A kind of anti-slurry system for assembled composite panels

By setting pulling bolts and sealing tapes on the assembled laminated plate strip, the problem of difficulty in connecting the gap between the laminated plate strip and the laminated plate is solved, and a firmer sealing performance and better plate molding effect are achieved.

CN222745402UActive Publication Date: 2025-04-11THE THIRD CONSTR OF CHINA CONSTR EIGHTH ENG BUREAU
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202421449682.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-24
Publication Date
2025-04-11
Estimated Expiration
2034-06-24

AI Technical Summary

Technical Problem

In prefabricated buildings, the gap between the overlapping plate strip and the overlapping plate is difficult to perfectly connect, resulting in poor anti-slurry effect. Especially when constructing under large shaft grids, there are problems such as prefabrication errors, frame building errors and concrete pouring disturbances.

Method used

A prefabricated laminate anti-slurry system is adopted, and several pulling bolts are set along the length of the laminated plate belt. They are fixed to the steel bars and plate surface formwork through uphill and downhill type cards, and sealant strips are set between the plate surface formwork and the stacked plate.

Benefits of technology

The gaps on both sides of the laminated plate belt are effectively reduced, the sealing performance between the laminated plate and the template is improved, the impact of construction errors on anti-slurry treatment is reduced, and the molding effect of the laminated plate surface is significantly improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222745402U_ABST
    Figure CN222745402U_ABST
Patent Text Reader

Abstract

The utility model provides an anti-slurry exudation system for assembled composite panels, which relates to the technical field of anti-slurry exudation for composite panels, and comprises a plurality of tension bolts arranged along the length direction of the composite panel strip, wherein the upper side of the tension bolts is fixed between two steel bars through an upward-mounted clamp, and the two steel bars are fixedly connected to the truss bars of the composite panel, and the lower side of the tension bolts is fixed to the panel template through a downward-mounted clamp, and a plurality of sealing strips are arranged between the panel template and the composite panel. The utility model provides a convenient and fast anti-slurry exudation measure for on-site construction, effectively solves the quality defect of slurry exudation of the super-long axis mesh assembled composite panel strip, and makes the composite panel panel surface forming effect excellent.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of anti-slurry exudation of composite panels, in particular to an assembled composite panel anti-slurry exudation system. Background Art

[0002] As a representative of green and low-carbon buildings, prefabricated buildings have been vigorously promoted by the country due to their significant advantages of energy saving and emission reduction, time saving, labor saving, and high construction efficiency. Prefabricated buildings refer to buildings that transfer a large number of on-site operations in traditional construction methods to factories, where building components (such as floor slabs, wall panels, stairs, balconies, etc.) are processed and manufactured in factories and transported to construction sites, where they are assembled and installed on site through reliable connection methods. There have been many successful application experiences at home and abroad, which not only improve production efficiency and reduce construction waste, but also save energy and reduce emissions. It is an important way for my country's construction industry to achieve dual carbon goals. Prefabricated buildings have become the main trend and inevitable choice of green development.

[0003] As a typical category of prefabricated applications, the application of composite slabs in the construction field has long been well known. However, how to achieve the perfect anti-slurry treatment of the slab strips between composite slabs in the current construction market with high quality requirements, so that the gaps between composite slabs can be perfectly connected after the concrete pouring of the composite slab strips is always a problem for construction, especially for the floor slabs of scientific research and office buildings under the large axis grid. There are two composite slab strips between the super-long column grids. The prefabrication errors of the composite slab precast panels, the errors of the on-site frame erection, the disturbances in the concrete pouring process, and the deflection of the templates between the slab strips after the composite slab precast panels are all key factors affecting the concrete pouring of the composite slab strips. Relying on the traditional anti-slurry strips under the composite slabs can no longer meet the anti-slurry effect of the composite slab strip concrete pouring. Summary of the invention

[0004] In view of the above-mentioned prior art, the utility model proposes an anti-slurry seepage system for assembled composite panels.

[0005] The utility model provides an assembled composite plate anti-slurry seepage system, comprising a plurality of tension bolts arranged along the length direction of the composite plate strip, the upper side of the tension bolts being fixed between two steel bars by means of an upward mountain-shaped clamp, the two steel bars being fixedly connected to the truss bars of the composite plate, the lower side of the tension bolts being fixed to the plate surface template by means of a downward mountain-shaped clamp, and a plurality of sealing strips being arranged between the plate surface template and the composite plate.

[0006] Preferably, the spacing distance between the plurality of tension bolts is 50 cm.

[0007] Preferably, wooden squares are provided on both sides of the lower end of the panel formwork located on the tension bolts, and the downhill type clips are fixed on the wooden squares.

[0008] Preferably, the thickness of the sealing strip is 0.5 mm.

[0009] Compared with the prior art, the beneficial effects of the utility model are:

[0010] 1. The utility model provides an anti-slurry seepage system for assembled composite panels, which increases the anti-slurry seepage measures for composite panel strips, reduces the gaps between the templates under the composite panels on both sides of the strips, and makes the sealing performance between the composite panels and the templates more reliable. It can effectively minimize the influence of construction errors on the anti-slurry seepage treatment of the composite panels during concrete pouring, and successfully solves a series of problems caused by the construction of the large-axis network assembled composite panel strip position for the anti-slurry treatment.

[0011] 2. The utility model provides a convenient and quick anti-slurry measure for on-site construction, effectively solves the quality defect of slurry in the super-long axis mesh assembled composite board strip, makes the composite board surface forming effect excellent, and greatly demonstrates the application effect of assembled engineering construction in scientific research and office floors. Through the use of this system, high-tech optimization, green environmental protection, innovation and efficiency improvement are achieved. It is an assembled floor anti-slurry treatment system that is truly suitable for actual use. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 It is a plan view of an embodiment of the utility model.

[0013] Figure 2 It is a side schematic diagram of an embodiment of the utility model.

[0014] In the figure: 1. Composite plate strip; 2. Tension bolts; 3. Uphill type clamps; 4. Rebars; 5. Composite plates; 6. Truss bars; 7. Downhill type clamps; 8. Plate formwork; 9. Wooden squares; 10. Sealing strips. DETAILED DESCRIPTION

[0015] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below with reference to specific illustrations.

[0016] Example: Figure 1 , 2The illustrated embodiment shows an assembled composite plate anti-slurry seepage system, comprising a plurality of tension bolts 2 arranged along the length direction of the composite plate strip 1, the spacing distance between the plurality of tension bolts 2 is 50 cm, the upper side of the tension bolts 2 is fixed between two steel bars 4 through an upward mountain-shaped clip 3, the steel bars 4 are placed on the composite plate 5 and pass through the truss bars 6 on the composite plate 5, the steel bars 4 are firmly fixed to the truss bars 6 through wire tying, the spacing between the two steel bars 4 meets the placement conditions of the upward mountain-shaped clip 3, the lower side of the tension bolts 2 is fixed to the plate surface template 8 through a downward mountain-shaped clip 7, the lower end of the plate surface template 8 is located on both sides of the tension bolts 2, and 38*88mm wooden squares 9 are arranged, the downward mountain-shaped clip 7 is fixed on the wooden square 9, the spacing between the two square timbers 9 meets the placement conditions of the downward mountain-shaped clip 7, and a plurality of sealing strips 10 are arranged between the plate surface template 8 and the composite plate 5, and the thickness of the sealing strips 10 is 0.5mm.

[0017] The system constructs a tension bolt 2 every 50 cm along the length of the composite board strip, and integrally reinforces the board surface template 8 and the composite board 5 at the composite board strip position, so that the sealing strip 10 at the composite board strip position plays a key role in preventing slurry seepage.

[0018] The above are only implementation methods of the present invention, and are not intended to limit the patent scope of the present invention. Any equivalent structure made using the contents of the specification and drawings of the present invention, directly or indirectly used in other related technical fields, are also within the patent protection scope of the present invention.

Claims

1. A prefabricated composite board anti-slurry system, characterized in that: It includes several tension bolts arranged along the length direction of the composite plate strip, the upper side of the tension bolts is fixed between two steel bars through an upward mountain-shaped clip, the two steel bars are fixedly connected to the truss bars of the composite plate, the lower side of the tension bolts is fixed to the plate surface template through a downward mountain-shaped clip, and several sealing strips are arranged between the plate surface template and the composite plate.

2. The anti-slurry exudation system for assembled composite panels according to claim 1, characterized in that: The spacing distance between the plurality of tension bolts is 50 cm.

3. The anti-slurry exudation system for assembled composite panels according to claim 1 or 2, characterized in that: The lower end of the panel formwork is located on both sides of the tension bolts and wooden squares are arranged, and the downhill type clamp is fixed on the wooden squares.

4. The anti-slurry exudation system for assembled composite panels according to claim 1 or 2, characterized in that: The thickness of the sealing strip is 0.5 mm.

Citation Information

Cited By

  • Laminated slab construction method capable of controlling thickness of slab strip protective layer of laminated slab

    CN120175023A

  • A laminated slab construction method capable of controlling the thickness of a protective layer of a laminated slab strip

    CN120175023B