Offshore photovoltaic booster station

By designing a split offshore photovoltaic booster station and using small floating cranes and crawler cranes for split construction, the problem that traditional booster stations cannot be suitable for nearshore water depth conditions is solved, and construction flexibility and cost are achieved under different water depths. reduce.

CN222484658UActive Publication Date: 2025-02-14SHANDONG ELECTRIC POWER ENG CONSULTING INST CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421047140.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-14
Publication Date
2025-02-14
Estimated Expiration
2034-05-14

AI Technical Summary

Technical Problem

Due to the draft restrictions of large floating cranes, traditional offshore wind power boost stations cannot be used in offshore photovoltaic sites with a depth of 3-4m nearshore water, resulting in the inability to carry out construction.

Method used

A offshore photovoltaic booster station was designed, adopting a split structure, including a platform, pipe pile and multiple split decks. The main transformer, firewall and secondary equipment can be detached on the platform, and divided by small floating cranes and crawler cranes. physical construction.

Benefits of technology

It realizes flexibility in construction under different water depth conditions, avoids draft restrictions on large floating cranes, reduces the cost of hoisting ships, and increases the stiffness and strength of the structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222484658U_ABST
    Figure CN222484658U_ABST
Patent Text Reader

Abstract

The utility model provides an offshore photovoltaic booster station, which comprises a platform and a plurality of pipe piles, two groups of platform beams are arranged below the platform, the two groups of platform beams are vertically arranged, and each group of platform beams comprises a plurality of platform beams which are sequentially arranged at intervals; a plurality of tubular piles are sequentially arranged on each platform beam; the platform comprises a plurality of split decks; a main transformer, a firewall and secondary equipment are detachably arranged on the platform, construction operation can be achieved through a small floating crane and a crawler crane, limitation of water depth is avoided, and the engineering development requirement is met.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the field of offshore photovoltaic boosting stations, and in particular relates to an offshore photovoltaic boosting station. Background Art

[0002] The statements in this section merely provide background technical information related to the present invention and do not necessarily constitute prior art.

[0003] At present, all projects using offshore booster stations are offshore wind power projects with a water depth of more than 10m. The offshore booster stations weigh more than 2,500t and are integral frame structures, which are hoisted as a whole by large floating cranes. Most offshore photovoltaic sites are near the coast with a water depth of 3-4m, or even in the mudflats. Large floating cranes have a draft of more than 8m and cannot enter the site for operation due to water depth restrictions. The structure of traditional offshore wind power booster stations is not applicable. Summary of the invention

[0004] In order to solve the above problems, the utility model proposes an offshore photovoltaic booster station. The utility model can realize construction operations with a small floating crane or a crawler crane, is not restricted by water depth, and meets the needs of engineering development.

[0005] According to some embodiments, the utility model adopts the following technical solutions:

[0006] An offshore photovoltaic booster station comprises a platform and a plurality of pipe piles, wherein two sets of platform beams are arranged below the platform, the two sets of platform beams are arranged vertically, and each set of platform beams comprises a plurality of platform beams arranged in sequence at intervals;

[0007] A plurality of pipe piles are sequentially arranged on each platform beam;

[0008] The platform includes a plurality of split decks;

[0009] The platform is detachably provided with a main transformer, a fire wall and secondary equipment.

[0010] In the above scheme, split construction can be achieved through the separate setting of pipe piles, decks and the equipment thereon. Construction can be carried out using small floating cranes and crawler cranes without the need for large floating cranes. This not only solves the problem of draft restrictions on the entry of large floating cranes, but also greatly reduces the cost of lifting ship machinery.

[0011] As an optional implementation, the two groups of platform beams are arranged in X and Y directions respectively.

[0012] As an optional embodiment, the spacing distances of the platform beams in each group of platform beams are the same;

[0013] The spacing distances between platform beams of different groups of platform beams are the same.

[0014] As an optional implementation, the spacing between platform beams corresponding to the secondary equipment and main transformer areas is set to be smaller than the spacing between platform beams in other areas.

[0015] As an optional embodiment, the area of ​​each deck is greater than the product of the maximum distance between two adjacent platform beams.

[0016] As an optional implementation, the pipe piles arranged on the platform beam are spaced at the same distance.

[0017] As an optional embodiment, the deck is a steel deck with a single-layer structure.

[0018] As an optional implementation, the pipe piles are steel pipe piles or PHC pipe piles.

[0019] As an optional implementation, a firewall is provided between the secondary equipment and the main transformer.

[0020] As an optional implementation, the secondary equipment adopts a prefabricated cabin in a container model.

[0021] Compared with the prior art, the beneficial effects of the utility model are:

[0022] The utility model can construct pipe piles, steel platforms, main transformer secondary equipment separately, and can be constructed by small floating cranes and crawler cranes without large floating cranes. It not only solves the problem of draft restrictions on large floating cranes entering the site, but also greatly reduces the cost of lifting ship machinery.

[0023] Due to the split construction, the steel platform adopts a single-layer structure and no longer has the frame structure required for overall lifting, such as lifting columns and beams, which greatly saves structural steel and reduces the project cost.

[0024] The utility model has multiple pipe piles arranged in multiple rows, and compared with the traditional four-pile structure, the overall rigidity and strength of the structure are high. The span and cross section of the beam are smaller, and the amount of steel used in the structure is further reduced.

[0025] After the steel platform is installed, it can serve as a supporting structure for the equipment and as a temporary operating platform for construction workers.

[0026] Water exchange can be achieved between the pipe piles, which are permeable structures with little impact on the marine environment.

[0027] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, preferred embodiments are given below and described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] The drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The illustrative embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation on the present invention.

[0029] Figure 1 It is a structural schematic diagram of the offshore booster station of this embodiment. DETAILED DESCRIPTION

[0030] The utility model is further described below in conjunction with the accompanying drawings and embodiments.

[0031] It should be noted that the following detailed descriptions are all exemplary and are intended to provide further explanation of the present invention. Unless otherwise specified, all technical and scientific terms used herein have the same meanings as those commonly understood by those skilled in the art to which the present invention belongs.

[0032] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit the exemplary embodiments according to the utility model. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprise" and / or "include" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof.

[0033] In the absence of conflict, the embodiments in this application and the features in the embodiments may be combined with each other.

[0034] Embodiment 1

[0035] Offshore photovoltaic booster station, such as Figure 1 As shown, it comprises multiple rows of densely distributed pipe piles (1) at the bottom and an upper platform.

[0036] The upper platform is composed of platform beams (2) and decks (3), wherein the platform beams (2) are divided into two groups, which are perpendicular to each other, and each group includes a plurality of platform beams (2).

[0037] In this embodiment, the spacing between the platform beams (2) is the same, which can ensure force balance and facilitate construction.

[0038] Of course, in some embodiments, the spacing between the platform beams (2) may also be different. For example, in an area where the main transformer (6) and the secondary equipment (4) are to be installed, the spacing between the platform beams (2) may be reduced to increase the supporting force.

[0039] Firewalls (5), main transformers (6), secondary equipment (4) and other equipment are arranged on the upper platform and are installed by small floating cranes and crawler cranes. After the construction is completed, offshore commissioning is carried out.

[0040] In this embodiment, the pipe piles (1) are made of steel pipe piles or PHC pipe piles. The distances between the pipe piles (1) of each platform beam (2) are the same. The overall pipe piles (1) are distributed in a matrix.

[0041] The upper platform is composed of a platform beam (2) and a deck (3), which is a reinforced concrete structure or a steel structure. The entire platform can be divided into a plurality of blocks by the deck (3), which are prefabricated at a land dock.

[0042] Of course, in this embodiment, the size of the deck (3) needs to be larger than the spacing between adjacent platform beams (2).

[0043] After the pile driving construction of the pipe pile (1) is completed, the upper platform is hoisted, and the pipe pile (1) and the upper platform are connected by grouting or welding, and the construction joints between the steel platform blocks are spliced. The distance between the piles is 6-7m.

[0044] After the steel platform is constructed, the main transformer (6), firewall (5), secondary equipment (4) and the like can be hoisted and installed. The firewall (5) is arranged between the main transformer (6) and the secondary equipment (4). In this embodiment, the secondary equipment (4) adopts a prefabricated cabin in a container mode. After the land construction and installation is completed, a small floating crawler crane is used to hoist it into place, and then wiring and debugging work are carried out.

[0045] The above description is only the preferred embodiment of the utility model and is not intended to limit the utility model. For those skilled in the art, the utility model may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made by those skilled in the art within the spirit and principle of the utility model without creative labor shall be included in the protection scope of the utility model.

Claims

1. An offshore photovoltaic booster station, characterized in that: It comprises a platform and a plurality of pipe piles, wherein two groups of platform beams are arranged below the platform, the two groups of platform beams are arranged vertically, and each group of platform beams comprises a plurality of platform beams arranged in sequence at intervals; A plurality of pipe piles are sequentially arranged on each platform beam; The platform includes a plurality of split decks; The platform is detachably provided with a main transformer, a fire wall and secondary equipment.

2. An offshore photovoltaic booster station as claimed in claim 1, characterized in that: The two groups of platform beams are arranged in X and Y directions respectively.

3. An offshore photovoltaic booster station as claimed in claim 1 or 2, characterized in that: The platform beams in each set of platform beams are spaced at the same distance.

4. An offshore photovoltaic booster station as claimed in claim 3, characterized in that: The spacing distances between platform beams of different groups of platform beams are the same.

5. The offshore photovoltaic booster station according to claim 1, characterized in that: The area of ​​each deck is greater than the product of the maximum distance between two adjacent platform beams.

6. The offshore photovoltaic booster station according to claim 3, characterized in that: The pipe piles arranged on the platform beam are arranged at the same interval distance.

7. The offshore photovoltaic booster station according to claim 1, characterized in that: The deck is a steel deck and has a single-layer structure.

8. An offshore photovoltaic booster station as claimed in claim 1 or 7, characterized in that: The pipe piles are steel pipe piles or PHC pipe piles.

9. The offshore photovoltaic booster station according to claim 1, characterized in that: A firewall is arranged between the secondary equipment and the main transformer.

10. An offshore photovoltaic booster station as claimed in claim 1 or 9, characterized in that: The secondary equipment adopts a prefabricated cabin in a container mode.