Anti-seismic communication iron tower
By adopting a concave seat and water storage tank structure in the seismic communication tower, the problem of high transportation and installation costs of augmented blocks is solved, and the stability of the communication tower in vibration and the savings in transportation and installation costs are achieved.
Patent Information
- Application Number
- CN202421312570.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-11
- Publication Date
- 2025-03-28
- Estimated Expiration
- 2034-06-11
AI Technical Summary
When transporting and installing reinforced blocks of seismic communication towers, due to their heavy weight, they cannot be transported in one go, which increases transportation and installation costs.
A seismic communication tower was designed, adopting a structure of a concave seat and a water storage tank. During the installation process, the water storage tank is cast on the ground and buried in the foundation. The rainwater is collected through the concave seat and transported to the water storage tank, increasing the overall weight to improve stability, and casting is carried out on site to reduce transportation and installation costs.
Through this design, the communication tower is more stable during vibration, and the transportation and installation costs are greatly saved. At the same time, the concave seat and water storage tank can be transported in one go, simplifying the installation process.
Smart Images

Figure CN222686300U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of communication towers, in particular to an earthquake-resistant communication iron tower. Background Art
[0002] Communication tower is a kind of signal transmission tower, also called signal transmission tower or signal tower. Its main function is to support signal transmission and provide support for signal transmission antenna. It is used in communication departments such as China Mobile, China Unicom, and China Transportation Satellite Positioning System.
[0003] The patent document with application number CN211396867U discloses an earthquake-resistant communication iron tower including: an iron tower body, a reinforcement mechanism and a collision mechanism, the iron tower body including a bracket and an expansion bolt, the reinforcement mechanism including a reinforcement block A, the reinforcement block A is located at the bottom end of the bracket, the bottom end of the reinforcement block A is provided with a reinforcement block B, the bottom end of the reinforcement block B is provided with a reinforcement block C, the bottom ends of the reinforcement block A, the bottom ends of the reinforcement block B, and the bottom ends of the reinforcement block C are provided with connection blocks, the top ends of the reinforcement block B and the top ends of the reinforcement block C are provided with connection grooves, the connection blocks are located inside the connection grooves, and the outer surface of the bottom end of the bracket is provided with a reinforcement ring. The earthquake-resistant communication iron tower provided by the utility model further improves the windproof and earthquake-resistant performance of the iron tower body by adding connection blocks on both sides of the bottom ends of the reinforcement blocks A, B, and C, and reduces the burden on the staff by adding blades on one side of the bottom end of the bracket.
[0004] However, in actual application, during the transportation of many reinforcement blocks, due to their heavy weight, many reinforcement blocks cannot be transported together at one time. At the same time, the weight of the reinforcement blocks requires the use of heavy-duty transport vehicles for transportation, which increases the installation cost and transportation cost during the installation process. To address the above problems, we have launched an earthquake-resistant communication tower. Utility Model Content
[0005] The utility model discloses an earthquake-resistant communication iron tower, which aims to solve the technical problem that during the transportation of a plurality of reinforcement blocks, the plurality of reinforcement blocks cannot be transported together at one time due to their heavy weight, and the weight of the reinforcement blocks requires the use of heavy-duty transport vehicles for transportation, thereby increasing the installation cost and the transportation cost during the installation process.
[0006] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0007] A seismic-resistant communication tower comprises a concave seat, the bottom of the inner wall of the concave seat is fixedly connected to a base, the top of the base is fixedly connected to a communication tower, the bottom of the concave seat is fixedly connected to four connecting columns, a water tank is fixedly connected between the bottoms of the four connecting columns, the bottom of the concave seat and both sides of the connecting columns are fixedly connected to delivery pipes, the delivery pipes are communicated with the concave seat and the inside of the water tank, and a filter is fixedly connected to the inside of the concave seat and the outside of the base.
[0008] Through the arrangement, during the installation of the communication tower, the water tank is cast on site and then buried in the foundation. When it rains, rainwater can be collected by the concave seat and transported to the inside of the water tank through the delivery pipe, thereby increasing the overall weight, making the communication tower more reliable. In the process of vibration, the communication tower is more stable, and the water tank and the concave seat can be transported at one time, and only need to be cast on site, thereby saving a lot of transportation and installation costs.
[0009] In a preferred embodiment, a connecting rod is fixedly connected to the top of the communication tower, a fixing plate is fixedly connected to the top of the connecting rod, connecting ropes are fixedly connected to the four bottom corners of the fixing plate, and a gong is fixedly connected to the bottom of the connecting ropes.
[0010] Through the setting, when there is wind, the wind will blow the gong to collide, thereby producing sound, preventing surrounding birds and animals from building nests and staying above the communication tower.
[0011] In a preferred solution, the four corners of the bottom of the concave seat are fixedly connected to fixed cones, and discharge holes are equidistantly provided on both sides of the water storage tank.
[0012] By setting, when the water storage tank is full of water, excess water can be discharged through the discharge hole.
[0013] In a preferred solution, the communication tower is rotatably connected to a rotating shaft on all four sides, one end of the rotating shaft is fixedly connected to a windmill, the outer side of the rotating shaft is fixedly connected to an eccentric wheel, and the eccentric wheel is used in conjunction with a corresponding gong.
[0014] Through the setting, when the wind is not strong enough, the windmill will be blown to rotate, so that its shaft can adjust the eccentric wheel to hit the gong, which can also make a sound.
[0015] In a preferred solution, the water storage tank and the concave seat are made of cement, a non-conductive material, and a one-way valve is fixedly connected to the inside of the discharge hole.
[0016] By setting, the one-way valve is used to prevent surrounding soil from entering the interior of the water storage tank through the discharge hole.
[0017] In a preferred solution, the horizontal height of the base is higher than the height of the concave seat, the four sides of the base are slopes, and the area of the concave seat is larger than the area of the water tank.
[0018] By setting the area of the concave seat to be larger than the area of the water tank, the equipment is prevented from sinking. At the same time, the horizontal height of the base is higher than the height of the concave seat, which avoids the possibility of water accumulation at the bottom of the communication tower.
[0019] The utility model provides an earthquake-resistant communication iron tower with the following advantages:
[0020] First, during the installation of the communication tower, the water tank is cast on site and then buried in the foundation. When it rains, the rainwater can be collected by the concave seat and transported to the inside of the water tank through the delivery pipe, thereby increasing the overall weight, making the communication tower more reliable. In the process of vibration, the communication tower is more stable, and the water tank and the concave seat can be transported at one time, and only need to be cast on site, thereby saving a lot of transportation and installation costs;
[0021] Secondly, when there is wind, the wind will blow the gong to collide, thereby producing a sound, preventing surrounding birds and animals from building nests and staying above the communication tower. When the wind is not strong enough, it will blow the windmill to rotate, so that its shaft can mobilize the eccentric wheel to hit the gong, which can also make a sound. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 The utility model is a three-dimensional schematic diagram of an earthquake-resistant communication tower.
[0023] Figure 2 The utility model is a schematic diagram of the main view of an earthquake-resistant communication tower.
[0024] Figure 3 The utility model is a schematic top view of an earthquake-resistant communication tower.
[0025] Figure 4 The utility model is a schematic diagram of an earthquake-resistant communication tower as seen from above.
[0026] In the attached figure: 1. concave seat; 2. base; 3. communication tower; 4. connecting column; 5. water tank; 6. delivery pipe; 7. discharge hole; 8. filter; 9. fixed cone; 10. connecting rod; 11. fixing plate; 12. connecting rope; 13. gong; 14. rotating shaft; 15. eccentric wheel; 16. windmill. DETAILED DESCRIPTION
[0027] The technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only a part of the embodiments of the present application, rather than all the embodiments. The components of the embodiments of the present application usually described and marked in the drawings here can be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of the present application provided in the drawings is not intended to limit the scope of the application claimed for protection, but merely represents the selected embodiments of the present application. Based on the embodiments of the present application, all other embodiments obtained by those skilled in the art without making creative work belong to the scope of protection of the present application.
[0028] The utility model discloses an earthquake-resistant communication tower which is mainly used in scenarios where, during the transportation of many reinforcement blocks, due to their heavy weight, many reinforcement blocks cannot be transported together at one time, and the weight of the reinforcement blocks requires the use of heavy-duty transport vehicles for transportation, thereby increasing the installation cost and transportation cost during the installation process.
[0029] Reference Figure 1 and Figure 2 A seismic-resistant communication iron tower comprises a concave seat 1, a base 2 is fixedly connected to the bottom of the inner wall of the concave seat 1, a communication tower 3 is fixedly connected to the top of the base 2, four connecting columns 4 are fixedly connected to the bottom of the concave seat 1, a water tank 5 is fixedly connected between the bottoms of the four connecting columns 4, a delivery pipe 6 is fixedly connected to the bottom of the concave seat 1 and on both sides of the connecting columns 4, the delivery pipe 6 is communicated with the inside of the concave seat 1 and the water tank 5, and a filter screen 8 is fixedly connected to the inside of the concave seat 1 and on the outside of the base 2:
[0030] In this embodiment: during the installation of the communication tower 3, the water tank 5 is cast on site and then buried in the foundation. When it rains, rainwater can be collected by the concave seat 1 and transported to the inside of the water tank 5 through the delivery pipe 6, thereby increasing the overall weight, making the communication tower 3 more reliable. During the vibration, the communication tower 3 is more stable, and the water tank 5 and the concave seat 1 can be transported at one time, and only need to be cast on site, thereby saving a lot of transportation and installation costs.
[0031] In the above technical solution, considering that there is a problem that during the transportation of many reinforcement blocks, due to the heavy weight of the reinforcement blocks, many reinforcement blocks cannot be transported together at one time, and the weight of the reinforcement blocks needs to be transported by heavy-duty transport vehicles, thereby increasing the installation cost and transportation cost during the installation process, in order to solve such problems, the specific operations are as follows:
[0032] Reference Figure 1 and Figure 3In a preferred embodiment, a connecting rod 10 is fixedly connected to the top of the communication tower 3, a fixing plate 11 is fixedly connected to the top of the connecting rod 10, connecting ropes 12 are fixedly connected to the four corners of the bottom of the fixing plate 11, and a gong 13 is fixedly connected to the bottom of the connecting rope 12;
[0033] In this embodiment, when there is wind, the wind will blow the gong 13 to collide, thereby generating a sound, thereby preventing surrounding birds and animals from nesting and staying above the communication tower 3.
[0034] Reference Figure 1 and Figure 3 In a preferred embodiment, the four corners of the bottom of the concave seat 1 are fixedly connected with fixed cones 9, and both sides of the water storage tank 5 are equidistantly provided with discharge holes 7;
[0035] In this embodiment, when the water storage tank 5 is full of water, the excess water can be discharged through the discharge hole 7.
[0036] Reference Figure 1 and Figure 4 In a preferred embodiment, the communication tower 3 is rotatably connected to a rotating shaft 14 on all sides, one end of the rotating shaft 14 is fixedly connected to a windmill 16, and the outer side of the rotating shaft 14 is fixedly connected to an eccentric wheel 15, and the eccentric wheel 15 is used in conjunction with the corresponding gong 13;
[0037] In this embodiment, when the wind is not strong enough, the windmill 16 will be driven to rotate, so that the rotating shaft 14 can adjust the eccentric wheel 15 to hit the gong 13, which can also make a sound.
[0038] Reference Figure 1 and Figure 4 In a preferred embodiment, the water storage tank 5 and the concave seat 1 are made of cement non-conductive material, and the inside of the discharge hole 7 is fixedly connected with a one-way valve;
[0039] In this embodiment, a one-way valve is used to prevent surrounding soil from entering the bottom of the water storage tank 5 through the discharge hole 7.
[0040] Reference Figure 1 and Figure 4 In a preferred embodiment, the horizontal height of the base 2 is higher than the height of the concave seat 1, the four sides of the base 2 are slopes, and the area of the concave seat 1 is larger than the area of the water tank 5;
[0041] In this embodiment: the area of the concave seat 1 is larger than the area of the water tank 5, which avoids the equipment from sinking. At the same time, the horizontal height of the base 2 is higher than the height of the concave seat 1, which avoids the possibility of water accumulation at the bottom of the communication tower 3.
[0042] Working principle: When in use, during the installation of the communication tower 3, the water tank 5 is cast on site and then buried in the foundation. When it rains, the rainwater can be collected by the concave seat 1 and transported to the inside of the water tank 5 through the delivery pipe 6, thereby increasing the overall weight, making the communication tower 3 more reliable. In the vibration process, the communication tower 3 is more stable, and the water tank 5 and the concave seat 1 can be transported at one time, and only need to be cast on site, thereby saving a lot of transportation and installation costs;
[0043] When it is windy, the wind will blow the gong 13 to collide with it, thereby producing a sound, preventing surrounding birds and animals from nesting and staying above the communication tower 3. When the wind is not strong enough, it will blow the windmill 16 to rotate, so that its rotating shaft 14 can mobilize the eccentric wheel 15 to hit the gong 13, which can also produce a sound.
[0044] The above are only preferred specific implementations of the utility model, but the protection scope of the utility model is not limited to them. The replacement can be a replacement of part of the structure, device, method step, or a complete technical solution. Equivalent replacement or change based on the technical solution of the utility model and its utility model concept should be included in the protection scope of the utility model.
Claims
1. An earthquake-resistant communication tower, comprising a concave seat (1), characterized in that: The bottom of the inner wall of the concave seat (1) is fixedly connected to a base (2), the top of the base (2) is fixedly connected to a communication tower (3), the bottom of the concave seat (1) is fixedly connected to four connecting columns (4), a water storage tank (5) is fixedly connected between the bottoms of the four connecting columns (4), the bottom of the concave seat (1) and both sides of the connecting columns (4) are fixedly connected to delivery pipes (6), the delivery pipes (6) are in communication with the inside of the concave seat (1) and the water storage tank (5), and the inside of the concave seat (1) and the outside of the base (2) are fixedly connected to a filter screen (8).
2. The earthquake-resistant communication tower according to claim 1, characterized in that: The top of the communication tower (3) is fixedly connected to a connecting rod (10), the top of the connecting rod (10) is fixedly connected to a fixing plate (11), the four bottom corners of the fixing plate (11) are fixedly connected to connecting ropes (12), and the bottom of the connecting ropes (12) is fixedly connected to a gong (13).
3. The earthquake-resistant communication tower according to claim 1, characterized in that: The four corners of the bottom of the concave seat (1) are fixedly connected with fixed cones (9), and discharge holes (7) are equidistantly provided on both sides of the water storage tank (5).
4. The earthquake-resistant communication tower according to claim 2, characterized in that: The communication tower (3) is rotatably connected to a rotating shaft (14) on all four sides, one end of the rotating shaft (14) is fixedly connected to a windmill (16), the outer side of the rotating shaft (14) is fixedly connected to an eccentric wheel (15), and the eccentric wheel (15) is used in conjunction with a corresponding gong (13).
5. The earthquake-resistant communication tower according to claim 3, characterized in that: The water storage tank (5) and the concave seat (1) are made of cement, a non-conductive material, and a one-way valve is fixedly connected to the inside of the discharge hole (7).
6. The earthquake-resistant communication tower according to claim 1, characterized in that: The horizontal height of the base (2) is higher than the height of the concave seat (1), the four sides of the base (2) are all slopes, and the area of the concave seat (1) is larger than the area of the water storage tank (5).