Climbing frame unloading platform provided with transport trolley

By installing transportation trolleys and traction mechanisms on the climbing frame, mechanical handling and unloading on the climbing frame is realized, time-consuming, labor-intensive and safety hazards caused by manual handling are solved, and construction efficiency is improved.

CN222435918UActive Publication Date: 2025-02-07NO 1 CONSTR ENG CO LTD OF CHINA CONSTR THIRD ENG BUREAU CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420812498.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-18
Publication Date
2025-02-07
Estimated Expiration
2034-04-18

AI Technical Summary

Technical Problem

The unloading platform on the existing climbing frame requires manual handling, which is time-consuming and labor-intensive, and workers are labor-intensive and poses great safety hazards.

Method used

A climbing frame unloading platform equipped with a transport trolley is designed, and the transport trolley is controlled to move between the unloading platform and the floor slab through a traction mechanism to realize mechanical handling and unloading.

Benefits of technology

It effectively avoids the time-consuming and labor-intensive problems caused by manual handling, reduces safety hazards, and improves construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222435918U_ABST
    Figure CN222435918U_ABST
Patent Text Reader

Abstract

The utility model provides a climbing frame unloading platform assembled with a transport trolley, which comprises a climbing frame, a transport trolley, a lifting platform, a lifting platform, a lifting platform, a lifting platform, a lifting platform and a lifting platform, and is characterized in that the climbing frame is erected on the ground; the discharging platform is fixed to the side, away from the floor, of the climbing frame. The supporting structure is arranged on the discharging platform and the floor slab; the conveying trolley moves on the supporting structure and is used for conveying materials; the traction mechanism is used for dragging the transportation trolley to move on the supporting structure; the traction mechanism can drag the transportation trolley to the discharging platform, and the traction mechanism can also drag the transportation trolley to a floor slab. The traction mechanism and the conveying trolley are arranged, the conveying trolley is used for conveying materials, and the traction mechanism controls the conveying trolley to move between the discharging platform and the floor slab. Therefore, mechanical carrying and unloading on the climbing frame are achieved. By the adoption of the carrying and unloading mode, the problems that time and labor are wasted, the labor intensity of workers is large, and potential safety hazards are large due to the manual carrying and unloading mode on a climbing frame can be solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of sludge treatment equipment, in particular to a climbing frame unloading platform equipped with a transport trolley. Background Art

[0002] A climbing frame refers to an external scaffolding that is erected at a certain height and attached to an engineering structure, and has anti-overturning and anti-falling devices. The climbing frame is mainly composed of columns, beams, attachment supports, anti-overturning devices, anti-falling devices, lifting mechanisms and control devices. The climbing frame is a rapidly developing new type of scaffolding technology, which has an important impact on the progress of my country's construction technology.

[0003] The climbing frames in the prior art generally have their own unloading platforms, which are used for the turnover of floor construction materials. For example, steel pipes, scaffolding, fixings, materials from dismantled floors, tools, etc. can all be transported to the floors to be constructed through the unloading platforms. However, the unloading platforms on the existing climbing frames can only be carried to the unloading platforms manually, which is time-consuming and labor-intensive, and the labor intensity of the workers is relatively high. In addition, there are great safety hazards when the workers carry the materials to the unloading platforms.

[0004] That is to say, the manual handling and unloading method on the climbing frame in the prior art is time-consuming and labor-intensive, has high labor intensity for workers, and has great safety hazards. Utility Model Content

[0005] The utility model provides a climbing frame unloading platform equipped with a transport trolley to solve the above technical problems, which solves the problems of time-consuming and labor-intensive manual handling and unloading on the climbing frame, high labor intensity for workers, and great safety hazards.

[0006] The utility model provides a climbing frame unloading platform equipped with a transport trolley, comprising: a climbing frame, which is erected on the ground, one end of the climbing frame is fixedly connected to the floor slab; and

[0007] The unloading platform is fixed on the side of the climbing frame away from the floor; and

[0008] A support structure provided on the unloading platform and the floor slab; and

[0009] A transport trolley, which moves on the support structure, and is used to transport materials; and

[0010] A traction mechanism, which is used to pull the transport trolley to move on the supporting structure;

[0011] Among them, the traction mechanism can pull the transport trolley to the unloading platform, and the traction mechanism can also pull the transport trolley to the floor.

[0012] In one embodiment, the climbing frame comprises:

[0013] A mounting frame mounted on the ground; and

[0014] A guide support, which is arranged on a side of the mounting frame close to the floor; and

[0015] A wall-attached support, one end of which is connected to the guide support, and the other end of which is mounted on the floor slab and fixedly connected to the floor slab; and

[0016] One end of the load-bearing diagonal brace is arranged on the other side of the mounting frame away from the floor slab, and the other end of the load-bearing diagonal brace is connected to the unloading platform.

[0017] In one embodiment, the unloading platform comprises:

[0018] A cantilevered channel steel frame is arranged on the load-bearing diagonal bracing rod, and one end of the cantilevered channel steel frame is connected to the mounting frame; and

[0019] A guardrail provided on a cantilevered channel steel frame; and

[0020] The formwork is rigidly closed and detachably arranged on the other end of the cantilevered channel steel frame.

[0021] In one embodiment, the support structure comprises:

[0022] Timber beams, which are laid on the cantilevered channel steel frames; and

[0023] a supporting frame erected on the floor slab; and

[0024] A plurality of longitudinal steel pipes are arranged on the wooden beams and the support frame at intervals along a first direction; and

[0025] A plurality of transverse steel pipes are arranged on the plurality of longitudinal steel pipes at intervals along the second direction, and the transport trolley moves on the plurality of transverse steel pipes.

[0026] In one embodiment, the transport vehicle comprises:

[0027] Base; and

[0028] A pulley is disposed on a base, and the pulley rolls on the transverse steel pipe along a first direction; and

[0029] A wooden formwork is disposed on a base; and

[0030] flap doors, which are set at the edge of the wooden formwork;

[0031] Among them, the wooden formwork is used to place materials, and the flap door is used to prevent the materials from spilling out of the wooden formwork.

[0032] In one embodiment, the base comprises:

[0033] a plurality of transverse I-beams spaced apart along the second direction; and

[0034] A plurality of longitudinal I-beams arranged at intervals along a first direction;

[0035] Wherein, a plurality of transverse I-beams are arranged on a plurality of longitudinal I-beams, a wooden formwork is arranged on a plurality of transverse I-beams, and a pulley is arranged on the longitudinal I-beams.

[0036] In one embodiment, a limiting structure is also included, which includes:

[0037] A front vertical limiter, which is arranged on one end of the plurality of transverse steel pipes close to the hard closure of the template; and

[0038] A rear end vertical limiter, which is arranged on the other end of the plurality of transverse steel pipes away from the hard closure of the template;

[0039] Among them, the front end vertical limit part is used to limit the moving position of the transport trolley in the unloading platform, and the rear end vertical limit part is used to limit the position of the transport trolley above the floor.

[0040] In one embodiment, a buffer spring is provided on a side of the front vertical limit portion close to the transport trolley, and / or a buffer spring is provided on a side of the rear vertical limit portion close to the transport trolley.

[0041] In one embodiment, the traction mechanism includes a first traction assembly and a second traction assembly, the first traction assembly is used to traction the transport trolley to the floor, and the second traction assembly is used to traction the transport trolley to the unloading platform;

[0042] The first traction assembly includes:

[0043] A first traction rope, one end of which is connected to the transport trolley; and

[0044] A first fixed pulley, which is arranged on the rear end vertical limiting portion, and the first traction rope is wound around the first fixed pulley; and

[0045] The first hoist is arranged on the floor slab and connected with the other end of the first traction rope.

[0046] In one embodiment, the second traction assembly comprises:

[0047] A second traction rope, one end of which is connected to the transport trolley; and

[0048] A second fixed pulley is arranged on the front vertical limiting portion, and the second traction rope is wound around the second fixed pulley; and

[0049] The second winch is arranged on the transverse steel pipe and is connected to the other end of the second traction rope.

[0050] Compared with the prior art, the utility model has the following beneficial effects: a traction mechanism and a transport trolley are provided, the transport trolley is used to transport materials, and the traction mechanism is used to control the transport trolley to move between the unloading platform and the floor slab. Thus, mechanical handling and unloading on the climbing frame is realized. The use of this mechanical handling and unloading method can avoid the time-consuming and labor-intensive manual handling and unloading method on the climbing frame in the prior art, the high labor intensity of workers, and the high safety hazards. BRIEF DESCRIPTION OF THE DRAWINGS

[0051] Figure 1 It is a schematic diagram of the structural composition of a climbing frame unloading platform equipped with a transport trolley in an embodiment of the utility model;

[0052] Figure 2 for Figure 1 Schematic diagram of the connection between the unloading platform of the middle climbing frame unloading platform, the climbing frame and the supporting structure;

[0053] Figure 3 for Figure 1 A-direction view of the middle climbing frame unloading platform;

[0054] Figure 4 for Figure 1 B-direction view of the middle climbing frame unloading platform;

[0055] Figure 5 for Figure 1 Main sectional view of the medium transport trolley.

[0056] In the figure: 1. Climbing frame; 1.1. Installation frame; 1.2. Guide support; 1.3. Wall support; 1.4. Load-bearing diagonal brace; 2. Unloading platform; 2.1. Hard closure of formwork; 2.2. Guardrail; 2.3. Cantilever channel steel frame; 3. Floor slab; 4.1. Wooden beam; 4.2. Longitudinal steel pipe; 4.3. Transverse steel pipe; 4.4. Support frame; 5. Transport trolley; 6. First traction rope; 7.1. First fixed pulley; 7.2. Second fixed pulley; 8.1. First winch; 8.2. Second winch; 9.1. Front vertical limit part; 9.2. Front transverse limit part; 9.3. Rear vertical limit part; 9.4. Rear transverse limit part. DETAILED DESCRIPTION

[0057] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments.

[0058] It should be noted that the first direction of this application is Figure 1 The length direction of the Figure 2 The height direction.

[0059] like Figures 1 to 5 As shown, the utility model provides a climbing frame unloading platform equipped with a transport trolley.

[0060] The above-mentioned climbing frame unloading platform includes a climbing frame 1, an unloading platform 2, a supporting structure, a transport trolley 5 and a traction mechanism. Among them, the climbing frame 1 is erected on the ground, and one end of the climbing frame 1 is fixedly connected to the floor 3; the unloading platform 2 is fixed to the side of the climbing frame 1 away from the floor 3; the supporting structure is arranged on the unloading platform 2 and the floor 3; the transport trolley 5 moves on the supporting structure, and the transport trolley 5 is used to transport materials; the traction mechanism is arranged on the supporting structure, and the traction mechanism is used to tow the transport trolley 5 to move on the supporting structure; the traction mechanism can tow the transport trolley 5 to the unloading platform 2, and the traction mechanism can also tow the transport trolley 5 to the floor 3.

[0061] In the above arrangement, a traction mechanism and a transport trolley 5 are provided, and the transport trolley 5 is used to transport materials, and the transport trolley 5 is controlled by the traction mechanism to move between the unloading platform 2 and the floor 3. Thus, mechanical handling and unloading on the climbing frame 1 is realized. The use of this mechanical handling and unloading method can avoid the time-consuming and labor-intensive manual handling and unloading method on the climbing frame in the prior art, the high labor intensity of workers, and the high safety hazards.

[0062] Specifically, in one embodiment, the climbing frame 1 includes a mounting frame 1.1, a guide support 1.2, a wall support 1.3 and a load-bearing diagonal brace 1.4. The mounting frame 1.1 is mounted on the ground; the guide support 1.2 is arranged on the side of the mounting frame 1.1 close to the floor 3; the wall support 1.3 is connected to the guide support 1.2 at one end, and the other end of the wall support 1.3 is mounted on the floor 3 and fixedly connected to the floor 3; the load-bearing diagonal brace 1.4 is arranged on the other side of the mounting frame 1.1 away from the floor 3 at one end, and the other end of the load-bearing diagonal brace 1.4 is connected to the unloading platform 2.

[0063] Specifically, in one embodiment, the unloading platform 2 includes a cantilevered channel steel frame 2.3, a guardrail 2.2 and a template hard enclosure 2.1. The cantilevered channel steel frame 2.3 is arranged on the load-bearing diagonal brace 1.4, and one end of the cantilevered channel steel frame 2.3 is connected to the mounting frame 1.1; the guardrail 2.2 is arranged on the cantilevered channel steel frame 2.3; and the template hard enclosure 2.1 is detachably arranged on the other end of the cantilevered channel steel frame 2.3.

[0064] Specifically, in one embodiment, the support structure includes a wooden beam 4.1, a support frame 4.4, a plurality of longitudinal steel pipes 4.2, and a plurality of transverse steel pipes 4.3. The wooden beam 4.1 is laid on the cantilevered channel steel frame 2.3; the support frame 4.4 is erected on the floor 3; the plurality of longitudinal steel pipes 4.2 are arranged on the wooden beam 4.1 and the support frame 4.4 at intervals along a first direction; the plurality of transverse steel pipes 4.3 are arranged on the plurality of longitudinal steel pipes 4.2 at intervals along a second direction, and the transport trolley 5 moves on the plurality of transverse steel pipes 4.3.

[0065] Specifically, in one embodiment, the transport trolley 5 includes a base, a pulley 5.4, a wooden template 5.3 and a flap door 5.5. The pulley 5.4 is arranged on the base and rolls on the transverse steel pipe 4.3 along a first direction; the wooden template 5.3 is arranged on the base; the flap door 5.5 is arranged at the edge of the wooden template 5.3; the wooden template 5.3 is used to place materials, and the flap door 5.5 is used to prevent materials from spilling out of the wooden template 5.3.

[0066] Specifically, in one embodiment, the base includes a plurality of transverse I-beams 5.2 and a plurality of longitudinal I-beams 5.1, wherein the plurality of transverse I-beams 5.2 are arranged at intervals along the second direction; the plurality of longitudinal I-beams 5.1 are arranged at intervals along the first direction; the plurality of transverse I-beams 5.2 are arranged on the plurality of longitudinal I-beams 5.1, the wooden formwork 5.3 is arranged on the plurality of transverse I-beams 5.2, and the pulley 5.4 is arranged on the longitudinal I-beams 5.1.

[0067] Specifically, in one embodiment, the climbing frame unloading platform also includes a limiting structure including a front vertical limiting portion 9.1 and a rear vertical limiting portion 9.3. The front vertical limiting portion 9.1 is arranged on one end of the plurality of transverse steel pipes 4.3 close to the template hard closure 2.1; the rear vertical limiting portion 9.3 is arranged on the other end of the plurality of transverse steel pipes 4.3 away from the template hard closure 2.1; the front vertical limiting portion 9.1 is used to limit the moving position of the transport trolley 5 in the unloading platform 2, and the rear vertical limiting portion 9.3 is used to limit the position of the transport trolley 5 above the floor slab 3.

[0068] Specifically, in one embodiment, a buffer spring is provided on a side of the front vertical limit portion 9.1 close to the transport trolley 5, and a buffer spring is provided on a side of the rear vertical limit portion 9.3 close to the transport trolley 5.

[0069] Specifically, in one embodiment, the traction mechanism includes a first traction assembly and a second traction assembly, wherein the first traction assembly is used to pull the transport trolley 5 to the floor 3, and the second traction assembly is used to pull the transport trolley 5 to the unloading platform 2; the first traction assembly includes a first traction rope 6, a first fixed pulley 7.1, and a first hoist 8.1. Among them, one end of the first traction rope 6 is connected to the transport trolley 5; the first fixed pulley 7.1 is arranged on the rear end vertical limit portion 9.3, and the first traction rope 6 is wound around the first fixed pulley 7.1; the first hoist 8.1 is arranged on the floor 3 and connected to the other end of the first traction rope 6.

[0070] Specifically, in one embodiment, the second traction assembly includes a second traction rope, a second fixed pulley 7.2 and a second hoist 8.2. The second traction rope has one end connected to the transport trolley 5; the second fixed pulley 7.2 is arranged on the front vertical limit portion 9.1, and the second traction rope is wound around the second fixed pulley 7.2; the second hoist 8.2 is arranged on the transverse steel pipe 4.3 and connected to the other end of the second traction rope.

[0071] A more complete embodiment of the present application is described below:

[0072] like Figures 1 to 5 The utility model shown provides a climbing frame unloading platform, and the climbing frame unloading platform body includes a climbing frame 1 and a unloading platform 2; the climbing frame 1 includes a mounting frame 1.1, a guide support 1.2, and a wall-mounted support 1.3, and the mounting frame 1.1 is extended into the floor through the guide support 1.2, and the unloading platform 2 is detachably arranged on the side of the climbing frame body 1 through the pre-embedded wall-mounted support 1.3 and the structural floor 3.

[0073] like Figure 1-Figure 5 As shown, the climbing frame 1 also includes a load-bearing diagonal brace 1.4, and the unloading platform 2 also includes a template hard closure 2.1, a guardrail 2.2 and a cantilevered channel steel frame 2.3. The cantilevered channel steel frame 2.3 is connected to the load-bearing diagonal brace 1.4 by welding. The load-bearing diagonal brace 1.4 provides support for the unloading platform 2. The guardrail 2.2 and the cantilevered channel steel frame 2.3 are welded together. The guardrail 2.2 and the hard closure 2.1 can prevent materials from falling during the construction process and ensure construction safety.

[0074] like Figures 1 to 5 As shown, the slide rail system includes a wooden beam 4.1, a longitudinal steel pipe 4.2, a transverse steel pipe 4.3 and a support frame 4.4. The longitudinal steel pipe 4.2 and the transverse steel pipe 4.3 are connected by fasteners as track beams. The wooden beam 4.1 is laid at the bottom to prevent the steel pipe from rolling and play a stabilizing role. The support frame 4.4 is constructed of a steel pipe frame and a scissor brace is set to enhance the stability of the support frame.

[0075] like Figures 1 to 5 As shown, the transport system includes a transport trolley 5, a traction rope (including a first and a second traction rope), a fixed pulley 7 and a winch 8. The transport trolley 5 is tied with the traction rope by a movable buckle, and the other end of the traction rope is connected to the winch (including the first and second winches) through a fixed pulley (including the first and second fixed pulleys).

[0076] like Figures 1 to 5As shown, the trolley 5 also includes a longitudinal I-beam 5.1, a transverse I-beam 5.2, a wooden formwork 5.3, a pulley 5.4, and a flap door 5.5. The longitudinal I-beam 5.1 and the transverse I-beam 5.2 are welded as the main keel of the transport trolley. The wooden formwork 5.3 is laid on the longitudinal I-beam 5.1 to provide a platform for materials. The pulley 5.4 is welded to the transverse I-beam 5.2 and placed on the slide rail track beam (transverse steel pipe 4.3). The trolley 5 is moved on the slide rail system by a winch. The flap door 5.5 is hinged to the transverse I-beam 5.2 and can be opened and closed freely.

[0077] like Figures 1 to 5 The limiting structure shown includes a front vertical limiting portion 9.1, a front lateral limiting portion 9.2, a rear vertical limiting portion 9.3, and a rear lateral limiting portion 9.4. Buffer springs are welded at the front ends of the front and rear vertical and lateral limiting portions. When the trolley 5 travels to the end or tail, the limiting portions (including the front vertical limiting portion 9.1, the front lateral limiting portion 9.2, the rear vertical limiting portion 9.3, and the rear lateral limiting portion 9.4) can limit the displacement of the trolley to ensure transportation safety.

[0078] How to use this device: When using this device, set up a track beam and install a limit device. If the trolley is to move in the direction of the unloading platform, put one end of the traction rope on the front pulley of the trolley, and put the other end on the front winch (the second winch) through the fixed pulley. Start the winch, and the operation of the winch drives the pulley to rotate. The rotation of the fixed pulley drives the pulley of the trolley to rotate, and the trolley moves. When the trolley moves to the material that needs to be transferred, stop the winch and load the material onto the trolley. If you want to transport it to the floor, untie the original traction rope of the front wheel (the second traction rope), re-bind the traction rope (the first traction rope) to the rear wheel, and open the rear end winch (the first winch).

[0079] In the present invention, the terms "first", "second", and "third" are used for descriptive purposes only and should not be understood as indicating or implying relative importance; the term "plurality" refers to two or more, unless otherwise clearly defined. The terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense. For example, "connected" can be a fixed connection, a detachable connection, or an integral connection; "connected" can be a direct connection or an indirect connection through an intermediate medium. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to the specific circumstances.

[0080] In the description of the present invention, it is necessary to understand that the directions or positional relationships indicated by terms such as "up", "down", "left", "right", "front" and "back" are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or unit referred to must have a specific direction, be constructed and operated in a specific orientation, and therefore, cannot be understood as a limitation on the present invention.

[0081] In the description of this specification, the description of the terms "one embodiment", "some embodiments", "specific embodiments", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the utility model. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.

[0082] The above are only preferred implementations of the utility model. The protection scope of the utility model is not limited to the above embodiments. All technical solutions under the idea of ​​the utility model belong to the protection scope of the utility model. It should be pointed out that for ordinary technicians in this technical field, some improvements and modifications without departing from the principle of the utility model should also be regarded as the protection scope of the utility model.

Claims

1. A climbing frame unloading platform equipped with a transport trolley, characterized in that: include: A climbing frame is erected on the ground, one end of which is fixedly connected to the floor slab; as well as A material unloading platform, which is fixed on a side of the climbing frame away from the floor slab; as well as A supporting structure, which is arranged on the unloading platform and the floor; as well as A transport trolley, which moves on the support structure, and the transport trolley is used for transporting materials; as well as A traction mechanism, used for towing the transport trolley to move on the support structure; Among them, the traction mechanism can pull the transport cart to the unloading platform, and the traction mechanism can also pull the transport cart to the floor.

2. The climbing frame unloading platform equipped with a transport trolley according to claim 1 is characterized in that: The climbing frame comprises: A mounting frame mounted on the ground; and a guide support, which is arranged on a side of the mounting frame close to the floor; and a wall-attached support, one end of which is connected to the guide support, and the other end of which is mounted on the floor slab and fixedly connected to the floor slab; and A load-bearing diagonal brace, one end of which is arranged on the other side of the mounting frame away from the floor slab, and the other end of the load-bearing diagonal brace is connected to the unloading platform.

3. The climbing frame unloading platform equipped with a transport trolley according to claim 2 is characterized in that: The unloading platform comprises: A cantilevered channel steel frame is arranged on the load-bearing diagonal brace, and one end of the cantilevered channel steel frame is connected to the mounting frame; and A guardrail, which is arranged on the cantilevered channel steel frame; and The template is rigidly closed and detachably arranged on the other end of the cantilevered channel steel frame.

4. The climbing frame unloading platform equipped with a transport trolley according to claim 3 is characterized in that: The support structure comprises: Wooden beams are laid on the cantilevered channel steel frame; and a supporting frame erected on the floor slab; and a plurality of longitudinal steel pipes, which are arranged on the wooden beam and the support frame at intervals along a first direction; and A plurality of transverse steel pipes are arranged on the plurality of longitudinal steel pipes at intervals along the second direction, and the transport trolley moves on the plurality of transverse steel pipes.

5. The climbing frame unloading platform equipped with a transport trolley according to claim 4 is characterized in that: The transport trolley comprises: Base; and a pulley, which is disposed on the base, and the pulley rolls on the transverse steel pipe along a first direction; and A wooden formwork disposed on the base; and A flap door, which is arranged at the edge of the wooden formwork; The wooden template is used for placing materials, and the flap door is used to prevent the materials from spilling out of the wooden template.

6. The climbing frame unloading platform equipped with a transport trolley according to claim 5 is characterized in that: The base comprises: a plurality of transverse I-beams spaced apart along the second direction; and A plurality of longitudinal I-beams arranged at intervals along a first direction; Wherein, the plurality of transverse I-beams are arranged on the plurality of longitudinal I-beams, the wooden formwork is arranged on the plurality of transverse I-beams, and the pulley is arranged on the longitudinal I-beams.

7. The climbing frame unloading platform equipped with a transport trolley according to claim 4, characterized in that: Also included is a limiting structure, which includes: A front vertical limit portion, which is arranged on one end of the plurality of transverse steel pipes close to the rigid closure of the template; and A rear end vertical limiter, which is arranged on the other end of the plurality of transverse steel pipes away from the rigid closure of the template; Among them, the front end vertical limit part is used to limit the moving position of the transport trolley in the unloading platform, and the rear end vertical limit part is used to limit the position of the transport trolley above the floor.

8. The climbing frame unloading platform equipped with a transport trolley according to claim 7, characterized in that: A buffer spring is provided on a side of the front end vertical limit portion close to the transport trolley, and / or a buffer spring is provided on a side of the rear end vertical limit portion close to the transport trolley.

9. The climbing frame unloading platform equipped with a transport trolley according to claim 7, characterized in that: The traction mechanism includes a first traction assembly and a second traction assembly, the first traction assembly is used to pull the transport trolley to the floor, and the second traction assembly is used to pull the transport trolley to the unloading platform; The first traction assembly comprises: A first traction rope, one end of which is connected to the transport trolley; and A first fixed pulley, which is arranged on the rear end vertical limiting portion, and the first traction rope is wound around the first fixed pulley; and A first hoist is arranged on the floor slab and connected to the other end of the first traction rope.

10. The climbing frame unloading platform equipped with a transport trolley according to claim 9, characterized in that: The second traction assembly comprises: A second traction rope, one end of which is connected to the transport trolley; and a second fixed pulley, which is disposed on the front end vertical limiting portion, and the second traction rope is wound around the second fixed pulley; and The second winch is arranged on the transverse steel pipe and connected to the other end of the second traction rope.