A green landscape road

By setting up green belts and overflow pipes on urban roads, excess rainwater is introduced into drainage and water transport mechanisms, the problem of rainwater accumulation on urban roads is solved, and effective hydrophobicity of the road and beautification of the environment is achieved.

CN222744717UActive Publication Date: 2025-04-11GUANGZHOU JINGHUI LANDSCAPE ENG CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202421302185.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-07
Publication Date
2025-04-11
Estimated Expiration
2034-06-07

AI Technical Summary

Technical Problem

During the process of urbanization, the increase in non-permeable surface area has led to an increase in the load of urban municipal drainage facilities, and it is difficult for the existing technology to effectively solve the problem of stormwater accumulation.

Method used

A green landscape road was designed, and the effective collection and treatment of rainwater was achieved by setting green belts on both sides of the roadway and sidewalk, and overflow pipes were used to guide excess rainwater into the drainage and water transport mechanism.

Benefits of technology

It effectively alleviates the water accumulation on the road, reduces the risk of excessive rainwater accumulation, and beautifies the road environment and reduces noise and dust pollution.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222744717U_ABST
    Figure CN222744717U_ABST
Patent Text Reader

Abstract

The utility model discloses a green landscape road including a carriageway and a sidewalk, and sidewalks are arranged on both sides of the carriageway. A green belt is arranged in the middle of the carriageway and on the side of the sidewalk away from the carriageway, and the height of the green belt is lower than the carriageway and the sidewalk and an overflow pipe is arranged. A drainage mechanism is arranged at the bottom of the carriageway, and a water delivery mechanism is arranged at the bottom of the sidewalk. The overflow pipe is connected with the drainage mechanism, and the drainage mechanism is connected with the water delivery mechanism. By making full use of the structural characteristics of the road itself and combining with drainage facilities, the occurrence of waterlogging and flooding on the road can be effectively reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of urban roads, in particular to a green landscape road. Background Art

[0002] In the process of urbanization, the proportion of impermeable surfaces has increased significantly, forming underlying surface characteristics that are different from natural surfaces. Extreme rainfall has continuously increased the load on urban municipal drainage facilities. In order to improve this situation, the concept of "sponge city" came into being. The "sponge" construction of urban roads is an important type of construction in my country's sponge city construction process. It mainly uses urban roads and drainage systems, green landscape facilities, etc. to effectively collect, utilize, and purify rainwater on the road surface, simulating the natural ecosystem so that rainwater can be retained more effectively. Utility Model Content

[0003] In order to solve the above technical problems, the utility model provides a green landscape road.

[0004] The technical solution of the utility model is as follows: a green landscape road includes a carriageway and a sidewalk, and sidewalks are arranged on both sides of the carriageway. A green belt is arranged in the middle of the carriageway and on the side of the sidewalk away from the carriageway, and the height of the green belt is lower than the carriageway and the sidewalk and is provided with an overflow pipe. A drainage mechanism is arranged at the bottom of the carriageway, and a water delivery mechanism is arranged at the bottom of the sidewalk. The overflow pipe is connected to the drainage mechanism, and the drainage mechanism is connected to the water delivery mechanism.

[0005] Furthermore, the roadway comprises an asphalt layer and a cement layer, an asphalt layer is arranged on the cement layer, a gravel layer, a medium sand layer and base soil are arranged below the cement layer in sequence, and a drainage mechanism is arranged on the gravel layer.

[0006] Furthermore, a first waterproof geotextile is provided between the gravel layer and the medium sand layer.

[0007] Furthermore, the overflow pipe comprises a first overflow pipe and a second overflow pipe. The green belt in the middle of the carriageway is provided with the first overflow pipe, and the green belt on the side of the sidewalk is provided with the second overflow pipe.

[0008] Furthermore, the drainage mechanism includes a drainage pipe and a first bottom pipe; one end of the first overflow pipe is located at a height between the road surface and the green belt ground, and the other end is connected to the drainage pipe through the first bottom pipe.

[0009] Furthermore, curbstones are arranged on both sides of the carriageway, and drainage holes are arranged at the bottoms of the curbstones.

[0010] Furthermore, the sidewalk is paved with sidewalk bricks, and the sidewalk (2) is provided with a plain soil layer, a gravel layer, a medium sand layer and a base soil in sequence downward, and the gravel layer is provided with a water conveying mechanism.

[0011] Furthermore, a second waterproof geotextile is provided between the plain soil layer and the gravel layer.

[0012] Furthermore, the water supply mechanism includes a second bottom pipe and multiple permeable blind pipes. One end of the second overflow pipe is located between the sidewalk pavement and the green belt ground, and the other end is connected to the permeable blind pipe through the second bottom pipe, and the permeable blind pipe is connected to the drainage mechanism.

[0013] Furthermore, a plurality of tree pits are provided on the sidewalk, which are evenly distributed along the length of the sidewalk, and trees are planted in the tree pits.

[0014] Furthermore, the green belt is provided with a planting soil layer and a base soil from the surface to the underground, and a variety of local waterlogging-resistant shrubs are planted in the planting soil layer.

[0015] Compared with the prior art, the utility model has the advantages of using overflow pipes to guide excess rainwater on the roadway and sidewalk into the drainage mechanism through the water delivery mechanism to prevent excessive accumulation of rainwater on the road. The green belt plays the role of water storage and drainage, alleviates the situation of water accumulation on the road, and at the same time plays the role of beautifying the road environment and reducing road noise and dust. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0017] Figure 1 It is a top view of the utility model;

[0018] Figure 2 It is a cross-sectional view of the utility model.

[0019] Among them: 1. Carriageway; 2. Sidewalk; 3. Green belt; 11. Curbstone; 12. Gravel layer; 13. Drain pipe; 14. Medium sand layer; 15. First waterproof geotextile; 16. First bottom pipe; 17. Asphalt layer; 18. Cement layer; 21. Tree pit; 22. Soil layer; 23. Arbor; 24. Second waterproof geotextile; 25. Permeable blind pipe; 31. Planting soil layer; 32. Shrubs; 33. Second bottom pipe; 34. Base soil; 35. First overflow pipe; 36. Second overflow pipe. DETAILED DESCRIPTION

[0020] In order to make the purpose, technical solution and advantages of the utility model clearer, the technical solution of the utility model will be described clearly and completely below. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work belong to the scope of protection of the utility model.

[0021] The specific implementation of the utility model will be described below in conjunction with the accompanying drawings:

[0022] like Figure 1 As shown, a green landscape road includes a carriageway 1 and a sidewalk 2, and the sidewalks 2 are arranged on both sides of the carriageway 1. A green belt 3 is arranged in the middle of the carriageway 1 and on the side of the sidewalk 2 away from the carriageway 1. The height of the green belt 3 is lower than the carriageway 1 and the sidewalk 2 and is provided with an overflow pipe. The overflow pipe includes a first overflow pipe 35 and a second overflow pipe 36. The green belt 3 in the middle of the carriageway 1 is provided with a first overflow pipe 35, and the green belt 3 on the side of the sidewalk 2 is provided with a second overflow pipe 36. The green belt 3 has the function of alleviating water accumulation on the road and at the same time plays the role of dust prevention and noise reduction.

[0023] like Figure 2 As shown, a drainage mechanism is provided at the bottom of the carriageway 1, a water delivery mechanism is provided at the bottom of the sidewalk 2, an overflow pipe is connected to the drainage mechanism, and the drainage mechanism is connected to the water delivery mechanism. The overflow pipe allows the accumulated water on the road to flow into the water delivery mechanism and the drainage mechanism through the overflow pipe, so as to prevent flooding of the road in time.

[0024] The carriageway 1 includes an asphalt layer 17 and a cement layer 18, and the asphalt layer 17 is arranged on the cement layer 18. Below the cement layer 17, a gravel layer 12, a medium sand layer 14 and a base soil 34 are arranged in sequence. The gravel layer 12 has a stable structure, and the gaps between the gravel layers 12 can absorb a lot of water. The drainage mechanism is arranged in the gravel layer 12, and the position is stable and not easy to deform. The medium sand layer 14 can further filter and purify the water to prevent polluted water from infiltrating the base soil 34. A first waterproof geotextile 15 is arranged between the gravel layer 12 and the medium sand layer 14. The first waterproof geotextile 15 is used to prevent the materials between the gravel layer 12 and the medium sand layer 14 from being lost or mixed, so as to maintain the overall structure and function of the carriageway 1. The drainage mechanism includes a drainage pipe 13 and a first bottom pipe 16. The height of one end of the first overflow pipe 35 is located between the road surface of the carriageway 1 and the ground of the green belt 3, so as to collect the water flowing from the carriageway 1 to the green belt 3. The other end of the first overflow pipe 35 is connected to the drain pipe 13 through the first bottom pipe 16, and the excess water is discharged to the water body near the road or the municipal drainage network through the drain pipe 13. The road arch slope of the carriageway 1 is controlled at 1% to 1.5%, which does not affect traffic and can guide the accumulated water to both sides of the carriageway 1. There are curbstones 11 on both sides of the carriageway 1, and drainage holes are provided at the bottom of the curbstones 11. The curbstones 11 serve as the boundary between the carriageway 1 and the sidewalk 2, and at the same time guide the accumulated water out of the carriageway 1.

[0025] The sidewalk 2 is paved with sidewalk bricks, and the gaps between the sidewalk bricks are filled with gravel to ensure that the sidewalk 2 has a certain ability to seep water and prevent excessive water accumulation on the sidewalk 2. The one-way longitudinal slope of the sidewalk 2 is less than 2.5%. The side of the sidewalk 2 close to the carriageway 1 is higher than the side close to the green belt 3. It is convenient to guide the accumulated water to the green belt 3 to prevent excessive water accumulation on the sidewalk 2. The sidewalk 2 is composed of a layer of plain soil 22, a gravel layer 12, a medium sand layer 14 and a base soil 34 in order from the surface to the underground. A second waterproof geotextile 24 is provided between the plain soil 22 layer and the gravel layer 12, and the second waterproof geotextile 24 is used to maintain the stability of the sidewalk 2 structure. The gravel layer 12 is provided with a water conveying mechanism, which includes a second bottom pipe 33 and a plurality of permeable blind pipes 25. The height of one end of the second overflow pipe 36 is located between the pavement of the sidewalk 2 and the ground of the green belt 3, and the other end is connected to the permeable blind pipe 25 through the second bottom pipe 33, and the permeable blind pipe 25 is connected to the drainage mechanism. The excess water in the green belt 3 is led to the drainage mechanism through the water delivery mechanism. A plurality of tree pits 21 are provided on the sidewalk 2, and the tree pits 21 are evenly distributed along the length direction of the sidewalk 2, and trees 23 are planted in the tree pits 21. The tree pits 21 have a certain water storage function and can accommodate a part of the water on the road. The trees 23 can provide shade for the sidewalk 2 and absorb dust and noise on both sides of the roadway 1.

[0026] The green belt 3 is composed of a planting soil layer 31 and a base soil 34 in order from the surface to the ground. The planting soil layer 31 is planted with a variety of local waterlogging-resistant shrubs 32. The various shrubs 32 can increase the species diversity of the green belt 3 and enhance the ecological value and ornamental value of the green belt 3. The use of local waterlogging-resistant shrubs 32 varieties can increase the survival probability of the green belt 3.

[0027] The working principle of the specific implementation of the utility model is as follows: the accumulated water on the roadway 1 flows to the drainage mechanism and the water delivery mechanism through the first overflow pipe 35 and the second overflow pipe 36 respectively, and is finally discharged. The multi-layer structure at the bottom of the roadway 1 and the sidewalk 2 can store a part of the accumulated water, and the green belt 3 can absorb a certain amount of accumulated water and provide ecological value.

[0028] It should be noted that when an element is referred to as being "fixed to" another element, it may be directly on the other element or there may be an element centered thereon. When an element is considered to be "connected to" another element, it may be directly connected to the other element or there may be an element centered thereon. The terms "upper", "lower", "left", "right", "front", "rear" and similar expressions used herein are for illustrative purposes only.

[0029] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Although the present invention has been disclosed as a preferred embodiment as above, it is not used to limit the present invention. Any technical personnel in this field can make some changes or modify the technical contents disclosed above into equivalent embodiments without departing from the scope of the technical solution of the present invention. However, any brief modifications, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention without departing from the content of the technical solution of the present invention are still within the scope of the technical solution of the present invention.

Claims

1. A green landscape road, comprising a carriageway (1) and a sidewalk (2), wherein the sidewalks (2) are arranged on both sides of the carriageway (1), and characterized in that: A green belt (3) is provided in the middle of the carriageway (1) and on the side of the sidewalk (2) away from the carriageway (1); the height of the green belt (3) is lower than that of the carriageway (1) and the sidewalk (2) and is provided with an overflow pipe; a drainage mechanism is provided at the bottom of the carriageway (1), a water delivery mechanism is provided at the bottom of the sidewalk (2), the overflow pipe is connected to the drainage mechanism, and the drainage mechanism is connected to the water delivery mechanism.

2. The green landscape road according to claim 1, characterized in that: The carriageway (1) comprises an asphalt layer (17) and a cement layer (18), wherein the asphalt layer (17) is arranged on the cement layer (18), and a gravel layer (12), a medium sand layer (14) and base soil (34) are arranged in sequence below the cement layer (18), and the gravel layer (12) is provided with the drainage mechanism; and a first waterproof geotextile (15) is arranged between the gravel layer (12) and the medium sand layer (14).

3. The green landscape road according to claim 1, characterized in that: The overflow pipe comprises a first overflow pipe (35) and a second overflow pipe (36); the green belt (3) in the middle of the carriageway (1) is provided with the first overflow pipe (35), and the green belt (3) on the side of the sidewalk (2) is provided with the second overflow pipe (36).

4. The green landscape road according to claim 3 is characterized by: The drainage mechanism comprises a drainage pipe (13) and a first bottom pipe (16); one end of the first overflow pipe (35) is located between the road surface of the carriageway (1) and the ground of the green belt (3), and the other end is connected to the drainage pipe (13) through the first bottom pipe (16).

5. The green landscape road according to claim 1, characterized in that: Kerbstones (11) are provided on both sides of the carriageway (1), and drainage holes are provided at the bottoms of the curbstones (11).

6. The green landscape road according to claim 1, characterized in that: The sidewalk (2) is paved with sidewalk bricks, and the sidewalk (2) is provided with a plain soil layer (22), a gravel layer (12), a medium sand layer (14) and a base soil (34) in sequence downward, and the gravel layer (12) is provided with the water conveying mechanism.

7. The green landscape road according to claim 6, characterized in that: A second waterproof geotextile (24) is provided between the plain soil layer (22) and the gravel layer (12).

8. The green landscape road according to claim 3, characterized in that: The water delivery mechanism comprises a second bottom pipe (33) and a plurality of permeable blind pipes (25); one end of the second overflow pipe (36) is located between the pavement of the sidewalk (2) and the ground of the green belt (3); the other end is connected to the permeable blind pipe (25) through the second bottom pipe (33); and the permeable blind pipe (25) is connected to the drainage mechanism.

9. The green landscape road according to claim 1, characterized in that: A plurality of tree pits (21) are provided on the sidewalk (2), the tree pits (21) are evenly distributed along the length direction of the sidewalk (2), and trees (23) are planted in the tree pits (21).

10. The green landscape road according to claim 1, characterized in that: The green belt (3) is provided with a planting soil layer (31) and a base soil (34) in sequence from the surface to the ground, and the planting soil layer (31) is planted with a variety of local waterlogging-resistant shrubs (32).