A tunnel steel arch installation trolley

By installing telescopic platform, slide rail, hydraulic cylinder hoisting device and crawler-type structure on the tunnel steel arch installation trolley, the existing trolley's body size, large weight, complex operation and poor adaptability are solved, and a wider scope of application and higher working efficiency are achieved.

CN222701994UActive Publication Date: 2025-04-01CCCC SHEC DONGMENG ENG CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421574875.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-04
Publication Date
2025-04-01
Estimated Expiration
2034-07-04

AI Technical Summary

Technical Problem

The body size of the existing tunnel steel arch frame installation trolley is too large to adapt to all tunnel environments, especially curved and narrow tunnels; it has a large weight, inconvenient movement; it has complex operation; it has poor adaptability when standing up three steps, and cannot work synchronously.

Method used

The telescopic platform is installed on the two wings of the load-bearing platform, and the mechanical gripper is connected to the telescopic rotating rod to reduce the size of the load-bearing platform and reduce the body size of the trolley body; the sliding rails and the telescopic platform are used to achieve the sliding of the telescopic platform relative to the load-bearing platform; the hydraulic cylinder hoisting device is used to adjust the height of the load-bearing platform; the crawler-type structure is installed at the lower part of the trolley body to improve movement convenience.

Benefits of technology

Adapt to different tunnel environments and expand the scope of use; solve the problem of large weight and inconvenient movement; simplify operations and improve adaptability and flexibility; realize multi-step synchronous operation to improve work efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222701994U_ABST
    Figure CN222701994U_ABST
Patent Text Reader

Abstract

The utility model provides a tunnel steel arch installation trolley, comprising a trolley body, N-level load-bearing platforms, 2N telescopic platforms, telescopic rotating rods and mechanical grippers, N≥1; the N-level load-bearing platforms are arranged along the height direction of the trolley body, and each level of the load-bearing platform is provided with a telescopic platform on both side wings; the end of each telescopic platform is connected to one end of a rotating telescopic rod, and the other end of the rotating telescopic rod is connected to a mechanical gripper; the mechanical gripper is connected to the steel arch of the tunnel. The utility model installs telescopic platforms on both wings of the load-bearing platform, and the telescopic platforms are connected to the mechanical grippers through telescopic rotating rods. The size of the original load-bearing platform is reduced by connecting the telescopic platform to the load-bearing platform, thereby reducing the body size of the trolley body, which is better adapted to different tunnel environments. The tunnel steel arch installation trolley has a wide range of applications.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of tunnel construction, in particular to a tunnel steel arch frame installation trolley. Background Art

[0002] Tunnel steel arch installation trolley is widely used in various tunnel projects, including highway tunnels, railway tunnels, municipal tunnels and mine tunnels, etc. In tunnel construction, it can effectively reduce the labor intensity of manual labor, improve work efficiency, and has strong adaptability and reliability.

[0003] The shortcomings of the existing tunnel steel arch frame installation trolley include: 1. The body size of the existing tunnel steel arch frame installation trolley is large and cannot adapt to all tunnel environments. In particular, for curved and narrow tunnels, the size and turning radius of the tunnel steel arch frame trolley limit its scope of use; 2. The existing tunnel steel arch frame installation trolley is heavy and requires a large force to move, which is not convenient for moving and adjusting at the construction site; 3. The operation difficulty of the existing tunnel steel arch frame installation trolley is complicated and is limited by the structure and size of the working arm of the arch frame installation trolley; 4. When the existing three-step arch is erected, the vehicle needs to be moved and positioned twice, and the upper, middle and lower steps cannot be operated synchronously. The arch erection speed is not as good as the manual three-step parallel operation, and it is easy to cause the arch frames on the left and right sides of the middle and lower steps to be symmetrically suspended, and the adaptability of the three-step arch erection is poor. Utility Model Content

[0004] The purpose of the utility model is to provide a tunnel steel arch frame installation trolley, in which telescopic platforms are installed on the two wings of the load-bearing platform, the telescopic platforms are connected to the mechanical gripper through telescopic rotating rods, and the size of the original load-bearing platform is reduced by connecting the telescopic platform to the load-bearing platform, thereby reducing the body size of the trolley, and better adapting to different tunnel environments. The tunnel steel arch frame installation trolley has a wide range of applications.

[0005] The technical solution to achieve the purpose of this utility model is as follows:

[0006] The utility model provides a tunnel steel arch frame installation trolley, comprising a trolley body, and also comprising: N-level load-bearing platforms, 2N telescopic platforms, telescopic rotating rods and mechanical grippers, N≥1; the N-level load-bearing platforms are arranged along the height direction of the trolley body, and one telescopic platform is arranged on each side wing of the load-bearing platform at each level;

[0007] The end of each telescopic platform is connected to one end of a rotating telescopic rod, and the other end of the rotating telescopic rod is connected to one of the mechanical grippers;

[0008] The mechanical gripper is connected to the steel arch frame of the tunnel.

[0009] As a further limitation of the present invention, two side wings of each level of the load-bearing platform are respectively installed with sliding rails, the sliding rails are connected to the telescopic platform, and the telescopic platform is telescoped along the sliding rails.

[0010] As a further limitation of the present utility model, a plurality of hydraulic cylinder lifting devices are installed inside the trolley body;

[0011] The hydraulic cylinder lifting device is vertically arranged along the height direction of the trolley body;

[0012] The lifting end of the hydraulic cylinder lifting device is connected to the load-bearing platform.

[0013] As a further limitation of the present invention, a crawler wheel structure is installed at the lower part of the trolley body.

[0014] As a further limitation of the present utility model, a ball joint support plate is mounted on the upper surface of each of the telescopic platforms;

[0015] The end of each telescopic platform is connected to one end of a telescopic rotating rod through the ball joint support plate.

[0016] As a further limitation of the present utility model, the telescopic rotating rod comprises: a primary rod, a secondary rod, a tertiary rod and a plurality of spherical knobs;

[0017] A spherical knob is provided at one end of each of the first-stage rod, the second-stage rod and the third-stage rod;

[0018] The spherical knob provided on the primary rod is connected to a spherical joint support plate installed on the telescopic platform;

[0019] The spherical knob provided on the secondary rod is connected to a spherical joint support plate installed on the other end of the primary rod;

[0020] The spherical knob provided on the third-level rod is connected to a spherical joint support plate installed on the other end of the second-level rod;

[0021] The other end of the three-stage rod is connected to the mechanical gripper.

[0022] As a further limitation of the present invention, the other end of the three-stage rod is hinged to a spherical knob; the spherical knob is connected to the mechanical gripper.

[0023] Compared with the prior art, the beneficial effects of the utility model are:

[0024] 1. The utility model installs telescopic platforms on both side wings of the load-bearing platform. The telescopic platforms are connected to mechanical grippers through telescopic rotating rods. The size of the original load-bearing platform is reduced by connecting the telescopic platform with the load-bearing platform, thereby reducing the body size of the trolley, which is better adapted to different tunnel environments. The tunnel steel arch frame installation trolley has a wide range of applications.

[0025] 2. The utility model realizes the sliding of the telescopic platform relative to the load-bearing platform through the cooperation of the slide rail and the telescopic platform, thereby solving the defect that the existing tunnel steel arch frame installation trolley is heavy and inconvenient to move and adjust at the construction site.

[0026] 3. The utility model adopts a hydraulic cylinder lifting device to adjust the height of the N-level load-bearing platform, thereby solving the defect that the existing tunnel steel arch frame installation trolley is difficult to operate.

[0027] 4. The utility model uses a mechanical gripper to connect the steel arch frame of the tunnel, which avoids the left and right sides of the telescopic platform being suspended in the air, and improves the adaptability of the tunnel steel arch frame installation trolley and the steel arch frame.

[0028] 5. The utility model installs a crawler wheel structure at the lower part of the trolley body, which facilitates the movement of the tunnel steel arch frame installation trolley, can save effort in moving the tunnel steel arch frame installation trolley, and can reduce the difficulty of operation when moving the tunnel steel arch frame installation trolley.

[0029] 6. When the mechanical gripper of the utility model is connected to the steel arch frame of the tunnel, the load-bearing platform and the telescopic platform serve as steps of the trolley body, enabling workers to work in parallel on each step, which has the advantage of being easy to use. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 A schematic diagram of the structure of a tunnel steel arch installation trolley provided by the utility model;

[0031] Figure 2 A side view of a tunnel steel arch installation trolley under construction provided by the utility model;

[0032] Figure 3 The utility model provides Figure 1 A partial enlarged view of part A;

[0033] Figure 4 The utility model provides Figure 1 A partial enlarged view of part B;

[0034] Figure markings: 1-trolley body; 2. load-bearing platform; 21-first-level load-bearing platform; 22-second-level load-bearing platform; 23-third-level load-bearing platform; 3-slide rail; 4.-telescopic platform; 41-platform device; 42-telescopic device; 5. ball joint support plate; 6-telescopic rotating rod; 61-semi-embedded spherical knob; 62-first-level rod; 63-second-level rod; 64-third-level rod; 65-non-embedded spherical knob; 7-mechanical gripper; 8-hydraulic cylinder lifting device; 81-support plate; 82-cylinder barrel; 83-piston rod; 84-hydraulic cylinder; 85-connecting rod; 86-oil cylinder; 87-oil pipe; 801-combined hydraulic cylinder lifting device; 802-independent hydraulic cylinder lifting device; 9-track wheel structure; 10-steel arch frame. DETAILED DESCRIPTION

[0035] The present invention is described in detail below in conjunction with the various embodiments shown in the accompanying drawings, but it should be noted that these embodiments are not limitations of the present invention, and any equivalent transformations or substitutions in functions, methods, or structures made by ordinary technicians in the field based on these embodiments are all within the scope of protection of the present invention.

[0036] See also Figure 1 , Figure 1 This is a schematic diagram of the structure of a tunnel steel arch frame installation trolley. An embodiment of the utility model discloses a tunnel steel arch frame installation trolley, comprising a trolley body 1, N-level load-bearing platforms 2, 2N telescopic platforms 4, telescopic rotating rods 6 and mechanical grippers 7, N ≥ 1; the N-level load-bearing platforms 2 are arranged along the height direction of the trolley body 1, and a telescopic platform 4 is arranged on both side wings of each level of the load-bearing platform 2; the end of each telescopic platform 4 is connected to one end of a rotating telescopic rod 6, and the other end of the rotating telescopic rod 6 is connected to a mechanical gripper 7; the mechanical gripper 7 is connected to the steel arch frame of the tunnel.

[0037] Please continue reading Figure 1 The load-bearing platform 2 of the embodiment of the utility model has three levels, along the height direction of the trolley body 1, from bottom to top, there are a first-level load-bearing platform 21, a second-level load-bearing platform 22 and a third-level load-bearing platform 23. The side wings of the load-bearing platform 2 disclosed in the embodiment of the utility model are Figure 1 The left and right sides of the load-bearing platform 2 are shown, Figure 1A telescopic platform is respectively arranged on the left and right sides of the first-level load-bearing platform 21, the second-level load-bearing platform 22 and the third-level load-bearing platform 23. In this way, the embodiment of the utility model installs telescopic platforms 4 on the two side wings of the load-bearing platform 2. The telescopic platforms 4 increase the workable area of ​​the workers, so that the tunnel steel arch frame installation trolley can adapt to the cross-sectional forms of different sizes of tunnels, which can not only improve the operational safety, but also be suitable for the narrow space of the tunnel. In addition, the work efficiency is improved and the manual labor is reduced in the tunnel construction, making the tunnel steel arch frame installation trolley more flexible and practical to use.

[0038] See also Figure 1 , Figure 2 and Figure 4 , Figure 1 This is a schematic diagram of the structure of the tunnel steel arch installation trolley. Figure 2 This is a side view of the trolley for installing the steel arch frame of the tunnel under construction. Figure 4 for Figure 1 In the partial enlarged view of part B, the two side wings of each level of the load-bearing platform 2 of the embodiment of the utility model are respectively installed with slide rails 3, and the slide rails 3 are connected to the telescopic platform 4, and the telescopic platform 4 is telescopic along the slide rails 3. It should be pointed out that the slide rails 3 of the embodiment of the utility model are preferably embedded slide rails, and the embedded slide rails are installed on the side wings of the load-bearing platform 2. The embedded slide rails are connected to the telescopic platform 4, and the telescopic platform 4 is preferably a telescopic platform with slidable side wings. Please continue to refer to Figure 4 The side slidable telescopic platform of the embodiment of the utility model includes a platform device 41 and a telescopic device 42. The telescopic device 42 matches the embedded slide rail, and the telescopic device 42 can slide forward and backward along the embedded slide rail. The telescopic device 42 of the embodiment of the utility model has a lateral telescopic function. In actual use, adjusting the telescopic platform 4 can expand the effective area of ​​the working platform of the tunnel steel arch frame installation trolley to adapt to different tunnel widths. At the same time, the telescopic platform 4 provides a stable working platform to ensure the safety of workers working at heights. The embodiment of the utility model realizes the sliding of the telescopic platform 4 relative to the load-bearing platform 2 through the cooperation of the above-mentioned slide rail 3 and the telescopic platform 4, which solves the defect that the existing tunnel steel arch frame installation trolley is heavy and inconvenient to move and adjust at the construction site.

[0039] Considering that the existing tunnel steel arch installation trolley cannot adapt to all tunnel environments, especially for curved and narrow tunnels, the size and turning radius of the existing tunnel steel arch installation trolley limit its scope of use. Figure 1 , Figure 2 and Figure 3 , Figure 1 Schematic diagram of the structure of the trolley for installing the tunnel steel arch; Figure 2 This is a side view of the trolley for installing the steel arch frame of the tunnel under construction. Figure 3 for Figure 1In the partial enlarged view of part A, the embodiment of the utility model, based on the above-disclosed scheme, further installs multiple hydraulic cylinder lifting devices 8 inside the trolley body 1; the hydraulic cylinder lifting devices 8 are vertically arranged along the height direction of the trolley body 1; the lifting ends of the hydraulic cylinder lifting devices 8 are connected to the load-bearing platform 2.

[0040] The load-bearing platform 2 of the utility model embodiment is controlled to rise and fall by the hydraulic cylinder lifting device 8; please continue to refer to Figure 2 A combined hydraulic cylinder lifting device 801 is arranged between the trolley body 1 of the lower layer and the first-level load-bearing platform 21, and the combined hydraulic cylinder lifting device 801 controls the lifting of the first-level load-bearing platform 22 and the second-level load-bearing platform 23; the third-level load-bearing platform 23 is controlled by an independent hydraulic cylinder lifting device 802 arranged between the second-level load-bearing platform 22 and the third-level load-bearing platform 23; the hydraulic system of the combined hydraulic cylinder lifting device 801 and the independent hydraulic cylinder lifting device 802 can provide a large thrust and a stable lifting speed during the lifting process of the load-bearing platform 2, and enables the load-bearing platform 2 to bear a larger load and realize accurate lifting control. The three-level load-bearing platform 2 of the embodiment of the utility model preferably adopts a multi-stage lifting method, and controls the lifting of the first-level load-bearing platform 21 and the second-level load-bearing platform 22 by the combined hydraulic cylinder lifting device 801, and the independent hydraulic cylinder lifting device 802 controls the lifting of the three-level load-bearing platform 23, thereby realizing the lifting operation of the load-bearing platform 2 in layers, and improving the flexibility and adaptability of the load-bearing platform 2.

[0041] Please continue reading Figure 3 The hydraulic cylinder lifting device 8 of the utility model embodiment includes: a support plate 81, a cylinder barrel 82, a piston rod 83, a hydraulic cylinder 84, a connecting rod 85, an oil cylinder 86, and an oil pipe 87. The support plate 81, the cylinder barrel 82, the piston rod 83, the hydraulic cylinder 84, the connecting rod 85, the oil cylinder 86, and the oil pipe 87 are connected as follows: Figure 3 As shown. When the hydraulic cylinder lifting device 8 needs to perform a lifting operation, the hydraulic oil is pressed from the oil cylinder 86 into the hydraulic cylinder 84 through the oil pipe 87. The inflow of hydraulic oil increases the hydraulic oil pressure in the hydraulic cylinder 84, pushing the piston rod 83 to move upward. Since the piston rod 83 is connected to the connecting rod 85, and the connecting rod 85 is connected to the support plate 81, when the hydraulic oil pushes the piston rod 83 to move upward, the connecting rod 85 transmits force to the support plate 81, and the lifting and lowering of the support plate 81 pushes the load-bearing platform 2 to lift and lower. It should be pointed out that the support plate 81 of the embodiment of the utility model is divided into an upper support plate and a lower support plate, the upper support plate is fixed at the top of the connecting rod 85, and the lower support plate is fixed at the bottom of the oil cylinder 86. The embodiment of the utility model adopts a hydraulic cylinder lifting device 8 to adjust the height of the load-bearing platform 2, so as to solve the defect that the existing tunnel steel arch frame installation trolley is complicated to operate.

[0042] Considering that the trolley body needs to be easy to move during tunnel construction, please continue to refer to Figure 1 In the embodiment of the utility model, a crawler wheel structure 9 is installed at the lower part of the trolley body 1. The crawler wheel structure 9 improves the passability of the trolley body 1 in complex road conditions. The crawler wheel structure 9 is preferably a triangular crawler wheel structure. The triangular crawler wheel structure is relatively simple to use and is relatively convenient to maintain. While ensuring the structural strength, it improves the convenience of disassembly and assembly, and improves the overall applicability of the tunnel steel arch frame installation trolley.

[0043] Please continue reading Figure 1 , Figure 3 and Figure 4 In the embodiment of the utility model, a ball joint support plate 5 is installed on the upper surface of each telescopic platform 4; the end of each telescopic platform 4 is connected to one end of a telescopic rotating rod 6 through the ball joint support plate 5. In the embodiment of the utility model, a ball joint support plate 5 is installed on the upper part of the telescopic platform 4, and the ball joint support plate 5 is used to hinge the telescopic rotating rod 6. Please continue to refer to Figure 4 The telescopic rotating rod 6 of the embodiment of the utility model includes: a primary rod 62, a secondary rod 63, a tertiary rod 64 and a plurality of spherical knobs; a spherical knob is arranged at one end of each of the primary rod 62, the secondary rod 63 and the tertiary rod 64, and preferably, the spherical knob of the articulated ball joint support plate 5 is a semi-embedded spherical knob 61, and the spherical knob of the articulated mechanical gripper 7 is a non-embedded spherical knob 65; the semi-embedded spherical knob 61 arranged on the primary rod 62 is connected to the ball joint support plate 5 installed on the telescopic platform 4; the semi-embedded spherical knob 61 arranged on the secondary rod 63 is connected to the ball joint support plate 5 installed on the other end of the primary rod 62; the semi-embedded spherical knob 61 arranged on the tertiary rod 64 is connected to the ball joint support plate 5 installed on the other end of the secondary rod 63; the other end of the tertiary rod 64 is connected to the mechanical gripper 7. Furthermore, in the embodiment of the utility model, the other end of the third-level rod 64 is hinged to the non-embedded spherical knob 65; the non-embedded spherical knob 65 is connected to the mechanical gripper 7.

[0044] The multi-stage retractable rotating rod device 6 is connected to the first-stage rod 62 through a semi-embedded spherical knob 61. The end of the first-stage rod 62 is provided with a ball joint support plate 5 hinged to the semi-embedded spherical knob 61. The semi-embedded spherical knob is connected to the second-stage rod 63. The end of the second-stage rod 63 is provided with a ball joint support plate 5 hinged to the semi-embedded spherical knob 61. The semi-embedded spherical knob 61 is connected to the tertiary rod 64. The end of the tertiary rod 64 is hinged to the non-embedded spherical knob 65.

[0045] The telescopic rotating rod 6 of the embodiment of the utility model can adapt to workspaces of different lengths or depths, providing greater flexibility and adaptability; the embodiment of the utility model adopts a hinged connection between a spherical knob and a spherical joint support plate, so that the telescopic rotating rod 6 has high durability and reliability, and the telescopic rotating rod 6 can withstand greater force and pressure while maintaining good operability. The embodiment of the utility model adjusts the angle and position of the mechanical gripper 7 relative to the telescopic platform 4 by rotating the knob, achieving fast and precise adjustment.

[0046] The end of the telescopic rotating rod 6 of the embodiment of the utility model is connected to the mechanical gripper 7, which can flexibly enter narrow spaces, corners or curved parts, and can not only realize more comprehensive and accurate installation of the steel arch frame 10, but also realize telescopic operation at different working distances, thereby adapting to tunnel sections of different sizes and shapes. At the same time, the mechanical gripper 7 of the embodiment of the utility model can provide additional stability and support, reducing the probability of accidents.

[0047] The series of detailed descriptions listed above are only specific descriptions of feasible implementation methods of the utility model. They are not intended to limit the protection scope of the utility model. Any equivalent implementation methods or changes that do not deviate from the technical spirit of the utility model should be included in the protection scope of the utility model.

[0048] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.

[0049] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. A tunnel steel arch installation trolley, comprising a trolley body, characterized in that: Also includes: N-level load-bearing platforms, 2N telescopic platforms, telescopic rotating rods and mechanical grippers, N≥1; the N-level load-bearing platforms are arranged along the height direction of the trolley body, and one telescopic platform is arranged on each side wing of the load-bearing platform of each level; The end of each telescopic platform is connected to one end of a telescopic rotating rod, and the other end of the telescopic rotating rod is connected to one of the mechanical grippers; The mechanical gripper is connected to the steel arch frame of the tunnel.

2. The tunnel steel arch installation trolley according to claim 1, characterized in that: Two side wings of each level of the load-bearing platform are respectively installed with slide rails, the slide rails are connected to the telescopic platform, and the telescopic platform is telescopic along the slide rails.

3. The tunnel steel arch installation trolley according to claim 1, characterized in that: A plurality of hydraulic cylinder lifting devices are installed inside the trolley body; The hydraulic cylinder lifting device is vertically arranged along the height direction of the trolley body; The lifting end of the hydraulic cylinder lifting device is connected to the load-bearing platform.

4. The tunnel steel arch installation trolley according to claim 1, characterized in that: A crawler wheel structure is installed at the lower part of the trolley body.

5. The tunnel steel arch installation trolley according to claim 1, characterized in that: A spherical joint support plate is installed on the upper surface of each telescopic platform; The end of each telescopic platform is connected to one end of a telescopic rotating rod through the ball joint support plate.

6. A tunnel steel arch installation trolley according to claim 1 or 5, characterized in that: The telescopic rotating rod comprises: a primary rod, a secondary rod, a tertiary rod and a plurality of spherical knobs; A spherical knob is provided at one end of each of the first-stage rod, the second-stage rod and the third-stage rod; The spherical knob provided on the primary rod is connected to a spherical joint support plate installed on the telescopic platform; The spherical knob provided on the secondary rod is connected to a spherical joint support plate installed on the other end of the primary rod; The spherical knob provided on the third-level rod is connected to a spherical joint support plate installed on the other end of the second-level rod; The other end of the three-stage rod is connected to the mechanical gripper.

7. The tunnel steel arch installation trolley according to claim 6, characterized in that: The other end of the three-stage rod is hinged to a spherical knob; the spherical knob is connected to the mechanical gripper.