Construction device for outer wall of building

By designing a building exterior wall construction device including a lifting part and a storage part, the problem that existing devices cannot protect pedestrians below the construction area is solved, safe fixation of workers and effective collection of fallen objects is achieved, and safety risks in the construction area are reduced.

CN222731055UActive Publication Date: 2025-04-08CHINA CONSTR SECOND ENG BUREAU LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421465308.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-25
Publication Date
2025-04-08
Estimated Expiration
2034-06-25

AI Technical Summary

Technical Problem

The existing building exterior wall construction equipment cannot effectively protect pedestrians below the construction area, and the mortar and paint that are prone to drop during the painting process pose a safety risk to pedestrians below.

Method used

A construction device including a hoisting part and a storage part is designed. The lifting part is secured by the operator through a seat belt, and the base can be adjusted to improve safety. The storage part is fixed under the base by a traction rope and a support member, and remains unfolded to collect the fallen mortar and paint.

Benefits of technology

Effectively fix the operators, improve their safety, and through the design of the storage part, the safety risks of pedestrians below the construction area are reduced and the damage caused by falling objects is prevented.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222731055U_ABST
    Figure CN222731055U_ABST
Patent Text Reader

Abstract

The utility model provides a construction device for a building outer wall, and belongs to the technical field of building engineering. The construction device for the building outer wall comprises a hoisting part and a storage part. The hoisting part can comprise a base, a safety belt and a first steel wire rope lock catch, one end of the safety belt is connected with a balancing weight on the top of the building through a rope, the other end of the safety belt is connected with the base, and the safety of operators is improved while the operators work by wearing the safety belt. Pulling ropes and a bearing piece are arranged below the base, one ends of the four pulling ropes are gathered and connected to the first steel wire rope buckles, the other ends of the four pulling ropes are connected to the four top corners of the bearing piece, and the bearing piece can be fixed to the lower portion of the base and can be kept in an unfolded state at the same time; mortar, paint and the like which are prone to falling in the outer wall painting operation process of operators can be conveniently collected, and therefore the safety risk of pedestrians below a construction area is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building engineering, in particular to a construction device for the exterior wall of a building. Background Art

[0002] At present, with the improvement of urbanization level, urban construction is gradually entering a mature stage, and new projects are gradually decreasing. Due to the long-term exposure of the exterior walls of buildings to wind, sun and rain, damage and falling off often occur. Therefore, the demand for building maintenance and renovation is increasing. However, the existing building exterior wall construction equipment can only provide construction work for operators when working, and cannot protect pedestrians and buildings below the work area. In addition, mortar and paint are prone to fall during the painting of the exterior walls of buildings, which poses a safety risk to pedestrians below.

[0003] The above information disclosed in the Background section is only for enhancement of understanding of the background of the present disclosure and therefore it may include information that does not constitute the prior art that is already known to one of ordinary skill in the art. Summary of the invention

[0004] The utility model provides a construction device for the exterior wall of a building, which can collect mortar, paint and the like that are easily dropped by workers during the exterior wall painting operation, thereby reducing the safety risk of pedestrians under the construction area.

[0005] In a first aspect, the present disclosure provides a construction device for an exterior wall of a building, comprising:

[0006] The hoisting part includes a base, a safety belt, and a first steel wire rope lock buckle. The base has a first end face located on the upper surface and a second end face located on the lower surface. One end of the safety belt is connected to a counterweight block on the top of the building through a rope, and the other end of the safety belt is connected to the first end face. The first steel wire rope lock buckle is located in the middle of the second end face.

[0007] The storage portion includes a traction rope and a supporting member connected to the traction rope, the supporting member has a third end face, the third end face is rectangular in shape, the number of the traction ropes is four, one ends of the four traction ropes converge and are connected to the first wire rope buckle, and the other ends of the four traction ropes are connected to the four vertex corners of the supporting member.

[0008] In an implementation of the first aspect of the present disclosure, the hoisting unit further includes:

[0009] A second steel wire rope lock buckle, located at the second end surface and spaced apart from the first steel wire rope lock buckle;

[0010] A pulling rope, one end of which passes through the second steel wire rope buckle and the first steel wire rope buckle in sequence, and is connected to the middle part of the third end surface to lock the pulling rope.

[0011] In an implementation of the first aspect of the present disclosure, the supporting member includes four support rods and a double-layer moisture-proof cloth, a ring is provided at one end of the support rod, the four support rods are passed through the double-layer moisture-proof cloth and are distributed diagonally, and the rings at one end of the four support rods converge at the middle of the double-layer moisture-proof part to connect the pulling rope.

[0012] In an implementation manner of the first aspect of the present disclosure, the safety belt is a harness-type safety belt.

[0013] In an implementation of the first aspect of the present disclosure, the base is made of a wooden material, and the wooden material is birch.

[0014] In an implementation of the first aspect of the present disclosure, the pulling rope is a steel wire rope.

[0015] In an implementation manner of the first aspect of the present disclosure, the support rod is a steel rod.

[0016] Beneficial effects:

[0017] According to the construction device for the exterior wall of a building provided by the present disclosure, one end of the safety belt is connected to the counterweight block on the top of the building through a rope, and the other end of the safety belt is connected to the base, so that the operator can be fixed on the base by wearing the safety belt, and the height of the base can be controlled by adjusting the length of the rope, so as to facilitate the operator to perform the work while improving the safety of the operator. A traction rope and a supporting member are arranged below the base, one end of the four traction ropes converge and are connected to the first steel wire rope buckle, and the other end is connected to the four top corners of the supporting member, so that the supporting member can be fixed below the base while maintaining an unfolded state, so as to collect mortar, paint, etc. that are easy to drop during the exterior wall painting operation of the operator, thereby reducing the safety risk of pedestrians below the construction area. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] In order to more clearly illustrate the technical solutions in the embodiments of the present disclosure or the conventional technology, the drawings required for use in the embodiments or the conventional technology descriptions will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present disclosure, and for ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0019] Figure 1 It is a structural schematic diagram of a construction device for an exterior wall of a building according to an embodiment of the present disclosure.

[0020] Description of reference numerals:

[0021] 100. Base; 110. Safety belt; 120. First steel wire rope buckle; 130. Towing rope; 140. Supporting member; 150. Second steel wire rope buckle; 160. Pulling rope; 170. Support rod; 180. Double-layer moisture-proof cloth. DETAILED DESCRIPTION

[0022] Example embodiments will now be described more fully with reference to the accompanying drawings. However, example embodiments can be implemented in a variety of forms and should not be construed as limited to the examples set forth herein; rather, these embodiments are provided so that the disclosure will be more comprehensive and complete and the concepts of the example embodiments are fully conveyed to those skilled in the art. The described features, structures, or characteristics may be combined in any suitable manner in one or more embodiments. In the following description, many specific details are provided to provide a full understanding of the embodiments of the present disclosure.

[0023] The described features, structures or characteristics may be combined in one or more embodiments in any suitable manner. In the following description, many specific details are provided to provide a full understanding of the embodiments of the present disclosure. However, those skilled in the art will appreciate that the technical solutions of the present disclosure may be practiced without one or more of the specific details, or other methods, components, materials, etc. may be adopted. In other cases, known structures, materials or operations are not shown or described in detail to avoid blurring the main technical ideas of the present disclosure.

[0024] When a structure is “on” another structure, it may mean that the structure is integrally formed on the other structure, or that the structure is “directly” disposed on the other structure, or that the structure is “indirectly” disposed on the other structure via another structure.

[0025] The terms "a", "an", "the" are used to indicate the presence of one or more elements / components / etc.; the terms "including" and "having" are used to indicate an open-ended inclusive meaning and mean that there may be additional elements / components / etc. in addition to the listed elements / components / etc. The terms "first" and "second" etc. are used only as labels and are not intended to limit the quantity of their objects.

[0026] At present, with the improvement of urbanization level, urban construction is gradually entering a mature stage, and new projects are gradually decreasing. Due to the long-term exposure of the exterior walls of buildings to wind, sun and rain, damage and falling off often occur. Therefore, the demand for building maintenance and renovation is increasing. However, the existing building exterior wall construction equipment can only provide construction work for operators when working, and cannot protect pedestrians and buildings below the work area. In addition, mortar and paint are prone to fall during the painting of the exterior walls of buildings, which poses a safety risk to pedestrians below.

[0027] In an embodiment of the present disclosure, a construction device for an exterior wall of a building is provided. Figure 1 As shown, the construction device includes a hoisting part and a storage part. The hoisting part may include a base 100, a safety belt 110, and a first steel wire rope buckle 120. The base 100 has a first end face located on the upper surface and a second end face located on the lower surface. One end of the safety belt 110 is connected to the counterweight block on the top of the building through a rope, and the other end of the safety belt 110 is connected to the first end face. The first steel wire rope buckle 120 is located in the middle of the second end face. The storage part may include a traction rope 130 and a supporting member 140 connected to the traction rope 130. The supporting member 140 has a third end face, and the shape of the third end face is rectangular. The number of the traction ropes 130 is four. One end of the four traction ropes 130 converges and is connected to the first steel wire rope buckle, and the other end of the four traction ropes 130 is connected to the four vertex corners of the supporting member 140.

[0028] According to the construction device for the exterior wall of a building provided by the present disclosure, one end of the safety belt 110 is connected to the counterweight block on the top of the building through a rope, and the other end of the safety belt 110 is connected to the base 100, so that the operator can be fixed on the base 100 by wearing the safety belt 110, and the height of the base 100 can be controlled by adjusting the length of the rope, so as to facilitate the operator to perform the work while improving the safety of the operator. Under the base 100, a traction rope 130 and a supporting member 140 are arranged, one end of the four traction ropes 130 converges and is connected to the first steel wire buckle, and the other end is connected to the four top corners of the supporting member 140, so that the supporting member 140 can be fixed under the base 100 while maintaining the unfolded state, so as to collect mortar, paint, etc. that are easy to drop during the exterior wall painting operation of the operator, thereby reducing the safety risk of pedestrians under the construction area.

[0029] The following is a detailed description of the components of the construction device for the exterior wall of a building provided by the embodiment of the present disclosure in conjunction with the accompanying drawings:

[0030] In one embodiment of the present disclosure, the hoisting part may further include a second steel wire rope lock 150 and a pull rope 160, wherein the second steel wire rope lock 150 is located at the second end surface and is spaced apart from the first steel wire rope lock 120. One end of the pull rope 160 passes through the second steel wire rope lock 150 and the first steel wire rope lock 120 in sequence, and is connected to the middle of the third end surface to lock the pull rope 160. When the operator is working in the hoisting part, the height of the storage part can be controlled by controlling the length of the pull rope 160, that is, the height of the storage part can be changed by locking the pull rope 160 through the first steel wire rope lock 120 and the second steel wire rope lock 150, so that the storage part can be unfolded or retracted.

[0031] Optionally, the support member 140 includes four support rods 170 and a double-layer moisture-proof cloth 180, one end of the support rod 170 is provided with a ring, the four support rods 170 are inserted into the double-layer moisture-proof cloth 180, and are distributed diagonally, and the rings at one end of the four support rods 170 converge at the middle of the double-layer moisture-proof part to connect the pull rope 160. In this way, by inserting the four support rods 170 into the double-layer moisture-proof cloth 180, when the pull rope 160 is in a tensioned state, the support member 140 can be unfolded, so as to collect mortar, paint, etc. that are easy to fall during the exterior wall painting operation of the operator, thereby reducing the safety risk of pedestrians under the construction area. When the lifting rope is in a relaxed state and is separated from the first wire rope lock 120 and the second wire rope lock 150, the support member 140 can be separated from the hoisting part, and the support member 140 is easy to fold. The dismantled supporting member 140 can be cleaned and reused multiple times, thereby improving the utilization rate of the supporting member 140 .

[0032] Optionally, the safety belt 110 is a harness-type safety belt 110. The harness-type safety belt 110 can provide additional protection during high-altitude operations. The harness-type safety belt 110 connects the shoulders and waist of the operator together to form a stable support structure, so that the operator can maintain balance and stability at high altitudes.

[0033] Optionally, the base 100 is made of a wood material, and the wood material is birch. Birch has a high mechanical strength and can bear the weight of the operator, thereby improving the safety of the operator.

[0034] Optionally, the lifting rope 160 is a steel wire rope, which includes a plurality of steel wires twisted together, and has a very high strength and can withstand a large load. In addition, the surface hardness of the steel wire rope is relatively high, and the wear resistance is also good, so it is not easy to be damaged even if it is used for a long time. Since the steel wire rope material is strong and wear-resistant, its service life is longer than that of other ropes. In addition, the steel wire rope is not easy to deform and wear, so it is less dangerous when used.

[0035] Optionally, the support rod 170 is a steel rod, which has greater rigidity and is not easily deformed when collecting mortar and paint, thereby ensuring the stability of the receiving part.

[0036] It should be noted that the wire rope lock can be a rope clip for the wire rope, which is used for temporary connection of the wire rope and fixation of the rear hand rope when the wire rope is passed through the pulley group, as well as fixation of the head of the guy rope on the climbing pole. The main types of wire ropes include phosphate coated wire rope, galvanized wire rope, stainless steel wire rope, etc.

[0037] It should be understood that the present disclosure does not limit its application to the detailed structure and arrangement of the components proposed in this specification. The present disclosure can have other embodiments and can be implemented and executed in a variety of ways. The aforementioned variations and modifications fall within the scope of the present disclosure. It should be understood that the present disclosure disclosed and defined in this specification extends to all alternative combinations of two or more individual features mentioned or apparent in the text and / or the drawings. All these different combinations constitute multiple alternative aspects of the present disclosure. The embodiments of this specification illustrate the best mode known for implementing the present disclosure and will enable those skilled in the art to utilize the present disclosure.

Claims

1. A construction device for the exterior wall of a building, characterized in that: include: The hoisting part includes a base, a safety belt, and a first steel wire rope lock buckle. The base has a first end face located on the upper surface and a second end face located on the lower surface. One end of the safety belt is connected to a counterweight block on the top of the building through a rope, and the other end of the safety belt is connected to the first end face. The first steel wire rope lock buckle is located in the middle of the second end face. The storage portion includes a traction rope and a supporting member connected to the traction rope, the supporting member has a third end face, the third end face is in the shape of a rectangle, the number of the traction ropes is four, one ends of the four traction ropes converge and are connected to the first wire rope lock buckle, and the other ends of the four traction ropes are connected to the four vertex corners of the supporting member.

2. The construction device according to claim 1, characterized in that: The hoisting part also includes: A second steel wire rope lock buckle, located at the second end surface and spaced apart from the first steel wire rope lock buckle; A pulling rope, one end of which passes through the second steel wire rope buckle and the first steel wire rope buckle in sequence, and is connected to the middle part of the third end surface to lock the pulling rope.

3. The construction device according to claim 2, characterized in that: The supporting member includes four support rods and a double-layer moisture-proof cloth. A ring is arranged at one end of the support rod. The four support rods are passed through the double-layer moisture-proof cloth and are distributed diagonally. The rings at one end of the four support rods converge at the middle of the double-layer moisture-proof cloth to connect the pulling rope.

4. The construction device according to claim 1, characterized in that: The safety belt is a harness-type safety belt.

5. The construction device according to claim 1, characterized in that: The base is made of wood, and the wood is birch.

6. The construction device according to claim 2, characterized in that: The pulling rope is a steel wire rope.

7. The construction device according to claim 3, characterized in that: The support rod is a steel rod.