Acetylene gas purification device convenient for replacing filler
By designing the structure of the replacement box, placement frame and grille plate in the acetylene gas purification device, the problem of cumbersome filler replacement operation in the prior art is solved, and more efficient filler replacement and purification process stability is achieved.
Patent Information
- Application Number
- CN202421310529.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-11
- Publication Date
- 2025-03-21
- Estimated Expiration
- 2034-06-11
AI Technical Summary
When replacing the packing inside the purification tower, the existing acetylene gas purification device is complicated to operate and has low replacement efficiency.
An acetylene gas purification device including a replacement box, a placement frame and a grille plate is designed. The placement frame slides smoothly through the guide structure and the fixed structure, and the filler is replaced by the entire grille plate.
It realizes convenient replacement of fillers, improves replacement efficiency, and ensures the stability of the acetylene gas purification process.
Smart Images

Figure CN222641612U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of acetylene gas production and purification equipment, and in particular relates to an acetylene gas purification device which is convenient for replacing fillers. Background Art
[0002] Acetylene, with the molecular formula C2H2, commonly known as wind coal and calcium carbide gas, is the smallest member of the alkyne compound series. It is mainly used for industrial purposes, especially in welding metals. Acetylene is a colorless, highly flammable gas at room temperature. Acetylene gas needs to be purified before use to avoid the influence of impurities in the acetylene gas on the reaction during use.
[0003] The utility model patent with Chinese patent application publication number CN219324049U discloses a purification device for acetylene gas produced by the calcium carbide process, including a main purification device and a spare purification device. The tops of the main purification device and the spare purification device are connected to the purification device inlet main pipe through the main purification device inlet pipe and the spare purification device inlet pipe respectively, the purification device inlet main pipe is connected to a blasting pressure relief component and a safety pressure relief component, the main purification device inlet pipe and the spare purification device inlet pipe are both connected to a replacement nitrogen component, the lower part of the main purification device and the lower part of the spare purification device are connected to the purification device outlet main pipe through the main purification device outlet pipe and the spare purification device outlet pipe respectively, and fillers are arranged in the main purification device and the spare purification device. The purpose is to reduce the trace phosphate, sulfate and soluble solids in the acetylene gas through the purification device, improve the cleanliness of the acetylene gas, and further improve the quality of the acetylene gas to meet more advanced production processes.
[0004] However, in actual use, when the internal packing of the purification tower needs to be replaced, it is necessary to open the inspection door, use special tools to take out the internal packing and then replace it, which is cumbersome and has low replacement efficiency. Utility Model Content
[0005] The utility model aims to provide an acetylene gas purification device with convenient packing replacement, so as to solve the problems of complicated replacement operation and low replacement efficiency of the packing of the purification tower in the prior art.
[0006] To achieve the above-mentioned purpose, the technical solution of the utility model is: an acetylene gas purification device that is easy to replace fillers, comprising a purification tower body, a replacement box is fixedly connected to the middle of the purification tower body, a placement frame is slidably connected in the replacement box, a grid plate is fixedly connected to the placement frame, a fixing structure that cooperates with the placement frame is provided on the replacement box, and the placement frame is slidably connected to the replacement box through a guide structure;
[0007] The fixing structure includes a fixing block, a fixing groove, a sliding rod, a sliding rod cavity and a screw rod. The bottom of the replacement box is provided with a sliding rod cavity, the sliding rod cavity is provided with a sliding rod, at least three fixing blocks are fixedly connected to the upper part of the sliding rod, the bottom of the placement frame is provided with a fixing groove adapted to the fixing block, one side of the replacement box is rotatably connected with a screw rod, the screw rod passes through the replacement box and the sliding rod cavity, and is rotatably connected with the replacement box, and the screw rod is threadedly connected with the sliding rod;
[0008] The guide structure includes guide rails, rotating shafts and guide wheels. The guide rails are symmetrically fixedly connected in the replacement box, the rotating shafts are rotatably connected on the guide rails, the rotating shafts are fixedly connected on the guide wheels, and the placement frame is slidably connected to the guide rails through the guide wheels.
[0009] Preferably, two connecting frames are fixedly connected to the purification tower body, and a maintenance structure is provided on the connecting frame, the maintenance structure includes a connecting shaft, an inspection door, a connecting column, a tightening block and a connecting rod, the connecting frame is rotatably connected to the connecting shaft, the inspection door is fixedly connected to the connecting shaft, a connecting column is provided at the bottom of the connecting shaft, a plurality of tightening blocks are fixedly connected to the outer wall of the connecting column, the connecting column is engaged with the connecting shaft through the tightening block, the bottom of the connecting column is fixedly connected to a connecting rod, and the connecting rod is slidably connected to the connecting frame.
[0010] Preferably, a guide rod is fixedly connected to the slide rod cavity, and the slide rod and the guide rod are slidably matched.
[0011] Preferably, the bottom end of the screw rod is fixedly connected with a grip rod.
[0012] Preferably, the expansion blocks are distributed in a circular array relative to the center of the connecting column.
[0013] Preferably, a pull plate is fixedly connected to the bottom of the connecting rod, and the connecting rod and the pull plate are vertically arranged.
[0014] Preferably, a spring is provided between the connecting column and the connecting frame, one end of the spring is fixedly connected to the connecting frame, and the other end of the spring is fixedly connected to the bottom of the connecting column.
[0015] Preferably, a water tank is fixedly connected to one side of the purification tower body, a water tank cover is rotatably connected to the water tank, a water pump is provided on one side of the water tank, the water pump is fixedly connected to the purification tower body through a water pipe, an air inlet is provided at the bottom of the purification tower body, and an air outlet is provided at the top of the purification tower body.
[0016] The advantages of the utility model are: a placement frame is slidably connected to the replacement box, a grille plate is fixedly connected to the placement frame, a fixing structure matched with the placement frame is provided on the replacement box, the fixing structure ensures the stability of the placement frame during the acetylene purification process, prevents gas leakage, and makes the sliding of the placement frame smoother through the guide structure, the filler is taken out through the placement frame and the grille plate, the filler is dumped as a whole, new filler is put in, and then the placement frame is inserted into the replacement box, the replacement of the filler is more convenient, which not only improves the replacement efficiency of the filler, but also ensures the stability during the acetylene gas purification process. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a structural schematic diagram of the utility model.
[0018] Figure 2 for Figure 1 Schematic diagram of the partially enlarged structure of part A in the middle.
[0019] Figure 3 for Figure 1 Schematic diagram of the partial enlarged structure of part B in the middle.
[0020] Figure 4 It is a structural schematic diagram of the cooperation between the placement frame and the grid plate of the utility model.
[0021] Figure 5 It is a cross-sectional structural schematic diagram of the cooperation between the placement frame and the replacement box of the utility model.
[0022] Figure 6 for Figure 5 Schematic diagram of the partial enlarged structure of part C in the middle.
[0023] Figure 7 for Figure 5 Schematic diagram of the partial enlarged structure of part D in the middle.
[0024] Figure 8 for Figure 5 Schematic diagram of the partial enlarged structure of part E in the middle.
[0025] Fig. 9 It is a schematic diagram of the structure of the expansion block and the connecting column of the utility model.
[0026] The meanings of the accompanying drawings are as follows: 1. purification tower body; 2. placement frame; 3. fixing structure; 301. fixing block; 302. fixing groove; 303. sliding rod; 304. screw rod; 305. gripping rod; 306. guide rod; 307. sliding rod cavity; 4. guiding structure; 401. guide rail; 402. rotating shaft; 403. guide wheel; 5. connecting frame; 6. maintenance structure; 601. connecting shaft; 602. maintenance door; 603. connecting column; 604. expansion block; 605. connecting rod; 606. spring; 607. pull plate; 7. air inlet; 8. water tank; 9. water tank cover; 10. grille plate; 11. water pump; 12. water pipe; 13. air outlet; 14. replacement box. DETAILED DESCRIPTION
[0027] The utility model is further described below in conjunction with the accompanying drawings and specific implementation methods.
[0028] like Figures 1 to 9 An acetylene gas purification device for convenient replacement of fillers shown in the figure comprises a purification tower body 1, a replacement box 14 is fixedly connected to the middle of the purification tower body 1, a placement frame 2 is slidably connected in the replacement box 14, a grid plate 10 is fixedly connected to the placement frame 2, a fixing structure 3 cooperating with the placement frame 2 is provided on the replacement box 14, and the placement frame 2 is slidably connected to the replacement box 14 through a guide structure 4;
[0029] The fixing structure 3 includes a fixing block 301, a fixing groove 302, a sliding rod 303, a sliding rod cavity 307 and a screw rod 304. The bottom of the replacement box 14 is provided with a sliding rod cavity 307, and the sliding rod cavity 307 is provided with a sliding rod 303. At least three fixing blocks 301 are fixedly connected to the upper part of the sliding rod 303. The bottom of the placement frame 2 is provided with a fixing groove 302 adapted to the fixing block 301. One side of the replacement box 14 is rotatably connected with a screw rod 304. The screw rod 304 penetrates the replacement box 14 and the sliding rod cavity 307, and is rotatably connected to the replacement box 14. The screw rod 304 is threadedly connected to the sliding rod 303.
[0030] The guide structure 4 includes a guide rail 401, a rotating shaft 402 and a guide wheel 403. The guide rail 401 is symmetrically fixedly connected in the replacement box 14, the rotating shaft 402 is rotatably connected to the guide rail 401, and the rotating shaft 402 is fixedly connected to the guide wheel 403. The placement frame 2 is slidably connected to the guide rail 401 through the guide wheel 403.
[0031] like Figure 5 , Figure 8 and Fig. 9As shown, in order to facilitate temporary inspection or maintenance of the purification tower body 1 during use, two connecting frames 5 are fixedly connected to the purification tower body 1, and a maintenance structure 6 is provided on the connecting frame 5. The maintenance structure includes a connecting shaft 601, an maintenance door 602, a connecting column 603, a tightening block 604 and a connecting rod 605. The connecting frame 5 is rotatably connected to the connecting shaft 601, and the maintenance door 602 is fixedly connected to the connecting shaft 601. A connecting column 603 is provided at the bottom of the connecting shaft 601, and a plurality of tightening blocks 604 are fixedly connected to the outer wall of the connecting column 603. The connecting column 603 is engaged with the connecting shaft 601 through the tightening block 604, and a connecting rod 605 is fixedly connected to the bottom of the connecting column 603. The connecting rod 605 is slidably connected to the connecting frame 5.
[0032] like Figure 7 As shown, in order to facilitate the up and down movement of the slide bar 303, a guide rod 306 is fixedly connected in the slide bar cavity 307, and the slide bar 303 and the guide rod 306 are slidably matched. The guide rod 306 plays a role of limiting and guiding the movement of the other side of the slide bar 303.
[0033] like Figure 2 and Figure 6 As shown, in order to facilitate the rotation of the screw rod 304 , a grip rod 305 is fixedly connected to the bottom end of the screw rod 304 .
[0034] like Figure 8 and Fig. 9 As shown, in order to make the expansion blocks 604 on the connecting column 603 better cooperate with the connecting shaft 601 and ensure that the inspection door 602 is fixed more securely when opened and closed, the expansion blocks 604 are arranged in a circular array relative to the center of the connecting column 603.
[0035] like Figure 3 and Figure 8 As shown, in order to facilitate the up and down movement of the connecting column 603, a pull plate 607 is fixedly connected to the bottom of the connecting rod 605, and the connecting rod (605) and the pull plate 607 are vertically arranged.
[0036] like Figure 8 As shown, in order to facilitate the resetting of the connecting column 603 and make it better cooperate with the connecting shaft 601, a spring 606 is provided between the connecting column 603 and the connecting frame 5, one end of the spring 606 is fixedly connected to the connecting frame 5, and the other end is fixedly connected to the bottom of the connecting column 603.
[0037] like Figure 1As shown, in order to further improve the purification effect of acetylene gas and facilitate the transportation of water in the water tank 8 to the upper part of the purification tower body 1, a water tank 8 is fixedly connected to one side of the purification tower body 1, and a water tank cover 9 is rotatably connected to the water tank 8. A water pump 11 is provided on one side of the water tank 8, and the water pump 11 is fixedly connected to the purification tower body 1 through a water pipe 12. An air inlet 7 is provided at the bottom of the purification tower body 1, and an air outlet 13 is provided at the top of the purification tower body 1.
[0038] When the utility model is in use, the acetylene gas generated by the calcium carbide method enters the bottom of the purification tower body 1 through the air inlet 7, and the acetylene gas passes through the placement frame 2. The impurities in the acetylene gas are adsorbed and purified by the filler on the placement frame 2, thereby improving the purity of the acetylene gas to ensure the safety of the acetylene gas in industrial production. When the purification tower body 1 completes the purification of the acetylene gas and needs to replace the filler, the screw rod 304 is rotated by the grip rod 305. When the screw rod 304 rotates, the thread drives the slide rod 303 to slide downward in the slide rod cavity 307, and the guide rod 30 The pair of slide bars 303 play the role of limiting and guiding. The slide bars 303 slide with the guide bars 306. When the slide bars 303 slide downward, the fixed block 301 also moves downward. When the fixed block 301 is no longer engaged with the fixed groove 302 at the bottom of the placement frame 2, the placement frame 2 can be drawn out of the replacement box 14, and the filler on the grid plate 10 is taken out at the same time, and the filler on the placement frame 2 is dumped, and new filler is placed on the placement frame 2 to complete the replacement operation of the filler, thereby improving the efficiency and convenience of replacing the filler. When the placement frame 2 slides outward, The guide rail 401 makes the placement frame 2 slide more smoothly, and the guide wheel 403 will roll with the placement frame 2. When the guide wheel 403 rotates, it drives the rotating shaft 402 to rotate. The sliding friction force is converted into rolling friction force through the guide wheel 403, making the placement frame 2 more stable to be drawn out. When it is necessary to open the inspection door 602 to inspect and maintain the interior of the purification tower 1, the pull plate 607 can be pressed downward. When the pull plate 607 moves downward, it drives the connecting rod 605 to move downward, and at the same time drives the connecting column 603 to move downward. When the connecting column 603 moves downward, it drives multiple expansion blocks 60 4 slides downward, the spring 606 contracts, and when the expansion block 604 is no longer engaged with the connecting shaft 601, the connecting shaft 601 rotates to drive the inspection door 602 to rotate and open. When the inspection door 602 rotates to a certain angle, the pull plate 607 is released, the spring 606 recovers, and drives the connecting column 603 to engage with the connecting shaft 601 again. The connecting column 603, the expansion block 607 and the connecting shaft 601 are engaged to fix the inspection door 602, so as to prevent the inspection door 602 from rotating freely when the operator is inspecting and maintaining the inside of the purification tower body 1.
[0039] The above-described embodiments are only preferred examples of the present invention, and the technical solutions of the present invention are not limited thereto. It should be pointed out that for ordinary technicians in this field, under the technical enlightenment provided by the present invention, as common knowledge in the field, other equivalent deformations and improvements can be made, which should also be regarded as the protection scope of the present invention.
Claims
1. An acetylene gas purification device that is easy to replace fillers, comprising a purification tower body (1), characterized in that: A replacement box (14) is fixedly connected to the middle of the purification tower body (1), a placement frame (2) is slidably connected inside the replacement box (14), a grid plate (10) is fixedly connected to the placement frame (2), a fixing structure (3) cooperating with the placement frame (2) is provided on the replacement box (14), and the placement frame (2) is slidably connected to the replacement box (14) via a guide structure (4); The fixing structure (3) comprises a fixing block (301), a fixing groove (302), a sliding rod (303), a sliding rod cavity (307) and a screw rod (304); a sliding rod cavity (307) is provided at the bottom of the replacement box (14); a sliding rod (303) is provided in the sliding rod cavity (307); at least three fixing blocks (301) are fixedly connected to the top of the sliding rod (303); a fixing groove (302) matched with the fixing block (301) is provided at the bottom of the placement frame (2); a screw rod (304) is rotatably connected to one side of the replacement box (14); the screw rod (304) passes through the replacement box (14) and the sliding rod cavity (307) and is rotatably connected to the replacement box (14); the screw rod (304) is threadedly connected to the sliding rod (303); The guide structure (4) comprises a guide rail (401), a rotating shaft (402) and a guide wheel (403); the guide rail (401) is symmetrically fixedly connected inside the replacement box (14); the guide rail (401) is rotatably connected to the rotating shaft (402); the guide wheel (403) is fixedly connected to the rotating shaft (402); and the placement frame (2) is slidably connected to the guide rail (401) via the guide wheel (403).
2. An acetylene gas purification device that is easy to replace fillers as claimed in claim 1, characterized in that: Two connection frames (5) are fixedly connected to the purification tower body (1), and an inspection structure (6) is provided on the connection frame (5). The inspection structure comprises a connection shaft (601), an inspection door (602), a connection column (603), a tightening block (604) and a connection rod (605). The connection frame (5) is rotatably connected to the connection shaft (601), and the inspection door (602) is fixedly connected to the connection shaft (601). A connection column (603) is provided at the bottom of the connection shaft (601), and a plurality of tightening blocks (604) are fixedly connected to the outer wall of the connection column (603). The connection column (603) is engaged with the connection shaft (601) via the tightening block (604), and a connection rod (605) is fixedly connected to the bottom of the connection column (603). The connection rod (605) is slidably connected to the connection frame (5).
3. The acetylene gas purification device for easy replacement of packing according to claim 1, characterized in that: A guide rod (306) is fixedly connected inside the slide rod cavity (307), and the slide rod (303) is slidably matched with the guide rod (306).
4. An acetylene gas purification device for easy replacement of packing as claimed in claim 3, characterized in that: The bottom end of the screw rod (304) is fixedly connected to a grip rod (305).
5. The acetylene gas purification device for easy replacement of packing according to claim 2, characterized in that: The expansion blocks (604) are distributed in a circular array relative to the center of the connecting column (603).
6. An acetylene gas purification device for easy replacement of packing as claimed in claim 5, characterized in that: A pull plate (607) is fixedly connected to the bottom of the connecting rod (605), and the connecting rod (605) and the pull plate (607) are arranged vertically.
7. An acetylene gas purification device for easy replacement of packing as claimed in claim 6, characterized in that: A spring (606) is provided between the connecting column (603) and the connecting frame (5); one end of the spring (606) is fixedly connected to the connecting frame (5), and the other end of the spring (606) is fixedly connected to the bottom of the connecting column (603).
8. The acetylene gas purification device for easy replacement of packing according to claim 1, characterized in that: A water tank (8) is fixedly connected to one side of the purification tower body (1), a water tank cover (9) is rotatably connected to the water tank (8), a water pump (11) is provided on one side of the water tank (8), the water pump (11) is fixedly connected to the purification tower body (1) via a water pipe (12), an air inlet (7) is provided at the bottom of the purification tower body (1), and an air outlet (13) is provided at the top of the purification tower body (1).
Citation Information
Patent Citations
Purification device for acetylene gas by calcium carbide method
CN219324049U