Restoration device for lake waterfront vegetation ecology
By designing a structure including the first embankment, shallow water planting area and the second embankment in the lake waterfront vegetation ecological restoration device, and using the combination of pine piles and slope protection panels, the problem of unsatisfactory restoration effect in the multi-level embankment environment is solved, effective soil and vegetation protection is achieved, the risks of soil erosion and riparian erosion are reduced, and water quality and soil stability are improved.
Patent Information
- Application Number
- CN202420605396.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-27
- Publication Date
- 2025-03-18
- Estimated Expiration
- 2034-03-27
AI Technical Summary
The existing lake waterfront vegetation ecological restoration device has poor restoration effect in multi-level embankment environments, making it difficult to effectively protect soil and vegetation.
A repair device including the first embankment, shallow water planting area and the second embankment is designed. Corner guards are provided at the connection between the shallow water planting area and the second embankment. A three-dimensional vegetation net, soil layer and slope guard plate are provided on the second embankment. The barrier belt is composed of rows of pine piles, passing through the gravel layer to improve stability.
Through the tightening effect of pine piles and the stable laying of slope guard panels, we can effectively prevent soil erosion, reduce the risk of riverbank erosion, improve water quality, stabilize the soil, and achieve ecological restoration and environmental beautification.
Smart Images

Figure CN222632148U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of water conservancy projects, and more specifically is a device for repairing lake waterfront vegetation ecology. Background Art
[0002] In the construction of lake landscape, the lakeshore is affected by land limitations, periodic floods, etc., and the lakeshore slope protection is often washed away or even destroyed by water flow, which is not conducive to the construction of the waterfront plant ecosystem.
[0003] The existing Chinese patent application "A device for restoring the ecology of lake waterfront vegetation" (application number: 202321614296.7) provides a device for restoring the ecology of lake waterfront vegetation. The device continuously arranges pine pile revetment devices on the normal water level and flood level elevations of the lake revetment. The device can adjust the size and shape of the wire mesh according to actual needs to meet the protection needs of different water flow conditions and bank slope boundary conditions; protect against water and soil erosion caused by water scouring and periodic floods, and use the holes and grooves of the pine piles to meet the activity channels of microorganisms, small animals, etc. in the soil. For the initial rainwater, when it passes through the waterfront plant planting area and when it is filtered through the block stone layer, the rainwater is preliminarily purified to reduce the content of pollutants in the rainwater, while keeping the soil moist, so that the waterfront plants are in a favorable habitat; but lakes often have multi-level revetments, which is a more complex ecological environment, resulting in unsatisfactory restoration effect of the device.
[0004] Therefore, it is necessary to develop a lake waterfront vegetation ecological restoration device suitable for multi-level revetments. Summary of the invention
[0005] The purpose of the utility model is to overcome the shortcomings of the above-mentioned background technology and to provide a device for repairing the lake waterfront vegetation ecology.
[0006] In order to achieve the above-mentioned purpose, the technical solution of the utility model is: a restoration device for lake waterfront vegetation ecology, characterized in that: it includes a first revetment, a shallow water planting area and a second revetment; the shallow water planting area is located between the first revetment and the second revetment; the shallow water planting area and the second revetment are both provided with a barrier zone;
[0007] The second revetment is provided with a three-dimensional vegetation net and a soil layer in sequence from the inside to the outside, and a plurality of slope protection boards are laid on the soil layer.
[0008] In the above technical solution, a corner stone is provided at the connection between the shallow water planting area and the second revetment.
[0009] In the above technical solution, the barrier strip is located on the side of the shallow water planting area close to the first revetment; and two barrier strips are provided from bottom to top along the slope direction of the second revetment.
[0010] In the above technical solution, the barrier strip is pine wood piles arranged in rows.
[0011] In the above technical solution, a first gravel layer is provided in the shallow water planting area at a position corresponding to the barrier zone, and the pine piles of the barrier zone pass through the first gravel layer;
[0012] A second gravel layer is arranged in the second revetment at a position corresponding to the barrier zone, and the pine piles of the two barrier zones all pass through the second gravel layer.
[0013] In the above technical solution, a fixed net is provided on the side of the barrier zone of the shallow water planting area away from the first revetment.
[0014] In the above technical solution, the slope protection board is provided with planting holes, the contact surface between the slope protection board and the soil layer is provided with fixing columns, the upper and lower sides of the slope protection board are provided with grooves, and multiple slope protection boards are plugged in through the grooves.
[0015] In the above technical solution, the lowermost slope protection plate abuts against the upper end of the barrier strip on the second revetment away from the shallow water planting area.
[0016] In the above technical solution, the first crushed stone layer and the second crushed stone layer both include a mesh frame and crushed stones in the mesh frame.
[0017] Compared with the prior art, the utility model has the following advantages:
[0018] 1) The pine wood piles of the utility model are inserted into the soil layer by hammering, and the original soil at the pile hole position is forced to be squeezed laterally, so that the density of the soil layer within a certain range around the pile is improved, which plays a compacting role, effectively protects the soil in the shallow water planting area and the second revetment, and reduces the risk of soil erosion.
[0019] 2) The utility model lays corner stones at the normal water level of the second revetment, which can reinforce the riverbed, support the embankment, and further reduce the risk of riverbank erosion and soil loss; vegetation planting effectively improves water quality and stabilizes the soil, achieves the effect of beautifying the environment, and realizes ecological restoration.
[0020] 3) The slope protection board at the lowermost side of the second revetment of the utility model abuts against the pine wood piles, thereby further improving the stability of laying the slope protection board.
[0021] 4) A crushed stone layer is laid in the soil layer at the insertion position of the pine wood pile of the utility model, which can improve the stability of the pine wood pile and the corresponding soil layer.
[0022] 5) The fixing column of the utility model is inserted into the soil layer, so that the slope protection board is firmly connected to the soil; the lowermost slope protection board abuts against the upper end of the third barrier strip, thereby further improving the stability of the slope protection board laying. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a structural schematic diagram of the utility model.
[0024] Figure 2 It is a structural schematic diagram of the slope protection board of the utility model.
[0025] Among them, 1-first revetment, 2-shallow water planting area, 21-first gravel layer, 22-second gravel layer, 3-second revetment, 31-three-dimensional vegetation net, 32-soil layer, 4-barrier zone, 41-pine wood piles, 42-fixed net, 5-slope protection board, 51-planting hole, 52-fixed column, 53-groove, 6-corner protection stone. DETAILED DESCRIPTION
[0026] The following is a detailed description of the implementation of the utility model in conjunction with the accompanying drawings, but they do not constitute a limitation of the utility model and are only used as examples. At the same time, the advantages of the utility model will become clearer and easier to understand through the description.
[0027] Referring to the attached drawings, it can be seen that: a restoration device for lake waterfront vegetation ecology comprises a first revetment 1, a shallow water planting area 2 and a second revetment 3;
[0028] like Figure 1 As shown, the shallow water planting area 2 is located between the first revetment 1 and the second revetment 3; the shallow water planting area 2 is used to plant emergent or floating plants, which can effectively improve water quality and stabilize soil, thereby achieving the effect of beautifying the environment;
[0029] The shallow water planting area 2 and the second revetment 3 are both provided with a barrier zone 4;
[0030] The second revetment 3 is provided with a three-dimensional vegetation net 31 and a soil layer 32 from the inside to the outside, and a plurality of slope protection boards 5 are laid on the soil layer 32; after the three-dimensional vegetation net 31 is laid, it is buried with a small amount of soil, and a plurality of slope protection boards 5 are laid on the upper surface of the three-dimensional vegetation net 31; the slope protection boards 5 are located above the normal water level.
[0031] A corner stone 6 is provided at the connection between the shallow water planting area 2 and the second revetment 3. The corner stone 6 is a relatively large stone material used to reinforce the riverbed, support the embankment, and reduce the risk of riverbank erosion and soil loss. The corner stone 6 is located at the normal water level line of the second revetment 3.
[0032] The barrier strip 4 is located on the side of the shallow water planting area 2 close to the first revetment 1; two barrier strips 4 are arranged from bottom to top along the slope direction of the second revetment 3; the barrier strip 4 is pine piles 41 arranged in rows, which can reduce the risk of soil loss. The pine piles 41 are inserted into the soil layer by hammering, and the original soil at the pile hole position is forced to be squeezed laterally, so that the density of the soil layer within a certain range around the pile is increased, which plays a compaction role, effectively protecting the soil on the shallow water planting area 2 and the second revetment 3, and reducing the risk of soil and water loss.
[0033] A first gravel layer 21 is provided in the shallow water planting area 2 at a position corresponding to the barrier zone 4, and the pine piles 41 of the barrier zone 4 pass through the first gravel layer 21; a second gravel layer 22 is provided in the second revetment 3 at a position corresponding to the barrier zone 4, and the pine piles 41 of the two barrier zones 4 both pass through the second gravel layer 22; the first gravel layer 21 and the second gravel layer 22 are both composed of mesh frames and gravel, which are used to consolidate the soil and fix the pine piles, and can improve the stability of the transition zone between the pine piles, the shallow water planting area 2 and the first revetment 1; by digging grooves at the piling positions of the pine piles, after the pine piles are hammered into the soil layer, the mesh frames are placed in the excavated grooves, the mesh frames pass through the pine piles and fix the two, and then the mesh frames are filled with gravel, and then the excavated grooves are backfilled, thereby improving the stability of the pine piles and the corresponding soil layers.
[0034] A fixing net 42 is provided on the side of the barrier zone 4 of the shallow water planting area 2 away from the first revetment 1 to further improve the fixing ability.
[0035] The slope protection board 5 is provided with a planting hole 51, and a fixing column 52 is provided on the contact surface between the slope protection board 5 and the soil layer 32. Grooves 53 are provided on the upper and lower sides of the slope protection board 5, and multiple slope protection boards 5 are plugged in through the grooves 53; the planting hole 51 is used for planting vegetation, and the fixing column 52 makes the connection between the slope protection board 5 and the soil layer 32 more stable, and multiple slope protection boards 5 are plugged in through the grooves 53, so that the connection between the slope protection boards 5 is more stable.
[0036] The lowermost slope protection plate 5 abuts against the upper end of the barrier strip 4 on the second revetment 3 away from the shallow water planting area 2 , further increasing the stability of the slope protection plate 5 .
[0037] The first crushed stone layer 21 and the second crushed stone layer 22 both include a mesh frame and crushed stones in the mesh frame.
[0038] The slope protection plate 5 includes a first vertical plate, a second vertical plate, a third vertical plate, a first horizontal plate, and a second horizontal plate. The first vertical plate and the second vertical plate are arranged in parallel, the first horizontal plate and the second horizontal plate are arranged in parallel and spaced apart between the first vertical plate and the second vertical plate, and the third vertical plate is arranged between the first horizontal plate and the second horizontal plate; the planting hole 51 is formed by the first vertical plate, the third vertical plate, the first horizontal plate, and the second horizontal plate, and the second vertical plate, the third vertical plate, the first horizontal plate, and the second horizontal plate; the groove 53 is formed by the first vertical plate, the second vertical plate and the first horizontal plate facing away from the third vertical plate, and the first vertical plate, the second vertical plate and the second horizontal plate facing away from the third vertical plate.
[0039] Other parts not described belong to the prior art.
Claims
1. A device for restoring lake waterfront vegetation ecology, characterized in that: The invention comprises a first revetment (1), a shallow water planting area (2) and a second revetment (3); the shallow water planting area (2) is located between the first revetment (1) and the second revetment (3); and barrier zones (4) are provided in the shallow water planting area (2) and the second revetment (3); The second revetment (3) is provided with a three-dimensional vegetation net (31) and a soil layer (32) in sequence from the inside to the outside, and a plurality of slope protection boards (5) are laid on the soil layer (32).
2. The device for restoring lake waterfront vegetation ecology according to claim 1 is characterized by: A corner protection stone (6) is provided at the connection between the shallow water planting area (2) and the second revetment (3).
3. The device for restoring lake waterfront vegetation ecology according to claim 1 is characterized by: The barrier strip (4) is located on one side of the shallow water planting area (2) close to the first revetment (1); two barrier strips (4) are provided from bottom to top along the slope direction of the second revetment (3).
4. The device for restoring lake waterfront vegetation ecology according to claim 3 is characterized by: The barrier strip (4) is pine wood piles (41) arranged in rows.
5. The device for restoring lake waterfront vegetation ecology according to claim 3 is characterized by: A first gravel layer (21) is provided in the shallow water planting area (2) at a position corresponding to the barrier zone (4), and the pine wood piles (41) of the barrier zone (4) pass through the first gravel layer (21); A second crushed stone layer (22) is provided in the second revetment (3) at a position corresponding to the barrier strip (4), and the pine wood piles (41) of the two barrier strips (4) both pass through the second crushed stone layer (22).
6. The device for restoring lake waterfront vegetation ecology according to claim 3 is characterized by: A fixed net (42) is provided on the side of the barrier zone (4) of the shallow water planting area (2) away from the first revetment (1).
7. The device for restoring lake waterfront vegetation ecology according to claim 3 is characterized by: The slope protection plate (5) is provided with a planting hole (51), a contact surface between the slope protection plate (5) and the soil layer (32) is provided with a fixing column (52), and grooves (53) are provided on both upper and lower sides of the slope protection plate (5), and a plurality of slope protection plates (5) are plugged in through the grooves (53).
8. The device for restoring lake waterfront vegetation ecology according to claim 7 is characterized by: The lowermost slope protection plate (5) abuts against the upper end of the barrier strip (4) on the second revetment (3) away from the shallow water planting area (2).
9. The device for restoring lake waterfront vegetation ecology according to claim 5, characterized in that: The first crushed stone layer (21) and the second crushed stone layer (22) both comprise a mesh frame and crushed stones in the mesh frame.
Citation Information
Patent Citations
Restoration device for lake waterfront vegetation ecology
CN220246810U