workstation, characterized in that: It comprises the installation platform and sewage treatment equipment described in any one of claims 1 to 8, wherein the sewage treatment equipment is provided with a base, the sewage treatment equipment is placed on the top of the placement frame through the base, the base is hidden in the top of the placement frame, one side of the sewage treatment equipment is arranged close to the standing frame and an electric control operation box is also provided on the side.

10. The sewage treatment station according to claim 9, characterized in that: The base of the sewage treatment equipment is placed on the placement seat plate and is hidden in a space surrounded by two adjacent outer frame edges and an inner frame edge on the top placement rack.