Flaring clamp type pipeline connecting piece
By designing the flared clamp type pipe connector and adopting a structure of a docking frame, guide bracket and bidirectional worm, the problem of time-consuming and labor-intensive installation and easy leakage of existing pipe connectors is solved, and efficient installation and stable sealing are achieved.
Patent Information
- Application Number
- CN202420890555.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-26
- Publication Date
- 2025-03-25
- Estimated Expiration
- 2034-04-26
AI Technical Summary
The existing pipe connectors are time-consuming and labor-intensive to install during use, and the structure is simple and easy to deform due to external forces, which may cause leakage.
A flared clamp type pipe connection is designed, using a structure of a docking frame, a guide bracket and a bidirectional worm, providing two installation methods, and sealing and fixing are achieved through sealing and adjustment bolts.
It improves the installation efficiency and flexibility of pipeline connections, ensures the stability and sealing of the structure, and avoids leakage problems caused by external forces.
Smart Images

Figure CN222669266U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of pipeline connectors, in particular to a flared clamp type pipeline connector. Background Art
[0002] The flared pipe fitting is also called a flared fitting. The end of the pipe is flared to form an inverted cone-shaped fitting. When connecting, the flared part is directly inserted into the connection port of another pipe or fitting and fixed with fasteners. Flared pipe fittings are usually used for the transmission of low and medium pressure liquids or gases. They have good sealing and connection strength. Flared pipe fittings are widely used in high-pressure pipeline applications in the industrial field, such as ships, offshore oil, metal processing and mining, etc.
[0003] The flared joint is made of forgeable cast iron or ductile iron as the main material, and consists of an inner liner pipe body (bushing), nuts or bolts, threaded rings or flared flanges, and sealing rubber rings. The sealing rubber rings are compressed by tightening the nuts or flanges to achieve an oblique side seal between the inner surface of the pipe and the sealing rubber ring on the inner liner pipe body. It is a simple metal pipe connection.
[0004] Conventional pipe connectors need to be sleeved on one end of the pipe connection during use. Due to the split structure during docking installation, the assembly installation process is relatively time-consuming and labor-intensive, affecting the installation efficiency. At the same time, the connection structure of the pipe connector is simple and is easily deformed due to external forces, which poses a risk of leakage to a certain extent.
[0005] Therefore, in view of this, the existing structure and defects are studied and improved, and a flared clamp type pipe connector is proposed. Utility Model Content
[0006] The utility model aims to provide a flared clamp type pipe connector to solve the problems raised in the above background technology.
[0007] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a flared clamp-type pipe connector, comprising a first connecting tube and a docking frame, a second connecting tube is docked and installed on one side of the first connecting tube, and a fastening bolt is horizontally installed at the connection between the first connecting tube and the second connecting tube, the docking frame is respectively installed on the ends of the first connecting tube and the second connecting tube away from the fastening bolt, and guide brackets are horizontally installed on the upper and lower sides of the docking frame, and a two-way worm is horizontally arranged at the lower end of the guide bracket, the docking frame comprises a main frame body, an external sleeve, an adjusting bolt, a sealing ring and a fastening ring, an external sleeve is arranged on the side of the main frame body away from the fastening bolt, and an adjusting bolt is vertically penetrated through the surface of the external sleeve, and a sealing ring is rotatably connected to the end of the adjusting bolt close to the center of the external sleeve, and a fastening ring is arranged at the connection between the main frame body and the first connecting tube and the second connecting tube.
[0008] Furthermore, the first connecting pipe includes a flared clamping pipe, a docking flange, a docking plug and a sealing gasket, one end of the flared clamping pipe is provided with a docking flange, and the end of the docking flange away from the docking flange is provided with a docking plug, and the surface of the docking plug is covered with a sealing gasket.
[0009] Furthermore, the flared clamping tube, the docking flange and the docking plug are arranged in an integrated structure, and the sealing gasket covers the inner and outer surfaces of the docking plug.
[0010] Furthermore, the second connecting pipe and the first connecting pipe adopt the same structural setting, and the fastening bolt is connected to the second connecting pipe and the first connecting pipe by threaded connection, and a cross groove structure is provided on the top of the fastening bolt.
[0011] Furthermore, the adjusting bolt is arranged on the surface of the external sleeve in an "X"-shaped structure, and the sealing ring is arranged in a quarter arc structure.
[0012] Furthermore, the fastening ring, sealing ring and sealing gasket are all made of the same material, and the fastening ring is arranged at the connection between the main frame and the expanded clamping tube with an interference fit structure.
[0013] Furthermore, the guide bracket slides through the upper and lower sides of the main frame, and the bidirectional worm is threadedly connected to the main frame.
[0014] Furthermore, the guide bracket and the bidirectional worm gear are parallel to each other, and the guide bracket and the bidirectional worm gear are respectively arranged at four diagonal positions of the main frame.
[0015] The utility model provides a flared clamp type pipe connector, which has the following beneficial effects:
[0016] 1. The utility model, by installing docking frames on the middle sections of the first connecting pipe and the second connecting pipe respectively, and utilizing the structure of the docking plug and the external sleeve, the pipes can be installed in two ways during docking installation. When the diameter of the pipe is smaller than the docking plug, it can be inserted into the interior of the docking plug by horizontal insertion, so as to facilitate subsequent pipe docking. When the pipe is larger than the outer diameter of the docking plug and smaller than the inner diameter of the external sleeve, the pipe can be inserted between the docking plug and the external sleeve along the horizontal direction to perform pipe docking. By utilizing the above structure, the entire structural member can have good flexibility in use to a certain extent. In addition, a cross-shaped groove is provided on the top of the fastening bolt used to connect and fix the first connecting pipe and the second connecting pipe, so that when the fastening bolt is screwed, different tools can be selected for screwing and fixing according to the installation operation, thereby improving the flexibility and convenience of the device structure combination.
[0017] 2. The utility model provides sealing gaskets on both the outer surface and the inner wall surface of the docking plug, so that no matter when the pipe is inserted into the inside or outside of the docking plug, it can have effective structural sealing, and at the same time, it can also ensure the structural connection stability of the pipe and the first connecting pipe and the second connecting pipe. In addition, adjusting bolts are threadedly penetrated around the external sleeve, and a sealing gasket with an arc structure is connected to the end of the adjusting bolt. By screwing the adjusting bolt, the sealing gasket connected to it is pressed against the outer wall surface of the pipe, so that the pipe sleeved on the outer wall of the docking plug and located in the external sleeve can be clamped and fixed around. Under the action of the sealing ring, the sealing and structural firmness of the pipe connection structure can be further achieved at the same time, so as to avoid the problem of structural loosening and leakage. The use of the fastening ring can effectively ensure the stability and tightness of the connection between the main frame and the expanded clamping pipe structure, and further avoid the occurrence of structural loosening.
[0018] 3. The utility model provides a guide bracket and a two-way worm gear on the upper and lower sides of the docking frame, so that the docking frame symmetrically arranged on the left and right has good structural integrity under the structural connection of the guide bracket and the two-way worm gear. When the two-way worm gear is rotated horizontally, the left and right docking frames can simultaneously perform left and right translation adjustment in the horizontal direction along the surfaces of the guide bracket and the two-way worm gear. By using the above structure, on the one hand, the structural disassembly and assembly of the first connecting tube and the second connecting tube can have structural stability in the horizontal direction, which is convenient for the disassembly and assembly of the structure, so that the efficiency of structural docking can be effectively improved, and structural dislocation during the docking process can be avoided to affect the installation efficiency. On the other hand, the use of the above structure can provide effective structural reinforcement around the connection between the first connecting tube and the second connecting tube to form a frame structure, which can avoid structural deformation of the connection between the first connecting tube and the second connecting tube due to external force to a certain extent, thereby causing leakage problems, so that the stability and safety of the entire structure are effectively improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 This is a schematic diagram of the side view of the main body of a flared clamp type pipe connector of the utility model;
[0020] Figure 2 This is a front cross-sectional structural diagram of the main body of a flared clamp-type pipe connector of the utility model;
[0021] Figure 3 The utility model is a flared clamp type pipe connector Figure 2 A schematic diagram of the enlarged structure at point A;
[0022] Figure 4 The utility model is a schematic diagram of the three-dimensional structure of the main frame of a flared clamp type pipe connector.
[0023] In the figure: 1. first connecting pipe; 101. flared clamping pipe; 102. docking flange; 103. docking plug; 104. sealing gasket; 2. second connecting pipe; 3. fastening bolts; 4. docking frame; 401. main frame body; 402. external sleeve; 403. adjusting bolts; 404. sealing ring; 405. fastening ring; 5. guide bracket; 6. bidirectional worm. DETAILED DESCRIPTION
[0024] The following is a further detailed description of the implementation of the present invention in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but cannot be used to limit the scope of the present invention.
[0025] like Figures 1 to 4As shown, a flared clamp type pipe connector comprises a first connecting pipe 1 and a docking frame 4, a second connecting pipe 2 is dockedly installed on one side of the first connecting pipe 1, and a fastening bolt 3 is horizontally installed at the junction of the first connecting pipe 1 and the second connecting pipe 2, the docking frame 4 is respectively installed on the ends of the first connecting pipe 1 and the second connecting pipe 2 away from the fastening bolt 3, and guide brackets 5 are horizontally installed on the upper and lower sides of the docking frame 4, and a two-way worm 6 is horizontally arranged at the lower end of the guide bracket 5, the docking frame 4 comprises a main frame body 401, an external sleeve 402, an adjusting bolt 403, a sealing ring 404 and a fastening ring 405, an external sleeve 402 is arranged on the side of the main frame body 401 away from the fastening bolt 3, and the surface of the external sleeve 402 is vertically penetrated by the adjusting bolt 403, and the adjusting bolt 403 is rotatably connected to the sealing ring 404 at one end close to the center of the external sleeve 402, the main frame body 401 is connected to the first connecting pipe 1 and the second connecting pipe 2 A fastening ring 405 is provided at the connection of the pipe 2, and the adjusting bolt 403 is arranged in an "X"-shaped structure on the surface of the external sleeve 402. The sealing ring 404 is arranged in a quarter arc structure. The second connecting pipe 2 and the first connecting pipe 1 adopt the same structural arrangement, and the fastening bolt 3 is threadedly connected to the second connecting pipe 2 and the first connecting pipe 1, and a cross groove structure is provided on the top of the fastening bolt 3. By using the structure of the docking plug 103 and the external sleeve 402, there are two installation methods for the pipeline during docking installation. When the diameter of the pipeline is smaller than the docking plug 103, it can be inserted into the interior of the docking plug 103 by horizontal insertion to facilitate subsequent pipeline docking. When the pipeline is larger than the outer diameter of the docking plug 103 and smaller than the inner diameter of the external sleeve 402, the pipeline can be docked by inserting the pipeline horizontally between the docking plug 103 and the external sleeve 402.
[0026] like Figures 1 to 4 As shown, the first connecting pipe 1 includes a flared clamping tube 101, a docking flange 102, a docking plug 103 and a sealing gasket 104. The docking flange 102 is provided at one end of the flared clamping tube 101, and the docking plug 103 is provided at the end of the docking flange 102 away from the docking flange 102, and the surface of the docking plug 103 is covered with a sealing gasket 104. The flared clamping tube 101, the docking flange 102 and the docking plug 103 are arranged in an integrated structure, and the sealing gasket 104 covers the inner and outer surfaces of the docking plug 103. The adjusting bolts 403 are threadedly penetrated around the external sleeve 402, and the sealing gasket 104 with an arc structure is connected to the end of the adjusting bolt 403. The sealing gasket 104 connected thereto is pressed against the outer wall surface of the pipe by screwing the adjusting bolt 403, so that the pipe sleeved on the outer wall of the docking plug 103 and located inside the external sleeve 402 can be clamped and fixed around.
[0027] like Figures 1 to 4As shown, the fastening ring 405, the sealing ring 404 and the sealing gasket 104 are all made of the same material, and the fastening ring 405 is arranged at the junction of the main frame 401 and the flared clamping tube 101 with an interference structure, the guide bracket 5 slides through the upper and lower sides of the main frame 401, and the two-way worm 6 is threadedly connected to the main frame 401, the guide bracket 5 and the two-way worm 6 are parallel to each other, and the guide bracket 5 and the two-way worm 6 are respectively arranged at the four diagonals of the main frame 401, and the guide bracket 5 and the two-way worm 6 are arranged on the upper and lower sides of the docking frame 4, so that the left and right symmetrically arranged docking frame 4 has good structural integrity under the structural connection of the guide bracket 5 and the two-way worm 6, and when the two-way worm 6 is rotated horizontally axially, the left and right docking frames 4 can simultaneously perform left and right translation adjustment in the horizontal direction along the surfaces of the guide bracket 5 and the two-way worm 6.
[0028] In summary, if Figures 1 to 4 As shown, when the flared clamp type pipe connector is used, the main frame body 401 with a fastening ring 405 on the inner wall is firstly docked with the flared clamp tubes 101 of the first connecting pipe 1 and the second connecting pipe 2 in the horizontal direction, and the stability of the structural connection is ensured. At this time, due to the structural connection and support of the guide bracket 5 and the two-way worm 6, the entire first connecting pipe 1, the second connecting pipe 2, the docking frame 4, the guide bracket 5 and the two-way worm 6 form a relatively stable frame structure;
[0029] Then, the connection method between the pipeline and the first connecting pipe 1 and the second connecting pipe 2 is selected according to the use needs. When the diameter of the pipeline is smaller than the docking plug 103, it can be inserted into the interior of the docking plug 103 by horizontal insertion to facilitate the subsequent pipeline docking. When the pipeline is larger than the outer diameter of the docking plug 103 and smaller than the inner diameter of the external sleeve 402, the pipeline can be docked by inserting the pipeline between the docking plug 103 and the external sleeve 402 in the horizontal direction. In this process, no matter which docking method is used, the sealing gasket 104 provides good structural sealing and insertion firmness between the pipeline and the docking plug 103. In addition, when the second connection method is selected, it is only necessary to screw the adjusting bolt 403 set on the outside of the external sleeve 402 and press the sealing ring 404 connected to its structure against the surface of the pipeline.
[0030] Then, by rotating the bidirectional worm gear 6, the first connecting pipe 1 and the second connecting pipe 2 with the pipes inserted will be translated in the horizontal direction toward the vertical central axis position of the guide bracket 5 until the structure is docked. Finally, it is only necessary to use the fastening bolts 3 to horizontally screw into the docking flanges 102 in the first connecting pipe 1 and the second connecting pipe 2 to complete the installation and fixation of the structure.
[0031] The embodiments of the present invention are provided for the purpose of illustration and description, and are not intended to be exhaustive or to limit the present invention to the disclosed forms. Many modifications and variations will be apparent to those of ordinary skill in the art. The embodiments are selected and described to better illustrate the principles and practical applications of the present invention, and to enable those of ordinary skill in the art to understand the present invention and thereby design various embodiments with various modifications suitable for specific uses.
Claims
1. A flared clamp type pipe connector, comprising a first connecting pipe (1) and a docking frame (4), characterized in that: The first connecting tube (1) is butt-jointed with the second connecting tube (2) at one side, and a fastening bolt (3) is horizontally mounted at the joint between the first connecting tube (1) and the second connecting tube (2), the butt-jointing frame (4) is respectively mounted on one end of the first connecting tube (1) and the second connecting tube (2) away from the fastening bolt (3), and guide brackets (5) are horizontally mounted on both upper and lower sides of the butt-jointing frame (4), and a bidirectional worm gear (6) is horizontally arranged at the lower end of the guide bracket (5), the butt-jointing frame (4) comprises a main frame body (401), an external sleeve ( 402), an adjusting bolt (403), a sealing ring (404) and a fastening ring (405); an external sleeve (402) is provided on a side of the main frame (401) away from the fastening bolt (3); an adjusting bolt (403) vertically penetrates the surface of the external sleeve (402); and a sealing ring (404) is rotatably connected to one end of the adjusting bolt (403) close to the center of the external sleeve (402); and a fastening ring (405) is provided at the connection between the main frame (401) and the first connecting pipe (1) and the second connecting pipe (2).
2. The flared clamp type pipe connector according to claim 1, characterized in that: The first connecting pipe (1) comprises a flared clamping pipe (101), a docking flange (102), a docking plug (103) and a sealing gasket (104); one end of the flared clamping pipe (101) is provided with a docking flange (102), and the end of the docking flange (102) away from the docking flange (102) is provided with a docking plug (103), and the surface of the docking plug (103) is covered with a sealing gasket (104).
3. The flared clamp type pipe connector according to claim 2, characterized in that: The flared clamping tube (101), the docking flange (102) and the docking plug tube (103) are arranged in an integrated structure, and the sealing gasket (104) covers the inner and outer surfaces of the docking plug tube (103).
4. The flared clamp type pipe connector according to claim 1, characterized in that: The second connecting pipe (2) and the first connecting pipe (1) adopt the same structural arrangement, and the fastening bolt (3) is threadedly connected to the second connecting pipe (2) and the first connecting pipe (1), and a cross groove structure is provided on the top of the fastening bolt (3).
5. The flared clamp type pipe connector according to claim 1, characterized in that: The adjusting bolt (403) is arranged on the surface of the external sleeve (402) in an "X"-shaped structure, and the sealing ring (404) is arranged in a quarter arc structure.
6. The flared clamp type pipe connector according to claim 2, characterized in that: The fastening ring (405), the sealing ring (404) and the sealing gasket (104) are all made of the same material, and the fastening ring (405) is arranged at the connection between the main frame (401) and the expanded clamping tube (101) with an interference fit structure.
7. The flared clamp type pipe connector according to claim 1, characterized in that: The guide bracket (5) slides through the upper and lower sides of the main frame (401), and the bidirectional worm gear (6) is threadedly connected to the main frame (401).
8. The flared clamp type pipe connector according to claim 1, characterized in that: The guide bracket (5) and the bidirectional worm gear (6) are parallel to each other, and the guide bracket (5) and the bidirectional worm gear (6) are respectively arranged at four diagonal positions of the main frame body (401).