Lifting appliance mounting structure for crane

By designing a lifting installation structure for a crane including main longitudinal beam, installed beam body, locking part, connector and connection part, the problem of overall replacement of the lifting beam structure in the prior art is solved when the gap in the hoisting range is too large, and the effect of flexible adjustment and improvement of the lifting load-bearing capacity is achieved.

CN222574046UActive Publication Date: 2025-03-07SICHUAN ROAD & BRIDGE EAST CHINA CONSTRUCTION CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420065830.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-11
Publication Date
2025-03-07
Estimated Expiration
2034-01-11

AI Technical Summary

Technical Problem

The existing hoist beam connecting structure needs to be replaced as a whole when the hoisting range is too large, resulting in difficulty in meeting the hoisting requirements.

Method used

A suspender installation structure for a crane is designed, including a main longitudinal beam, an installed beam body, a locking part, a connecting part and a connecting part. By symmetrically installing the installed beam body and a locking part, the suspended beam structure can be adjusted according to the requirements of the lifting range, and longitudinal rib reinforcement parts are provided inside the main longitudinal beam and the installed beam body to meet the lifting load-bearing needs.

Benefits of technology

It effectively solves the problem of the overall replacement of the lifting beam structure when the gap in the lifting range is too large, and realizes flexible adjustments according to the requirements of different lifting ranges, meets the lifting needs and improves the load-bearing capacity of the lifting.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222574046U_ABST
    Figure CN222574046U_ABST
Patent Text Reader

Abstract

The utility model discloses a lifting appliance mounting structure for a crane, which comprises a main longitudinal beam of a square structure. Two beam bodies are additionally arranged; two groups of locking parts; a plurality of connecting pieces; two groups of connecting parts; and three groups of longitudinal rib reinforcing parts. According to the embodiment of the utility model, the two additionally-mounted beam bodies are symmetrically additionally mounted at the two ends of the main longitudinal beam through the locking parts, so that the connecting parts can be selectively mounted at the bottom ends of the main longitudinal beam and / or the additionally-mounted beam bodies, and the connecting pieces can be selectively mounted at the top ends of the main longitudinal beam and / or the additionally-mounted beam bodies according to the requirement of a hoisting range; and therefore, the hoisting requirements of different hoisting range requirements are met. And meanwhile, longitudinal rib reinforcing parts are arranged in the main longitudinal beams and the additionally-mounted beam body, so that the main longitudinal beams and the additionally-mounted beam body meet the hoisting and bearing requirements. The defect that in the prior art, when the hoisting range difference is too large, the whole hoisting beam structure needs to be replaced is effectively overcome.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of crane slings, in particular to a sling installation structure for a crane. Background Art

[0002] When the crane is directly hoisted using the sling, the gravity of the object being hoisted will directly act on the crane, which can easily reduce the service life of the crane. At the same time, it is easily affected by the shaking and rotational force of the object being hoisted, which may cause accidents. Therefore, a beam connection structure is generally arranged between the crane and the sling to achieve a balanced interaction force during hoisting.

[0003] Today's hanging beam connection structures are generally integral, and the adjustment of the hanging point position is limited for objects in different lifting ranges. When the difference in the lifting range is too large, it is necessary to replace the entire hanging beam structure with a different longitudinal width to meet the lifting needs, so as to meet the lifting requirements. Utility Model Content

[0004] The utility model aims to solve the shortcoming in the prior art that the hanging beam structure needs to be replaced as a whole when the hanging range is too large, and proposes a hanging device installation structure for a crane.

[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0006] A crane sling installation structure, comprising:

[0007] A main longitudinal beam, wherein the main longitudinal beam has a square structure;

[0008] Two additional beams, the two additional beams are respectively arranged at two ends of the main longitudinal beam, and the two additional beams are symmetrically arranged;

[0009] Two sets of locking parts, the two sets of locking parts are arranged at both ends of the main longitudinal beam, and the locking parts are used to lock and connect the main longitudinal beam with the additional beam body;

[0010] A plurality of connecting members, wherein the connecting members are arranged at the top ends of the main longitudinal beams and / or the additional beams, and the connecting members are used to be connected to the crane;

[0011] Two groups of connection parts, the two groups of connection parts are arranged at the bottom ends of the main longitudinal beam and / or the additional beam body, and the two groups of connection parts are symmetrically arranged, and the bottom ends of the connection parts are used to install the sling;

[0012] There are three groups of longitudinal rib reinforcement parts, one group of the longitudinal rib reinforcement parts is arranged inside the main longitudinal beam, and the other two groups of the longitudinal rib reinforcement parts are respectively arranged in the two added beam bodies, and the arrangement directions of the three groups of longitudinal rib reinforcement parts are consistent.

[0013] In a feasible embodiment, the locking portion includes:

[0014] A plurality of first connection holes, wherein the plurality of first connection holes are respectively arranged on the top surface and the bottom surface of the connection between the main longitudinal beam and the additional beam body, and the plurality of first connection holes are distributed in a rectangular array on the top surface and the bottom surface of the connection between the main longitudinal beam and the additional beam body;

[0015] Two first locking plates, each of which is provided with a plurality of first locking holes, the positions of the first locking holes and the first connecting holes corresponding to each other, the two first locking plates being respectively arranged on the top surface and the bottom surface of the connection between the main longitudinal beam and the additional beam body, and the two first locking plates being symmetrically arranged up and down;

[0016] A plurality of second connection holes, wherein the plurality of second connection holes are respectively arranged on both side surfaces of the connection between the main longitudinal beam and the additional beam body, and the plurality of second connection holes are distributed in an I-shaped manner on both side surfaces of the connection between the main longitudinal beam and the additional beam body;

[0017] Two second locking plates, the second locking plates are in an I-shape, a plurality of second locking holes are arranged on the second locking plates, the positions of the second locking holes correspond one to one with the positions of the second connecting holes, the two second locking plates are respectively arranged on the two side surfaces of the connection between the main longitudinal beam and the additional beam body, and the two second locking plates are symmetrically arranged front to back.

[0018] In a feasible embodiment, the first connecting hole and the second connecting hole are screw holes.

[0019] In a feasible embodiment, the first locking plate, the second locking plate, the main longitudinal beam and the additional beam body are detachably connected by rivets or bolts.

[0020] In a feasible embodiment, the longitudinal rib reinforcement portion includes:

[0021] At least two ring plates, the ring plates are in a square structure, each two ring plates are arranged parallel to each other, and a plurality of mounting grooves are arranged on the outer periphery of the ring plates;

[0022] A plurality of ribs are strip-shaped, are arranged along the outer circumference of the ring plate, are connected to the ring plate through the mounting groove, and connect the parallelly arranged ring plates as a whole.

[0023] In a feasible embodiment, the ribs are respectively connected to the ring plates by welding.

[0024] In a feasible embodiment, the connecting portion includes:

[0025] Two connecting sleeves, the connecting sleeves are arranged through the main longitudinal beam and / or the additional beam body, and the two connecting sleeves are arranged symmetrically;

[0026] A connecting seat, wherein two connecting ears are symmetrically arranged on the top of the connecting seat, and the two connecting ears are sleeved on the two ends of the connecting sleeve, and the connecting seat is connected to the connecting sleeve and the main longitudinal beam and / or the additional beam body through the two connecting ears;

[0027] Wherein, a first mounting hole is provided at the bottom of the connecting seat;

[0028] The first distribution beam is a square structure, the setting direction of the first distribution beam is perpendicular to the setting direction of the main longitudinal beam and / or the additional beam body, the first distribution beam is provided with a second mounting hole, the first distribution beam is connected to the first mounting hole on the connecting seat through the second mounting hole, and the bottom end of the first distribution beam is used for connecting a sling.

[0029] The beneficial effects of the utility model are:

[0030] In the embodiment of the utility model, two additional beams are symmetrically installed at both ends of the main longitudinal beam through locking parts. According to the requirements of the lifting range, it is possible to choose to install the connecting part at the bottom end of the main longitudinal beam and / or the additional beam, or to choose to install the connecting part at the top end of the main longitudinal beam and / or the additional beam, so as to meet the lifting requirements of different lifting ranges. At the same time, longitudinal rib reinforcement parts are arranged inside the main longitudinal beam and the additional beam, so that the main longitudinal beam and the additional beam meet the lifting load-bearing requirements. That is, it effectively solves the disadvantage of the prior art that the lifting beam structure needs to be replaced as a whole when the lifting range difference is too large. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 It is a schematic diagram of the overall structure of a sling installation structure for a crane provided in an embodiment of the utility model;

[0032] Figure 2 It is a schematic diagram of the locking part structure in a crane sling installation structure provided in an embodiment of the utility model;

[0033] Figure 3 It is a schematic diagram of the structure of the longitudinal rib reinforcement part in a crane sling installation structure provided in an embodiment of the utility model;

[0034] Figure 4 A schematic diagram of a connecting seat structure in a crane sling installation structure provided in an embodiment of the utility model

[0035] Figure 5It is a schematic diagram of the first distribution beam structure in a crane sling installation structure provided in an embodiment of the utility model.

[0036] The markings in the figure are as follows:

[0037] 1. Main longitudinal beam;

[0038] 2. Install beams; 21. Connectors;

[0039] 3. First locking plate; 31. First connecting hole;

[0040] 4. second locking plate; 41. second connecting hole;

[0041] 5. Connecting part; 51. Connecting seat; 511. Connecting sleeve; 512. Connecting ear; 513. First mounting hole; 52. First distribution beam; 521. Second mounting hole;

[0042] 6. Longitudinal rib reinforcement; 61. Ribs; 62. Ring plate. DETAILED DESCRIPTION

[0043] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0044] It should be noted that all directional indications in the embodiments of the present invention (such as up, down, left, right, front, back...) are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.

[0045] In the present invention, unless otherwise clearly specified and limited, the terms "connection", "fixation", etc. should be understood in a broad sense. For example, "fixation" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0046] In addition, if there are descriptions involving "first", "second", etc. in the embodiments of the utility model, the descriptions of "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the meaning of "and / or" appearing in the full text includes three parallel schemes. Taking "A and / or B" as an example, it includes scheme A, or scheme B, or a scheme that satisfies both A and B. In addition, the technical solutions between the various embodiments can be combined with each other, but it must be based on the ability of ordinary technicians in this field to implement. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such a combination of technical solutions does not exist and is not within the scope of protection required by the utility model.

[0047] Example

[0048] Reference Figures 1 to 5In order to solve the disadvantage of the prior art that the entire suspension beam structure needs to be replaced when the lifting range is too large, the utility model provides a suspension equipment installation structure for a crane, the installation structure comprising: a main longitudinal beam 1, two additional beam bodies 2, a plurality of connectors 21, two sets of locking parts and two sets of connecting parts 5. The main longitudinal beam 1 is a square structure, so that the crane and the suspension equipment can be installed later. The two additional beam bodies 2 are respectively arranged at the two ends of the main longitudinal beam 1, and the two additional beam bodies 2 are symmetrically arranged. Two sets of locking parts are arranged at the two ends of the main longitudinal beam 1, and the locking parts are used to lock and connect the main longitudinal beam 1 with the additional beam body 2. A plurality of connecting parts 21 are arranged at the top of the main longitudinal beam 1 and / or the additional beam body 2, and the connecting parts 21 are used to connect with the crane. That is, according to the requirements of the lifting range, the connecting parts 21 can be selected to be installed at the top of the main longitudinal beam 1 and / or the additional beam body 2, and then connected with the crane by using the connecting parts 21. Two groups of the connection parts 5 are arranged at the bottom ends of the main longitudinal beam 1 and / or the additional beam body 2, and the two groups of the connection parts 5 are symmetrically arranged, and the bottom ends of the connection parts 5 are used to install the hoist. That is, according to the requirements of the hoisting range, the connection parts 5 can be installed at the bottom ends of the main longitudinal beam 1 and / or the additional beam body 2, and then connected to the crane by using the connection parts 5. In this embodiment, in order to allow the main longitudinal beam 1 and the additional beam body 2 to meet the hoisting requirements, the installation structure also includes: three groups of longitudinal rib reinforcement parts 6, one group of the longitudinal rib reinforcement parts 6 is arranged inside the main longitudinal beam 1, and the other two groups of the longitudinal rib reinforcement parts 6 are respectively arranged in the two additional beam bodies 2, and the three groups of the longitudinal rib reinforcement parts 6 are arranged in the same direction. In this embodiment, two additional beams 2 are symmetrically installed at both ends of the main longitudinal beam 1 through locking parts, and the connection part 5 can be installed at the bottom of the main longitudinal beam 1 and / or the additional beam 2, and the connection part 21 can be installed at the top of the main longitudinal beam 1 and / or the additional beam 2 according to the requirements of the lifting range, so as to meet the lifting requirements of different lifting ranges. At the same time, longitudinal rib reinforcement parts 6 are arranged inside the main longitudinal beam 1 and the additional beam 2, so that the main longitudinal beam 1 and the additional beam 2 can meet the lifting load-bearing requirements. That is, it effectively solves the disadvantage of the prior art that the lifting beam structure needs to be replaced as a whole when the lifting range difference is too large.

[0049] Reference Figure 1 and Figure 2, two groups of the locking parts are used to connect the main longitudinal beam 1 and the two additional beam bodies 2 as a whole at both ends of the main longitudinal beam 1. In order to facilitate the description of the structure of the locking part, a group of the locking parts is used as an example. Specifically, the locking part includes: two first locking plates 3, a plurality of first connecting holes 31, two second locking plates 4 and a plurality of second connecting holes 41. The plurality of first connecting holes 31 are respectively arranged on the top surface and the bottom surface of the connection between the main longitudinal beam 1 and the additional beam body 2, and the plurality of first connecting holes 31 are distributed in a rectangular array on the top surface and the bottom surface of the connection between the main longitudinal beam 1 and the additional beam body 2. The first locking plate 3 is provided with a plurality of first locking holes (not marked in the figure), and the positions of the first locking holes and the first connecting holes 31 correspond one to one. The two first locking plates 3 are respectively arranged on the top surface and the bottom surface of the connection between the main longitudinal beam 1 and the additional beam body 2, and the two first locking plates 3 are symmetrically arranged up and down. A plurality of second connection holes 41 are respectively arranged on both sides of the connection between the main longitudinal beam 1 and the additional beam body 2, and the plurality of second connection holes 41 are distributed in an I-shaped manner on both sides of the connection between the main longitudinal beam 1 and the additional beam body 2. The second locking plate 4 is in an I-shaped manner, and a plurality of second locking holes (not marked in the figure) are arranged on the second locking plate 4, and the positions of the second locking holes and the second connection holes 41 correspond one to one, and two second locking plates 4 are respectively arranged on both sides of the connection between the main longitudinal beam 1 and the additional beam body 2, and the two second locking plates 4 are symmetrically arranged front to back. In this embodiment, when it is necessary to connect the main longitudinal beam 1 with the two additional beam bodies 2, it is only necessary to connect the two first locking plates 3 with the first connection holes 31 through the first locking holes to connect the top surface and the bottom surface of the connection between the main longitudinal beam 1 and the additional beam body 2; it is only necessary to connect the two second locking plates 4 with the second connection holes 41 through the second locking holes to connect the two sides of the connection between the main longitudinal beam 1 and the additional beam body 2. In a feasible embodiment, the two second locking plates 4 are connected to the second connection holes 41 through the second locking holes by rivets or bolts; similarly, the two first locking plates 3 are connected to the first connection holes 31 through the first locking holes by rivets or bolts. That is, the first locking plates 3 and the second locking plates 4 are detachably connected to the main longitudinal beam 1 and the additional beam body 2 at the connection point between the main longitudinal beam 1 and the additional beam body 2 by rivets or bolts. That is, the first connection hole 31 and the second connection hole 41 are screw holes.

[0050] Reference Figure 2 and Figure 3In this embodiment, in order to further make the load-bearing capacity of the main longitudinal beam 1 and the additional beam body 2 meet the lifting requirements, three groups of longitudinal rib reinforcement parts 6 are respectively arranged inside the main longitudinal beam 1 and the two additional beam bodies 2. In order to facilitate the description of the structure of the longitudinal rib reinforcement part 6, one longitudinal rib reinforcement part 6 is described. Specifically, the longitudinal rib reinforcement part 6 includes: at least two ring plates 62 and a plurality of ribs 61. The ring plates 62 are square structures, and each two ring plates 62 are arranged parallel to each other. A plurality of mounting grooves (not marked in the figure) are arranged on the outer periphery of the ring plates 62 to facilitate the subsequent installation of the ribs 61. The ribs 61 are strip-shaped, and a plurality of ribs 61 are arranged along the outer periphery of the ring plates 62. The plurality of ribs 61 are connected to the ring plates 62 through the mounting grooves. The plurality of ribs 61 connect the parallel ring plates 62 as a whole to form the longitudinal rib reinforcement part 6. The longitudinal rib reinforcement part 6 is respectively arranged inside the main longitudinal beam 1 and the additional beam body 2, that is, the structure composed of multiple ribs 61 and the ring plate 62 is respectively arranged inside the main longitudinal beam 1 and the additional beam body 2. In this embodiment, the main longitudinal beam 1 and the additional beam body 2 are beam structures formed by installing templates around the longitudinal rib reinforcement part 6 composed of multiple ribs 61 connected to multiple ring plates 62. Among them, the size of the ring plate 62 of the additional beam body 2 away from the main longitudinal beam 1 gradually decreases, and accordingly, the multiple ribs 61 on the additional beam body 2 are arranged obliquely.

[0051] In a feasible embodiment, in order to enhance the load-bearing capacity of the longitudinal rib reinforcement portion 6 for the main longitudinal beam 1 and the additional beam body 2 during hoisting, the ribs 61 are respectively connected to the ring plates 62 by welding.

[0052] Reference Figure 1 , Figure 4 and Figure 5, the two groups of connecting parts 5 are respectively arranged at the bottom ends of the main longitudinal beam 1 and / or the additional beam body 2, and the two groups of connecting parts 5 are symmetrically arranged. In order to facilitate the description of the structure of the connecting part 5, one group of connecting parts 5 is used for explanation. Specifically, the connecting part 5 includes: a connecting seat 51, a connecting sleeve 511 and a first distribution beam 52. The connecting sleeve 511 is arranged on the main longitudinal beam 1 and / or the additional beam body 2, and the two connecting sleeves 511 are symmetrically arranged. Two connecting ears 512 are symmetrically arranged on the top of the connecting seat 51, and the two connecting ears 512 are sleeved on the two ends of the connecting sleeve 511. The connecting seat 51 is connected to the connecting sleeve 511 and the main longitudinal beam 1 and / or the additional beam body 2 through the two connecting ears 512. A first mounting hole 513 is arranged at the bottom of the connecting seat 51. The first distribution beam 52 is in a square structure, the arrangement direction of the first distribution beam 52 is perpendicular to the arrangement direction of the main longitudinal beam 1 and / or the additional beam body 2, the first distribution beam 52 is provided with a second mounting hole 521, and the first distribution beam 52 is connected to the first mounting hole 513 on the connecting seat 51 through the second mounting hole 521. The bottom end of the first distribution beam 52 is used to connect a sling.

[0053] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A crane sling installation structure, characterized in that: include: A main longitudinal beam, wherein the main longitudinal beam has a square structure; Two additional beams, the two additional beams are respectively arranged at two ends of the main longitudinal beam, and the two additional beams are symmetrically arranged; Two sets of locking parts, the two sets of locking parts are arranged at both ends of the main longitudinal beam, and the locking parts are used to lock and connect the main longitudinal beam with the additional beam body; A plurality of connecting members, wherein the connecting members are arranged at the top ends of the main longitudinal beams and / or the additional beams, and the connecting members are used to be connected to the crane; Two groups of connection parts, the two groups of connection parts are arranged at the bottom ends of the main longitudinal beam and / or the additional beam body, and the two groups of connection parts are symmetrically arranged, and the bottom ends of the connection parts are used to install the sling; There are three groups of longitudinal rib reinforcement parts, one group of the longitudinal rib reinforcement parts is arranged inside the main longitudinal beam, and the other two groups of the longitudinal rib reinforcement parts are respectively arranged in the two added beam bodies, and the arrangement directions of the three groups of longitudinal rib reinforcement parts are consistent.

2. A crane sling installation structure according to claim 1, characterized in that: The locking portion comprises: A plurality of first connection holes, wherein the plurality of first connection holes are respectively arranged on the top surface and the bottom surface of the connection between the main longitudinal beam and the additional beam body, and the plurality of first connection holes are distributed in a rectangular array on the top surface and the bottom surface of the connection between the main longitudinal beam and the additional beam body; Two first locking plates, each of which is provided with a plurality of first locking holes, the positions of the first locking holes and the first connecting holes corresponding to each other, the two first locking plates being respectively arranged on the top surface and the bottom surface of the connection between the main longitudinal beam and the additional beam body, and the two first locking plates being symmetrically arranged up and down; A plurality of second connection holes, wherein the plurality of second connection holes are respectively arranged on both side surfaces of the connection between the main longitudinal beam and the additional beam body, and the plurality of second connection holes are distributed in an I-shaped manner on both side surfaces of the connection between the main longitudinal beam and the additional beam body; Two second locking plates, the second locking plates are in an I-shape, a plurality of second locking holes are arranged on the second locking plates, the positions of the second locking holes correspond one to one with the positions of the second connecting holes, the two second locking plates are respectively arranged on the two side surfaces of the connection between the main longitudinal beam and the additional beam body, and the two second locking plates are symmetrically arranged front to back.

3. A crane sling installation structure according to claim 2, characterized in that: The first connecting hole and the second connecting hole are screw holes.

4. A crane sling installation structure according to claim 3, characterized in that: The first locking plate, the second locking plate, the main longitudinal beam and the added beam body are detachably connected by rivets or bolts.

5. A crane sling installation structure according to any one of claims 1 to 4, characterized in that: The longitudinal rib reinforcement portion comprises: At least two ring plates, the ring plates are in a square structure, each two ring plates are arranged parallel to each other, and a plurality of mounting grooves are arranged on the outer periphery of the ring plates; A plurality of ribs are strip-shaped, are arranged along the outer circumference of the ring plate, are connected to the ring plate through the mounting groove, and connect the parallelly arranged ring plates as a whole.

6. A crane sling installation structure according to claim 5, characterized in that: The ribs are respectively connected to the ring plates by welding.

7. A crane sling installation structure according to claim 1, characterized in that: The connecting portion comprises: Two connecting sleeves, the connecting sleeves are arranged through the main longitudinal beam and / or the additional beam body, and the two connecting sleeves are arranged symmetrically; A connecting seat, wherein two connecting ears are symmetrically arranged on the top of the connecting seat, and the two connecting ears are sleeved on the two ends of the connecting sleeve, and the connecting seat is connected to the connecting sleeve and the main longitudinal beam and / or the additional beam body through the two connecting ears; Wherein, a first mounting hole is provided at the bottom of the connecting seat; The first distribution beam is a square structure, the setting direction of the first distribution beam is perpendicular to the setting direction of the main longitudinal beam and / or the additional beam body, the first distribution beam is provided with a second mounting hole, the first distribution beam is connected to the first mounting hole on the connecting seat through the second mounting hole, and the bottom end of the first distribution beam is used for connecting a sling.