By designing a lifting tool for hydraulic oil pipes for sluice gates and using the gantry and guide rail system to limit the movement of the hanging frame, the problem of traditional spreaders causing the oil pipe to shake is solved, and higher installation accuracy and efficiency are achieved.

CN222498448UActive Publication Date: 2025-02-18SINOHYDRO BUREAU 11 CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421136921.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-23
Publication Date
2025-02-18
Estimated Expiration
2034-05-23

AI Technical Summary

Technical Problem

Traditional spreaders can easily cause the oil pipe to shake when lifting and installing hydraulic oil pipes, affecting the installation accuracy and efficiency.

Method used

A lifting tool for sluice hydraulic oil pipes is designed, including a gantry, a movable hoist spreader and a guide rail system. The load on the guide rail moves along the guide rail, pulling the connecting rope to limit the movement of the hanging frame, improving the stability of the transfer process, and reducing the probability of the oil pipe shaking.

Benefits of technology

It effectively improves the accuracy and stability of the oil pipe during installation and docking, reduces shaking, and improves installation efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222498448U_ABST
    Figure CN222498448U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of hoisting equipment, in particular to a hoisting tool for accurately installing a water gate hydraulic oil pipe, which comprises a portal frame, a movable hoist hoisting tool is arranged on a cross beam of the portal frame, the extending end of a hoisting chain of the hoist hoisting tool is connected with a hoisting frame, a lower hoisting hook is arranged at the lower end of the hoisting frame, and hanging lugs are arranged on two sides of the hoisting frame. Guide rails are arranged on the inner sides of two stand columns of the portal frame, loads are vertically installed on the two guide rails in a sliding mode, connecting ropes are connected to the two loads in a hooked mode, and the other ends of the two connecting ropes are connected with the hanging lugs on the same side respectively. In the lifting process, the loads move along the guide rails, and the two loads pull the lifting frame through the connecting rope, so that the lifting frame is limited, the stability in the transferring process is improved, the shaking probability of the oil pipe is reduced, and the oil pipe is more accurate during installation and butt joint. Therefore, the installation and butt joint are quicker, and the installation efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of lifting equipment, and in particular to a lifting tool for precise installation of a hydraulic oil pipe for a sluice. Background Art

[0002] Sluice gates are important control structures in the water conservancy engineering system and are one of the main means of dispatching floods and ensuring the supply of water resources. In many sluice gate projects, hydraulic hoists are widely used. However, during the daily inspection and maintenance of the oil pipeline, maintenance personnel often find oil leakage in the return oil pipeline valve group joints, tees, etc., which poses a serious threat to the safe operation of the sluice gate. For this reason, a vacuum breaker valve is installed on the return oil main pipe to block the siphon phenomenon, slow down the oil leakage, and reduce the blockage and overflow in the return oil pipe. However, there are still many pipelines that cannot be used anymore, so they need to be disassembled and replaced.

[0003] When disassembling and assembling the oil pipe, lifting equipment is used in most cases. Traditional lifting equipment mainly includes hangers and hoists (hoisting equipment). After being tied with straps, the oil pipe is lifted by the hoisting equipment and then transferred to reduce the burden of manpower handling. However, there are certain problems with this use during installation. Ordinary hoists have a hook head. During the process of carrying the oil pipe, the oil pipe will inevitably shake, especially when the oil pipe is docked, the shaking will affect the installation process and docking accuracy.

[0004] To this end, the present application provides a lifting tool for the precise installation of the hydraulic oil pipe of a sluice gate, which solves the problem of shaking of the oil pipe caused by traditional lifting tools. Utility Model Content

[0005] The purpose of the present application is to solve the problems existing in the prior art and to propose a lifting tool for precise installation of a sluice hydraulic oil pipe.

[0006] In order to achieve the above purpose, this application adopts the following technical solutions:

[0007] A lifting tool for precise installation of hydraulic oil pipes for water gates comprises a gantry, a movable hoist is arranged on the crossbeam of the gantry, the protruding end of the lifting chain of the hoist is connected to a lifting frame, a lower hook is arranged at the lower end of the lifting frame, and hanging ears are arranged on both sides, guide rails are arranged on the inner sides of two uprights of the gantry, weights are vertically slidably installed on the two guide rails, connecting ropes are hooked on the two weights, and the other ends of the two connecting ropes are respectively connected to the hanging ears on the same side.

[0008] Preferably, the hoist is any one of a hand hoist or an electric hoist.

[0009] Preferably, the weight sleeve is arranged on a guide rail.

[0010] Preferably, the guide rail is detachably mounted on the gantry.

[0011] Preferably, the guide rail is a C-shaped tube, the weight is embedded in the C-shaped tube, and the connecting rope extends from the opening of the C-shaped tube.

[0012] Preferably, winches are provided on both sides of the gantry, a pulling rope is wound around the reel of the winch, a hook is provided at the protruding end of the pulling rope, and the hook is connected to the hanging ear on the corresponding side.

[0013] Preferably, a control box is provided on the gantry, and the control box is electrically connected to the controllers of the two winches and the electric hoist.

[0014] Compared with the prior art, the present application provides a lifting tool for precise installation of a sluice hydraulic oil pipe, which has the following beneficial effects:

[0015] The extended end of the hoisting chain of the hoist is connected to a hanging frame, and there are hanging ears on both sides of the hanging frame. There are guide rails on the inner sides of the two columns of the gantry, and weights are installed on the two guide rails for vertical sliding. There are hanging rings on the two weights, and the hooks on the hanging rings are connected with connecting ropes. The other ends of the two connecting ropes are respectively hooked with the hanging ears on the same side. During the lifting process, the weight moves along the guide rails, and the two weights pull the hanging frame through the connecting ropes, thereby limiting the hanging frame, thereby improving the stability during the transfer process, reducing the probability of oil pipe shaking, and making the installation and docking of the oil pipe more accurate; without shaking, the installation and docking is also faster, improving the installation efficiency.

[0016] Other advantages, objectives and features of the present application will be described in the following description to some extent; and will be apparent to those skilled in the art based on the following examination and study to some extent; or, may be taught from the practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a three-dimensional schematic diagram of this application.

[0018] Figure 2 Schematic diagram of two guide rail structures of this application.

[0019] Figure 3 It is a front view schematic diagram of the present application.

[0020] Figure 4 For this application Figure 3 Local schematic diagram of point A.

[0021] Figure 5 It is a front view schematic diagram of the winch pulling structure of the present application.

[0022] Figure 6 A schematic diagram of the remote control for this application.

[0023] In the figure: 1. Gantry; 2. Hoist; 3. Lifting frame; 4. Hanging ears; 5. Lower hook; 6. Guide rails; 7. Load; 8. Winch; 9. Connecting rope; 10. Pulling rope; 11. Control box; 12. Remote control. DETAILED DESCRIPTION

[0024] The following will be combined with the attached examples of the present application Figure 1-6 , the technical solutions in the embodiments of the present application are described clearly and completely. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments.

[0025] In order to solve the problems existing in the prior art, the present embodiment provides a lifting tool for the precise installation of the hydraulic oil pipe of a sluice gate, including a gantry 1, a movable hoist sling 2 is provided on the crossbeam of the gantry 1, the protruding end of the lifting chain of the hoist sling 2 is connected to a lifting frame 3, a lower hook 5 is provided at the lower end of the lifting frame 3, and hanging ears 4 are provided on both sides, guide rails 6 are provided on the inner sides of the two columns of the gantry 1, weights 7 are vertically slidably installed on the two guide rails 6, and connecting ropes 9 are hooked on the two weights 7, and the other ends of the two connecting ropes 9 are respectively connected to the hanging ears 4 on the same side.

[0026] Principle details of this embodiment:

[0027] A lifting tool for precise installation of hydraulic oil pipes for water gates, comprising a gantry 1, which is mainly composed of a crossbeam and columns erected at both ends of the crossbeam, and ribs are arranged on the columns to reinforce the support. A hoist sling 2 is arranged on the crossbeam of the gantry 1, and the hoist sling 2 is mounted on a mobile frame, and the mobile frame is provided with a guide wheel, which is driven by a motor to control the hoist sling 2 to move along the crossbeam. The hoist sling 2 comprises an upper hook, a winding mechanism, a lower hook 5, and a lifting chain. The upper hook is hoisted on the mobile frame.

[0028] The protruding end of the lifting chain of the hoist 2 is connected to a hanging frame 3, and hanging ears 4 are provided on both sides of the hanging frame 3. The lower hook 5 is suspended on the bottom wall of the hanging frame 3. Guide rails 6 are provided on the inner sides of the two columns of the gantry 1, and weights 7 are vertically slidably installed on the two guide rails 6. Both weights 7 are provided with hanging rings, and connecting ropes 9 are hooked on the hanging rings. The other ends of the two connecting ropes 9 are respectively hooked with the hanging ears 4 on the same side.

[0029] When in use, the oil pipe is lifted to the installation site by a car crane and then transferred to the device. The lower hook 5 lifts the oil pipe and is lifted and transferred. During the lifting process, the weight 7 moves along the guide rail 6, and the two weights 7 pull the hanging frame 3 through the connecting rope 9, thereby restricting the hanging frame 3, thereby improving the stability during the transfer process and reducing the probability of oil pipe shaking, so that the oil pipe installation and docking are more accurate; without shaking, the installation and docking are also faster, and the installation efficiency is improved.

[0030] In a further embodiment of the present solution, the hoist 2 is any one of a hand chain hoist and an electric hoist, both of which can realize the hoisting of the oil pipe.

[0031] In a further embodiment of the present invention, the weight 7 is sleeved on the guide rail 6. The weight 7 is provided with a through hole and sleeved on the guide rail 6, and the diameter of the through hole is larger than the size of the guide rail 6 to leave a gap to avoid jamming.

[0032] In a further embodiment of the present scheme, the guide rail 6 can be detachably mounted on the gantry 1. The guide rail 6 is C-shaped, with one end of the guide rail 6 being a cylindrical end and the other end being rotatably mounted with a stud. The columns of the gantry 1 are provided with plug holes and threaded holes at vertical intervals. During installation, the cylindrical end is aligned with the plug hole, the stud is aligned with the threaded hole, the stud is screwed and tightened into the threaded hole, and the cylindrical end is also inserted into the plug hole, thereby installing the guide rail 6 on the column. The guide rail 6 can be detachably installed, which is convenient for maintenance and replacement. And compared with fastening the two ends of the guide rail 6 to the column through multiple fasteners, when the driving structure is installed, only one needs to be screwed, and the installation is more convenient and easy.

[0033] In a further embodiment of the present scheme, the guide rail 6 can also be a C-shaped tube, and the openings of the two C-shaped tubes are both facing the hoist sling 2. At this time, the weight 7 is a steel ball, and the steel ball-shaped weight 7 is embedded in the C-shaped tube, and the connecting rope 9 extends from the opening of the C-shaped tube.

[0034] The weight 7 is used to pull and limit the position. For large sluice gates, the oil pipe is large in size and heavy in weight. Then, it may still deviate to one side due to the deviation of the center of gravity. At this time, the weight 7 on the other side of the deviation direction will slide upward and straighten to pull. Although the pull and limit can still be achieved in the end, there is still a small amount of shaking. Therefore, in this embodiment, another structure is set to replace the weight 7 structure. A winch 8 is provided at the bottom end of the columns on both sides of the gantry 1. A pulling rope 10 is wound on the reel of the winch 8. A hook is provided at the protruding end of the pulling rope 10, and the hook is connected to the corresponding side hanging ear 4. The winch 8 is wound or released in real time according to the pulling state, so as to ensure that the hanging frame 3 is always in a vertical straight state regardless of whether it is lifting or moving, which is more intelligent (such as moving to the left, the left winch 8 winds up the pulling rope 10, and the right winch 8 releases the pulling rope 10, and the pulling rope 10 is always straight). And because the winch 8 does not move, the pulling point does not move, so that the restriction is more stable and will not swing due to the movement of the hanging frame 3, which can further improve the stability of the hoisting, avoid hoisting shaking, and improve the installation accuracy of the oil pipe.

[0035] In a further embodiment of this scheme, the hoist 2 is selected as an electric hoist, and a control box 11 is provided on the gantry 1. The control box 11 is electrically connected to the controllers of the two hoists 8, the electric hoist, and the motor. The control box 11 is electrically connected to a remote controller 12. The remote controller 12 is shown in the attached figure. Figure 6 As shown, the upper and lower ends are respectively provided with an emergency stop button and a switch knob, and the middle part is provided with four groups of paired buttons at vertical intervals, which correspond to the two winches 8, the winding and releasing buttons of the electric hoist, and the forward and backward buttons of the motor of the mobile frame. Through the remote control 12, multiple groups of electric equipment can be manually controlled, and the operation is clear and convenient. The switch knob is turned to open and close, which increases the locking ability and avoids the electric equipment from being started by accidental contact or bumping; the equipment is started only after the switch knob is turned, which improves the safety of use.

[0036] The above is only a preferred specific implementation manner of the present application, but the protection scope of the present application is not limited thereto. Any technician familiar with the technical field can make equivalent substitutions or changes within the technical scope disclosed in the present application according to the technical solution and application concept of the present application, which should be covered by the protection scope of the present application.

[0037] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.

[0038] Although the embodiments of the present application have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limitations on the present application. Ordinary technicians in this field can change, modify, replace and modify the above embodiments within the scope of the present application.

Claims

1. A lifting tool for accurately installing a hydraulic oil pipe of a water gate, comprising a gantry (1), a movable hoist (2) being arranged on a crossbeam of the gantry (1), characterized in that: The extended end of the lifting chain of the hoist (2) is connected to a lifting frame (3), the lower end of the lifting frame (3) is provided with a lower hook (5), and both sides are provided with hanging ears (4), the inner sides of the two columns of the gantry (1) are provided with guide rails (6), and the two guide rails (6) are vertically slidably mounted with loads (7), and the two loads (7) are hooked with connecting ropes (9), and the other ends of the two connecting ropes (9) are respectively connected to the hanging ears (4) on the same side.

2. A lifting tool for accurate installation of a water gate hydraulic oil pipe according to claim 1, characterized in that: The hoist (2) is any one of a hand chain hoist and an electric hoist.

3. A lifting tool for accurate installation of a water gate hydraulic oil pipe according to claim 1, characterized in that: The load (7) is sleeved on the guide rail (6).

4. A lifting tool for accurate installation of a water gate hydraulic oil pipe according to claim 3, characterized in that: The guide rail (6) is detachably mounted on the gantry (1).

5. A lifting tool for accurate installation of a water gate hydraulic oil pipe according to claim 1, characterized in that: The guide rail (6) is a C-shaped tube, the weight (7) is embedded in the C-shaped tube, and the connecting rope (9) extends from the opening of the C-shaped tube.

6. A lifting tool for accurate installation of a water gate hydraulic oil pipe according to claim 2, characterized in that: A winch (8) is provided on both sides of the gantry (1), a pulling rope (10) is wound around the reel of the winch (8), a hook is provided at the protruding end of the pulling rope (10), and the hook is connected to the hanging ear (4) on the corresponding side.

7. A lifting tool for accurate installation of a water gate hydraulic oil pipe according to claim 6, characterized in that: A control box (11) is provided on the gantry (1), and the control box (11) is electrically connected to the controllers of the two winches (8) and the electric hoist.