A pipeline blockage simulation training device
By designing a pipeline blockage simulation training device that includes multiple adjustable leakage pipes and solenoid valves, the problems of single functions and structural inconvenience of existing equipment are solved, and realistic simulation and efficient training of multiple leakage scenarios are achieved.
Patent Information
- Application Number
- CN202420777426.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-16
- Publication Date
- 2025-04-01
- Estimated Expiration
- 2034-04-16
AI Technical Summary
The existing pipeline leakage plugging simulation training equipment has a single function and cannot simulate leakage in different pipe diameters, positions and methods, and its structure is not convenient for disassembly and replacement.
A pipeline blockage simulation training equipment is designed, using a support chassis and pipeline system, and the pipeline system is fixed by clamps. The pipeline system includes multiple leakage pipes. Each leakage pipe can be set with different pipe diameters and leakage types. Different leakage scenarios are automatically controlled by solenoid valves, and the disassembly and replacement is facilitated through flange connection.
It realizes the simulation of a variety of leakage scenarios with different pipe diameters, positions and methods, improves the realistic and efficient training, facilitates the disassembly and replacement of parts, and extends the service life of the equipment.
Smart Images

Figure CN222705071U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of fire training equipment, in particular to pipeline blockage simulation training equipment. Background Art
[0002] In addition to extinguishing fires, fire rescue also needs to deal with pipeline leakage hazards. Pipeline plugging simulation training equipment is a professional simulation training equipment, which is mainly used to cultivate and improve the skills of operators to quickly and accurately plug leaks when pipelines leak. This type of device can simulate real pipelines of various types, sizes and materials, and can set different leakage scenarios, such as crack leakage, loose interfaces, hole leakage, etc., and through the various professional pipeline plugging tools and materials, such as quick pluggers, plugging tapes, sealants, plugging plugs, clamps, etc., trainees can understand and master their use. Through this training system, not only can the emergency response team's ability to deal with sudden pipeline leakage incidents be improved, but also their safety awareness and business level in actual work can be strengthened.
[0003] The existing pipeline plugging simulation training equipment has the following main disadvantages: the simulated leaking pipeline diameter and material are single in function, the leaking point pipeline position is single, and in reality, there may be some leaking pipelines with no space for plugging devices. The structure mostly adopts welding connection, the valve is a manual gate valve and is connected to the pipeline through threads, which makes it difficult to replace the pipeline and valve when damaged, and it cannot be disassembled and moved. Utility Model Content
[0004] The purpose of the utility model is to provide a pipeline blockage simulation training device to solve the problems existing in the prior art, which can simulate leakage of various pipe diameters, different positions and different modes.
[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0006] A pipeline blockage simulation training device comprises a supporting frame and a pipeline system; the pipeline system is fixedly installed on the supporting frame through a clamp;
[0007] The piping system includes a water inlet, a pressure gauge, an overflow valve, a water inlet main pipe, a water inlet branch pipe, a solenoid valve, a leakage pipe, a water outlet branch pipe, a water outlet main pipe, a water outlet and an electronic control device; the water inlet is connected to a water inlet main pipe, and the water inlet main pipe is connected to at least two water inlet branches to act as a branch; the pressure gauge is installed on the water inlet main pipe; the overflow valve is installed on the water inlet main pipe or one of the water inlet branches; each water inlet branch pipe is fixedly connected to a solenoid valve, and a leakage pipe is fixedly connected behind the solenoid valve, the leakage pipe is provided with cracks or holes, and the leakage pipes on different branches have different diameters; each leakage pipe is fixedly connected to a water outlet branch pipe, and the water outlet branches of all branches are connected to a water outlet main pipe, and the water outlet main pipe is connected to the water outlet; the electronic control device is connected to the solenoid valves on all branches, and is used to independently control the solenoid valves on each branch.
[0008] Furthermore, the pipeline system is also provided with an internal plugging pipe, which is connected to one of the water inlet branches, and an electromagnetic valve is connected between the internal plugging pipe and the water outlet end of the corresponding water inlet branch; and the water outlet end of the internal plugging pipe is suspended.
[0009] Furthermore, the inner leak-blocking pipe is arranged below the water inlet main pipe.
[0010] Furthermore, the pipeline system is also provided with a manual gate valve, which is connected to one of the water inlet branches, and an electromagnetic valve is connected between the manual gate valve and the water outlet end of the corresponding water inlet branch.
[0011] Furthermore, the water inlet and outlet ends of the solenoid valve and the water inlet and outlet ends of the leakage pipe are both provided with connecting flanges, and the solenoid valve and the leakage pipe are fixedly connected via the connecting flanges.
[0012] Furthermore, a one-way valve for one-way flow to the water outlet is fixedly connected behind the leakage pipe.
[0013] Furthermore, the water inlet main pipe or the water inlet branch pipe is provided with an air inlet interface for introducing gas into the pipeline system.
[0014] Furthermore, a universal wheel and an adjustment foot are provided at the bottom of the support frame; wherein the adjustment foot is threadedly connected to the support frame.
[0015] The pipeline blockage simulation training equipment of the utility model has a leakage pipe installed on each branch, each leakage pipe can be set to different pipe diameters, and different leakage types can also be set, so as to achieve a more realistic, multi-variety and efficient training effect. All leakage pipes are connected by flange installation and can be disassembled and replaced at any time. The electromagnetic valve is used for automatic control simulation, and the traditional manual valve control is abandoned. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1It is a structural schematic diagram of a pipeline blockage simulation training device provided by an embodiment of the utility model;
[0017] Figure 2 This is the installation diagram of the relief valve. DETAILED DESCRIPTION
[0018] The technical solution of the utility model will be described in detail below with reference to the accompanying drawings and specific embodiments. Embodiment 1
[0019] like Figure 1 to Figure 2 As shown, the utility model provides a pipeline blockage simulation training device, which includes a support frame 1 and a pipeline system 2; the pipeline system 2 is fixedly installed on the support frame 1 through a clamp 3;
[0020] The piping system 2 includes a water inlet 201, a pressure gauge 202, a relief valve 203, a water inlet main pipe 204, a water inlet branch pipe 205, a solenoid valve 206, a leakage pipe 207, a water outlet branch pipe 208, a water outlet main pipe 209, a water outlet 210 and an electronic control device (not shown); the water inlet 201 is connected to a water inlet main pipe 204, and the water inlet main pipe 204 is connected to at least two water inlet branches 205 to serve as a branch; the pressure gauge 202 is installed on the water inlet main pipe 204; the relief valve 203 is installed on the water inlet main pipe 204 or one of the water inlet branches 205; each A solenoid valve 206 is fixedly connected to each water inlet branch pipe 205, and a leakage pipe 207 is fixedly connected behind the solenoid valve 206. The leakage pipe 207 is provided with cracks or holes, and the diameters of the leakage pipes 207 on different branches are different; a water outlet branch pipe 208 is fixedly connected behind each leakage pipe 207, and a water outlet main pipe 209 is connected behind the water outlet branch pipes 208 of all branches, and the water outlet main pipe 209 is connected to a water outlet 210; the electronic control device is connected to the solenoid valves 206 on all branches, and is used to independently control the solenoid valve 206 on each branch.
[0021] A leakage pipe 207 on each branch corresponds to a leakage situation of a pipe diameter. When the equipment is working, the water outlet 210 is closed, or it can also be connected to other equipment for joint use. Liquid is input into the pipeline system 2 through the water inlet 201. At this time, all solenoid valves 206 are in a closed state. The pressure gauge 202 can monitor the pressure of the pipeline system in real time. When it exceeds the safe pressure range and reaches the threshold of the overflow valve 203, the overflow valve 203 begins to overflow, thereby maintaining the system pressure within a safe range. Each solenoid valve 206 in the pipeline system 2 controls a branch, thereby controlling various types of leakage scenarios such as different pipe diameters and different positions. The opening of the solenoid valve 206 is controlled by the electronic control device, thereby simulating different leakage scenarios, such as crack leakage, loose interface, hole leakage, flange 213 leakage, etc.
[0022] Furthermore, the pipeline system 2 is also provided with an internal plugging pipe 211, which is connected to one of the water inlet branches 205, and an electromagnetic valve 206 is connected between the internal plugging pipe 211 and the water outlet end of the corresponding water inlet branch 205; and the water outlet end of the internal plugging pipe 211 is suspended.
[0023] The leakage pipe 207 simulates the leakage of the pipe wall, and the training can be carried out to block the outer wall of the leakage pipe 207. The inner plugging pipe 211 simulates the leakage of the pipeline rupture, and the training can be carried out to block the cross section of the inner plugging pipe 211. The electromagnetic valve 206 in front of the inner plugging pipe 211 is opened, and the training can be carried out.
[0024] Specifically, the inner plugging pipe 211 is arranged below the water inlet main pipe 204. In this way, when the training is finished, the electromagnetic valve 206 in front of the inner plugging pipe 211 can be opened to drain the accumulated water in the pipeline system 2 by utilizing the principle that water flows downward.
[0025] Preferably, the pipeline system 2 is further provided with a manual gate valve 212, which is connected to one of the water inlet branches, and a solenoid valve 206 is connected between the manual gate valve 212 and the outlet end of the corresponding water inlet branch pipe 205. Thus, leakage of the manual gate valve 212 can be simulated, adding a simulation scenario.
[0026] As an improvement, the water inlet and outlet ends of the solenoid valve 206 and the water inlet and outlet ends of the leakage pipe 207 are both provided with connection flanges 213, and the solenoid valve 206 and the leakage pipe 207 are fixedly connected via the connection flanges 213. These flange 213 interfaces can simulate the scene of flange 213 leakage and facilitate subsequent disassembly and replacement.
[0027] As an improvement, a one-way valve 214 for one-way flow to the water outlet 210 is fixedly connected to the leakage pipe 207. Each branch can prevent liquid from flowing back and damaging the parts of the pipeline system 2 by arranging a one-way valve.
[0028] Since pipeline leakage is not necessarily a liquid pipe leakage, it may be a gas pipe leakage. In order to enable the device to simulate a gas pipe leakage scenario, preferably, the water inlet main pipe 204 or the water inlet branch pipe 205 is provided with an air inlet interface for introducing gas into the pipeline system 2.
[0029] As an improvement, the bottom of the support frame 1 is provided with universal wheels and adjustment feet, wherein the adjustment feet are threadedly connected to the support frame 1. The universal wheels can drive the equipment to move at will, making it convenient to transfer the training venue. Before using the equipment, first operate the adjustment feet to fix the equipment.
[0030] The utility model provides a pipeline blockage simulation training device, which can simulate leakage scenarios of various leakage types in different positions and different pipe diameters, and can train the training personnel's ability to block leaks in a more comprehensive and comprehensive manner. Each pipeline and valve is spliced by a flange 213, which is convenient for disassembly and replacement of damaged parts. At the same time, new pipelines can be expanded on the original pipeline system 2 according to training needs, thereby simulating more leakage scenarios. And the solenoid valve 206 is used to control each different type of leakage scenario, which improves the efficiency and convenience of training compared to the original manual valve solution. The setting of the one-way valve 214 can also prevent equipment damage and increase the service life of the equipment.
[0031] The above-mentioned embodiments only express several implementation methods of the utility model, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the patent of the utility model. It should be pointed out that, for ordinary technicians in this field, several variations and improvements can be made without departing from the concept of the utility model, and these all belong to the protection scope of the utility model. Therefore, the protection scope of the utility model patent shall be based on the attached claims.
Claims
1. A pipeline blockage simulation training device, characterized in that: It includes a supporting frame and a piping system; the piping system is fixedly installed on the supporting frame through a clamp; The piping system includes a water inlet, a pressure gauge, an overflow valve, a water inlet main pipe, a water inlet branch pipe, a solenoid valve, a leakage pipe, a water outlet branch pipe, a water outlet main pipe, a water outlet and an electronic control device; the water inlet is connected to a water inlet main pipe, and the water inlet main pipe is connected to at least two water inlet branches to act as a branch; the pressure gauge is installed on the water inlet main pipe; the overflow valve is installed on the water inlet main pipe or one of the water inlet branches; each water inlet branch pipe is fixedly connected to a solenoid valve, and a leakage pipe is fixedly connected behind the solenoid valve, the leakage pipe is provided with cracks or holes, and the leakage pipes on different branches have different diameters; each leakage pipe is fixedly connected to a water outlet branch pipe, and the water outlet branches of all branches are connected to a water outlet main pipe, and the water outlet main pipe is connected to the water outlet; the electronic control device is connected to the solenoid valves on all branches, and is used to independently control the solenoid valves on each branch.
2. The pipeline blockage simulation training device according to claim 1, characterized in that: The pipeline system is also provided with an internal plugging pipe, which is connected to one of the water inlet branches, and an electromagnetic valve is connected between the internal plugging pipe and the water outlet end of the corresponding water inlet branch; and the water outlet end of the internal plugging pipe is suspended.
3. The pipeline blockage simulation training device according to claim 2, characterized in that: The inner leak-blocking pipe is arranged below the water inlet main pipe.
4. The pipeline blockage simulation training device according to claim 1, characterized in that: The pipeline system is also provided with a manual gate valve, which is connected to one of the water inlet branches, and an electromagnetic valve is connected between the manual gate valve and the water outlet end of the corresponding water inlet branch.
5. The pipeline blockage simulation training device according to claim 1, characterized in that: The water inlet and outlet ends of the solenoid valve and the water inlet and outlet ends of the leakage pipe are both provided with connecting flanges, and the solenoid valve and the leakage pipe are fixedly connected via the connecting flanges.
6. The pipeline blockage simulation training device according to claim 1, characterized in that: A one-way valve for one-way flow to the water outlet is fixedly connected behind the leakage pipe.
7. The pipeline blockage simulation training device according to claim 1, characterized in that: The water inlet main pipe or the water inlet branch pipe is provided with an air inlet interface for introducing gas into the pipeline system.
8. The pipeline blockage simulation training device according to claim 1, characterized in that: The bottom of the supporting frame is provided with universal wheels and adjusting feet, wherein the adjusting feet are threadedly connected to the supporting frame.