Water supply and drainage pipeline

By designing and collecting structures in the water supply and drainage pipelines, the problem of insufficient waste disposal in large-scale projects in sewage is solved, and the effective collection and cleaning of garbage is achieved, ensuring the normal progress of drainage is ensured.

CN222477678UActive Publication Date: 2025-02-14CCCC SHANGHAI DREDGING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421287942.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-06
Publication Date
2025-02-14
Estimated Expiration
2034-06-06

AI Technical Summary

Technical Problem

During the use of existing water supply and drainage pipes in mechanical and electrical engineering, there is a lack of treatment and collection devices for large-scale engineering waste in sewage, resulting in the pipeline being blocked and affecting normal drainage work.

Method used

A water supply and drainage pipe is designed, including a first supply and drainage pipe, a second supply and drainage pipe and a third supply and drainage pipe. The second supply and drainage pipe is provided with a pushing structure and a collection structure. The push structure consists of a fixing rod, a telescopic motor and a push plate to push garbage from the sewage surface into the transition bin; the collection structure includes a transition bin and a collection bin for accumulating and cleaning up the garbage.

Benefits of technology

By promoting the design of the structure and collection structure, effective treatment and collection of large-scale engineering waste in sewage is achieved, pipeline blockage is avoided, and normal drainage work is ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222477678U_ABST
    Figure CN222477678U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of electromechanical engineering, in particular to a water supply and drainage pipeline which comprises a first supply and drainage pipe, a second supply and drainage pipe and a third supply and drainage pipe. When the device discharges sewage, the sewage enters the first feeding and discharging pipe and then arrives at the intersection of the first feeding and discharging pipe and the third feeding and discharging pipe along the second feeding and discharging pipe, due to the fact that a second filter screen is arranged in the third feeding and discharging pipe, garbage in the sewage is blocked at the joint of the second feeding and discharging pipe and the third feeding and discharging pipe and floats on the surface of the sewage, and at the moment, the garbage is discharged through driving of a telescopic motor. An output shaft drives a pushing plate to continuously stretch out and draw back, so that garbage on the surface of sewage is pushed into a transition box, the garbage in the transition box is continuously pushed by garbage behind and enters a collecting box, and after a certain amount of garbage is accumulated, a worker opens a cover plate to collect and clean the garbage; therefore, the purpose of treating and collecting the large engineering garbage in the sewage is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of electromechanical engineering, in particular to a water supply and drainage pipeline. Background Art

[0002] Mechanical and electrical engineering is a discipline that integrates the fields of mechanical engineering and electrical engineering. It covers cutting-edge technologies in multiple fields and provides strong support for the development and progress of modern society. Mechanical and electrical engineering includes electrical engineering technology, automatic control and instrumentation, water supply and drainage, mechanical equipment installation, container installation, heating, ventilation and air-conditioning engineering, building intelligent engineering, fire protection engineering, equipment and pipeline anti-corrosion and insulation technology, etc.

[0003] During the use of the existing water supply and drainage pipelines in electromechanical engineering, there is a lack of processing and collection devices for large-scale engineering waste in sewage, which leads to blockage in the pipeline during drainage, affecting normal drainage work. Based on the existing technical deficiencies, the utility model designs a water supply and drainage pipeline. Utility Model Content

[0004] In view of the deficiencies of the prior art, the utility model provides a water supply and drainage pipeline, which has the advantage of processing and collecting large-scale engineering garbage in sewage.

[0005] The utility model provides the following technical solutions: a water supply and drainage pipeline, comprising a first supply and drainage pipe, a second supply and drainage pipe, and a third supply and drainage pipe, the bottom of the first supply and drainage pipe is fixedly connected to the top end of the second supply and drainage pipe, one side of the second supply and drainage pipe is fixedly connected to one end of the third supply and drainage pipe, and a pushing structure is arranged inside the second supply and drainage pipe; the pushing structure comprises a fixed rod and a second filter screen, the fixed rod is arranged on the outer surface of the second supply and drainage pipe, a fixed ring is installed at the top end of the fixed rod, a telescopic motor is installed inside the fixed ring, a pushing plate is installed at one end of the output shaft of the telescopic motor, and the second filter screen is arranged inside the third supply and drainage pipe; a collecting structure is installed on one side of the outer surface of the second supply and drainage pipe, the collecting structure comprises a transition box, and a collecting box is installed on one side of the transition box.

[0006] As a preferred technical solution of the present utility model, a first filter screen is installed at the bottom of the inner cavity of the transition box, and a connecting pipe is provided at the bottom of the transition box.

[0007] As a preferred technical solution of the utility model, the connecting pipe is communicated with the first filter screen, and the connecting pipe is fixedly connected to the third supply and discharge pipe.

[0008] As a preferred technical solution of the utility model, the collection box is connected to the transition box, and a cover plate is provided inside the collection box.

[0009] As a preferred technical solution of the utility model, a protective cover is provided on one side of the outer surface of the second supply and discharge pipe, and the protective cover covers the outer surface of the telescopic motor.

[0010] As a preferred technical solution of the utility model, an activated carbon bag is arranged inside the third supply and discharge pipe, and the outside of the activated carbon bag is a fiberboard barrel, and the inside is coated with activated carbon.

[0011] Compared with the prior art, the utility model has the following beneficial effects:

[0012] 1. This water supply and drainage pipeline uses a collecting structure and a pushing structure. When the device discharges sewage, the sewage enters the first water supply and drainage pipe and then follows the second water supply and drainage pipe to the intersection with the third water supply and drainage pipe. Since the third water supply and drainage pipe is provided with a second filter screen inside, the garbage in the sewage is blocked at the connection between the second water supply and drainage pipe and the third water supply and drainage pipe and floats on the surface of the sewage. At this time, the output shaft of the telescopic motor drives the pushing plate to continuously extend and retract, thereby pushing the garbage on the surface of the sewage into the transition box. The sewage pushed through with the garbage flows from the first filter screen into the connecting pipe, and flows into the third water supply and drainage pipe when a certain amount is accumulated. At the same time, the garbage in the transition box is continuously pushed by the garbage at the rear and enters the collection box. After a certain amount is accumulated, the staff opens the cover to collect and clean it, thereby achieving the purpose of processing and collecting large-scale engineering garbage in the sewage. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 This is a schematic diagram of the appearance structure of the utility model;

[0014] Figure 2 This is a schematic diagram of the second supply and discharge pipe structure of the utility model;

[0015] Figure 3 This is a schematic diagram of the propulsion structure of the utility model;

[0016] Figure 4 It is a schematic diagram of the collection structure of the utility model.

[0017] In the figure: 1. First supply and discharge pipe; 2. Second supply and discharge pipe; 3. Third supply and discharge pipe; 4. Protective cover; 5. Collecting structure; 51. Transition box; 52. First filter; 53. Connecting pipe; 54. Collecting box; 55. Cover plate; 6. Pushing structure; 61. Fixed rod; 62. Fixed ring; 63. Telescopic motor; 64. Pushing plate; 65. Second filter; 7. Activated carbon bag. DETAILED DESCRIPTION

[0018] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0019] See also Figure 1-4 A water supply and drainage pipeline comprises a first water supply and drainage pipe 1, a second water supply and drainage pipe 2, and a third water supply and drainage pipe 3. The bottom of the first water supply and drainage pipe 1 is fixedly connected to the top end of the second water supply and drainage pipe 2, and one side of the second water supply and drainage pipe 2 is fixedly connected to one end of the third water supply and drainage pipe 3. A pushing structure 6 is arranged inside the second water supply and drainage pipe 2; the pushing structure 6 comprises a fixing rod 61 and a second filter screen 65. The fixing rod 61 is arranged on the outer surface of the second water supply and drainage pipe 2, and a fixing ring 62 is installed at the top end of the fixing rod 61. A telescopic motor 63 is installed inside the fixing ring 62. A pushing plate 64 is installed at one end of the output shaft of the telescopic motor 63. The second filter screen 65 is arranged inside the third water supply and drainage pipe 3; a collecting structure 5 is installed on one side of the outer surface of the second water supply and drainage pipe 2. The collecting structure 5 comprises a transition box 51, and a collecting box 54 is installed on one side of the transition box 51.

[0020] See also Figure 4 A first filter screen 52 is installed at the bottom of the inner cavity of the transition box 51, and a connecting pipe 53 is provided at the bottom of the transition box 51. The connecting pipe 53 is connected to the first filter screen 52, and the connecting pipe 53 is fixedly connected to the third supply and discharge pipe 3. The collection box 54 is connected to the transition box 51, and a cover plate 55 is provided inside the collection box 54.

[0021] The garbage on the surface of the sewage is pushed into the transition box 51, and the sewage pushed through with the garbage flows into the connecting pipe 53 from the first filter screen 52, and flows into the third supply and discharge pipe 3 when a certain amount is accumulated. At the same time, the garbage in the transition box 51 is continuously pushed by the garbage behind and enters the collection box 54. After a certain amount is accumulated, the staff opens the cover 55 to collect and clean it.

[0022] See also Figure 2-3 A protective cover 4 is provided on one side of the outer surface of the second supply and discharge pipe 2, and the protective cover 4 covers the outer surface of the telescopic motor 63. An activated carbon bag 7 is provided inside the third supply and discharge pipe 3, and the activated carbon bag 7 is a fiberboard barrel on the outside and is coated with activated carbon on the inside.

[0023] The telescopic motor 63 is waterproofed by the protective cover 4, and the sewage is preliminarily filtered by the activated carbon bag 7 to reduce the odor in the sewage.

[0024] Working principle: when a water supply and drainage pipeline is used, in the initial state, first, the device is connected to the electromechanical engineering pipeline through the flanges at both ends. During water supply and drainage, the sewage enters the first water supply and drainage pipe 1 and follows the second water supply and drainage pipe 2 to the intersection with the third water supply and drainage pipe 3. Since the third water supply and drainage pipe 3 is provided with a second filter screen 65 inside, the garbage in the sewage is blocked at the connection between the second water supply and drainage pipe 2 and the third water supply and drainage pipe 3 and floats on the surface of the sewage. At this time, the output shaft of the telescopic motor 63 drives the push plate 64 to continuously expand and contract, thereby pushing the garbage on the surface of the sewage into the transition box 51. The sewage pushed through with the garbage flows from the first filter screen 52 into the connecting pipe 53, and flows into the third water supply and drainage pipe 3 when a certain amount is accumulated. At the same time, the garbage in the transition box 51 is continuously pushed by the garbage behind and enters the collection box 54. After a certain amount of accumulation, the staff opens the cover plate 55 to collect and clean it. Then the sewage passing through the third water supply and drainage pipe 3 can be discharged after being filtered by the activated carbon bag 7.

[0025] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A water supply and drainage pipeline, comprising a first water supply and drainage pipe (1), a second water supply and drainage pipe (2), and a third water supply and drainage pipe (3), characterized in that: The bottom of the first supply and discharge pipe (1) is fixedly connected to one end of the top of the second supply and discharge pipe (2), one side of the second supply and discharge pipe (2) is fixedly connected to one end of the third supply and discharge pipe (3), and a pushing structure (6) is provided inside the second supply and discharge pipe (2); The pushing structure (6) comprises a fixing rod (61) and a second filter screen (65), wherein the fixing rod (61) is arranged on the outer surface of the second supply and discharge pipe (2), a fixing ring (62) is installed at one end of the top of the fixing rod (61), a telescopic motor (63) is installed inside the fixing ring (62), a pushing plate (64) is installed at one end of the output shaft of the telescopic motor (63), and the second filter screen (65) is arranged inside the third supply and discharge pipe (3); A collecting structure (5) is installed on one side of the outer surface of the second supply and discharge pipe (2), and the collecting structure (5) comprises a transition box (51), and a collecting box (54) is installed on one side of the transition box (51).

2. A water supply and drainage pipeline according to claim 1, characterized in that: A first filter screen (52) is installed at the bottom of the inner cavity of the transition box (51), and a connecting pipe (53) is provided at the bottom of the transition box (51).

3. A water supply and drainage pipeline according to claim 2, characterized in that: The connecting pipe (53) is in communication with the first filter screen (52), and the connecting pipe (53) is fixedly connected to the third supply and discharge pipe (3).

4. A water supply and drainage pipeline according to claim 1, characterized in that: The collection box (54) is in communication with the transition box (51), and a cover plate (55) is provided inside the collection box (54).

5. A water supply and drainage pipeline according to claim 1, characterized in that: A protective cover (4) is provided on one side of the outer surface of the second supply and discharge pipe (2), and the protective cover (4) covers the outer surface of the telescopic motor (63).

6. A water supply and drainage pipeline according to claim 1, characterized in that: An activated carbon bag (7) is arranged inside the third supply and discharge pipe (3); the activated carbon bag (7) has a fiberboard barrel on the outside and is coated with activated carbon on the inside.