A high fill roadbed compaction device

By designing a high-fill roadbed compaction device containing spray components, the problem of water spraying when the soil or filler is insufficient, achieving a more efficient roadbed compaction and improved working environment.

CN222700767UActive Publication Date: 2025-04-01JIANGSU YANNING ENG CONSULTANCY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421312385.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-11
Publication Date
2025-04-01
Estimated Expiration
2034-06-11

AI Technical Summary

Technical Problem

During the compaction process of high-fill roadbed, when the natural moisture content of the soil or filler is lower than the optimal value, water spraying is required to increase moisture, but the existing compaction device lacks a water spray structure, which leads to dust and affects the working environment and workers' health.

Method used

A high-fill roadbed compaction device is designed, including a spray assembly, including a water tank, a water pump, a connecting water pipe, a hose, a shunt pipe and a spray head. The spray head is arranged towards the ground to ensure the even distribution of the water spray. The device also includes a combination design of support frame, clamping plate and spring to provide a solid suspension and buffering mechanism for the spray assembly.

Benefits of technology

Through uniform distribution of water spray, the compaction effect and working efficiency of the roadbed are improved, the dust at the construction site is reduced, the working environment is improved, and the durability and reliability of the equipment are increased.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222700767U_ABST
    Figure CN222700767U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of high fill roadbed compaction, and discloses a high fill roadbed compaction device. The utility model solves the problem that when the natural water content of soil or filler is lower than the optimal value, water needs to be sprayed to increase the moisture content, and dust is easily affected by the working environment and the health of workers. A high fill roadbed compaction device includes a trolley, a frame, a connecting block, a first groove, and a spray assembly. Under the action of a water pump, the water inside the water tank enters the diversion pipe through the connecting water pipe and the hose in turn, and finally sprays out through the nozzle. The nozzle is set toward the ground to ensure that the water spray is evenly distributed on the surface of the roadbed that needs to be compacted, thereby improving the compaction effect and work efficiency, and effectively reducing the dust on the construction site and improving the working environment. The combined design of the support frame, the clamping plate and the spring provides a stable suspension and buffer mechanism for the spray assembly, which is convenient for reducing the impact of vibration on the spray system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of high fill roadbed compaction, in particular to a high fill roadbed compaction device. Background Art

[0002] High fill roadbed refers to a roadbed structure that is higher than the natural ground and is formed by filling a large amount of earth and stone materials. In order to improve the density of the roadbed, reduce the porosity in the soil, arrange the soil particles more closely, form a more solid structure, and thus enhance the mechanical properties of the roadbed, the high fill roadbed needs to be compacted.

[0003] In order to achieve the best compaction effect, the soil or filler needs to maintain a certain moisture content, usually close to its optimal moisture content. When the natural moisture content is lower than the optimal value, water needs to be sprayed to increase the moisture content, help form a good bond between particles, and facilitate compaction to achieve a higher density. When working in a dry environment, the rolling process will cause a lot of dust to fly, affecting the working environment and the health of workers, but the existing compaction device lacks the corresponding water spraying structure. Utility Model Content

[0004] The utility model aims to provide a high fill roadbed compaction device. The device is used to work, thereby solving the problem that when the natural moisture content of soil or filler is lower than the optimal value, water needs to be sprayed to increase the moisture content and dust is easily generated, which affects the working environment and the health of workers.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a high fill roadbed compaction device, comprising a trolley and a frame, and a connecting block movably connected between the trolley and the frame, a first groove and a through opening are provided on the upper surface of the frame, a spray assembly for spraying water is provided on the top of the trolley, and the first groove and the through opening are connected;

[0006] The spray assembly includes a water tank and a water pump fixedly connected to the top of the trolley, a connecting water pipe fixedly running through the water tank and the water pump, a hose fixedly running through one side of the water pump, a shunt pipe fixedly running through one end of the hose, and a spray head fixedly running through the outer surface of the shunt pipe, a mounting frame arranged above the shunt pipe, a support frame fixedly connected to the bottom end of the mounting frame, a clamping plate fixedly connected to the bottom end of the support frame, a spring fixedly connected to the inner side of the clamping plate, and a clamping block fixedly connected to one end of the spring, the spray head is arranged toward the ground, and the hose and the clamping plate both pass through the through opening

[0007] Furthermore, a friction pad is movably connected to the inner side of the clamping block. The friction pad is a component made of rubber material. The friction pad is in contact with the outer surface of the shunt pipe.

[0008] Furthermore, an adjustment component for adjusting the height of the shunt pipe is provided at the top of the first groove, and the adjustment component includes a fixing plate fixedly connected to the top of the first groove, a second groove opened on one side of the fixing plate, a threaded rod arranged inside the second groove, a motor fixedly connected to the top of the fixing plate, and a first slider threadedly connected to the outer surface of the threaded rod, the first slider is fixedly connected to the mounting frame, one end of the threaded rod is rotatably connected to the inner wall of the second groove, and the other end of the threaded rod passes through the second groove and is fixedly connected to the output end of the motor.

[0009] Furthermore, a second slider is fixedly connected to one side of the first slider, a sliding groove is provided on the inner wall of the second groove, and the second slider is slidably connected to the sliding groove.

[0010] Furthermore, a first pressure roller is arranged at one end of the frame away from the trolley, a first rotating shaft is rotatably connected between the first pressure roller and the frame, a support plate is fixedly connected to the bottom end of the frame, a second pressure roller is arranged on the inner side of the support plate, and a second rotating shaft is rotatably connected between the second pressure roller and the support plate.

[0011] Furthermore, a connecting plate is movably provided at the top of the frame, a scraper is fixedly connected to one end of the connecting plate, a locking bolt is threadedly connected between the connecting plate and the frame, and the scraper is in contact with the outer surface of the first pressure roller.

[0012] Compared with the prior art, the beneficial effects of the utility model are as follows:

[0013] The utility model proposes a high fill roadbed compaction device. Under the action of a water pump, the water in the water tank enters the shunt pipe in turn through the connecting water pipe and the hose, and is finally sprayed out through the nozzle. The nozzle is arranged toward the ground to ensure that the water is evenly distributed on the surface of the roadbed to be compacted, thereby improving the compaction effect and working efficiency, while effectively reducing the dust on the construction site and improving the working environment. The combined design of the support frame, the clamping plate and the spring provides a stable suspension and buffer mechanism for the spray assembly, which is convenient for reducing the impact of vibration on the spray system, and increases the durability and reliability of the equipment. At the same time, it is easy to disassemble the shunt pipe, which solves the problem that when the natural water content of the soil or filler is lower than the optimal value, water needs to be sprayed to increase the moisture content and the flying dust easily affects the working environment and the health of the workers. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0015] Figure 2 This is a schematic diagram of the top structure of the rack of the utility model;

[0016] Figure 3 The structure of the spray assembly of the utility model is shown in FIG. Figure 1 ;

[0017] Figure 4The structure of the spray assembly of the utility model is shown in FIG. Figure 2 ;

[0018] Figure 5 It is a schematic diagram of the structure of the regulating component of the utility model.

[0019] In the figure: 1. trolley; 11. opening; 12. first groove; 2. frame; 21. connecting block; 3. first pressure roller; 31. first rotating shaft; 4. connecting plate; 41. scraper; 42. locking bolt; 5. spray assembly; 51. water tank; 52. water pump; 53. connecting water pipe; 54. hose; 55. diverter pipe; 56. nozzle; 57. mounting frame; 58. support frame; 59. clamping plate; 591. spring; 510. clamping block; 6. support plate; 61. second pressure roller; 62. second rotating shaft; 7. adjusting assembly; 71. fixing plate; 72. second groove; 721. slide groove; 73. threaded rod; 74. motor; 75. first slider; 751. second slider. DETAILED DESCRIPTION

[0020] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0021] In order to further understand the content of the utility model, the utility model is described in detail in conjunction with the accompanying drawings.

[0022] Combination Figure 1-Figure 2 A high fill roadbed compaction device includes a trolley 1 and a frame 2, and a connecting block 21 movably connected between the trolley 1 and the frame 2. A first groove 12 and a through opening 11 are provided on the upper surface of the frame 2. A spray assembly 5 for spraying water is provided on the top of the trolley 1, and the first groove 12 is connected to the through opening 11.

[0023] The utility model is further described below in conjunction with embodiments.

[0024] Embodiment 1:

[0025] See also Figure 1-Figure 5The spray assembly 5 includes a water tank 51 and a water pump 52 fixedly connected to the top of the trolley 1, a connecting water pipe 53 fixedly running through the water tank 51 and the water pump 52, a hose 54 fixedly running through one side of the water pump 52, a shunt pipe 55 fixedly running through one end of the hose 54, and a spray head 56 fixedly running through the outer surface of the shunt pipe 55, a mounting frame 57 arranged above the shunt pipe 55, a support frame 58 fixedly connected to the bottom end of the mounting frame 57, a clamping plate 59 fixedly connected to the bottom end of the support frame 58, a spring 591 fixedly connected to the inner side of the clamping plate 59, and a clamping block 510 fixedly connected to one end of the spring 591. The spray head 56 is arranged toward the ground, and the soft The pipe 54 and the clamping plate 59 both pass through the opening 11. Under the action of the water pump 52, the water in the water tank 51 enters the shunt pipe 55 through the connecting water pipe 53 and the hose 54 in turn, and is finally sprayed out through the nozzle 56. The nozzle 56 is set toward the ground to ensure that the water spray is evenly distributed on the surface of the roadbed that needs to be compacted, thereby improving the compaction effect and work efficiency, and effectively reducing the dust on the construction site and improving the working environment. The combined design of the support frame 58, the clamping plate 59 and the spring 591 provides a stable suspension and buffer mechanism for the spray assembly 5, which is convenient for reducing the impact of vibration on the spray system, increasing the durability and reliability of the equipment, and facilitating the disassembly of the shunt pipe 55.

[0026] A friction pad is movably connected to the inner side of the clamping block 510. The friction pad is a component made of rubber material. The friction pad is in contact with the outer surface of the shunt tube 55. The rubber material has a high friction coefficient. When the friction pad is in contact with the outer surface of the shunt tube 55, it is easy to provide a strong friction force to ensure that the shunt tube 55 maintains a stable position during the movement of the trolley 1, reducing the risk of displacement or loosening.

[0027] The top of the first groove 12 is provided with an adjustment component 7 for adjusting the height of the shunt tube 55. The adjustment component 7 includes a fixing plate 71 fixedly connected to the top of the first groove 12, a second groove 72 opened on one side of the fixing plate 71, a threaded rod 73 arranged inside the second groove 72, a motor 74 fixedly connected to the top of the fixing plate 71, and a first slider 75 threadedly connected to the outer surface of the threaded rod 73. The first slider 75 is fixedly connected to the mounting frame 57, one end of the threaded rod 73 is rotatably connected to the inner wall of the second groove 72, the other end of the threaded rod 73 passes through the second groove 72 and is fixedly connected to the output end of the motor 74, and the threaded rod 73 is driven to rotate by the motor 74, so that the first slider 75 threadedly connected to the threaded rod 73 moves up and down accordingly, thereby realizing the adjustment of the height of the shunt tube 55, facilitating the shunt tube 55 to be moved to the top of the frame 2 for disassembly, and the disassembled shunt tube 55 can be conveniently cleaned by hand by the first pressure roller 3 and the second pressure roller 61.

[0028] A second slider 751 is fixedly connected to one side of the first slider 75, a slide groove 721 is provided on the inner wall of the second groove 72, and the second slider 751 is slidably connected to the slide groove 721. The sliding connection of the second slider 751 in the slide groove 721 provides a parallel guide rail for the up and down movement of the first slider 75, thereby ensuring the linear movement of the first slider 75 during the adjustment process.

[0029] A first pressing roller 3 is provided at one end of the frame 2 away from the trolley 1, and a first rotating shaft 31 is rotatably connected between the first pressing roller 3 and the frame 2. A support plate 6 is fixedly connected to the bottom end of the frame 2, and a second pressing roller 61 is provided on the inner side of the support plate 6. A second rotating shaft 62 is rotatably connected between the second pressing roller 61 and the support plate 6. During the forward movement of the trolley 1, the second pressing roller 61 performs preliminary compaction on the surface of the roadbed, and the first pressing roller 3 further increases the squeezing effect on the roadbed material. The coordinated work of the two facilitates enhancing the overall compaction effect and helps to form a denser and more stable roadbed.

[0030] A connecting plate 4 is movably provided at the top of the frame 2, and a scraper 41 is fixedly connected to one end of the connecting plate 4. A locking bolt 42 is threadedly connected between the connecting plate 4 and the frame 2, and the scraper 41 is in contact with the outer surface of the first pressure roller 3. The design of the scraper 41 in contact with the outer surface of the first pressure roller 3 makes it easy to effectively remove residual materials such as mud and gravel adhering to the surface of the pressure roller when it is working. Since the locking bolt 42 is threadedly connected between the connecting plate 4 and the frame 2, it is easy to disassemble the scraper 41 for cleaning.

[0031] When in use, start the water pump 52. Under the action of the water pump 52, the water in the water tank 51 enters the shunt pipe 55 through the connecting water pipe 53 and the hose 54 in turn, and is finally sprayed out through the nozzle 56. The nozzle 56 is set toward the ground to ensure that the water spray is evenly distributed on the surface of the roadbed that needs to be compacted, thereby improving the compaction effect and working efficiency. At the same time, it effectively reduces the dust on the construction site and improves the working environment. Start the trolley 1. During the forward movement of the trolley 1, the second pressure roller 61 performs preliminary compaction on the surface of the roadbed, and the first pressure roller 3 further increases the squeezing effect on the roadbed material. The coordinated work of the two facilitates to enhance the overall compaction effect, which helps to form a more dense and stable roadbed. 58. The combined design of the clamping plate 59 and the spring 591 provides a stable suspension and buffer mechanism for the spray assembly 5, which is convenient for reducing the impact of vibration on the spray system. The design of the scraper 41 in contact with the outer surface of the first pressure roller 3 is convenient for effectively removing residual materials such as soil and gravel adhering to the surface of the first pressure roller 3 when the first pressure roller 3 is working. After compaction, the threaded rod 73 is driven to rotate by the motor 74, so that the first slider 75 threadedly connected to the threaded rod 73 moves up and down accordingly, thereby realizing the adjustment of the height of the shunt pipe 55, facilitating the shunt pipe 55 to be moved to the top of the frame 2 for disassembly. The disassembled shunt pipe 55 can be conveniently cleaned by hand by the first pressure roller 3 and the second pressure roller 61.

[0032] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0033] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A high fill roadbed compaction device, comprising a trolley (1) and a frame (2), and a connecting block (21) movably connected between the trolley (1) and the frame (2), characterized in that: The upper surface of the frame (2) is provided with a first groove (12) and a through opening (11); a spray assembly (5) for spraying water is provided at the top of the trolley (1); the first groove (12) is connected to the through opening (11); The spray assembly (5) comprises a water tank (51) and a water pump (52) fixedly connected to the top of the trolley (1), a connecting water pipe (53) fixedly passing through the water tank (51) and the water pump (52), a hose (54) fixedly passing through one side of the water pump (52), a shunt pipe (55) fixedly passing through one end of the hose (54), and a spray head (56) fixedly passing through the outer surface of the shunt pipe (55), a mounting frame (57) arranged above the shunt pipe (55), a support frame (58) fixedly connected to the bottom end of the mounting frame (57), a clamping plate (59) fixedly connected to the bottom end of the support frame (58), a spring (591) fixedly connected to the inner side of the clamping plate (59), and a clamping block (510) fixedly connected to one end of the spring (591), the spray head (56) is arranged toward the ground, and the hose (54) and the clamping plate (59) both pass through the through opening (11).

2. A high fill roadbed compaction device according to claim 1, characterized in that: A friction pad is movably connected to the inner side of the clamping block (510), and the friction pad is a component made of rubber material. The friction pad is in contact with the outer surface of the shunt pipe (55).

3. The high fill roadbed compaction device according to claim 1, characterized in that: An adjustment component (7) for adjusting the height of the shunt pipe (55) is arranged at the top of the first groove (12), the adjustment component (7) comprising a fixing plate (71) fixedly connected to the top of the first groove (12), a second groove (72) provided on one side of the fixing plate (71), a threaded rod (73) arranged inside the second groove (72), a motor (74) fixedly connected to the top of the fixing plate (71), and a first slider (75) threadedly connected to the outer surface of the threaded rod (73), the first slider (75) being fixedly connected to the mounting frame (57), one end of the threaded rod (73) being rotatably connected to the inner wall of the second groove (72), and the other end of the threaded rod (73) passing through the second groove (72) and fixedly connected to the output end of the motor (74).

4. A high fill roadbed compaction device according to claim 3, characterized in that: A second sliding block (751) is fixedly connected to one side of the first sliding block (75), a sliding groove (721) is provided on the inner wall of the second groove (72), and the second sliding block (751) is slidably connected to the sliding groove (721).

5. The high fill roadbed compaction device according to claim 1, characterized in that: A first pressing roller (3) is arranged at one end of the frame (2) away from the trolley (1); a first rotating shaft (31) is rotatably connected between the first pressing roller (3) and the frame (2); a support plate (6) is fixedly connected to the bottom end of the frame (2); a second pressing roller (61) is arranged on the inner side of the support plate (6); and a second rotating shaft (62) is rotatably connected between the second pressing roller (61) and the support plate (6).

6. A high fill roadbed compaction device according to claim 5, characterized in that: A connecting plate (4) is movably provided at the top of the frame (2); a scraper (41) is fixedly connected to one end of the connecting plate (4); a locking bolt (42) is threadedly connected between the connecting plate (4) and the frame (2); and the scraper (41) is in contact with the outer surface of the first pressing roller (3).