Raw mill sludge treatment device

By designing a raw abrasive sludge treatment device including a storage silo, discharge pipe, feed pipe and hinglong structure, the problem of sludge prone to precipitation and leakage in the storage stage is solved, and the safe treatment of sludge and energy recovery are achieved.

CN222684483UActive Publication Date: 2025-03-28LANZHOU HONGSHI ENVIRONMENTAL PROTECTION TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420939127.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-30
Publication Date
2025-03-28
Estimated Expiration
2034-04-30

AI Technical Summary

Technical Problem

Sludge is prone to precipitation and agglomeration during the storage stage and may contain organic compounds and toxic substances. Improper handling can pose a threat to the environment and human health.

Method used

A raw material abrasive sludge treatment device is designed, including a storage silo, a discharge pipe, a feed pipe and a hinge structure. By setting up a first hinge in the storage silo for stirring, the sludge is prevented from precipitation, and the sludge is used to pass the communication pipe into the feed pipe through the communication pipe during discharge, ensuring that the sludge does not leak during the transportation process.

Benefits of technology

It effectively avoids precipitation and accumulation and leakage during sludge storage, ensures that the sludge will not pose a potential threat to the environment and human health during the treatment process, and achieves safe treatment of sludge and energy recovery.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222684483U_ABST
    Figure CN222684483U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of raw material mill sludge treatment and energy recovery, in particular to a raw material mill sludge treatment device which comprises a storage bin, a hole is formed in the bottom of the storage bin and communicated with a discharging pipe, a conveying pipe is arranged below the discharging pipe, a hole is formed in one side of the upper end face of the conveying pipe and communicated with a communicating pipe, and the communicating pipe is communicated with the discharging pipe. The device further comprises a first auger and a second auger. The first auger is arranged in the storage bin; wherein the bottom end of the first auger extends into the discharging pipe; and the second auger is arranged in the conveying pipe. The utility model solves the problems that the sludge is easy to precipitate in the sludge storage stage, organic compounds and possible toxic substances exist in the sludge, and potential threats are caused to the environment and human health if the treatment is improper.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of raw mill sludge treatment and energy recovery, in particular to a raw mill sludge treatment device. Background Art

[0002] With the development of industrialization and the acceleration of urbanization, sludge as a waste has attracted widespread attention in environmental protection treatment. The process of sludge generation involves multiple fields, including industrial production, waste treatment, and urban domestic waste management. Not only does the amount of sludge continue to increase, but the diversity of its composition also increases the complexity of treatment.

[0003] Among them, waste treatment sludge includes sludge from municipal waste incineration and hazardous waste treatment, which may contain harmful chemicals and require special treatment methods to prevent its pollution to the environment. Heavy metal sludge may contain heavy metal elements such as cadmium, lead, and mercury, and its toxicity and persistence pose a serious threat to soil and water bodies. Construction waste sludge comes from waste from construction projects, which may contain gypsum, concrete and other components. It needs to be treated according to its characteristics to reduce waste of resources and impact on the environment.

[0004] In the cement production process, the recycled sludge can be processed and reused. Before the sludge is introduced into the raw mill, it needs to be properly pretreated to ensure the quality and performance of the sludge. The pretreatment design includes steps such as sludge drying, crushing and screening to reduce the adverse effects on the raw mill system. At the same time, sludge precipitation is prone to occur during the sludge storage stage, and the sludge contains organic compounds and possible toxic substances. If improperly handled, it will pose a potential threat to the environment and human health. Therefore, a raw mill sludge treatment device is needed to solve the above problems. Utility Model Content

[0005] The purpose of the utility model is to provide a raw mill sludge treatment device, which has the advantages of avoiding sedimentation and agglomeration during sludge storage and avoiding sludge leakage and pollution, and solves the problems that sludge is prone to sedimentation during the sludge storage stage, and that the sludge contains organic compounds and possible toxic substances, which pose a potential threat to the environment and human health if not handled properly.

[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a raw mill sludge treatment device, comprising a storage bin, the bottom of which is opened and connected with a discharge pipe, a feed pipe is arranged below the discharge pipe, a hole is opened on one side of the upper end face of the feed pipe and connected with a connecting pipe, and further comprising a first hinge dragon and a second hinge dragon;

[0007] The first auger is arranged in the storage bin;

[0008] The bottom end of the first auger extends into the discharge pipe;

[0009] The second auger is arranged in the material conveying pipe.

[0010] When a raw mill sludge treatment device in the technical solution is used, sludge is injected into the storage bin through the feed pipe and temporarily stored in the storage bin. In order to prevent sludge leakage, a first cover is installed on the top of the storage bin, and a first auger is arranged in the storage bin, so that the first auger can be rotated clockwise in the storage bin to achieve stirring of the sludge in the storage bin, thereby preventing the sludge from settling. When discharging is required, the first auger is rotated counterclockwise in the storage bin, so that the sludge is squeezed into the discharge pipe through the extrusion force and enters the feed pipe through the connecting pipe. When the second auger rotates, the sludge can be transported through the feed pipe, and the sludge will not leak during the transportation stage. At the same time, the sludge is squeezed into the discharge trough through the feed pipe, and the sludge enters the next processing step through the discharge trough.

[0011] Preferably, a first cover body is fixedly installed on the top of the storage bin, and a hole is opened on the top of the front side of the storage bin and is connected to and connected with a feed pipe.

[0012] A hole is opened on the top of the front side of the storage bin and a feeding pipe is connected and installed, so that sludge can be injected into the storage bin through the storage pipe.

[0013] Preferably, the bottom of the discharge pipe is connected and installed with the top of the connecting pipe.

[0014] The bottom of the discharge pipe is connected and installed with the top of the connecting pipe, so that the sludge can be injected into the connecting pipe through the discharge pipe and injected into the conveying pipe through the connecting pipe.

[0015] Preferably, the other side of the lower end surface of the feeding pipe is open and connected to a discharge trough, and a second cover is fixedly installed at one end of the feeding pipe.

[0016] The other side of the lower end surface of the conveying pipe is opened and connected with a discharge trough, so that the sludge conveyed through the conveying pipe can be discharged through the discharge trough.

[0017] Preferably, a first drive motor is fixedly installed in the middle of the top of the first cover body, and the driving end of the first drive motor passes through the first cover body and is transmission-mounted with the top of the first auger.

[0018] By fixing the first drive motor in the middle of the top of the first cover body, and passing the driving end of the first drive motor through the first cover body and being installed with the top of the first auger, the first auger can be driven by the first drive motor, so that the first auger can rotate in the storage bin.

[0019] Preferably, a second drive motor is fixedly mounted in the middle of a side of the second cover body facing away from the feed pipe, and a driving end of the second drive motor passes through the second cover body and is drivingly mounted with one end of the second auger.

[0020] A second drive motor is fixedly installed in the middle of the side of the second cover body away from the feed pipe, and the transmission end of the second drive motor passes through the second cover body and is transmission-installed with one end of the second auger. The second auger can be driven by the second drive motor, thereby causing the second auger to rotate in the feed pipe.

[0021] Preferably, the bottom end of the first auger passes through the discharge pipe and extends into the connecting pipe, and the first auger is perpendicular to the second auger and does not contact.

[0022] By passing the bottom end of the first auger through the discharge pipe and extending it into the connecting pipe, and making the first auger vertical and non-contacting with the second auger, the discharge of the storage bin can be accelerated through the first auger, and the sludge entering the conveying pipe can be transported through the second auger.

[0023] Compared with the prior art, the beneficial effects of the utility model are as follows:

[0024] The utility model provides a first auger and a second auger, and the first auger is arranged in the storage bin, and at the same time, the bottom end of the first auger extends into the discharge pipe, and at the same time, the second auger is arranged in the delivery pipe. During specific operation, sludge is injected into the storage bin through the feed pipe, and the sludge is temporarily stored in the storage bin. In order to prevent the sludge from leaking, the first cover is installed on the top of the storage bin, and the first auger is arranged in the storage bin, so that the sludge in the storage bin can be stirred by the first auger in the storage bin, thereby preventing the sludge from settling. When discharging is required, the first auger is rotated counterclockwise in the storage bin, so that the sludge is squeezed into the discharge pipe through the extrusion force and enters the delivery pipe through the connecting pipe. When the second auger rotates, the sludge can be transported through the delivery pipe, and the sludge will not leak during the transportation stage. At the same time, the sludge is squeezed into the discharge trough through the delivery pipe, and the sludge enters the next process through the discharge trough. The effect of avoiding sedimentation and agglomeration of sludge during storage and avoiding leakage of sludge and pollution is achieved. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 This is a schematic diagram of the main structure of the utility model;

[0026] Figure 2 It is a schematic diagram of the cross-sectional structure of the utility model;

[0027] Figure 3 It is a schematic diagram of the cross-sectional structure of the material conveying pipe of the utility model.

[0028] In the figure: 1. storage bin; 2. first drive motor; 3. first cover body; 4. feed pipe; 5. conveying pipe; 6. discharge chute; 7. connecting pipe; 8. second cover body; 9. second drive motor; 10. discharge pipe; 11. first hinge dragon; 12. second hinge dragon. DETAILED DESCRIPTION

[0029] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0030] Example

[0031] like Figure 1 , Figure 2 and Figure 3 As shown, the utility model provides an embodiment: a raw mill sludge treatment device, including a storage bin 1, the bottom of the storage bin 1 has a hole and is connected to a discharge pipe 10, a feed pipe 5 is provided below the discharge pipe 10, and a hole is opened on one side of the upper end surface of the feed pipe 5 and is connected to a connecting pipe 7, and also includes a first hinge dragon 11 and a second hinge dragon 12;

[0032] Specifically, the first hinge 11 is arranged in the storage bin 1;

[0033] The bottom end of the first auger 11 extends into the discharge pipe 10;

[0034] The second auger 12 is arranged in the material conveying pipe 5 .

[0035] By setting the first hinge 11 and the second hinge 12, and setting the first hinge 11 in the storage bin 1, at the same time, the bottom end of the first hinge 11 extends into the discharge pipe 10, and at the same time, the second hinge 12 is set in the feed pipe 5. In the specific operation, the sludge is injected into the storage bin 1 through the feed pipe 4, and the sludge is temporarily stored in the storage bin 1. In order to avoid leakage of sludge, the first cover 3 is installed on the top of the storage bin 1, and the first hinge 11 is set in the storage bin 1, so that the sludge can be discharged from the storage bin 1 through the first hinge 11. The clockwise rotation can stir the sludge in the storage bin 1, thereby preventing the sludge from settling. When discharge is required, the first auger 11 is rotated counterclockwise in the storage bin 1, so that the sludge is squeezed into the discharge pipe 10 through the connecting pipe 7 and enters the feed pipe 5. When the second auger rotates, the sludge can be transported through the feed pipe 5, and the sludge will not leak during the transportation stage. At the same time, the sludge is squeezed into the discharge trough 6 through the feed pipe 5, and the sludge enters the next process through the discharge trough 6. The effect of avoiding sedimentation and agglomeration of sludge during storage and avoiding leakage of sludge and pollution is achieved.

[0036] Furthermore, a first cover body 3 is fixedly installed on the top of the storage bin 1, and a hole is opened on the top of the front side of the storage bin 1 and is connected to and connected with a feed pipe 4.

[0037] A hole is opened on the top of the front side of the storage bin 1 and a feed pipe 4 is connected and installed thereto, so that sludge can be injected into the storage bin 1 through the storage pipe 4 .

[0038] Furthermore, the bottom of the discharge pipe 10 is connected and installed with the top of the connecting pipe 7 .

[0039] By connecting the bottom of the discharge pipe 10 with the top of the connecting pipe 7 , the sludge can be injected into the connecting pipe 7 through the discharge pipe 10 and injected into the feed pipe 5 through the connecting pipe 7 .

[0040] Furthermore, the other side of the lower end surface of the material delivery pipe 5 is open and connected to a discharge trough 6 , and a second cover 8 is fixedly installed at one end of the material delivery pipe 5 .

[0041] A discharge trough 6 is installed through the opening at the other side of the lower end surface of the conveying pipe 5 and connected thereto, so that the sludge conveyed through the conveying pipe 5 can be discharged through the discharge trough 6 .

[0042] Furthermore, a first driving motor 2 is fixedly installed in the middle of the top of the first cover body 3 , and a driving end of the first driving motor 2 passes through the first cover body 3 and is installed in a driving manner with the top of the first hinge dragon 11 .

[0043] By fixing the first drive motor 2 in the middle of the top of the first cover body 3, and making the transmission end of the first drive motor 2 pass through the first cover body 3 and be installed with the top of the first hinge dragon 11, the first drive motor 2 can be used to drive the first hinge dragon 11, so that the first hinge dragon 11 can be rotated in the storage bin 1.

[0044] Furthermore, a second drive motor 9 is fixedly installed in the middle of the second cover body 8 on the side facing away from the feeding pipe 5 , and the driving end of the second drive motor 9 passes through the second cover body 8 and is drivingly installed with one end of the second auger 12 .

[0045] A second drive motor 9 is fixedly installed in the middle of the side of the second cover body 8 facing away from the conveying pipe 5, and the transmission end of the second drive motor 9 passes through the second cover body 8 and is installed with one end of the second auger 12. The second auger 12 can be driven by the second drive motor 9, so that the second auger 12 can rotate in the conveying pipe 5.

[0046] Furthermore, the bottom end of the first hinge 11 passes through the discharge pipe 10 and extends into the connecting pipe 7, and the first hinge 11 and the second hinge 12 are perpendicular and do not contact each other.

[0047] By passing the bottom end of the first auger 11 through the discharge pipe 10 and extending it into the connecting pipe 7, and making the first auger 11 and the second auger 12 vertical and non-contacting, the discharge of the storage bin 1 can be accelerated through the first auger 11, and the sludge entering the conveying pipe 5 can be transported through the second auger 12.

[0048] When the utility model is used, sludge is injected into the storage bin 1 through the feed pipe 4 and the sludge is temporarily stored in the storage bin 1. In order to prevent the sludge from leaking, the first cover body 3 is installed on the top of the storage bin 1, and the first auger 11 is set in the storage bin 1, so that the first auger 11 can be rotated clockwise in the storage bin 1, thereby realizing the stirring of the sludge in the storage bin 1, thereby preventing the sludge from settling. When discharging is required, the first auger 11 is rotated counterclockwise in the storage bin 1, so that the sludge is squeezed into the discharge pipe 10 through the extrusion force and enters the delivery pipe 5 through the connecting pipe 7, and when the second auger rotates, the sludge can be transported through the delivery pipe 5, and the sludge will not leak during the transportation stage. At the same time, the sludge is squeezed into the discharge trough 6 through the delivery pipe 5, and the sludge enters the next processing step through the discharge trough 6.

[0049] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.

Claims

1. A raw mill sludge treatment device, comprising a storage bin (1), the bottom of the storage bin (1) is opened and connected with a discharge pipe (10), a feed pipe (5) is arranged below the discharge pipe (10), a hole is opened on one side of the upper end surface of the feed pipe (5) and connected with a connecting pipe (7), characterized in that: Also includes: A first hinge dragon (11) is arranged in the material storage bin (1); The bottom end of the first hinge dragon (11) extends into the discharge pipe (10); The second auger (12) is arranged in the material conveying pipe (5).

2. A raw mill sludge treatment device according to claim 1, characterized in that: A first cover body (3) is fixedly installed on the top of the storage bin (1), and a hole is opened on the top of the front side of the storage bin (1) and is connected to a feed pipe (4) installed thereon.

3. A raw mill sludge treatment device according to claim 1, characterized in that: The bottom of the discharge pipe (10) is connected and installed with the top of the connecting pipe (7).

4. A raw mill sludge treatment device according to claim 1, characterized in that: The other side of the lower end surface of the material conveying pipe (5) is open and connected to a discharge trough (6), and a second cover body (8) is fixedly installed on one end of the material conveying pipe (5).

5. A raw mill sludge treatment device according to claim 2, characterized in that: A first drive motor (2) is fixedly mounted in the middle of the top of the first cover body (3); a transmission end of the first drive motor (2) passes through the first cover body (3) and is transmission-mounted with the top of the first hinge (11).

6. A raw mill sludge treatment device according to claim 4, characterized in that: A second drive motor (9) is fixedly mounted in the middle of the second cover body (8) on the side facing away from the feed pipe (5); the transmission end of the second drive motor (9) passes through the second cover body (8) and is transmission-mounted with one end of the second auger (12).

7. The raw mill sludge treatment device according to claim 1, characterized in that: The bottom end of the first hinge dragon (11) passes through the discharge pipe (10) and extends into the connecting pipe (7), and the first hinge dragon (11) and the second hinge dragon (12) are perpendicular and non-contacting.