Modularized wind power blade on-site crushing system
Through the modularly designed wind power blade in-site crushing system, the problems of high transportation costs and difficult crushing in wind power blade recycling and disposal are solved, and the in-situ crushing in the wind farm is achieved, reducing energy consumption and transportation costs.
Patent Information
- Application Number
- CN202420915639.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-28
- Publication Date
- 2025-03-11
- Estimated Expiration
- 2034-04-28
AI Technical Summary
It is difficult to recycle and dispose of wind power blades after retirement, especially due to their huge size, complex structure and material characteristics, the transportation cost is high and the difficulty of crushing is difficult. The existing mobile processing system has poor adaptability to different structural materials and high energy consumption.
The wind power blade in-site crushing system adopts a modular design, including the first and second crushing modules. Each module includes different crushing equipment and conveyors. It can be used alone or in combination, and the crushing method is flexibly selected according to the thickness of the material to reduce energy consumption.
The wind power blades are broken in situ or near the wind farm, reducing transportation costs and energy consumption, and the energy consumption saving ratio can reach more than 29%, and the crushing efficiency and equipment adaptability are improved.
Smart Images

Figure CN222590402U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of solid waste resource utilization, and in particular to a modular on-site crushing system for wind turbine blades. Background Art
[0002] The recycling and disposal of retired wind turbine blades is one of the problems that the wind power industry needs to solve urgently. At present, the technical paths for the recycling and disposal of retired wind turbine blades mainly include physical recycling, disguised life extension, chemical recycling, thermal treatment, etc. However, no matter which technical path is adopted, it is necessary to carry out common pre-treatment work such as cutting and crushing on retired wind turbine blades. Since wind farms are generally located in remote and scattered areas, and wind turbine blades are huge in size, complex in structure, and the main material is high-strength glass fiber-resin composite materials, their transportation costs are high and crushing is difficult. In actual operation, it is found that the material structures of various parts of wind turbine blades are quite different. Parts such as the blade root are pure composite materials and are relatively thick, which makes crushing extremely difficult; the rest of the parts are relatively thin, and parts such as the web are sandwich structures, which make crushing relatively easy. Therefore, how to develop an efficient and energy-saving crushing device and crushing method based on the characteristics of wind turbine blade structural materials has also become one of the problems that the wind turbine blade processing industry needs to solve urgently.
[0003] The Chinese utility model patent with the authorization announcement number CN219377406U discloses a wind turbine blade crushing and sorting line, which includes a shredder, a crusher, a specific gravity sorter, a heavy material vibrating screen and a light material vibrating screen, etc., which can realize the crushing and sorting of wind turbine blade cutting materials. However, this patent is a fixed processing line, and the wind turbine blade cutting materials need to be transported from the wind farm to the processing line. The wind turbine blades are irregular in shape and still have a certain curvature after cutting. The stacking density is low during transportation, and it can only be used in areas with dense wind farms, and the transportation cost is high.
[0004] The Chinese invention patent with the authorization announcement number CN113856876B discloses a mobile industrial solid waste fiber composite material processing system, which integrates crushing, screening and other equipment into a skid and installs it on a car, realizing on-site crushing of waste. However, the patent only includes a primary coarse crushing device, which has poor adaptability to the different thickness characteristics of different structural materials of wind turbine blades and high processing energy consumption.
[0005] The Chinese utility model patent with the authorization announcement number CN219768832U discloses a system for efficiently cutting and crushing large-sized composite solid waste on site. The crushing device is integrated into a vehicle-mounted skid, which can achieve efficient mechanical cutting and crushing of large-sized composite solid waste on site. The crushing device part of the patent also only includes a primary coarse crushing device, which is not very targeted at crushing materials in different structural parts of wind turbine blades. Utility Model Content
[0006] The utility model aims to provide a modular on-site wind turbine blade crushing system to solve the problem that wind farms are generally located in remote and scattered areas. Recycling retired wind turbine blades through fixed processing lines requires transporting the blades from the wind farms to the processing lines. The wind turbine blades are huge in size and irregular in shape, and the transportation cost is high. The wind turbine blades have a complex structure and the material thickness of each part is different. The existing wind turbine blade mobile processing system uses a single device to roughly crush the wind turbine blade cutting materials, which has performance mismatch and places high requirements on subsequent crushing equipment.
[0007] The utility model is realized by adopting the following technical solutions:
[0008] The utility model provides a modular on-site crushing system for wind turbine blades, comprising a first crushing module and a second crushing module, which can be used alone or in combination;
[0009] The first crushing module includes a first container, a first mobile loader, and a primary coarse crusher, a first conveyor, and a first distribution box arranged inside the first container; the discharge port of the first mobile loader is sealedly connected to the feed port of the primary coarse crusher, and the discharge port of the primary coarse crusher is sealedly connected to the feed port of the first conveyor;
[0010] The second crushing module includes a second container, a second mobile loader, and a secondary coarse crusher, a second conveyor, a fine crusher, a cyclone dust removal discharger, a material receiving vehicle, and a second distribution box arranged inside the second container; when the second mobile loader is used for feeding the primary coarse crushed material, the feeding port of the second mobile loader is sealed and connected to the discharging port of the first conveyor;
[0011] The discharge port of the second mobile loader is sealedly connected to the feed port of the secondary coarse crusher, the discharge port of the secondary coarse crusher is sealedly connected to the feed port of the second conveyor, and the second conveyor is used for sealed conveying or discharging of the secondary coarse crushed material; when the secondary coarse crushed material needs to be finely crushed, the discharge port of the second conveyor is sealedly connected to the feed port of the fine crusher, the discharge port of the fine crusher is sealedly connected to the feed pipe of the cyclone dust collector discharger, and the material receiving vehicle is arranged at the discharge port of the cyclone dust collector discharger.
[0012] As the preferred technical solution:
[0013] A box-type dust collector is also provided inside the second container;
[0014] The primary coarse crusher is provided with a first dust collecting port, and the first dust collecting port is connected to the box-type dust collector through a pipeline;
[0015] The secondary coarse crusher is provided with a second dust collecting port, and the second dust collecting port is connected to the box-type dust collector through a pipeline;
[0016] The cyclone dust removal discharge machine has a third dust collection port, and the third dust collection port is connected to the box-type dust collector through a pipeline.
[0017] As the preferred technical solution:
[0018] The discharge port of the first mobile loader, the feed port of the first coarse crusher, the discharge port of the second mobile loader and the feed port of the second coarse crusher are all provided with sealing structures.
[0019] As the preferred technical solution:
[0020] A plurality of switchable interfaces are arranged on the shells of the first container and the second container.
[0021] As the preferred technical solution:
[0022] The first mobile loader is arranged at a side outside the first container, and the second mobile loader is arranged at a side outside the second container.
[0023] As the preferred technical solution:
[0024] The first distribution box is connected to each device of the first crushing module, and the second distribution box is connected to each device of the second crushing module.
[0025] As the preferred technical solution:
[0026] The discharge port of the first mobile loader, the feed port of the first coarse crusher, the discharge port of the first conveyor, the feed port of the second mobile loader, the discharge port of the second mobile loader and the feed port of the secondary coarse crusher are all arranged in a square shape.
[0027] As the preferred technical solution:
[0028] The material receiving vehicle is arranged below the discharge port of the cyclone dust removal discharging machine.
[0029] As the preferred technical solution:
[0030] The bottoms of the first mobile loader and the second mobile loader are both provided with moving wheels.
[0031] As the preferred technical solution:
[0032] The first conveyor and the second conveyor each have two feed openings.
[0033] Used to meet different conveying or discharging conditions.
[0034] The method for crushing wind turbine blades by using the modular wind turbine blade on-site crushing system comprises the following steps:
[0035] S1: Cutting and sorting wind turbine blades;
[0036] Cutting wind turbine blades to obtain wind turbine blade cutting materials, which are classified according to material type and thickness before crushing. The wind turbine blade cutting materials are divided into two categories: the first category of cutting materials is cutting materials at the blade root with a thickness of more than 40 mm; the second category of cutting materials is cutting materials at the main beam, leading edge, trailing edge, and sandwich material with a thickness of ≤40 mm;
[0037] S2: The classified wind turbine blade cutting materials are crushed, and a single crushing module or two crushing modules are selected for operation according to the material properties and discharge conditions.
[0038] As the preferred technical solution:
[0039] The step S2 specifically includes:
[0040] When the cutting material is of the first type and only needs to be subjected to primary coarse crushing, the first crushing module is operated alone; the cutting material raw material is passed into the first crushing module, crushed by the primary coarse crusher, and the product is discharged by the first conveyor, and the coarse crushing dust enters the box-type dust collector in the second crushing module to be emptied after dust removal;
[0041] When the cutting material is the first type of cutting material and needs to be subjected to secondary coarse crushing, the two crushing modules are used together; the cutting material raw material is passed into the first crushing module, crushed by the primary coarse crusher, and then enters the second crushing module, and then crushed by the secondary coarse crusher. The product is discharged from the discharge port of the horizontal section of the second conveyor, and the coarse crushing dust enters the box-type dust collector to complete dust removal and then is emptied;
[0042] When the cutting material is the first type of cutting material and needs to be finely crushed, the two crushing modules are used together; the cutting material raw material is passed into the first crushing module, crushed by the first-level coarse crusher, and then enters the second crushing module, and then crushed by the second-level coarse crusher and the fine crusher in turn, and the product is discharged from the discharge port of the cyclone dust removal discharger, and the coarse crushing dust and the fine crushing dust enter the box-type dust collector to complete dust removal and then be emptied;
[0043] When the cutting material is the second type of cutting material and only needs to be subjected to secondary coarse crushing, the second crushing module is operated separately; the cutting material raw material is passed into the second crushing module, crushed by the secondary coarse crusher, and the product is discharged from the discharge port of the horizontal section of the second conveyor, and the coarse crushing dust enters the box-type dust collector to be emptied after dust removal;
[0044] When the cutting material belongs to the second type of cutting material and needs to be finely crushed, the second crushing module is operated alone; the cutting material raw material is passed into the second crushing module, and is crushed by the secondary coarse crusher and the fine crusher in turn. The product is discharged from the discharge port of the cyclone dust collector, and the coarse crushing dust and the fine crushing dust enter the box-type dust collector to be emptied after dust removal.
[0045] In summary, due to the adoption of the above technical solution, the beneficial effects of the utility model are:
[0046] 1. The utility model adopts modular design, and flexibly selects two crushing modules to be used together or separately according to the different thicknesses of wind turbine blade materials to meet various feeding requirements. While ensuring the full structural crushing performance of wind turbine blades, it reduces the overall operating energy consumption of blade crushing, is highly efficient and energy-saving, and the energy saving ratio can reach more than 29%; at the same time, the conveyor equipment is flexibly modified to meet different discharging requirements, and the first-level coarse crushing material, the second-level coarse crushing material and the fine crushing material can be discharged separately.
[0047] 2. The crushing system of the utility model has an ingenious layout and a compact structure. The crushing system can be transported to the wind farm site by vehicle, solving the problem of high transportation cost of retired wind turbine blades. The wind turbine blade cuttings can be crushed on-site or near the wind farm, thereby increasing the transportation volume density and reducing transportation costs.
[0048] 3. The discharge port of the first mobile loader, the feed port of the first coarse crusher, the discharge port of the first conveyor, the feed port of the second mobile loader, the discharge port of the second mobile loader and the feed port of the second coarse crusher of the crushing system of the utility model are all arranged in a square shape, which is convenient for multi-directional connection between the equipment, such as linear connection or cross connection, and can realize multi-directional feeding function. The system devices can be flexibly placed according to the conditions of the crushing site to form a variety of layout forms, and the site adaptability is strong.
[0049] 4. To address the dust problem during the crushing process, the utility model adopts a closed design and is equipped with a two-stage dust removal device. The wind turbine blade material is crushed in a closed environment throughout the entire process, which can effectively avoid the problem of dust overflow during the crushing process and is environmentally friendly. BRIEF DESCRIPTION OF THE DRAWINGS
[0050] Figure 1 It is a structural schematic diagram of the modular wind turbine blade on-site crushing system described in the utility model.
[0051] Figure 2 This is a schematic structural diagram of the first crushing module described in the utility model.
[0052] Figure 3 This is a schematic structural diagram of the second crushing module described in the present utility model.
[0053] Figure 4 The present invention is a process flow chart for crushing wind turbine blades using the modular wind turbine blade on-site crushing system of the present invention.
[0054] Icons: 1-first crushing module, 2-second crushing module, 11-first container, 12-first mobile loader, 13-first coarse crusher, 14-first conveyor, 15-first distribution box, 21-second container, 22-second mobile loader, 23-secondary coarse crusher, 24-second conveyor, 25-fine crusher, 26-cyclone dust removal discharger, 27-material receiving cart, 28-box dust collector, 29-second distribution box. DETAILED DESCRIPTION
[0055] In order to make the purpose, technical solution and advantages of the embodiments of the utility model clearer, the technical solution in the embodiments of the utility model will be clearly and completely described below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0056] Example 1
[0057] like Figure 1 As shown, this embodiment provides a modular on-site crushing system for wind turbine blades, including a first crushing module 1 and a second crushing module 2 .
[0058] like Figure 2 As shown, the first crushing module 1 includes a first container 11 , a first mobile loader 12 , and a primary coarse crusher 13 , a first conveyor 14 , and a first distribution box 15 arranged inside the first container 11 .
[0059] The first container 11 meets the requirements of vehicle-mounted road transportation, and a plurality of switchable interfaces are provided on the shell of the first container 11 for realizing functions such as feeding, discharging, dust collection, maintenance, and power connection.
[0060] The first mobile loader 12 is disposed on one side outside the first container 11. The first mobile loader 12 is mainly used for feeding cutting materials from parts such as the root of wind turbine blades, and can be moved on the ground via moving wheels.
[0061] The discharge port of the first mobile loader 12 and the feed port of the primary coarse crusher 13 are both provided with a sealing structure, and the two are connected by a connecting pipe to prevent dust from escaping from the feed port. The openings of the connecting pipe and the sealing structure are both square, which can realize multi-directional feeding and adapt to different on-site environments.
[0062] The primary coarse crusher 13 is mainly used for primary coarse crushing of cutting materials from the blade roots and other parts of wind turbine blades, and the discharge port of the primary coarse crusher 13 is sealed and connected to the feed port of the first conveyor 14. Further, the primary coarse crusher 13 is provided with a first dust collection port, which can be connected to the box-type dust collector 28 through an external pipe to achieve a dust removal function.
[0063] The first conveyor 14 is used for sealed conveying or discharging of primary coarse crushed materials. It can be directed by moving wheels and slide rails, and two feeding ports with sealing structures are arranged in the horizontal section of the first conveyor 14 to meet different conveying or discharging conditions.
[0064] The first distribution box 15 is used to supply energy and control each device of the first crushing module 1. The first distribution box 15 is connected to each device to monitor the operating status of each device and can realize functions such as intelligent linkage, control interlocking and abnormal alarm between each device. The first distribution box 15 is connected to an external energy source, which includes but is not limited to a diesel generator and green electricity from a wind farm.
[0065] like Figure 3 As shown, the second crushing module 2 includes a second container 21, a second mobile loader 22, and a secondary coarse crusher 23, a second conveyor 24, a fine crusher 25, a cyclone dust removal discharger 26, a material receiving trolley 27, a box-type dust collector 28 and a second distribution box 29 arranged inside the second container 21.
[0066] The second container 21 meets the requirements of vehicle-mounted road transportation, and a plurality of switchable interfaces are provided on the shell of the second container 21 for realizing functions such as feeding, discharging, dust collection, maintenance, and power connection.
[0067] The second mobile loader 22 is arranged on one side outside the second container 21. The second mobile loader 22 is used for feeding cut materials or primary coarse crushed materials of main beams, sandwich materials and other parts, and can be moved on the ground by moving wheels.
[0068] The discharge port of the second mobile loader 22 and the feed port of the secondary coarse crusher 23 are both provided with a sealing structure, and the two are connected by a connecting pipe to prevent dust from escaping from the feed port. The openings of the connecting pipe and the sealing structure are both square, which can realize multi-directional feeding and adapt to different on-site environments.
[0069] Furthermore, when the second mobile loader 22 is used for feeding the primary coarse crushed material, its feed port is sealedly connected to the discharge port of the first conveyor 14, so as to realize sealed feeding of the primary coarse crushed material. The discharge port of the first conveyor 14 and the feed port of the second mobile loader 22 are both set in a square shape, which can also realize multi-directional feeding.
[0070] The secondary coarse crusher 23 is used for secondary coarse crushing of cut materials from parts such as main beams and sandwich materials or primary coarse crushed materials. The discharge port of the secondary coarse crusher 23 is sealed and connected to the feed port of the second conveyor 24.
[0071] Furthermore, the secondary coarse crusher 23 is provided with a second dust collecting port, and the second dust collecting port can be connected to the box-type dust collector 28 through an external pipe to achieve a dust removal function.
[0072] The second conveyor 24 is used for sealed conveying or discharging of the secondary coarse crushed material, and its motor can realize forward or reverse rotation. Furthermore, the horizontal section of the second conveyor 24 can be directional and move a certain distance on the platform, and is provided with two feed ports with sealing structures, and a discharging port that can be switched at the end, which can meet different conveying or discharging conditions.
[0073] When the secondary coarse crushed material does not need to be finely crushed, the secondary coarse crushed material is directly discharged from the discharge port of the second conveyor 24; when the secondary coarse crushed material needs to be finely crushed, the discharge port of the second conveyor 24 is sealed and connected to the feed port of the fine crusher 25.
[0074] The fine crusher 25 is used for fine crushing of the secondary coarse crushed material, and a screen is provided at the discharge port below the crushing chamber to control the discharge particle size. Furthermore, the discharge port of the fine crusher 25 is sealed and connected to the feed pipe of the cyclone dust removal discharger 26, and the fine crushed dust and fine crushed material enter the cyclone dust removal discharger 26 together.
[0075] The cyclone dust removal discharger 26 has both dust removal and discharge functions. The finely crushed material sinks to the bottom of the equipment and falls onto the material receiving trolley 27 through the discharge port to complete the discharge. The finely crushed dust enters the dust collecting port of the cyclone dust removal discharger 26 upward and enters the box-type dust collector 28 through a sealed pipe.
[0076] The box-type dust collector 28 is used for dust removal of crushing dust from the first crushing module 1 and the second crushing module 2. The dust-containing gas enters the box-type dust collector 28 through a sealed pipe, and the dust-removed gas is discharged through the fan at the rear of the box-type dust collector 28.
[0077] The second distribution box 29 is used to supply energy and control each device of the second crushing module 2. The second distribution box 29 is connected to each device to monitor the operating status of each device and can realize functions such as intelligent linkage, control interlocking and abnormal alarm between each device. The second distribution box 29 is connected to an external energy source, which includes but is not limited to a diesel generator and green electricity from a wind farm.
[0078] The modular on-site wind turbine blade crushing system provided in this embodiment can realize the on-site crushing of retired wind turbine blade materials at the wind farm or nearby crushing, thereby reducing the material transportation cost; and adopts a modular design, and can select the use of a single module or two modules in combination according to the thickness of the wind turbine blade material, while ensuring the full structural crushing performance of the wind turbine blades, reducing the overall operating energy consumption; when using green electricity from wind farms as an external energy source, it can further save energy and reduce carbon emissions; the system has good airtightness and is equipped with a two-stage dust removal system. The wind turbine blade materials are in a closed environment throughout the process, which can effectively avoid the problem of dust overflow during feeding and crushing; at the same time, the two crushing modules of the system are flexible in arrangement direction when used in combination, and the appropriate connection method can be selected according to the site conditions, such as linear combination and parallel combination, etc., and it has a wide range of applications.
[0079] like Figure 4 As shown, the method for crushing wind turbine blades using the modular wind turbine blade on-site crushing system specifically includes the following steps:
[0080] S1: Cutting and sorting wind turbine blades;
[0081] Cut the wind turbine blades to obtain wind turbine blade cutting materials, classify the wind turbine blade cutting materials according to material type and thickness before crushing, and select single crushing module operation or two crushing modules in combination according to material properties and discharge conditions;
[0082] The wind turbine blade cuttings are divided into two categories. The first category of cuttings is the cuttings from the blade root and other parts with a larger thickness (>40mm). The first category of cuttings should be processed by the first crushing module 1 first; the second category of cuttings is the cuttings from the main beam, leading edge, trailing edge, sandwich material and other parts with a smaller thickness (≤40mm). The second category of cuttings can only be processed by the second crushing module 2;
[0083] S2: crushing the classified wind turbine blade cuttings;
[0084] When the cutting material is the first type of cutting material and only needs to be subjected to primary coarse crushing, the first crushing module 1 is operated alone;
[0085] Place the modular wind turbine blade crushing system at a suitable location on the crushing site, open the corresponding interfaces on the container according to actual operation requirements, seal and connect the interfaces of each device, and complete the power connection work of the distribution box;
[0086] The wind turbine blade cutting material with a length×width×thickness not greater than 1000mm×800mm×80mm is fed into the crushing chamber of the primary coarse crusher 13 through the first mobile feeder 12 and crushed into materials with a length and width of ≤300mm and a thickness of ≤40mm. The materials are directly discharged through the first conveyor 14, and the primary coarse crushing dust enters the box-type dust collector 28 in the second crushing module 2 through a sealed pipeline to be emptied after dust removal.
[0087] When the cutting material is the first type of cutting material and needs to be processed by secondary coarse crushing, the two crushing modules are used together;
[0088] Place the modular wind turbine blade crushing system at a suitable location on the crushing site, open the corresponding interface on the container according to the actual operation requirements, seal and connect the interfaces of each device, complete the power connection of the distribution box, and adjust the position of the horizontal section of the second conveyor 24 and the rotation direction of its motor;
[0089] The wind turbine blade cutting material with a length×width×thickness not greater than 1000mm×800mm×80mm is passed through the first mobile feeder 12 to the primary coarse crusher 13 to be crushed into primary coarse crushed material with a length and width of ≤300mm and a thickness of ≤40mm. The primary coarse crushed material is successively conveyed by the first conveyor 14 and the second mobile feeder 22 in a sealed manner, and enters the secondary coarse crusher 23 to be crushed into secondary coarse crushed material with a size of ≤100mm. The secondary coarse crushed material is discharged through the horizontal section of the second conveyor 24, and the primary coarse crushed dust and the secondary coarse crushed dust enter the box-type dust collector 28 through a sealed pipeline to be emptied after dust removal.
[0090] When the cutting material is the first type of cutting material and needs to be finely crushed, the two crushing modules are used together;
[0091] Place the modular wind turbine blade crushing system at a suitable location on the crushing site, open the corresponding interface on the container according to the actual operation requirements, seal and connect the interfaces of each device, complete the power connection of the distribution box, and adjust the position of the horizontal section of the second conveyor 24 and the rotation direction of its motor;
[0092] The wind turbine blade cutting material with a length×width×thickness not greater than 1000mm×800mm×80mm is passed through the first mobile feeder 12 to the primary coarse crusher 13 to be crushed into primary coarse crushed material with a length and width of ≤300mm and a thickness of ≤40mm. The primary coarse crushed material is successively conveyed by the first conveyor 14 and the second mobile feeder 22 in a sealed manner, and enters the secondary coarse crusher 23 to be crushed into secondary coarse crushed material with a size of ≤100mm. The secondary coarse crushed material enters the fine crusher 25 through the second conveyor 24 to be crushed into fine crushed material with a particle size of ≤10mm. The fine crushed material and crushed dust enter the cyclone dust removal discharging machine 26 through a sealed pipe. In the cyclone dust removal discharging machine 26, the fine crushed material sinks to the bottom of the equipment, and falls into the receiving trolley 27 through the discharging port to complete the discharging. The fine crushed dust enters the dust collecting port above the equipment, and enters the box-type dust collector 28 through a sealed pipe together with the primary coarse crushed dust and the secondary coarse crushed dust to complete the dust removal and then be emptied;
[0093] When the cutting material is the second type of cutting material and only needs to be subjected to secondary coarse crushing, the second crushing module 2 is operated alone;
[0094] Place the modular wind turbine blade crushing system at a suitable location on the crushing site, open the corresponding interface on the container according to the actual operation requirements, seal and connect the interfaces of each device, complete the power connection of the distribution box, and adjust the position of the horizontal section of the second conveyor 24 and the rotation direction of its motor;
[0095] The wind turbine blade cutting material with a length×width×thickness not greater than 800mm×800mm×35mm is fed into the secondary coarse crusher 23 through the second mobile feeder 22 to be crushed into secondary coarse crushed material with a size of ≤100mm. The secondary coarse crushed material is discharged through the horizontal section of the second conveyor 24. The secondary coarse crushed dust enters the box-type dust collector 28 through a sealed pipeline to be emptied after dust removal.
[0096] When the cutting material is the second type of cutting material and needs to be finely crushed, the second crushing module 2 is operated alone;
[0097] Place the modular wind turbine blade crushing system at a suitable location on the crushing site, open the corresponding interface on the container according to the actual operation requirements, seal and connect the interfaces of each device, complete the power connection of the distribution box, and adjust the position of the horizontal section of the second conveyor 24 and the rotation direction of its motor;
[0098] The wind turbine blade cutting material with a length×width×thickness not exceeding 800mm×800mm×35mm enters the secondary coarse crusher 23 through the second mobile loader 22 and is crushed into secondary coarse crushed material with a size of ≤100mm. The secondary coarse crushed material enters the fine crusher 25 through the second conveyor 24 and is crushed into fine crushed material with a particle size of ≤10mm. The fine crushed material together with the fine crushed dust is conveyed to the cyclone dust removal discharging machine 26 through a closed pipe. In the cyclone dust removal discharging machine 26, the fine crushed material sinks to the bottom of the equipment and falls onto the receiving trolley 27 through the discharging port to complete the discharging. The fine crushed dust enters the dust collecting port above the equipment and enters the box-type dust collector 28 through a closed pipe together with the secondary coarse crushed dust to complete the dust removal and then is emptied.
[0099] This embodiment further uses the cutting material of a whole 1.5MW wind turbine blade of a certain model as the crushing object, and uses the modular wind turbine blade on-site crushing system of the utility model to process it. The total mass of the cutting material is about 6 tons, of which the mass of the cutting material with a thickness of more than 40mm such as the blade root is about 2 tons.
[0100] The first crushing module 1 and the second crushing module 2 of the modular wind turbine blade on-site crushing system have a processing capacity of 0.5t / h for this type of wind turbine blade, the operating power of the first crushing module 1 is 120KW, and the operating power of the second crushing module 2 is 130KW. Cutting materials with a thickness of >40mm such as blade roots are processed by the two crushing modules, and the remaining cutting materials with a thickness of ≤40mm are processed only by the second crushing module 2. The energy consumption for processing the cutting materials of a wind turbine blade of this type is approximately: 2 / 0.5*(120+130)+(6-2) / 0.5*130=2040KW·h.
[0101] A whole set of 1.5MW wind turbine blade cuttings was used as the crushing object and processed using a conventional wind turbine blade cuttings crushing processing line. The total mass of the cuttings was about 6 tons, of which the mass of the cuttings with a thickness of more than 40 mm, such as blade roots, was about 2 tons.
[0102] The crushing capacity of the wind turbine blade cutting material crushing processing line is designed based on the root thickness of the wind turbine blade to be processed, and the processing capacity is 0.5t / h. The operating power of the processing line is 240KW, and the energy consumption for processing the cutting material of a wind turbine blade of this model is approximately: 6 / 0.5*240=2880KW·h.
[0103] By comparison, it can be obtained that the modular wind turbine blade on-site crushing system of the utility model can significantly reduce the overall operating energy consumption of blade crushing while ensuring the full structural crushing performance of the wind turbine blade, and the energy consumption saving ratio is about 29.2%.
[0104] The above description is only the preferred embodiment of the utility model, and is not intended to limit the utility model. For those skilled in the art, the utility model can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.
Claims
1. A modular wind turbine blade on-site crushing system, characterized by: It includes a first crushing module and a second crushing module, which can be used alone or in combination; The first crushing module includes a first container, a first mobile loader, and a primary coarse crusher, a first conveyor, and a first distribution box arranged inside the first container; the discharge port of the first mobile loader is sealedly connected to the feed port of the primary coarse crusher, and the discharge port of the primary coarse crusher is sealedly connected to the feed port of the first conveyor; The second crushing module includes a second container, a second mobile loader, and a secondary coarse crusher, a second conveyor, a fine crusher, a cyclone dust removal discharger, a material receiving vehicle, and a second distribution box arranged inside the second container; when the second mobile loader is used for feeding the primary coarse crushed material, the feeding port of the second mobile loader is sealed and connected to the discharging port of the first conveyor; The discharge port of the second mobile loader is sealedly connected to the feed port of the secondary coarse crusher, the discharge port of the secondary coarse crusher is sealedly connected to the feed port of the second conveyor, and the second conveyor is used for sealed conveying or discharging of the secondary coarse crushed material; when the secondary coarse crushed material needs to be finely crushed, the discharge port of the second conveyor is sealedly connected to the feed port of the fine crusher, the discharge port of the fine crusher is sealedly connected to the feed pipe of the cyclone dust collector discharger, and the material receiving vehicle is arranged at the discharge port of the cyclone dust collector discharger.
2. The modular wind turbine blade on-site crushing system according to claim 1 is characterized by: A box-type dust collector is also provided inside the second container; The primary coarse crusher is provided with a first dust collecting port, and the first dust collecting port is connected to the box-type dust collector through a pipeline; The secondary coarse crusher is provided with a second dust collecting port, and the second dust collecting port is connected to the box-type dust collector through a pipeline; The cyclone dust removal discharge machine has a third dust collection port, and the third dust collection port is connected to the box-type dust collector through a pipeline.
3. The modular wind turbine blade on-site crushing system according to claim 1 is characterized by: The discharge port of the first mobile loader, the feed port of the first coarse crusher, the discharge port of the second mobile loader and the feed port of the second coarse crusher are all provided with sealing structures.
4. The modular wind turbine blade on-site crushing system according to claim 1 is characterized by: A plurality of switchable interfaces are arranged on the shells of the first container and the second container.
5. The modular wind turbine blade on-site crushing system according to claim 1 is characterized by: The first mobile loader is arranged at a side outside the first container, and the second mobile loader is arranged at a side outside the second container.
6. The modular wind turbine blade on-site crushing system according to claim 1 is characterized by: The first distribution box is connected to each device of the first crushing module, and the second distribution box is connected to each device of the second crushing module.
7. The modular wind turbine blade on-site crushing system according to claim 1 is characterized by: The discharge port of the first mobile loader, the feed port of the first coarse crusher, the discharge port of the first conveyor, the feed port of the second mobile loader, the discharge port of the second mobile loader and the feed port of the secondary coarse crusher are all arranged in a square shape.
8. The modular wind turbine blade on-site crushing system according to claim 1 is characterized by: The material receiving vehicle is arranged below the discharge port of the cyclone dust removal discharging machine.
9. The modular wind turbine blade on-site crushing system according to claim 1 is characterized by: The bottoms of the first mobile loader and the second mobile loader are both provided with moving wheels.
10. The modular wind turbine blade on-site crushing system according to claim 1, characterized in that: The first conveyor and the second conveyor each have two feed openings.
Citation Information
Patent Citations
Mobile industrial solid waste fiber composite material treatment system, working method and application
CN113856876B
Wind power blade crushing and sorting line
CN219377406U
System for efficiently cutting and crushing large-size composite solid waste on site
CN219768832U
Cited By
Fan blade crushing system
CN120079495A