Mounting frame for hydraulic engineering construction

By designing a mounting frame for water conservancy engineering construction, the combination of fixed base plate, riser pipe, lifting column, installation flat plate, telescopic column and elastic positioning device is solved, and the problem of unstable placement of detection instruments is achieved, achieving higher stability and convenience of use.

CN222669510UActive Publication Date: 2025-03-25ZHONGZHOU MENG CONSTRUCTION GROUP CO LTD +8
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421968604.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-08-14
Publication Date
2025-03-25
Estimated Expiration
2034-08-14

AI Technical Summary

Technical Problem

The placement method of detection instruments in existing water conservancy projects is not stable enough, which can easily lead to the overturn of the instrument and affect the stability of use.

Method used

A mounting frame for water conservancy engineering construction is designed, including fixed base plate, fixed riser, lifting column, mounting plate, telescopic column and elastic positioning device. Through the synergy of these components, stable fixing and positioning of the detection instrument is achieved.

Benefits of technology

It effectively improves the stability of the use of detection instruments, reduces the risk of instrument dumping, and improves the convenience and efficiency during construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222669510U_ABST
    Figure CN222669510U_ABST
Patent Text Reader

Abstract

The utility model discloses a mounting rack for hydraulic engineering construction, which belongs to the technical field of hydraulic engineering and comprises a fixed bottom plate, a fixed screw inserted into the ground penetrates through the fixed bottom plate, a fixed vertical pipe is fixedly mounted on the upper surface of the fixed bottom plate, a slidable lifting upright post is arranged in the fixed vertical pipe, and the lifting upright post is fixedly mounted on the upper surface of the fixed bottom plate. A mounting flat plate is fixedly mounted on the upper surface of the lifting stand column, and a positioning rod inserted into the lifting stand column penetrates through the top of the fixed stand pipe. According to the mounting frame for hydraulic engineering construction, positioning spring columns are arranged to drive an operation flat plate and clamping blocks to move inwards under the action of self elasticity to clamp and fix connecting blocks and positioning cones, so that the better clamping and fixing effects on the connecting blocks and the positioning cones are achieved, and the fixing stability of the positioning cones on a fixed vertical pipe can be better guaranteed; and people can better use the device, and the use convenience of people is effectively improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of water conservancy projects, in particular to a mounting frame for water conservancy project construction. Background Art

[0002] Water conservancy projects are projects built to control and allocate surface water and groundwater in nature to achieve the purpose of eliminating harm and promoting benefits. They are also called water projects. Water is a valuable resource that is indispensable to human production and life, but its natural state does not fully meet human needs. Only by building water conservancy projects can we control water flows, prevent floods and waterlogging disasters, and regulate and distribute water to meet people's needs for water resources in life and production. Currently, existing water conservancy projects generally place detection instruments directly on the ground for use during construction. The existing placement method of detection instruments is not stable enough, which can easily cause the detection instruments to tip over during use, resulting in poor stability in the use of the detection instruments, which is not conducive to better use. Utility Model Content

[0003] 1. Technical issues to be resolved

[0004] In order to overcome the above-mentioned defects of the prior art, the utility model provides a mounting bracket for water conservancy project construction, which solves the problem that the placement of the detection instrument is not stable enough, which can easily cause the detection instrument to tip over during use, resulting in poor stability of the detection instrument and is not conducive to better use.

[0005] (II) Technical solution

[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a mounting frame for water conservancy project construction, comprising a fixed base plate, a fixing screw inserted into the ground is passed through the interior of the fixed base plate, a fixed riser is fixedly installed on the upper surface of the fixed base plate, a slidable lifting column is provided inside the fixed riser, a mounting plate is fixedly installed on the upper surface of the lifting column, a positioning rod inserted into the lifting column is passed through the top of the fixed riser, a fixed sleeve is fixedly installed on the bottom of the outer surface of the fixed riser, a slidable telescopic column is provided inside the fixed sleeve, an elastic positioning device is fixedly installed on the lower surface of the telescopic column, a supporting inclined rod connected to the outer surface of the fixed riser is fixedly installed on the top of the outer surface of the fixed sleeve, and a limiting rod inserted into the telescopic column is passed through the interior of the fixed sleeve.

[0007] As a further solution of the utility model: the elastic positioning device includes a fixed block fixedly installed on the lower surface of the telescopic column, a positioning spring column is fixedly installed on the outer side of the fixed block, an operating plate is fixedly installed on the outer side of the positioning spring column, an operating handle is fixedly installed on the outer side of the operating plate, a clamping block is fixedly installed on the bottom of the inner side of the operating plate, a rotatable connecting block is provided on the inner side of the clamping block, and a positioning cone is fixedly installed on the lower surface of the connecting block.

[0008] As a further solution of the utility model: a plurality of groups of limit through holes are provided on the upper surface of the telescopic column, and the size of the limit through holes is matched with the size of the limit rod.

[0009] As a further solution of the utility model: the outer surface of the operating handle is provided with an anti-skid layer, and the outer surface of the anti-skid layer is evenly provided with friction anti-skid patterns.

[0010] As a further solution of the utility model: a clamping groove is provided on the inner side surface of the clamping block, a clamping protrusion is fixedly installed on the outer side surface of the connecting block, and the clamping groove is matched with the clamping protrusion.

[0011] As a further solution of the utility model: a plurality of groups of positioning through holes are provided on the left side of the lifting column, and the size of the positioning through holes is matched with the size of the positioning rod.

[0012] (III) Beneficial effects

[0013] Compared with the prior art, the beneficial effects of the utility model are:

[0014] 1. The installation frame for water conservancy project construction drives the operating plate and the clamping block to move inward to clamp and fix the connecting block and the positioning cone by arranging the positioning spring column under the action of its own elastic force, so that the connecting block and the positioning cone have a better clamping and fixing effect, and can better ensure the stability of the positioning cone to fix the riser, which is helpful for people to use it better and effectively improves the convenience of people's use.

[0015] 2. The installation frame for water conservancy project construction is provided with a telescopic column and an elastic positioning device, which move along the inside of the fixed sleeve to a suitable position and then stop. The limit rod is inserted into the telescopic column through the fixed sleeve to perform a limit fixing operation, so that the telescopic column and the elastic positioning device have a better limit fixing effect, which can better ensure the stability during use and further improve the convenience of people's use.

[0016] 3. The installation frame for water conservancy project construction is provided with a lifting column and a mounting plate, which slide up and down along the inside of a fixed riser to a suitable position, and then a positioning rod is inserted into the lifting column through the fixed riser to perform a positioning operation, so that the lifting column and the mounting plate have a better positioning effect, and can better ensure the stability of the lifting column and the mounting plate during use, which is helpful for people to use them better. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a schematic diagram of the structure of the utility model;

[0018] Figure 2 It is a schematic diagram of the local structure of the utility model;

[0019] Figure 3 This is a schematic diagram of the structure decomposition of the elastic positioning device of the utility model;

[0020] In the figure: 1. Fixed base plate; 2. Fixed screw; 3. Fixed vertical pipe; 4. Lifting column; 5. Mounting plate; 6. Positioning rod; 7. Fixed sleeve; 8. Telescopic column; 9. Elastic positioning device; 901. Fixed block; 902. Positioning spring column; 903. Operating plate; 904. Operating handle; 905. Clamping block; 906. Connecting block; 907. Positioning cone; 10. Support diagonal rod; 11. Limit rod. DETAILED DESCRIPTION

[0021] The technical solution of this patent is further described in detail below in conjunction with specific implementation methods.

[0022] like Figure 1-3 As shown, the utility model provides a technical solution: a mounting frame for water conservancy project construction, comprising a fixed base plate 1, a fixed screw 2 inserted into the ground is penetrated inside the fixed base plate 1, a fixed riser 3 is fixedly installed on the upper surface of the fixed base plate 1, a slidable lifting column 4 is provided inside the fixed riser 3, a mounting plate 5 is fixedly installed on the upper surface of the lifting column 4, a positioning rod 6 inserted into the lifting column 4 is penetrated on the top of the fixed riser 3, a fixed sleeve 7 is fixedly installed on the bottom of the outer surface of the fixed riser 3, a slidable telescopic column 8 is provided inside the fixed sleeve 7, an elastic positioning device 9 is fixedly installed on the lower surface of the telescopic column 8, a supporting inclined rod 10 connected to the outer surface of the fixed riser 3 is fixedly installed on the top of the outer surface of the fixed sleeve 7, and a limiting rod 11 inserted into the telescopic column 8 is penetrated inside the fixed sleeve 7.

[0023] The elastic positioning device 9 includes a fixed block 901 fixedly installed on the lower surface of the telescopic column 8, a positioning spring column 902 is fixedly installed on the outer side of the fixed block 901, an operating plate 903 is fixedly installed on the outer side of the positioning spring column 902, an operating handle 904 is fixedly installed on the outer side of the operating plate 903, a clamping block 905 is fixedly installed on the bottom of the inner side of the operating plate 903, a rotatable connecting block 906 is provided on the inner side of the clamping block 905, and a positioning cone 907 is fixedly installed on the lower surface of the connecting block 906.

[0024] Specifically, Figure 1 and Figure 2 As shown, the upper surface of the telescopic column 8 is provided with multiple groups of limiting through holes, and the size of the limiting through holes is adapted to the size of the limiting rod 11. The limiting through holes on the upper surface of the telescopic column 8 cooperate with the limiting rod 11 to facilitate better limiting. The inner side surface of the clamping block 905 is provided with a clamping groove, and the outer side surface of the connecting block 906 is fixedly installed with a clamping protrusion, and the clamping groove is adapted to the clamping protrusion. The clamping groove on the inner side surface of the clamping block 905 and the clamping protrusion on the outer side surface of the connecting block 906 cooperate with each other, which improves the clamping and fixing effect. The left side surface of the lifting column 4 is provided with multiple groups of positioning through holes, and the size of the positioning through holes is adapted to the size of the positioning rod 6. The positioning through holes on the left side of the lifting column 4 and the positioning rod 6 facilitate better positioning operations.

[0025] Specifically, Figure 3 As shown, the outer surface of the operating handle 904 is provided with an anti-skid layer, and the outer surface of the anti-skid layer is evenly provided with friction anti-skid patterns. The friction anti-skid patterns on the outer surface of the operating handle 904 increase the friction force and improve the anti-skid effect.

[0026] The working principle of the utility model is:

[0027] S1, place the device at a designated location, and use a fixing screw 2 to penetrate the fixing base plate 1 and insert it into the ground for fixing;

[0028] S2, then control the telescopic column 8 and the elastic positioning device 9 to move along the interior of the fixed sleeve 7 to a suitable position and then stop, and insert the limiting rod 11 through the fixed sleeve 7 into the telescopic column 8 for limiting and fixing;

[0029] S3, insert the connection block 906 and the positioning cone 907 into the ground, and then the positioning spring column 902 drives the operating plate 903 and the clamping block 905 to move inward under the action of its own elastic force to clamp and fix the connection block 906 and the positioning cone 907;

[0030] S4, then control the lifting column 4 and the mounting plate 5 to slide up and down along the inside of the fixed vertical pipe 3 to a suitable position, and then insert the positioning rod 6 through the fixed vertical pipe 3 into the lifting column 4 for positioning, and then the detection instrument can be used.

[0031] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood by specific circumstances.

[0032] The above describes in detail the preferred implementation of this patent, but this patent is not limited to the above implementation. Various changes can be made within the knowledge scope of ordinary technicians in this field without departing from the purpose of this patent.

Claims

1. A mounting frame for water conservancy engineering construction, comprising a fixed base plate (1), wherein a fixed screw (2) inserted into the ground penetrates the interior of the fixed base plate (1), and a fixed riser (3) is fixedly mounted on the upper surface of the fixed base plate (1), characterized in that: A slidable lifting column (4) is provided inside the fixed vertical pipe (3), a mounting plate (5) is fixedly installed on the upper surface of the lifting column (4), a positioning rod (6) inserted into the lifting column (4) is passed through the top of the fixed vertical pipe (3), a fixed sleeve (7) is fixedly installed at the bottom of the outer surface of the fixed vertical pipe (3), a slidable telescopic column (8) is provided inside the fixed sleeve (7), an elastic positioning device (9) is fixedly installed on the lower surface of the telescopic column (8), a supporting inclined rod (10) connected to the outer surface of the fixed vertical pipe (3) is fixedly installed on the top of the outer surface of the fixed sleeve (7), and a limiting rod (11) inserted into the telescopic column (8) is passed through the inside of the fixed sleeve (7).

2. The installation frame for water conservancy project construction according to claim 1, characterized in that: The elastic positioning device (9) comprises a fixed block (901) fixedly mounted on the lower surface of the telescopic column (8); a positioning spring column (902) is fixedly mounted on the outer side surface of the fixed block (901); an operating plate (903) is fixedly mounted on the outer side surface of the positioning spring column (902); an operating handle (904) is fixedly mounted on the outer side surface of the operating plate (903); a clamping block (905) is fixedly mounted on the bottom of the inner side surface of the operating plate (903); a rotatable connecting block (906) is provided on the inner side of the clamping block (905); and a positioning cone (907) is fixedly mounted on the lower surface of the connecting block (906).

3. The installation frame for water conservancy project construction according to claim 1, characterized in that: The upper surface of the telescopic column (8) is provided with a plurality of groups of limiting through holes, and the size of the limiting through holes is adapted to the size of the limiting rod (11).

4. The installation frame for water conservancy project construction according to claim 2, characterized in that: The outer surface of the operating handle (904) is provided with an anti-skid layer, and the outer surface of the anti-skid layer is evenly provided with friction anti-skid patterns.

5. The installation frame for water conservancy project construction according to claim 2, characterized in that: The inner side surface of the clamping block (905) is provided with a clamping groove, and the outer side surface of the connecting block (906) is fixedly mounted with a clamping protrusion, and the clamping groove is adapted to the clamping protrusion.

6. The installation frame for water conservancy project construction according to claim 1, characterized in that: The left side of the lifting column (4) is provided with a plurality of groups of positioning through holes, and the size of the positioning through holes is matched with the size of the positioning rod (6).